CN110395662A - A kind of computer room chassis and its installation method - Google Patents

A kind of computer room chassis and its installation method Download PDF

Info

Publication number
CN110395662A
CN110395662A CN201910753671.8A CN201910753671A CN110395662A CN 110395662 A CN110395662 A CN 110395662A CN 201910753671 A CN201910753671 A CN 201910753671A CN 110395662 A CN110395662 A CN 110395662A
Authority
CN
China
Prior art keywords
component
computer room
room chassis
chassis
gantry crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910753671.8A
Other languages
Chinese (zh)
Inventor
罗磊
汪杰
曾鹏
李义明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenghua Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenghua Heavy Industries Co Ltd filed Critical Shanghai Zhenghua Heavy Industries Co Ltd
Priority to CN201910753671.8A priority Critical patent/CN110395662A/en
Publication of CN110395662A publication Critical patent/CN110395662A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/52Details of compartments for driving engines or motors or of operator's stands or cabins
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M7/00Details of attaching or adjusting engine beds, frames, or supporting-legs on foundation or base; Attaching non-moving engine parts, e.g. cylinder blocks

Abstract

One of the objects of the present invention is to provide a kind of computer room chassis, including main supporting structure and auxiliary supports, which is used to support the computer room of gantry crane.Wherein, main supporting structure includes lateral girder, longitudinal girder and other functors;And the auxiliary supports of lateral girder outermost end are set, which includes the first component, second component and third member.The first component is connect with lateral girder;Second component and the horizontal brace rod of gantry crane connect;Third member is for connecting the first component and second component.The technical solution makes the cantilever beam of script become the structure with weak support, it is therefore prevented that the excessive deformation of chassis outermost end and the larger bending moment to girder enhance the safety of computer room chassis during the work time.Another object of the present invention is to provide a kind of installation method on computer room chassis, component greatly reduces production difficulty and production cost, integral installation is convenient, and size is flexibly adjusted convenient for manufacture.

Description

A kind of computer room chassis and its installation method
Technical field
The present invention relates to gantry crane field, especially a kind of computer room chassis and its installation method.
Background technique
Shore container crane (referred to as: gantry crane) project is more, is in various forms.According to the real data of harbour and user Actual requirement, gantry crane is often also required to the design of the metal structure of some new intention and design, especially gantry crane.In reality Berth terms and user actual demand have many limitations to the integrated steel-structure of gantry crane after, conventional computer room chassis metal Structural support cannot reach enough safety requirements, or not be able to satisfy specific stiffness requirement.
Summary of the invention
To solve the above problems, one of the objects of the present invention is to provide a kind of computer room chassis, mainly for computer room chassis The endpoint of two sides (or side) relative to intermediate conventional support apart from larger (having exceeded normal range (NR)) the case where.Here normal Rule support generally refers to the computer room chassis supports seat for being mounted on gantry crane main carriage support crossbeam, width of the support base width with crossbeam Degree.
Computer room chassis of the invention includes main supporting structure and auxiliary supports, which is used to support the machine of gantry crane Room.Wherein, main supporting structure includes lateral girder, longitudinal girder and other functors;And it is arranged in lateral girder outermost end Auxiliary supports, which includes the first component, second component and third member.The first component and lateral girder connect It connects;Second component and the horizontal brace rod of gantry crane connect;Third member is for connecting the first component and second component.The technical side Case makes the cantilever beam of computer room chassis script become the structure with weak support, it is therefore prevented that the excessive deformation of chassis outermost end is prevented Chassis girder in the course of work is stopped and has generated excessive bending moment stress, it is therefore prevented that the significantly free vibration of chassis structure prevents The additional bending moment stress generated when vibration enhances safety of chassis during lifting work, and greatly reduces life Produce difficulty and production cost.Auxiliary supports in the technical program do not need all four ends for being mounted on main supporting structure Point, but position and the number of installation can be selected according to the actual situation.
Further, the first component, second component and third member are respectively equipped with bolt hole, and are connected by bolt pair. The connection type of the technical solution is simple, reduces the production difficulty of workpiece, easy for installation.
Further, the first component is T-steel, and the flange plate of the first component is connect with lateral girder, the abdomen of the first component Plate is connect with third member;Second component is sheet material, and contact end part of the second component with horizontal brace rod surrounds horizontal connection Bar;Third member is double layer sheet, to clamp the first component and second component.Connecing for junction can increase using the technical solution Contacting surface product, and can make to connect stronger.And the technical solution is primarily adapted for use in main supporting structure and is located at gantry crane along gravity direction The situation of the lower section of horizontal brace rod is suitble to complete to install in low latitude, avoids high altitude operation.
Further, it is equipped with the long waist shaped bolt hole extended along gravity direction, in the first component to adjust installation position It sets.
Further, it is arranged in parallel on two rows of bolts hole and/or second component and is arranged in parallel on the web of the first component There are two rows of bolts hole.Using the technical solution, convenient for adjusting the size and installation site of auxiliary supports.
Further, two to four row's bolts hole are arranged in parallel on each layer of sheet material of third member, are preferably provided with four rows Bolt hole, and four row's bolts hole are mirror symmetry in two sheets.The technical solution can further increase Auxiliary support The controllability of part.
Further, main supporting structure is located at the lower section of the horizontal brace rod of gantry crane along gravity direction.Using the technical side Case is hung on horizontal brace rod on auxiliary supports, can complete to install in low latitude.
Further, the first component is I-steel, and the top flange plate of the first component is connect with the lateral girder, first The bottom wing listrium of part is equipped with bolt hole;Second component is T-steel, and the flange plate of second component is equipped with bolt hole, second component Web part surrounds horizontal brace rod;Third member is class T-steel, and the flange plate of third member is equipped with bolt hole and is used for and first The bottom wing listrium of component connects, and the web of third member is double webs, and the lower end of the web of third member is welded on second component Flange plate on.The technical solution is primarily adapted for use in the top that main supporting structure is located at the horizontal brace rod of gantry crane along gravity direction Situation, can high-altitude complete install.
Further, the two sides of the web of second component are equipped with reinforcing rib.
Further, third member has long waist type bolt hole, control errors when convenient for docking.
Further, the first component and main supporting structure are connected by welded connecting and/or second component and the horizontal of gantry crane Extension bar passes through welded connecting.
The invention has the benefit that the middle position the characteristics of and manufacturing and designing and pacifying according to chassis major part distribution of weight The Auxiliary support of effective adjustment when dress, two sides is especially small in stationary condition lower stress, or even does not stress, and effectively prevent cantilever beam Vibration, greatly strengthens the safety of chassis structure.
Another object of the present invention is to provide a kind of installation methods on computer room chassis, for installing any of the above-described technical side Computer room chassis in case, includes the following steps:
(A) main supporting structure is made, main supporting structure includes lateral girder, longitudinal girder and other functors;By main branch Support structure is mounted on the suitable position of gantry crane;
(B) auxiliary supports are installed, auxiliary supports include the first component, second component and third member, step (B) packet Include following step:
(B1) first component is mounted on to the outermost end of lateral girder;
(B2) position for adjusting second component, keeps it vertically aligned with the first component, and by second component It is connected on the horizontal brace rod of gantry crane;
(B3) first component and the second component are connected by third member.
The invention has the benefit that easy for installation, size is flexibly adjusted convenient for manufacture.
Detailed description of the invention
Below in conjunction with attached drawing, specific embodiments of the present invention will be described in further detail.
Fig. 1 is the schematic side view of gantry crane;
Fig. 2 a, 2b are respectively the schematic elevation view and schematic top plan view on the computer room chassis of first embodiment of the invention;
Fig. 3 is the structural schematic diagram of the auxiliary supports of first embodiment of the invention;
Fig. 3 a, 3b, 3c be respectively the facing, overlook of the first component of the auxiliary supports of first embodiment of the invention, Schematic side view;
Fig. 4 a, 4b are respectively facing, overlooking signal for the second component of the auxiliary supports of first embodiment of the invention Figure;
Fig. 5 a, 5b are respectively facing, overlooking signal for the third member of the auxiliary supports of first embodiment of the invention Figure;
Fig. 6 is the structural schematic diagram on the computer room chassis of second embodiment of the invention;
Fig. 7 is the schematic elevation view of the auxiliary supports of second embodiment of the invention;
Fig. 8 a, 8b, 8c be respectively the facing of the first component of the auxiliary supports of second embodiment of the invention, side view, Schematic top plan view;
Fig. 9 a, 9b are respectively the facing of the second component of the auxiliary supports of second embodiment of the invention, side view signal Figure;
Figure 10 a, 10b, 10c are respectively the facing of the Part III of the auxiliary supports of second embodiment of the invention, side Depending on, elevational schematic view.
Component label instructions
100 computer room chassis
10 main supporting structures
11 lateral girders
20 auxiliary supports
21 first components
22 second components
23 third members
200 gantry cranes
201 extra large side crossbeams
202 land side crossbeams
203 horizontal brace rods
204 crossbeams
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this specification Revealed content is understood other advantages and efficacy of the present invention easily.Although description of the invention will combine preferred embodiment It introduces together, but this feature for not representing the invention is only limitted to the embodiment.On the contrary, being invented in conjunction with embodiment The purpose of introduction is to be possible to the other selections extended or transformation to cover based on claim of the invention.In order to mention For that will include many concrete details in depth understanding of the invention, being described below.The present invention can also be thin without using these Section is implemented.In addition, in order to avoid confusion or obscuring emphasis of the invention, some details will be omitted in the de-scription.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
One of the objects of the present invention is to provide a kind of computer room chassis 100, mainly for 100 two sides endpoint of computer room chassis away from Excentric support crossbeam 204 farther out, the case where having exceeded normal range (NR).In conjunction with shown in the scene of Fig. 1,200 main carriage of gantry crane Supporting crossbeam 204 is single box beam, and computer room chassis 100 is placed in doorframe middle position, between extra large side crossbeam 201 and land side crossbeam 202 Design has horizontal brace rod 203 (being laterally located on the outside of chassis).
As shown in Fig. 2 a, 2b and Fig. 6, computer room chassis 100 includes main supporting structure 10 and auxiliary supports 20.Wherein, Main supporting structure 10 includes lateral girder, longitudinal girder and other functors;And the auxiliary of lateral girder outermost end is set Supporting element 20, as shown in Fig. 3, Fig. 7, which includes the first component 21, second component 22 and third member 23.The One component 21 is connect with lateral girder;Second component 22 is connect with the horizontal brace rod 203 of gantry crane 200;Third member 23 is used for Connect the first component 21 and second component 22.The technical solution can prevent the free vibration on computer room chassis, make the cantilever of script Girder construction becomes the structure with weak support, enhances the safety of chassis during the work time, and greatly reduce life Produce difficulty and production cost.
Another object of the present invention is to provide a kind of installation methods on computer room chassis 100, will pass through first embodiment The installation method is specifically described with second embodiment.
First embodiment:
First embodiment is primarily adapted for use in the horizontal brace rod that main supporting structure 10 is located at gantry crane 200 along gravity direction The situation of 203 lower section is suitble to complete to install in low latitude, avoids high altitude operation.
As shown in Fig. 3 a~3c, the first component 21 is T-steel, and the flange plate of the first component 21 is connect with lateral girder, the The web of one component 21 is connect with third member 23;As shown in Fig. 4 a, 4b, second component 22 is sheet material, second component 22 and water The contact end part of flushconnection bar 203 surrounds horizontal brace rod 203;As shown in Fig. 5 a, 5b, third member 23 is double layer sheet, To clamp the first component 21 and second component 22, that is, the first component 21 and second component 22 of the auxiliary supports 20 after installing It is all sandwiched between the double layer sheet of third member 23.It can increase the contact area of junction using the technical solution, and can make It connects stronger.In this embodiment, it is hung on horizontal brace rod 203 on auxiliary supports 20, this design method is effective High altitude operation is avoided, production difficulty and production cost are greatly reduced.
As shown in figure 3, the first component 21, second component 22 and third member 23 are respectively equipped with bolt hole, and pass through bolt Pair connection, reduces the production difficulty of workpiece, easy for installation.As shown in Figure 3a, it is equipped in the first component 21 along gravity side To the long waist shaped bolt hole of elongation, to adjust installation site.As shown in Fig. 3 a, 4a, it is arranged in parallel on the web of the first component 21 Have and is arranged in parallel with two rows of bolts hole on two rows of bolts hole and/or second component 22.Here "and/or" means the technology Scheme can be equipped with two rows of bolts hole for the first component 21 in parallel, with no restrictions to the arrangement of the bolt hole of second component 22, energy Meet installation requirements;It is also possible to the first component 21 without limitation, second component 22 is arranged in parallel with two rows of bolts hole;Also It can be the first component 21 and second component 22 be equipped with two rows of bolts hole.This kind is constructed to adjust auxiliary supports 20 size and installation site.Two to four row's spiral shells are arranged in parallel on each layer of sheet material of the third member 23 as shown in Fig. 5 a, 5b Keyhole, to further increase the controllability of auxiliary supports 20.In the present embodiment, third member 23 is respectively arranged with four Bolt hole is arranged, and four row's bolts hole are mirror symmetry in two sheets.
Another object of the present invention is to provide a kind of installation methods on computer room chassis 100, and it is real to be detailed below first Apply the installation method of mode:
(A) main supporting structure 10 is made, as shown in Fig. 2, main supporting structure 10 includes lateral girder, longitudinal girder and other Functor.Main supporting structure 10 is designed according to actual needs, completes the production installation by drawing.Main supporting structure After 10 make, main supporting structure 10 will be mounted on to the suitable position of gantry crane 200.
(B) auxiliary supports 20 as shown in Figure 3 are installed, auxiliary supports 20 include the first component 21 (shown in Fig. 3 a), Second component 22 (shown in Fig. 4 a) and third member 23 (shown in Fig. 5 a), step (B) include the following steps:
(B1) first component 21 is welded on to the outermost end of lateral girder;In other embodiments, the first component 21 and machine Other connection types can also be used in the lateral girder in room chassis 100, and the application is with no restrictions.
(B2) position for adjusting second component 22, keeps it vertically aligned with the first component 21, and by second Component 22 is welded on the horizontal brace rod 203 of gantry crane 200;Similarly, in other embodiments, it is not intended to limit second component 22 Reliable connection is realized as long as being able to satisfy actual needs with the connection type of horizontal brace rod 203.
(B3) by the both ends of third member 23 respectively with the first component 21 and second component 22 to it, after adjusting good position, Be bolted the first component 21, second component 22 and third member 23, this connection type convenient for sized, but Other connection types can be used.
It can be seen that its component of the installation method on computer room chassis 100 provided by the invention is convenient for manufacture, integral installation is convenient, and ruler It is very little flexibly adjustable.
Second embodiment:
Second embodiment is primarily adapted for use in the horizontal brace rod that main supporting structure 10 is located at gantry crane 200 along gravity direction The situation of 203 top can be completed to install in high-altitude.The first component employed in second embodiment and first embodiment 21, second component 22 and the construction of third member 23 be not identical, but this does not imply that the component in two embodiments cannot Compatibility is replaced, and it is not to this hair that two embodiments, which are applicable in situation only in conjunction with the specific of example description technique scheme, The limitation of bright protection scope.
As shown in Fig. 8 a~8c, the first component 21 is I-steel, the top flange plate of the first component 21 and the lateral girder The bottom wing listrium of connection, the first component 21 is equipped with bolt hole;As shown in Fig. 9 a, 9b, second component 22 is T-steel, second component 22 flange plate is equipped with bolt hole, and the web part of second component 22 surrounds horizontal brace rod 203, and the shape of web can be in life It is adaptively adjusted when production according to the appearance profile of horizontal brace rod 203;As shown in Figure 10 a~10c, third member 23 is class T-steel, the flange plate of third member 23 are equipped with bolt hole and are used to connect with the bottom wing listrium of the first component 21, third member 23 Web is double webs, and the lower end of the web of third member 23 is welded on the flange plate of second component 22.As shown in figure 9b, second The two sides of the web of component 22 are equipped with reinforcing rib.Further, as shown in Figure 10 a, third member 23 has long waist type bolt Hole, control errors when convenient for docking up and down.
In the present embodiment, the first component 21 and main supporting structure 10 are by being welded to connect, second component 22 and gantry crane 200 horizontal brace rod 203 passes through welded connecting.
Above-mentioned technical proposal effectively prevent the vibration on computer room chassis 100, greatly strengthens computer room chassis during the work time Safety Safety.
The installation method of second embodiment is detailed below:
(A) main supporting structure 10, (in conjunction with Fig. 2 b) as shown in Figure 6 are made, main supporting structure 10 includes lateral girder, longitudinal direction Main supporting structure 10 after main supporting structure 10 is made, is mounted on the suitable position of gantry crane 200 by girder and other functors. Main supporting structure 10 in any embodiment of the invention is designed according to actual needs, completes the production peace by drawing Dress does not do specific limitation to main supporting structure 10 herein.Such as in first embodiment and second embodiment, Main supporting structure 10 can be identical.
(B) auxiliary supports 20 as shown in Figure 3 are installed, auxiliary supports 20 include the first component 21 (shown in Fig. 8 a), Second component 22 (shown in Fig. 9 a) and third member 23 (shown in Figure 10 a), step (B) include the following steps:
(B1) first component 21 is welded on to the outermost end of lateral girder;In other embodiments, the first component 21 and machine Other connection types can also be used in the lateral girder in room chassis 100, herein with no restrictions.
(B2) position for adjusting second component 22, keeps it vertically aligned with the first component 21, and by second Component 22 is welded on the horizontal brace rod 203 of gantry crane 200;Similarly, in other embodiments, it is not intended to limit second component 22 Reliable connection is realized as long as being able to satisfy actual needs with the connection type of horizontal brace rod 203.
(B3) first component 21 and the second component 22 are connected by third member 23, in the present embodiment, in third Component 23 is equipped with long waist type bolt hole, and the connection of third member 23 and the first component 21 uses bolt pair, third member 23 with The connection of second component 22 is by the way of welding.Therefore it before third member 23 is installed, needs first to adjust third member 23 position.
It can be seen that its component of the installation method on computer room chassis 100 provided by the invention is convenient for manufacture, integral installation is convenient, and ruler It is very little flexibly adjustable.
In conclusion provided by the invention, the above-described embodiments merely illustrate the principles and effects of the present invention, rather than For limiting the present invention.Any person skilled in the art all without departing from the spirit and scope of the present invention, to above-mentioned reality It applies example and carries out modifications and changes.Therefore, such as those of ordinary skill in the art without departing from disclosed Spirit with technical idea under all equivalent modifications or change for being completed, should be covered by the claims of the present invention.

Claims (13)

1. a kind of computer room chassis, is used to support the computer room of gantry crane characterized by comprising
Main supporting structure, including lateral girder, longitudinal girder and other functors;
The outermost end of the lateral girder is arranged in auxiliary supports, comprising:
The first component, the first component are connect with the lateral girder;
The horizontal brace rod of second component, the second component and gantry crane connects;
Third member, for connecting the first component and the second component.
2. computer room chassis as described in claim 1, which is characterized in that the first component, the second component and described the Three components are respectively equipped with bolt hole, and are connected by bolt pair.
3. computer room chassis as claimed in claim 2, which is characterized in that
The first component is T-steel, and the flange plate of the first component is connect with the lateral girder, the first component Web is connect with the third member;
The second component is sheet material, and contact end part of the second component with horizontal brace rod surrounds horizontal brace rod;
The third member is double layer sheet, to clamp the first component and the second component.
4. computer room chassis as claimed in claim 3, which is characterized in that be equipped in the first component and extended along gravity direction Long waist shaped bolt hole.
5. computer room chassis as claimed in claim 3, which is characterized in that be arranged in parallel with two rows on the web of the first component Two rows of bolts hole are arranged in parallel on bolt hole and/or the second component.
6. computer room chassis as claimed in claim 5, which is characterized in that be arranged in parallel on each layer of sheet material of the third member There are two to four row's bolts hole.
7. such as the described in any item computer room chassis of claim 2~6, which is characterized in that the main supporting structure is along gravity direction Positioned at the lower section of the horizontal brace rod of gantry crane.
8. computer room chassis as described in claim 1, which is characterized in that
The first component is I-steel, and the top flange plate of the first component is connect with the lateral girder, described first The bottom wing listrium of part is equipped with bolt hole;
The second component is T-steel, and the flange plate of the second component is equipped with bolt hole, the web part of the second component Surround horizontal brace rod;
The third member is class T-steel, and the flange plate of the third member is equipped with bolt hole and is used for and the first component The connection of bottom wing listrium, the web of the third member are double webs, and the lower end of the web of the third member is welded on described the On the flange plate of two components.
9. computer room chassis as claimed in claim 8, which is characterized in that the two sides of the web of the second component, which are equipped with, to be reinforced Muscle.
10. computer room chassis as claimed in claim 8, which is characterized in that the third member has long waist type bolt hole.
11. such as the described in any item computer room chassis of claim 8~10, it is characterised in that the main supporting structure is along gravity direction Positioned at the top of the horizontal brace rod of gantry crane.
12. computer room chassis as described in claim 1, which is characterized in that the first component passes through with the main supporting structure Welded connecting and/or the second component and the horizontal brace rod of gantry crane pass through welded connecting.
13. a kind of installation method on computer room chassis, which is characterized in that for installing the described in any item machines of claim 1~12 Room chassis, the method includes the following steps:
(A) main supporting structure is made, the main supporting structure includes lateral girder, longitudinal girder and other functors;And it will lead Support construction is mounted on the suitable position of gantry crane;
(B) auxiliary supports are installed, the auxiliary supports include the first component, second component and third member, the step (B) include the following steps:
(B1) first component is mounted on to the outermost end of the lateral girder;
(B2) position for adjusting the second component, keeps it vertically aligned with the first component, and by described second Component is connected on the horizontal brace rod of gantry crane;
(B3) first component and the second component are connected by the third member.
CN201910753671.8A 2019-08-15 2019-08-15 A kind of computer room chassis and its installation method Pending CN110395662A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910753671.8A CN110395662A (en) 2019-08-15 2019-08-15 A kind of computer room chassis and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910753671.8A CN110395662A (en) 2019-08-15 2019-08-15 A kind of computer room chassis and its installation method

Publications (1)

Publication Number Publication Date
CN110395662A true CN110395662A (en) 2019-11-01

Family

ID=68328386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910753671.8A Pending CN110395662A (en) 2019-08-15 2019-08-15 A kind of computer room chassis and its installation method

Country Status (1)

Country Link
CN (1) CN110395662A (en)

Similar Documents

Publication Publication Date Title
CN102286925B (en) Bridge single column pier assembled box bracket system and mounting method thereof
CN101549835A (en) Lattice mast crane and lattice mast boom
CN207244899U (en) A kind of horizontal corrugated steel shear wall
CN104792628B (en) One kind becomes space Π type shearing test devices
CN110395662A (en) A kind of computer room chassis and its installation method
CN108118939A (en) A kind of high-strength steel controller perturbation ductility construction
CN206307905U (en) Full trussed girder bank bridge
CN106368322B (en) A kind of installation method for the bi-directional symmetrical inclination steel column between super high-rise building conversion layer
CN105421251B (en) Plate-girder jacking supporting mechanism, plate-girder jacking supporting tool
CN106395619B (en) Truss-like gantry crane girder and truss-like gantry crane
CN106988281B (en) Manufacturing method and structure of high-narrow large-hole-opening main longitudinal beam down-the-hole arc door
CN104213578B (en) Transmission line of electricity double-rod gate shaft tower self-regulated basis
CN210917011U (en) Cable tower structure and bridge
CN207633774U (en) A kind of attachment device with three-dimensional regulation function
CN206693060U (en) A kind of hoisting device for the lifting of suspension bridge saddle bearing plate
CN208329151U (en) A kind of assemble welding formula steel construction
CN208718081U (en) A kind of new steel structure bean column node connecting elements
CN206665954U (en) Steel tubular bank protection structure hoisting fixture
CN207390868U (en) A kind of plate drawing system for being used to fix auxiliary operating mode
CN207139179U (en) Large-sized end enclosure base welds displacement device
CN110877654A (en) Reinforced structure of LNG-FSRU regasification module
CN205376734U (en) Shortwave antenna stand column modular structure
CN108775075A (en) A kind of adjusting apparatus for overhanging steel structure
CN205533022U (en) Polygon wind power tower
CN108130953A (en) Vertical muscle and steel I-beam connecting node and steel pier connection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination