CN110397122A - The mounting structure and installation method of the connector of flower irrigating tap in a kind of light steel villa - Google Patents

The mounting structure and installation method of the connector of flower irrigating tap in a kind of light steel villa Download PDF

Info

Publication number
CN110397122A
CN110397122A CN201910718408.5A CN201910718408A CN110397122A CN 110397122 A CN110397122 A CN 110397122A CN 201910718408 A CN201910718408 A CN 201910718408A CN 110397122 A CN110397122 A CN 110397122A
Authority
CN
China
Prior art keywords
water pipe
fixed plate
wall
upright bar
internal thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910718408.5A
Other languages
Chinese (zh)
Other versions
CN110397122B (en
Inventor
刘定荣
邓露
谭肖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Ding Rong Technology Co Ltd
Original Assignee
Beijing Ding Rong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Ding Rong Technology Co Ltd filed Critical Beijing Ding Rong Technology Co Ltd
Priority to CN201910718408.5A priority Critical patent/CN110397122B/en
Publication of CN110397122A publication Critical patent/CN110397122A/en
Application granted granted Critical
Publication of CN110397122B publication Critical patent/CN110397122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C1/021Devices for positioning or connecting of water supply lines
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C1/025Water supply lines as such, e.g. shower hoses
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C1/06Devices for suspending or supporting the supply pipe or supply hose of a shower-bath
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • E04B2/60Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L43/00Bends; Siphons
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L47/00Connecting arrangements or other fittings specially adapted to be made of plastics or to be used with pipes made of plastics
    • F16L47/02Welded joints; Adhesive joints
    • F16L47/03Welded joints with an electrical resistance incorporated in the joint

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Electromagnetism (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

The present invention relates to the mounting structure and installation method of the connector of flower irrigating tap in a kind of light steel villa, the mounting structure of the connector of flower irrigating tap in a kind of light steel villa, structure includes wall frame, wall upright bar, fixed plate and connector;Wall frame and wall upright bar are C-type steel structure, and C-type steel includes epipleural, lower side panel, bottom plate and crimping;Wall frame is sequentially connected by four C-type steel head and the tail and is formed;Two wall upright bars are arranged in wall frame;Fixed plate be arranged in shower installation corresponding position, the both ends of fixed plate and the epipleural of wall upright bar are affixed, opened up in fixed plate there are two perforate;Connector include pipe fitting internal thread directly, connecting tube and the second water pipe elbow, two connecting tubes pass through perforation, and one end of connecting tube is connected with that pipe fitting internal thread is direct, and the other end is connected with the second water pipe elbow.The advantages of present invention has when installing reserved water faucet, guarantees that water faucet mounting hole spacing is 15cm, improves the stability of water faucet connection.

Description

The mounting structure and installation method of the connector of flower irrigating tap in a kind of light steel villa
Technical field
The present invention relates to the technical field of light steel villa Water supplying tube joint installation, in particular to shower in a kind of light steel villa The mounting structure and installation method of the connector of faucet.
Background technique
Currently, light steel villa is more and more obtained due to the features such as its energy conservation and environmental protection, good appearance and short construction period Construction is promoted, especially in rural area, light steel villa becomes the first choice of new building, reconstruction room.The wall one of existing light steel villa As frame done using lightgage steel joist, inside and outside two sides is used as metope using plank or Europe deals, it is internal use the sound insulations such as mineral wool every Hot material is filled.As shown in figure 4, generally using inner thread elbow in the connector of Toilet Installation showerhead faucet now 10, inner thread elbow 10 is plugged on vertical water pipe 3, and the one end of inner thread elbow 10 with screw thread is towards flower irrigating tap direction.Chang Cai It is backboard with plank or Europe deals, using steel drawstring 9 or the fixed vertical water pipe 3 of iron sheet, so that water faucet be fixed.Concealed installation 10 reserving installation hole of shower inner thread elbow is 15cm away from standard, and error is no more than 5mm.However using steel drawstring 9 or iron sheet come When the mode of fixed vertical water pipe 3, not can guarantee 10 mounting hole spacing of inner thread elbow in toilet is 15cm, when there is deviation, It will have a direct impact on the installation of shower switch.Moreover, the length that inner thread elbow 10 finally exposes metope also requires, expose too short When, shower can not be installed, when exposing too long, influence beauty.
In addition, will appear the case where flower irrigating tap and backboard junction loosen after long-time switchs use, influence using Texture.And along with the loosening used, there will be friction between metope and inner thread elbow 10, generate gap, in kitchen, defend Between life in equal long-term environment with water, have water or vapor from gap penetration to wall inside, structure durability is made At influence.
Summary of the invention
The first purpose of this invention is to provide a kind of mounting structure of the connector of flower irrigating tap in light steel villa, it has Have when installing reserved water faucet, guarantee that water faucet mounting hole spacing is 15cm, improves the stability of water faucet connection Advantage.
Above-mentioned purpose of the invention has the technical scheme that
The mounting structure of the connector of flower irrigating tap in a kind of light steel villa, including wall frame, wall upright bar, fixed plate and connect Head;The wall frame and wall upright bar are C-type steel structure, and C-type steel includes epipleural, lower side panel, bottom plate and crimping;It is described Wall frame is sequentially connected by four C-type steel head and the tail and is formed;The wall upright bar has two, and setting is installed in flower irrigating tap and corresponded to In the wall frame of position, opening is opposite, and the both ends of wall upright bar and wall frame are affixed;The fixed plate is arranged in shower The corresponding position of installation, the both ends of fixed plate and the epipleural of wall upright bar are affixed, and opened up in fixed plate there are two perforation;Institute Stating connector includes direct pipe fitting internal thread, connecting tube and the second water pipe elbow, and two connecting tubes are each passed through perforation setting, institute Stating one end of connecting tube, to be connected with pipe fitting internal thread direct, and the other end is connected with the second water pipe elbow, second water pipe elbow and The direct outer diameter of pipe fitting internal thread is greater than the aperture of perforation, and the second water pipe elbow and pipe fitting internal thread are directly connected to fixed plate two Side;Second water pipe elbow is connect with vertical water pipe.
By using above-mentioned technical proposal, when installation shower reserves water faucet, by wall upright bar, fixed plate and wear The setting in hole, plank is compared in wall upright bar with fixed plate or Europe deals has greatly improved in rigidity, and because setting exists The mounting hole spacing of perforation in fixed plate opens up by standard in advance, it is ensured that guaranteeing when installing reserved water faucet Water faucet mounting hole spacing is 15cm, improves the stability of water faucet connection, avoids using water faucet junction for a long time The case where loosening, and enhance the rigidity of structure.
The present invention is further arranged to: the fixed plate is C-shaped steel, and the epipleural and lower side panel of the fixed plate are fastened on Between wall upright bar, the both ends of the bottom plate of the fixed plate and the epipleural of wall upright bar are affixed, and open on the bottom plate of fixed plate If there are two perforation;Vertical water pipe is connected on the crimping of fixed plate.
By using above-mentioned technical proposal, fixed plate is set as C-type steel, and rigidity is reinforced;Vertical water pipe is connected to crimping, side simultaneously Plate is fastened between wall upright bar, is played a supporting role to wall upright bar;Again because pipe fitting internal thread is directly connected in fixed plate, Protruded length is fixed, and vertical water pipe is connected on the crimping of fixed plate, so pipe fitting internal thread is directly and vertical water pipe is by fixed plate It clamps, can avoid connector perpendicular to wall surface movable, reserve too long to avoid the occurrence of shower nozzle water pipe faucet interface, influence beautiful Problem.
The present invention is further arranged to: one end nozzle of the connecting tube and one end far from the direct screw thread of pipe fitting internal thread Hot-melt adhesive paste, the other end of connecting tube and the second water pipe elbow hot-melt adhesive paste.
By using above-mentioned technical proposal, connecting tube and pipe fitting internal thread are realized directly and connecting tube and the second water pipe elbow Sealed connection.
The present invention is further arranged to: mineral wool is filled between two wall upright bars.
By using above-mentioned technical proposal, the filling of the sound and thermal insulating materials such as mineral wool, not only to lateral water pipe and vertically Water pipe is protected into shape, also further to the water flow sound noise reduction in lateral water pipe and vertical water pipe.
The present invention is further arranged to: stiffening plate is provided between the wall upright bar, the stiffening plate is C-type steel, is opened Mouth down and the top that fixed plate is arranged in are plugged in the inside of wall upright bar at the two ends of the stiffening plate, and are connected to On the bottom plate of wall upright bar.
By using above-mentioned technical proposal, the setting of stiffening plate strengthens the stability of wall upright bar.
The present invention is further arranged to: the bottom level of the wall upright bar offers the second through-hole that water supplying pipe passes through.
Space is saved convenient for connection of the water pipe in wall frame by using above-mentioned technical proposal, and facilitates wall frame Support of the frame to water pipe.
Second object of the present invention is to provide a kind of installation method of the connector of flower irrigating tap in light steel villa, it has Have when installing flower irrigating tap, guarantees that water faucet mounting hole spacing is 15cm, improve the stability of water faucet connection, and enhance The rigidity of structure;It also can avoid occurring flower irrigating tap interface and reserve too long or too short, influence beautiful advantage.
Above-mentioned purpose of the invention has the technical scheme that
Shower reserves the installation method of water faucet, including following construction procedure in a kind of light steel villa:
The assembling of S1 wall: assembling wall frame, is fixed up after being adjusted correction;In the wall of shower installation corresponding position Two parallel wall upright bars are installed, the both ends of wall upright bar and wall body keel frame are affixed in frame;Along wall frame length Simultaneously two water pipes are arranged in direction on the inside of wallboard, and water pipe level penetrates wall upright bar and enters between two wall upright bars, then It is folded upward at the corresponding position for continuing to extend to flower irrigating tap installation close to the water pipe of wall upright bar, forms vertical water pipe, laterally Pass through the first water pipe elbow hot-melt adhesive paste between water pipe and vertical water pipe;
S2 measures and makes fixed plate: measuring and determines the spacing between wall upright bar, cut the C-type steel of corresponding length as solid Fixed board determines position of opening further according to mounting hole spacing, opens up two spacing in fixed plate using hole making drill equal to flower irrigating tap The perforation of mounting hole spacing;
The second water pipe elbow of S3 and vertical water pipe hot-melt adhesive paste: the second water pipe elbow and vertical water pipe hot melt are connected using heat melting device It connects, the two sides of heat melting device are equipped with heating die head;When connection, the nozzle on vertical water pipe top is imported into heating die head, then Second water pipe elbow is shifted on heating die head close to one end nozzle of vertical water pipe;After heating reaches the predetermined time, it will erect It is removed from heating die head to water pipe and the second water pipe elbow, vertical water pipe is rapidly inserted into the second water pipe elbow, it is fixed Form one, and the direction that the nozzle of the second water pipe elbow other end is installed towards flower irrigating tap;
S4 pipe fitting internal thread is directly and connecting tube hot-melt adhesive paste: using heat melting device by pipe fitting internal thread is direct and connecting tube hot-melt adhesive paste, When connection, the nozzle of one end of the direct without screw thread of pipe fitting internal thread is shifted on heating die head, then one end nozzle of connecting tube is led Enter into heating die head;After heating reaches the predetermined time, pipe fitting internal thread is directly removed from heating die head with connecting tube, it will Connecting tube be rapidly inserted into pipe fitting internal thread directly in, it is fixed to form one;Meanwhile two connecting tubes in fixed plate horizontal through wearing Hole directly abuts to pipe fitting internal thread in fixed plate;
S5 connecting tube and the second water pipe elbow hot-melt adhesive paste: using heat melting device by connecting tube and the second water pipe elbow hot-melt adhesive paste, When connection, connecting tube is imported into heating die head far from the direct one end nozzle of pipe fitting internal thread, then by the second water pipe elbow court One end nozzle in the direction installed to flower irrigating tap is shifted on heating die head;Heating reach the predetermined time after, by heat melting device from It is removed on connecting tube and the second water pipe elbow, connecting tube is rapidly inserted into the second water pipe elbow, it is fixed to form one;Simultaneously Vertical water pipe is connected to crimping, and fixed plate is directly clamped with vertical water pipe, side plate is then fastened on wall and is stood by pipe fitting internal thread Between bar;
The installation of S6 fixed plate is fixed: fixed plate is mounted in wall upright bar.
By using above-mentioned technical proposal, the assembling of wall frame is first done, then wall upright bar, water pipe are installed, is measured simultaneously Fixed plate is made, determines position of opening further according to mounting hole spacing;The second water pipe elbow, vertical water pipe and pipe are carried out by fuse machine Part internal thread directly heats, and steps up fixed plate;Finally fixed plate is fixed in wall upright bar again;With in installation flower When spilling faucet, guarantees that water faucet mounting hole spacing is 15cm, improve the stability of water faucet connection, and enhancing structure is rigid Degree;It also can avoid occurring flower irrigating tap interface and reserve too long or too short, influence beautiful advantage.
In conclusion the invention has the following advantages:
1. passing through the setting of wall upright bar, fixed plate and perforation, wall upright bar compares plank or Europe deals with fixed plate rigid Have greatly improved on degree, and because the mounting hole spacing for the perforation being arranged in fixed plate is opened up by standard in advance, institute Guarantee that water faucet mounting hole spacing is 15cm when installing reserved water faucet to ensure, improves the stabilization of water faucet connection Property, the case where loosening for a long time using water faucet junction is avoided, and enhance the rigidity of structure;
2. being set as C-type steel by fixed plate, rigidity is reinforced;Vertical water pipe is connected to crimping simultaneously, and it is vertical that side plate is fastened on wall Between bar, play a supporting role to wall upright bar;Again because pipe fitting internal thread is directly connected in fixed plate, protruded length is fixed, Vertical water pipe is connected on crimping, so pipe fitting internal thread directly clamps fixed plate with vertical water pipe, can avoid shower dragon occur Head interface is reserved too long or too short, influences beautiful problem;
3. by the setting of connecting tube, realize connecting tube with pipe fitting internal thread directly and connecting tube and the second water pipe elbow it is close Envelope connection.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the facade of the device;
Fig. 2 be water pipe elbow, connecting tube, pipe fitting internal thread directly and fixed plate decomposition texture schematic diagram;
Fig. 3 is the direct the schematic diagram of the section structure of pipe fitting internal thread;
Fig. 4 is the schematic view of facade structure that existing steel drawstring is fixed in background technique.
In figure, 1, wall frame;101, first through hole;2, wall upright bar;21, the second through-hole;22, epipleural;23, downside Plate;24, bottom plate;25, crimping;3, vertical water pipe;4, lateral water pipe;41, the first water pipe elbow;42, the second water pipe elbow;5, solid Fixed board;51, it perforates;6, pipe fitting internal thread is direct;7, connecting tube;8, stiffening plate;9, steel drawstring;10, inner thread elbow.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1
Referring to Fig.1, in a kind of light steel villa disclosed by the invention the connector of flower irrigating tap mounting structure and installation method, including Wall frame 1, wall upright bar 2, fixed plate 5 and connector;Wall frame 1 and wall upright bar 2 are C-type steel structure, including upside Plate 22, lower side panel 23, bottom plate 24 and crimping 25;Wall frame 1 is sequentially connected forming closed frame by four C-type steel head and the tail, And C-type steel opening is inwardly.Wall upright bar 2 has two, is arranged in the wall frame 1 of flower irrigating tap installation corresponding position, opening Relatively, and the both ends of wall upright bar 2 and wall frame 1 are affixed.
The corresponding position of shower installation, the both ends of fixed plate 5 and wall upright bar 2 is arranged in fixed plate 5 combined with Figure 1 and Figure 2, Epipleural 22 it is affixed, and opened up in fixed plate 5 there are two perforation 51;As shown in figure 3, connector includes that pipe fitting internal thread is direct 6, even Adapter tube 7 and the second water pipe elbow 42, two connecting tubes 7 are each passed through 51 setting of perforation, using heat melting device by one end of connecting tube 7 One end hot-melt adhesive paste of nozzle and the screw thread far from pipe fitting internal thread direct 6,42 heat of the other end of connecting tube 7 and the second water pipe elbow Molten connection, the two sides of heat melting device are equipped with heating die head.The outer diameter of second water pipe elbow 42 and pipe fitting internal thread direct 6 is greater than perforation 51 aperture, and the second water pipe elbow 42 and pipe fitting internal thread direct 6 are connected to 5 two sides of fixed plate.The setting of the device, wall are vertical Bar 2 compares plank with fixed plate 5 or Europe deals has greatly improved in rigidity, and because wearing in fixed plate 5 is arranged in The mounting hole spacing in hole 51 opens up by standard in advance, it is ensured that guaranteeing water faucet peace when installing reserved water faucet Filling pitch-row is 15cm, improves the stability of water faucet connection, avoids the case where loosening for a long time using water faucet junction, And enhance the rigidity of structure.
Combined with Figure 1 and Figure 2, along 1 length direction of wall frame in being provided with two water pipes in 1 bottom of wall frame, including Lateral water pipe 4 and vertical water pipe 3, two water pipes are located at the lower section of flower irrigating tap installation site, and wall upright bar 2 and wall frame 1 two sides bottom level offers the first through hole 101 passed through for lateral water pipe 4 and the second through-hole 21, convenient for water pipe in wall Connection in frame 1 saves space, and facilitates support of the wall frame 1 to water pipe.
In conjunction with Fig. 1 and Fig. 3, preferably, by the material of fixed plate 5 be replaced with C-type steel (in this section, the C-type steel of fixed plate 5 The label of structure does not mark in Fig. 1, please refers to Fig. 3).The epipleural 22 and lower side panel 23 of fixed plate 5 are fastened on wall upright bar 2 Between, the both ends of the bottom plate 24 of fixed plate 5 and the epipleural 22 of wall upright bar 2 are affixed, and offer on the bottom plate 24 of fixed plate 5 Two perforation 51.Fixed plate 5 is set as C-type steel, and rigidity is reinforced.When installation, vertical water pipe 3 is connected to the crimping 25 of fixed plate 5, Side plate is fastened between wall upright bar 2, is played a supporting role to wall upright bar 2.Again because pipe fitting internal thread direct 6 is connected to fixation On plate 5, protruded length is fixed, and vertical water pipe 3 is connected on the crimping 25 of fixed plate 5, so pipe fitting internal thread direct 6 and vertical water Pipe 3 clamps fixed plate 5, can avoid connector perpendicular to wall surface movable, reserved to avoid the occurrence of shower nozzle water pipe faucet interface It is long, influence beautiful problem.
As shown in Fig. 2, stiffening plate 8 is C-type steel, opening down to set preferably, being provided with stiffening plate 8 between wall upright bar 2 It sets, the inside of wall upright bar 2 is plugged at the two ends of stiffening plate 8, and be connected on the bottom plate 24 of wall upright bar 2.Stiffening plate 8 Setting strengthen the stability of wall upright bar 2.
Preferably, filled with sound and thermal insulating materials such as mineral wools between two wall upright bars 2.The sound-insulating and heat-insulatings such as mineral wool The filling of material is not only protected lateral water pipe 4 and vertical water pipe 3 into shape, also further to lateral water pipe 4 and vertical water pipe 3 Interior water flow sound noise reduction.
Embodiment 2
The installation method of the connector of flower irrigating tap in a kind of light steel villa disclosed by the invention, comprising the following steps:
The assembling of S1 wall: referring to Fig.1, assembling wall frame 1, is fixed up after being adjusted correction;It installs and corresponds in shower Two parallel wall upright bars 2 are installed, the both ends of wall upright bar 2 and wall body keel frame are affixed in the wall frame 1 of position;Edge Two water pipes are simultaneously arranged on the inside of the wallboard for 1 length direction of wall frame, first by lateral water pipe 4 from 1 two sides of wall frame successively water It puts down across first through hole 101 and the second through-hole 21, between wall upright bar 2, then water pipe is folded upward at close to wall upright bar 2 Continue to extend to the corresponding position that flower irrigating tap is installed, forms vertical water pipe 3.Using heat melting device by lateral water pipe 4 and vertical water For pipe 3 by 41 hot-melt adhesive paste of the first water pipe elbow, the two sides of heat melting device are equipped with heating die head;When connection, by lateral water pipe 4 Nozzle is imported into heating die head, then the first water pipe elbow 41 is shifted on heating die head.It, will after heating reaches the predetermined time Lateral water pipe 4 and the first water pipe elbow 41 are removed from heating die head, and lateral water pipe 4 is rapidly inserted into the first water pipe elbow 41 It is interior, it is fixed to form one, and the other end of the first water pipe elbow 41 is towards the nozzle direction of vertical water pipe 3.Vertical water pipe 3 and the Above step is equally used when one 41 hot-melt adhesive paste of water pipe elbow, lateral water pipe 4 and vertical water pipe 3 are connected.
S2 is measured and is made fixed plate 5: referring to Fig.1, being measured and is determined the spacing between wall upright bar 2, cut corresponding length The C-type steel of degree determines position of opening as fixed plate 5, further according to mounting hole spacing, and two are opened up in fixed plate 5 using hole making drill Spacing is equal to the perforation 51 of shower nozzle water pipe faucet mounting hole spacing;
3 hot-melt adhesive paste of the second water pipe elbow of S3 42 and vertical water pipe: referring to Fig. 2, using heat melting device by 42 He of the second water pipe elbow 3 hot-melt adhesive paste of vertical water pipe, the two sides of heat melting device are equipped with heating die head;When connection, the nozzle on vertical 3 top of water pipe is imported It is shifted on heating die head into heating die head, then by the second water pipe elbow 42 close to one end nozzle of vertical water pipe 3;Heating reaches After predetermined time, vertical water pipe 3 and the second water pipe elbow 42 are removed from heating die head, by vertical 3 quick insertion of water pipe It is fixed to form one into the second water pipe elbow 42, and the nozzle of 42 other end of the second water pipe elbow is leading towards shower nozzle water pipe The direction of installation;
7 hot-melt adhesive paste of S4 pipe fitting internal thread direct 6 and connecting tube: in conjunction with Fig. 1 and Fig. 3, using heat melting device by direct 6 He of pipe fitting internal thread 7 hot-melt adhesive paste of connecting tube when connection, the nozzle of one end of direct 6 without screw thread of pipe fitting internal thread is shifted on heating die head, then will be even One end nozzle of adapter tube 7 is imported into heating die head;After heating reaches the predetermined time, by pipe fitting internal thread direct 6 and connecting tube 7 It is removed from heating die head, connecting tube 7 is rapidly inserted into pipe fitting internal thread direct 6, it is fixed to form one;Meanwhile two companies Adapter tube 7 abuts to pipe fitting internal thread direct 6 in fixed plate 5 horizontal through perforating 51 in fixed plate 5;
42 hot-melt adhesive paste of S5 connecting tube 7 and the second water pipe elbow: using heat melting device that connecting tube 7 and the second water pipe is curved referring to Fig. 3 First 42 hot-melt adhesive paste when connection, connecting tube 7 is imported into heating die head far from one end nozzle of pipe fitting internal thread direct 6, then will One end nozzle in the direction that the second water pipe elbow 42 is installed towards shower nozzle water pipe faucet is shifted on heating die head;Heating reaches predetermined After time, heat melting device is removed from connecting tube 7 and the second water pipe elbow 42, connecting tube 7 is rapidly inserted into the second water pipe It is fixed to form one in elbow 42;Vertical water pipe 3 is connected to crimping 25 simultaneously, and side plate is fastened between wall upright bar 2, pipe fitting Internal thread direct 6 and vertical water pipe 3 clamp fixed plate 5;
The installation of S6 fixed plate 5 is fixed: referring to Fig.1, fixed plate 5 being mounted in wall upright bar 2 using screw, fixed plate 5 is consolidated It is fixed.
The embodiment of present embodiment is present pre-ferred embodiments, not limits protection model of the invention according to this Enclose, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (7)

1. the mounting structure of the connector of flower irrigating tap in a kind of light steel villa, it is characterised in that: including wall frame (1), wall Upright bar (2), fixed plate (5) and connector;The wall frame (1) and wall upright bar (2) are C-type steel structure, and C-type steel includes upper Side plate (22), lower side panel (23), bottom plate (24) and crimping (25);The wall frame (1) is sequentially connected by four C-type steel head and the tail Composition;The wall upright bar (2) has two, is arranged in the wall frame (1) of flower irrigating tap installation corresponding position, and be open phase It is right, and the both ends of wall upright bar (2) and wall frame (1) are affixed;The correspondence position of shower installation is arranged in the fixed plate (5) Set, the both ends of fixed plate (5) and the epipleural (22) of wall upright bar (2) are affixed, and opened up in fixed plate (5) there are two perforation (51);The connector includes pipe fitting internal thread directly (6), connecting tube (7) and the second water pipe elbow (42), two connecting tubes (7) it is each passed through perforation (51) setting, one end of the connecting tube (7) is connected with pipe fitting internal thread directly (6), and the other end is connected with The outer diameter of second water pipe elbow (42), second water pipe elbow (42) and pipe fitting internal thread directly (6) is greater than the hole of perforation (51) Diameter, and the second water pipe elbow (42) and pipe fitting internal thread directly (6) are connected to fixed plate (5) two sides;Second water pipe elbow (42) with Vertical water pipe (3) connection.
2. the mounting structure of the connector of flower irrigating tap in a kind of light steel villa according to claim 1, it is characterised in that: institute State fixed plate (5) be C-shaped steel, the epipleural (22) and lower side panel (23) of the fixed plate (5) be fastened on wall upright bar (2) it Between, the both ends of the bottom plate (24) of the fixed plate (5) and the epipleural (22) of wall upright bar (2) are affixed, and the bottom of fixed plate (5) It is opened up on plate (24) there are two perforating (51), vertical water pipe (3) is connected on the crimping (25) of fixed plate (5).
3. the mounting structure of the connector of flower irrigating tap in a kind of light steel villa according to claim 1, it is characterised in that: institute State connecting tube (7) one end nozzle and far from pipe fitting internal thread directly (6) screw thread one end hot-melt adhesive paste, connecting tube (7) it is another One end and the second water pipe elbow (42) hot-melt adhesive paste.
4. the mounting structure of the connector of flower irrigating tap in a kind of light steel villa according to claim 1, it is characterised in that: institute It states between two wall upright bars (2) filled with mineral wool.
5. the mounting structure of the connector of flower irrigating tap in a kind of light steel villa according to claim 1, it is characterised in that: institute It states and is provided between wall upright bar (2) stiffening plate (8), the stiffening plate (8) is C-type steel, and opening down and setting is in fixed plate (5) top is plugged in the inside of wall upright bar (2) at the two ends of the stiffening plate (8), and is connected to wall upright bar (2) Bottom plate (24) on.
6. the mounting structure of the connector of flower irrigating tap in a kind of light steel villa according to claim 1, it is characterised in that: institute The bottom level for stating wall upright bar (2) offers the second through-hole (21) that water supplying pipe passes through.
7. the installation method of the connector of flower irrigating tap in a kind of light steel villa, which comprises the following steps:
The assembling of S1 wall: assembling wall frame (1), is fixed up after being adjusted correction;In shower installation corresponding position Two parallel wall upright bars (2) are installed, the both ends of wall upright bar (2) and wall body keel frame are affixed in wall frame (1);Edge Simultaneously two water pipes are arranged in wall frame (1) length direction on the inside of wallboard, and lateral water pipe (4) level penetrates wall upright bar (2) simultaneously Continue to extend to flower irrigating tap peace between two wall upright bars (2), then the water pipe close to wall upright bar (2) is folded upward at The corresponding position of dress is formed vertical water pipe (3), passes through the first water pipe elbow (41) between lateral water pipe (4) and vertical water pipe (3) Hot-melt adhesive paste;
S2 is measured and is made fixed plate (5): being measured and is determined the spacing between wall upright bar (2), cut the C-type steel of corresponding length As fixed plate (5), position of opening is determined further according to mounting hole spacing, and two spacing are opened up on fixed plate (5) using hole making drill Equal to the perforation (51) of flower irrigating tap mounting hole spacing;
The second water pipe elbow of S3 (42) and vertical water pipe (3) hot-melt adhesive paste: it by the second water pipe elbow (42) and is erected using heat melting device To water pipe (3) hot-melt adhesive paste, the two sides of heat melting device are equipped with heating die head;When connection, the nozzle on vertical water pipe (3) top is led Enter into heating die head, then the second water pipe elbow (42) are shifted on heating die head close to one end nozzle of vertical water pipe (3);Add After heat reaches the predetermined time, vertical water pipe (3) and the second water pipe elbow (42) are removed from heating die head, by vertical water pipe (3) it is rapidly inserted into the second water pipe elbow (42), it is fixed to form one, and the nozzle court of the second water pipe elbow (42) other end The direction installed to flower irrigating tap;
S4 pipe fitting internal thread directly (6) and connecting tube (7) hot-melt adhesive paste: use heat melting device by pipe fitting internal thread directly (6) and connecting tube (7) when connection, the nozzle of pipe fitting internal thread directly one end of (6) without screw thread is shifted on heating die head for hot-melt adhesive paste, then will connection One end nozzle of pipe (7) is imported into heating die head;After heating reaches the predetermined time, by pipe fitting internal thread directly (6) and connection Pipe (7) is removed from heating die head, and connecting tube (7) is rapidly inserted into pipe fitting internal thread directly (6), fixed to form one;Together When, two connecting tubes (7) are perforated (51) horizontal through on fixed plate (5), and pipe fitting internal thread directly (6) is abutted to fixed plate (5) On;
S5 connecting tube (7) and the second water pipe elbow (42) hot-melt adhesive paste: use heat melting device by connecting tube (7) and the second water pipe elbow (42) when connection, connecting tube (7) are imported into heating die head far from one end nozzle of pipe fitting internal thread directly (6) for hot-melt adhesive paste, One end nozzle in the direction that the second water pipe elbow (42) is installed towards flower irrigating tap again is shifted on heating die head;Heating reaches pre- After fixing time, heat melting device is removed from connecting tube (7) and the second water pipe elbow (42), connecting tube (7) is rapidly inserted into It is fixed to form one in second water pipe elbow (42);Vertical water pipe (3) is connected to crimping (25) simultaneously, and pipe fitting internal thread is directly (6) Fixed plate (5) are clamped with vertical water pipe (3), then side plate is fastened between wall upright bar (2);
S6 fixed plate (5) installation is fixed: fixed plate (5) is mounted on wall upright bar (2).
CN201910718408.5A 2019-08-05 2019-08-05 Mounting structure and mounting method for connector of shower faucet in light steel villa Active CN110397122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910718408.5A CN110397122B (en) 2019-08-05 2019-08-05 Mounting structure and mounting method for connector of shower faucet in light steel villa

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910718408.5A CN110397122B (en) 2019-08-05 2019-08-05 Mounting structure and mounting method for connector of shower faucet in light steel villa

Publications (2)

Publication Number Publication Date
CN110397122A true CN110397122A (en) 2019-11-01
CN110397122B CN110397122B (en) 2024-05-17

Family

ID=68327437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910718408.5A Active CN110397122B (en) 2019-08-05 2019-08-05 Mounting structure and mounting method for connector of shower faucet in light steel villa

Country Status (1)

Country Link
CN (1) CN110397122B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113864536A (en) * 2021-09-26 2021-12-31 新昌县杰创控股有限公司 Connecting pipe fitting for refrigeration system and manufacturing method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201296953Y (en) * 2008-10-22 2009-08-26 章步权 Shower pipe mounting fixing device
CN101654927A (en) * 2008-08-19 2010-02-24 茂地(上海)建筑工程咨询有限公司 Main structure of combined type house and assembly method thereof
CN204570835U (en) * 2015-04-30 2015-08-19 北京业之峰诺华装饰股份有限公司 A kind of feedwater piping installation positioner
CN105619315A (en) * 2016-02-15 2016-06-01 于广平 Fuser unit die head and method for maintaining metal threads of hot melting pipe
CN205839886U (en) * 2016-07-22 2016-12-28 中建八局第四建设有限公司 A kind of positioner installed for hot water pipe
CN207760945U (en) * 2017-06-10 2018-08-24 东莞市华美乐建材超市有限公司 A kind of positioning device of hot water pipe
CN208185513U (en) * 2018-01-25 2018-12-04 江门市霈霖卫浴科技有限公司 A kind of flower irrigating tap and in-wall shower embedded box
CN208870120U (en) * 2018-08-06 2019-05-17 中建八局第四建设有限公司 A kind of concealed installation water pipe shower admission port sizing device
CN208913954U (en) * 2018-08-21 2019-05-31 中建八局第二建设有限公司 A kind of device being horizontally mounted cold and hot mouth of a river inner thread elbow
CN209114545U (en) * 2018-08-22 2019-07-16 宁波敏宝卫浴五金水暖洁具有限公司 A kind of shower faucets
CN210507633U (en) * 2019-08-05 2020-05-12 北京定荣家科技有限公司 Mounting structure of joint of shower faucet in light steel villa

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101654927A (en) * 2008-08-19 2010-02-24 茂地(上海)建筑工程咨询有限公司 Main structure of combined type house and assembly method thereof
CN201296953Y (en) * 2008-10-22 2009-08-26 章步权 Shower pipe mounting fixing device
CN204570835U (en) * 2015-04-30 2015-08-19 北京业之峰诺华装饰股份有限公司 A kind of feedwater piping installation positioner
CN105619315A (en) * 2016-02-15 2016-06-01 于广平 Fuser unit die head and method for maintaining metal threads of hot melting pipe
CN205839886U (en) * 2016-07-22 2016-12-28 中建八局第四建设有限公司 A kind of positioner installed for hot water pipe
CN207760945U (en) * 2017-06-10 2018-08-24 东莞市华美乐建材超市有限公司 A kind of positioning device of hot water pipe
CN208185513U (en) * 2018-01-25 2018-12-04 江门市霈霖卫浴科技有限公司 A kind of flower irrigating tap and in-wall shower embedded box
CN208870120U (en) * 2018-08-06 2019-05-17 中建八局第四建设有限公司 A kind of concealed installation water pipe shower admission port sizing device
CN208913954U (en) * 2018-08-21 2019-05-31 中建八局第二建设有限公司 A kind of device being horizontally mounted cold and hot mouth of a river inner thread elbow
CN209114545U (en) * 2018-08-22 2019-07-16 宁波敏宝卫浴五金水暖洁具有限公司 A kind of shower faucets
CN210507633U (en) * 2019-08-05 2020-05-12 北京定荣家科技有限公司 Mounting structure of joint of shower faucet in light steel villa

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113864536A (en) * 2021-09-26 2021-12-31 新昌县杰创控股有限公司 Connecting pipe fitting for refrigeration system and manufacturing method
CN113864536B (en) * 2021-09-26 2023-03-14 新昌县杰创控股有限公司 Method for manufacturing connecting pipe fitting of refrigeration system

Also Published As

Publication number Publication date
CN110397122B (en) 2024-05-17

Similar Documents

Publication Publication Date Title
CN103031964B (en) Modularized clean operating room and installation technology thereof
CN206646700U (en) Small space cell curtain wall mounting device
CN206358311U (en) A kind of efficient ship's space wall-enclosing board
CN110397122A (en) The mounting structure and installation method of the connector of flower irrigating tap in a kind of light steel villa
CN107587635A (en) The vertical bolt-type construction technique of exterior wall ceramic plate
CN210507633U (en) Mounting structure of joint of shower faucet in light steel villa
CN207277730U (en) Exterior wall ceramic plate parapet bears down on one node structure
CN206220314U (en) A kind of Side fascia waterproofing node
CN110242016A (en) A kind of co-extrusion wood moulding is without screw corner end cap
CN204983235U (en) Connected node structure of battenboard wall body and glass curtain wall window
CN205742832U (en) The mounting structure of wallboard
CN110241941A (en) A kind of no purlin formula wall surface colorful steel plate system and its installation method
CN210459785U (en) Roof marble edge bracket type mounting structure
CN208604856U (en) A kind of cladding panel and its installation node
CN207314721U (en) Integrated exterior wall board mounting structure
CN110295699A (en) A kind of imitation wood line aluminum facade structure and its construction method
CN206591694U (en) Aluminum plate unit formula curtain wall
CN210369883U (en) Building wall durability heat preservation fire prevention composite formwork
CN205976148U (en) Side fascia installation node
CN207812678U (en) It can be in wallboard that is more, being applied in high-rise steel structure house and beam connection structure
CN207633526U (en) A kind of multi-layered modular house with eaves discharge structure
CN215630909U (en) Large decorative line mounting structure of glass curtain wall
CN212802129U (en) Framework structure of sprayed and built wall
CN205330024U (en) Metal eaves mouth keeps off combs and roofing system of falling into water
CN208168211U (en) Bright frame external wall insulation connection decoration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant