CN110390564A - Build project quick self-checking method, system and computer readable storage medium in pricing - Google Patents
Build project quick self-checking method, system and computer readable storage medium in pricing Download PDFInfo
- Publication number
- CN110390564A CN110390564A CN201910648042.9A CN201910648042A CN110390564A CN 110390564 A CN110390564 A CN 110390564A CN 201910648042 A CN201910648042 A CN 201910648042A CN 110390564 A CN110390564 A CN 110390564A
- Authority
- CN
- China
- Prior art keywords
- project
- data
- inventory
- check
- item
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 64
- 238000003860 storage Methods 0.000 title claims abstract description 32
- 238000007689 inspection Methods 0.000 claims abstract description 39
- 238000012545 processing Methods 0.000 claims abstract description 25
- 238000005516 engineering process Methods 0.000 claims abstract description 20
- 238000012360 testing method Methods 0.000 claims abstract description 13
- 230000014759 maintenance of location Effects 0.000 claims abstract description 12
- 239000000463 material Substances 0.000 claims description 27
- 238000004590 computer program Methods 0.000 claims description 11
- 230000008676 import Effects 0.000 claims description 8
- 238000004458 analytical method Methods 0.000 claims description 6
- 238000004364 calculation method Methods 0.000 claims description 6
- 239000000284 extract Substances 0.000 claims description 5
- 238000001914 filtration Methods 0.000 claims description 5
- 230000008901 benefit Effects 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims 2
- 238000010586 diagram Methods 0.000 description 11
- 238000010276 construction Methods 0.000 description 10
- 230000008569 process Effects 0.000 description 9
- 230000006870 function Effects 0.000 description 7
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 241001484259 Lacuna Species 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 235000000332 black box Nutrition 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2457—Query processing with adaptation to user needs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/80—Information retrieval; Database structures therefor; File system structures therefor of semi-structured data, e.g. markup language structured data such as SGML, XML or HTML
- G06F16/84—Mapping; Conversion
- G06F16/86—Mapping to a database
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/08—Auctions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Finance (AREA)
- Accounting & Taxation (AREA)
- Development Economics (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Databases & Information Systems (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Primary Health Care (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Computational Linguistics (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of project quick self-checking methods in building pricing, including are standardized to self-test project;Check item is subjected to digitlization and structuring processing;The quick reading and processing that electric bidding document and papery table bidding documents are established to the newly-built bid project in building pricing, form standardized digital document and are directed to different situation record storages.Inspection of the present invention to papery bidding documents collects and surveys the history engineering data of user in valuation industry, forms a set of normal data for meeting business rule using big data technology.By the difference of analytical standard data and the current project data of user, check the current project data of user there may be the problem of.The range of inspection problem mainly includes that comprehensive unit price inspection and wrong set leakage set check.Normal data is that dynamic updates, and ensure that the timeliness and accuracy of data.
Description
Technical field
The present invention relates to the fields such as big data, multithreading, XML, mainly for the highway bids of construction industry bidding link
Measure the inspection of the accordance, consistency and conventional points for attention of inventory, bid contrul valence and offer by tender.
Background technique
With the development of construction industry, in order to improve the transparency of buying, economize on resources and transaction cost, evade utilization technology
Means solve to practise fraud, black-box operation, collusive tendering, limitation are repelled the protrusion in the field of inviting and submitting bids such as potential source rocks and asked
Topic, since carrying out " e-bidding method " from China, to make full use of Information Technology Methods solution field of inviting and submitting bids prominent
Problem creates advantageous condition, and each province, city are directed to public trick project and have carried out unified and standard e-bidding bid data at present
Great changes have occurred in the data interaction interface of format and standard, the administrative supervision mode submitted a tender to e-bidding, are benefits by it
With information technology, it can be achieved that networking, with no paper comprehensive, real-time and transparent supervision;For the enterprise for calling for bid, submitting a tender, how
It ensures bid, submit a tender and can go on smoothly, often normalization of the enterprise to bid inventory, bid contrul valence and offer by tender, symbol
The verifications such as conjunction property are increasingly focused on, and user how to be helped accurately efficiently to verify bidding documents problem, are that relevant design software needs
The problem to be solved.
It is as shown in Figure 1 construction project data structure diagram, used product is more the data-interface specification for standard
Built-in routine inspection item etc.:
If table 1 is construction project element property table (M be essential, O is optional)
And in the practical business of user:
1 construction project element property table of table
Serial number | Property Name | Attribute description | Data type | Explanation |
1 | Number | Project number | String | |
2 | Name | Project name | String | |
3 | Segment | Bid section title | String | |
4 | ProjectAddress | Item address | String | |
5 | ProjectAddressCode | Final engineering cost ground digital code | String | |
6 | FileKind | Cost file type | String | |
7 | StandardName | Title | String | |
8 | StandardNumber | Standard number | String | |
9 | Scale | Construction scale | String | |
10 | Mode | Construction mode | String | |
11 | Explains | Work out leader | String |
1. electronics mark engineering use Engineering Quantity List Pricing engineering project, in addition to data-interface specification clear stipulaties must
It looks into outside item, there are also the meeting clear stipulaties such as list counts specification, bidding document: bidder must make a report on valence by highway bids amount inventory
Lattice, project code, project name, item characteristic, measurement unit, project amount must be consistent with highway bids amount inventory.If different
Cause can generally be handled by abandoned tender, and problem is very serious.And when engineering project called for bid, submitted a tender using e-bidding system,
When the assessment of bids, user establishes bid project by importing e-bidding book, can be because dividing the work, accidentally during working out offer by tender
Situations such as operation, causes the modification of bill of quantities to change, in order to avoid there is abandoned tender problem, generally in the bid of finished item
It needs quickly to check the accordance problem that whether there is bill of quantities in worked out offer by tender file after quotation, go forward side by side
Row amendment operation, and this work efficiently, can not be completed accurately at all by artificial contrast.
As shown in Fig. 2, the prior art be by tender document establishment inventory and e-bidding book inventory according to inventory coding,
After the matching of the conditions such as item characteristic, consistency is checked.Above-mentioned matching and checking process are one by one that inventory carries out, and efficiency is relatively low
Under.
2. papery mark engineering, bidding document etc. also can clear stipulaties: bidder must make a report on valence by highway bids amount inventory
Lattice, project code, project name, item characteristic, measurement unit, project amount must be consistent with highway bids amount inventory etc..If no
It unanimously can generally be handled by abandoned tender, problem is very serious.And identical inventory comprehensive unit price, identical material unit price need unanimously.Such as one
A biggish project might have tens a construction units up to a hundred, it will usually which the construction unit in project is distributed to different people
Member is worked out respectively, finally carries out the merging of project.At this time it is possible that the quotation of identical inventory item is inconsistent or identical
The inconsistent situation of material unit price.Therefore after merging project, user wishes the inspection that quotation consistency is carried out for projects
It looks into, after such as checking that comprehensive unit price is inconsistent, the inventory of this part would generally be carried out a group valence comparison by user, which Xiang Qing judged
Single comprehensive unit price is correctly, then correct inventory group valence to be multiplexed under other inventory items, to realize the one of comprehensive unit price
Cause property.No matter completion inventory comprehensive unit price rapidly and efficiently, labor and materials machine unit price consistency check demand are for tenderer, tenderer
All it is highly desirable to.It can cause abandoned tender problem because of situations such as time, maloperation during working out offer by tender, generally complete
It needs to verify the accordance problem of bill of quantities after the bidding price in detail, and is modified operation, and this workload
Very big, artificial contrast can not efficiently, accurately complete.
For the mode of both the above bidding documents inspection, existing technology is checked according to interface specification, complete
In face property and the scope of examination of papery bidding documents not comprehensively, and inefficiency is checked.And extensively join the product reached in addition to for standard
Data-interface specification built in outside routine inspection item, also built-in " consistency check ", " routine inspection ", " inspection of papery bidding documents "
Deng check item.Inspection efficiency is substantially improved by multithreading.In conjunction with big data technology, according to user, industry history work
Number of passes is checked according to more intelligent, more accurate inventory comprehensive unit price, mistakes and omissions set etc. is carried out.
In general, there are still many disadvantages for existing bidding documents inspection.
1, more to check that needing operator to download the individual checking tool of installation checks, the operation phase of lead-in portion
To trouble, and when checking when something goes wrong, needs to return and be corrected in valuation software, checking tool is with valuation software itself without phase
Mutually fusion;
2, as defined in the standard interface other than check item, inspection, consistency check routinely is still that user pays special attention to
And abandoned tender condition entry, so, still have missing in comprehensive and papery bidding documents the scope of examination.
3, tender document is checked to inventory one by one, efficiency is relatively low.
Summary of the invention
The present invention is in view of the above problems, be to provide a kind of method for quickly carrying out project self-test, user passes through simple several
The problem of step interacts, and can quickly check cost book, and correct in time.
In order to achieve the above object of the invention, the present invention provides a kind of project quick self-checking method in building pricing,
Include:
Step 1: be standardized to self-test project, including distinguish bid inventory, bid contrul valence, offer by tender,
Quota project, free one of list counts and quota costing or a variety of as check item;
Step 2: check item is carried out digitlization and structuring processing, pressed according to the different check items under different settings
Digitlization and structuring are carried out according to unified reference format, forms the digital document of standard, and classify according to data format and carry out
Storage;
Step 3: establishing the fast fast reading of electric bidding document and papery watch bidding documents to the newly-built bid project in building pricing
It takes and handles, form standardized digital document and be directed to different situation record storages.
Preferably, when importing e-bidding book in above-mentioned quick self-checking method, bidding documents content is read in a manner of SAX.
Preferably, the information read from the e-bidding book, is stored in ephemeral data library file, in batches interim
Database file is disposably imported into user's bid engineering, generates corresponding inventory.
Preferably, according to setting rule, it is generated to the table record of engineering data base, the rule is with common text files lattice
Formula is stored and can dynamically be modified.
Preferably, all inventories are assigned to multiple threads by using multithreading by above-mentioned quick self-checking method
Middle execution matching and inspection, compare inspection for bid bill of quantities and highway bids amount inventory, to check and recruit one by one
Bidding documents consistency.
Preferably, above-mentioned quick self-checking method also needs routine inspection item, and including but not limited to inventory coding repeats, is identical
Coding inventory comprehensive unit price is inconsistent, inventory entitled empty, list item feature be empty, specific item project amount be zero, labor and materials machine
Price is zero.
Preferably, above-mentioned quick self-checking method further include:
Step 4: being classified and being generated the report of reference format aiming at the problem that checking, tool can be checked by report
Body problem or double-click navigate to issue list and modify or intelligently quickly correct.
Preferably, in above-mentioned quick self-checking method import papery bidding documents when the following steps are included:
Step 1.1, using big data spark technology, collect and survey the history engineering data of user in valuation industry, formed
Meet the normal data of business rule;
Step 1.2 imports electric bidding document and carries out data structured processing, is deposited in a manner of table and record in database
Storage;
Step 1.3, all inventories in traversal engineering project, labor and materials machine, and sentenced according to identical inventory, identical labor and materials machine
Broken strip part, the identical inventory of Rapid matching, labor and materials machine form matched data table, and then whether comparison comprehensive unit price, unit price are identical,
For different situation record storages;
Step 1.4, by the difference of normal data and the current project data of user in analytical procedure 1.1, check use
The current project data in family there may be the problem of;
Step 1.5, the report classified aiming at the problem that checking and generate reference format can check tool by report
Body problem or double-click navigate to issue list and modify or intelligently quickly correct.
Preferably, the range that problem is checked in above-mentioned steps 1.5 mainly includes that comprehensive unit price inspection and wrong set leakage set check.
Preferably, above-mentioned steps 1.1 specifically include:
(1) temporally batch extracts listings data in user engineering, and upload server;
(2) wrong item will be present, the inventory group valence scheme filtering of multinomial and few item screens out;
It (3) is that basic calculation note is comprehensive single with inventory library, sequence, title, coding, unit, feature, taxation mode field
The Hash of valence;
(4) merge identical inventory comprehensive unit price according to Hash;
(5) inventory comprehensive unit price result is saved.
Project quick self-checking system in a kind of building pricing, comprising:
Standardization unit for being standardized to self-test project, including distinguishes bid inventory, bid contrul
Valence, offer by tender, quota project, free one of list counts and quota costing or a variety of as check item;
Structuring processing unit, for check item to be carried out digitlization and structuring processing, according under different settings
Different check items carry out digitlization and structuring according to unified reference format, form the digital document of standard, and according to data
Format classification is stored;
Reading processing unit is stated, for establishing electric bidding document and papery to the newly-built bid project in building pricing
The quick reading and processing of table bidding documents, form standardized digital document and are directed to different situation record storages;
Report generation output unit leads to for being classified and being generated the report of reference format aiming at the problem that checking
Cross report can check particular problem or double-click navigate to issue list modify or intelligence quickly amendment.
Preferably, when above-mentioned importing papery bidding documents the following steps are included:
Step 1.1, using big data spark technology, collect and survey the history engineering data of user in valuation industry, formed
Meet the normal data of business rule;
Step 1.2 imports electric bidding document and carries out data structured processing, is deposited in a manner of table and record in database
Storage;
Step 1.3, all inventories in traversal engineering project, labor and materials machine, and sentenced according to identical inventory, identical labor and materials machine
Broken strip part, the identical inventory of Rapid matching, labor and materials machine form matched data table, and then whether comparison comprehensive unit price, unit price are identical,
For different situation record storages;
Step 1.4, by the difference of normal data and the current project data of user in analytical procedure 1.1, check use
The current project data in family there may be the problem of;
Step 1.5, the report classified aiming at the problem that checking and generate reference format can check tool by report
Body problem or double-click navigate to issue list and modify or intelligently quickly correct.
Preferably, above-mentioned steps 1.1 specifically include:
(1) temporally batch extracts listings data in user engineering, and upload server;
(2) wrong item will be present, the inventory group valence scheme filtering of multinomial and few item screens out;
It (3) is that basic calculation note is comprehensive single with inventory library, sequence, title, coding, unit, feature, taxation mode field
The Hash of valence;
(4) merge identical inventory comprehensive unit price according to Hash;
(5) inventory comprehensive unit price result is saved.
A kind of computer readable storage medium, is stored thereon with computer program, realization when which is executed by processor
The step of any one above method.
Compared with prior art, present invention has the advantage that
1, examination scope is more comprehensively: particular exam item is divided into consistency check, interface check and conventional item inspection, and according to
Authority file defaults corresponding check item, and user can adjust on demand.
2, test mode is more perfect: by the setting of " inspection of electronics mark " and " inspection of papery mark ", it is existing can to meet user
The mode of inviting and submitting bids check.And big data technology is introduced, it is more intelligent more smart using the history engineering data of user and industry
Really the engineering of user is checked.
3, program utilizes multithreading, concurrently checks all inventories, the labor and materials machine in engineering project, checks efficiency
It is substantially improved.
4, check that problem presentation is more intuitive: report is clearly presented to use in system unification, classification aiming at the problem that checking
Family, user can check that particular problem or double-click navigate to issue list and modify or intelligently quickly correct.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will make below to required in the embodiment of the present invention
Attached drawing is briefly described, for those of ordinary skill in the art, without creative efforts, also
Other drawings may be obtained according to these drawings without any creative labor.
Fig. 1 shows construction project data structure diagram in the prior art and product;
Fig. 2 shows the inventories of the inventory in the prior art working out tender document and e-bidding book to encode according to inventory,
After the matching of the conditions such as item characteristic, the flow chart of consistency is checked;
Fig. 3 shows the technical schematic diagram of project quick self-checking method guiding flow in present invention building pricing;
It is former that Fig. 4 shows the technology for building project quick self-checking method in pricing present invention employs multithreading
Reason figure;
Fig. 5 shows big present invention employs utilizing in project quick self-checking method in multithreading building pricing
The schematic diagram of data technique progress data collection and analysis.
Specific embodiment
The feature and exemplary embodiment of various aspects of the invention is described more fully below, in order to make mesh of the invention
, technical solution and advantage be more clearly understood, with reference to the accompanying drawings and embodiments, the present invention is further retouched in detail
It states.It should be understood that specific embodiment described herein is only configured to explain the present invention, it is not configured as limiting the present invention.
To those skilled in the art, the present invention can be real in the case where not needing some details in these details
It applies.Below the description of embodiment is used for the purpose of better understanding the present invention to provide by showing example of the invention.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence " including ... ", it is not excluded that including
There is also other identical elements in the process, method, article or equipment of the element.
The present embodiment provides a kind of project quick self-checking methods in building pricing, comprising:
Step 1: be standardized to self-test project, including distinguish bid inventory, bid contrul valence, offer by tender,
Quota project, free one of list counts and quota costing or a variety of as check item;
Step 2: check item is carried out digitlization and structuring processing, pressed according to the different check items under different settings
Digitlization and structuring are carried out according to unified reference format, forms the digital document of standard, and classify according to data format and carry out
Storage;
Step 3: establishing the fast fast reading of electric bidding document and papery watch bidding documents to the newly-built bid project in building pricing
It takes and handles, form standardized digital document and be directed to different situation record storages.
In some embodiments, when importing e-bidding book in quick self-checking method, bidding documents content is read in a manner of SAX.
In some embodiments, the information read from the e-bidding book, is stored in ephemeral data library file, batch
Amount disposably imported into ephemeral data library file in user's bid engineering, generates corresponding inventory.
In some embodiments, according to setting rule, it is generated to the table record of engineering data base, the rule is with common text
This document format is stored and can dynamically be modified.
In some embodiments, quick self-checking method is assigned to all inventories multiple by using multithreading
Matching is executed in thread and is checked, bid bill of quantities and highway bids amount inventory are compared into inspection one by one, to check
With tender consistency.
In some embodiments, quick self-checking method also needs routine inspection item, including but not limited to inventory coding repeat,
Identical coding inventory comprehensive unit price is inconsistent, inventory entitled empty, list item feature be empty, specific item project amount be zero, work
Material machine price is the check items such as zero.
In some embodiments, quick self-checking method further include: Step 4: being classified and being given birth to aiming at the problem that checking
At the report of reference format, by report can check particular problem or double-click navigate to issue list modify or intelligence quickly
Amendment.
In some embodiments, as shown in table 2, rule is stored with common text files format to self-test rule, can be with
Dynamic is modified.
2 self-test rule sample table of table
In some embodiments, in quick self-checking method import papery bidding documents when the following steps are included:
Step 1.1, using big data spark technology, collect and survey the history engineering data of user in valuation industry, formed
Meet the normal data of business rule;
Step 1.2 imports electric bidding document and carries out data structured processing, is deposited in a manner of table and record in database
Storage;
Step 1.3, all inventories in traversal engineering project, labor and materials machine, and sentenced according to identical inventory, identical labor and materials machine
Broken strip part, the identical inventory of Rapid matching, labor and materials machine form matched data table, and then whether comparison comprehensive unit price, unit price are identical,
For different situation record storages;
Step 1.4, by the difference of normal data and the current project data of user in analytical procedure 1.1, check use
The current project data in family there may be the problem of;
Step 1.5, the report classified aiming at the problem that checking and generate reference format can check tool by report
Body problem or double-click navigate to issue list and modify or intelligently quickly correct.The range of inspection problem mainly includes comprehensive single
Valence inspection and wrong set leakage set check.
In some embodiments, step 1.1 specifically includes:
(1) temporally batch extracts listings data in user engineering, and upload server;
(2) wrong item will be present, the inventory group valence scheme filtering of multinomial and few item screens out;
It (3) is that basic calculation note is comprehensive single with inventory library, sequence, title, coding, unit, feature, taxation mode field
The Hash of valence;
(4) merge identical inventory comprehensive unit price according to Hash;
(5) inventory comprehensive unit price result is saved.
The present invention also provides a kind of embodiments, comprising the following steps:
One, electric bidding document check item:
1, e-bidding book is imported when creating bid project.
The file format of e-bidding book is usually XML.When importing e-bidding book, bidding documents content is read in a manner of SAX.
SAX is a kind of technology for efficiently reading XML file, and the technology of XML is read compared to another: DOM, SAX are more efficient,
EMS memory occupation is lower.
The information read from tender is stored in ephemeral data library file.Then, in batches ephemeral data library file
It disposably imported into user's bid engineering, generates corresponding inventory.How the maximum technological difficulties of this step are tender
Information is generated to the table record of engineering data base according to certain rule.Rule is stored with the file of fixed format, can be with
Dynamic is modified.Alteration ruler file is only needed, does not need to recompile code, can support different bid book formats, is used
Very flexibly.The technical schematic diagram of guiding flow is as shown in Figure 3.If rule variation, modifies corresponding rule file.
2, " accordance inspection " or " checking and tender consistency " function is executed, (system can be by bill of quantities of submitting a tender
The problems such as comparing inspection one by one with highway bids amount inventory, record new-added item, lacuna, modification item);
As shown in figure 4, the characteristics of using multithreading in the present invention, using modern computer being generally multi-core CPU,
All inventories are assigned in multiple threads and executes matching and checks, improve several times in operational efficiency than original technology.
3, routine inspection item can be freely set according to option.
4, system is unified aiming at the problem that checking, classifying clearly is presented report to user, and user, which can check, specifically to be asked
Topic or double-click navigate to issue list modify or intelligence quickly amendment;
Export report file format is Excel and Html, and report result is presented intuitively, clear in structure.
Two, papery bidding documents check item:
1, the inspection of papery bidding documents is selected.
2, the functions such as " inventory comprehensive unit price consistency ", " labor and materials machine unit price consistency " and routine inspection are set;
3, all inventories in program pass engineering project, labor and materials machine, and according to the judgement of identical inventory, identical labor and materials machine
Condition, the identical inventory of Rapid matching, labor and materials machine form matched data table, then compare comprehensive unit price, monovalent whether identical, needle
To different situation record storages;
4, after comparison check, unify aiming at the problem that checking, report is clearly presented to user, user can check
Particular problem or double-click navigate to issue list or labor and materials machine is modified or intelligence quickly amendment.
As shown in figure 5, the inspection to papery bidding documents, using big data technology, user's is gone through in collection and analysis valuation industry
History project data forms a set of normal data for meeting business rule.Pass through analytical standard data and the current project data of user
Difference, check the current project data of user there may be the problem of.The range of inspection problem mainly includes comprehensive unit price inspection
It looks into and wrong set leakage set checks.Normal data is that dynamic updates, and ensure that the timeliness and accuracy of data.
In addition, additionally providing a kind of computer readable storage medium, it is stored thereon with computer program, the program is processed
The step of above method is realized when device executes.
It may, furthermore, provide a kind of server, including memory, processor and storage on a memory and can handled
The step of computer program run on device, the processor realizes the above method when executing described program.
Compared with prior art, of the invention
1, examination scope is more comprehensively: particular exam item is divided into consistency check, interface check and conventional item inspection, and according to
Authority file defaults corresponding check item, and user can adjust on demand.
2, test mode is more perfect: by the setting of " inspection of electronics mark " and " inspection of papery mark ", it is existing can to meet user
The mode of inviting and submitting bids check.
3, check that problem presentation is more intuitive: report is clearly presented to use in system unification, classification aiming at the problem that checking
Family, user can check that particular problem or double-click navigate to issue list and modify or intelligently quickly correct;
4, user, industry history engineering data warehouse are established with big data technology, so that more intelligent more accurately do project
Self-test.
5, the efficiency checked is promoted with multithreading.
6, user, industry history engineering data warehouse are established with big data technology, so that more intelligent more accurately do project
Self-test.
7, the efficiency for greatly promoting inspection while guaranteeing accuracy with multithreading, keeps the work of user higher
Effect.
For convenience of description, it is divided into various units when description apparatus above with function to describe respectively.Certainly, implementing this
The function of each unit can be realized in the same or multiple software and or hardware when application.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
The application can describe in the general context of computer-executable instructions executed by a computer, such as program
Module.Generally, program module includes routines performing specific tasks or implementing specific abstract data types, programs, objects, group
Part, data structure etc..The application can also be practiced in a distributed computing environment, in these distributed computing environments, by
Task is executed by the connected remote processing devices of communication network.In a distributed computing environment, program module can be with
In the local and remote computer storage media including storage equipment.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net
Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/or
The forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flashRAM).Memory is showing for computer-readable medium
Example.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method
Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data.
The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves
State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable
Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM),
Digital versatile disc (DVD) or other optical storage, magnetic cassettes, tape magnetic disk storage or other magnetic storage devices
Or any other non-transmission medium, can be used for storage can be accessed by a computing device information.As defined in this article, it calculates
Machine readable medium does not include temporary computer readable media (transitory media), such as the data-signal and carrier wave of modulation.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability
It include so that the process, method, commodity or the equipment that include a series of elements not only include those elements, but also to wrap
Include other elements that are not explicitly listed, or further include for this process, method, commodity or equipment intrinsic want
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described want
There is also other identical elements in the process, method of element, commodity or equipment.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment
Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality
For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method
Part explanation.
The above description is only an example of the present application, is not intended to limit this application.For those skilled in the art
For, various changes and changes are possible in this application.All any modifications made within the spirit and principles of the present application are equal
Replacement, improvement etc., should be included within the scope of the claims of this application.
Claims (14)
1. a kind of project quick self-checking method in building pricing, it is characterised in that the described method includes:
Step 1: being standardized to self-test project, including distinguish bid inventory, bid contrul valence, offer by tender, quota
Project, free one of list counts and quota costing or a variety of as check item;
Step 2: check item is carried out digitlization and structuring processing, according to the different check items under different settings according to system
One reference format carries out digitlization and structuring, forms the digital document of standard, and stored according to data format classification;
Step 3: to the newly-built bid project in building pricing establish the quick reading of electric bidding document and papery table bidding documents with
Processing forms standardized digital document and is directed to different situation record storages.
2. project quick self-checking method in building pricing according to claim 1, which is characterized in that it is described quickly from
When importing e-bidding book in detecting method, bidding documents content is read in a manner of SAX.
3. project quick self-checking method in building pricing according to claim 1 or 2, which is characterized in that from described
The information that e-bidding book has been read is stored in ephemeral data library file, and ephemeral data library file is disposably imported in batches
Into user's bid engineering, corresponding inventory is generated.
4. project quick self-checking method in building pricing according to claim 3, which is characterized in that advised according to setting
Then, it is generated to the table record of engineering data base, the rule is stored and can dynamically be modified with common text files format.
5. project quick self-checking method in building pricing described in one of -4 according to claim 1, which is characterized in that described
Quick self-checking method is assigned to all inventories in multiple threads by using multithreading and executes matching and check, will
Bid bill of quantities and highway bids amount inventory compare inspection one by one, to check and tender consistency.
6. project quick self-checking method in building pricing described in one of -5 according to claim 1, which is characterized in that described
Quick self-checking method also needs routine inspection item, the including but not limited to repetition of inventory coding, identical coding inventory comprehensive unit price not
Unanimously, entitled empty, the list item feature of inventory is sky, specific item project amount is zero, labor and materials machine price is zero.
7. project quick self-checking method in building pricing described in one of -6 according to claim 1, which is characterized in that described
Quick self-checking method further include:
Step 4: being classified and being generated the report of reference format aiming at the problem that checking, it can be checked by report and specifically be asked
Topic or double-click navigate to issue list modify or intelligence quickly amendment.
8. project quick self-checking method in building pricing according to claim 1, which is characterized in that it is described quickly from
In detecting method import papery bidding documents when the following steps are included:
Step 1.1, using big data spark technology, collect and survey the history engineering data of user in valuation industry, formation meets
The normal data of business rule;
Step 1.2 imports electric bidding document and carries out data structured processing, is stored in a manner of table and record in database;
Step 1.3, all inventories in traversal engineering project, labor and materials machine, and according to identical inventory, the judgement item of identical labor and materials machine
Part, the identical inventory of Rapid matching, labor and materials machine form matched data table, and then whether comparison comprehensive unit price, unit price are identical, for
Different situation record storages;
Step 1.4, by the difference of normal data and the current project data of user in analytical procedure 1.1, check that user works as
Preceding project data there may be the problem of;
Step 1.5, the report classified aiming at the problem that checking and generate reference format can be checked by report and specifically be asked
Topic or double-click navigate to issue list modify or intelligence quickly amendment.
9. project quick self-checking method in building pricing according to claim 8, which is characterized in that the step
The range that problem is checked in 1.5 mainly includes that comprehensive unit price inspection and wrong set leakage set check.
10. project quick self-checking method in building pricing according to claim 8 or claim 9, which is characterized in that the step
Rapid 1.1 specifically include:
(1) temporally batch extracts listings data in user engineering, and upload server;
(2) wrong item will be present, the inventory group valence scheme filtering of multinomial and few item screens out;
It (3) is basic calculation note comprehensive unit price with inventory library, sequence, title, coding, unit, feature, taxation mode field
Hash;
(4) merge identical inventory comprehensive unit price according to Hash;
(5) inventory comprehensive unit price result is saved.
11. project quick self-checking system in a kind of building pricing, comprising:
Standardization unit, for being standardized to self-test project, including distinguish bid inventory, bid contrul valence,
Offer by tender, quota project, free one of list counts and quota costing or a variety of as check item;
Structuring processing unit, for check item to be carried out digitlization and structuring processing, according to the difference under different settings
Check item carries out digitlization and structuring according to unified reference format, forms the digital document of standard, and according to data format
Classification is stored;
Reading processing unit is stated, for establishing electric bidding document and papery table mark to the newly-built bid project in building pricing
The quick reading and processing of book, form standardized digital document and are directed to different situation record storages;
Report generation output unit passes through report for being classified and being generated the report of reference format aiming at the problem that checking
Announcement can check particular problem or double-click navigate to issue list modify or intelligence quickly amendment.
12. system according to claim 11, which is characterized in that when the importing papery bidding documents the following steps are included:
Step 1.1, using big data spark technology, collect and survey the history engineering data of user in valuation industry, formation meets
The normal data of business rule;
Step 1.2 imports electric bidding document and carries out data structured processing, is stored in a manner of table and record in database;
Step 1.3, all inventories in traversal engineering project, labor and materials machine, and according to identical inventory, the judgement item of identical labor and materials machine
Part, the identical inventory of Rapid matching, labor and materials machine form matched data table, and then whether comparison comprehensive unit price, unit price are identical, for
Different situation record storages;
Step 1.4, by the difference of normal data and the current project data of user in analytical procedure 1.1, check that user works as
Preceding project data there may be the problem of;
Step 1.5, the report classified aiming at the problem that checking and generate reference format can be checked by report and specifically be asked
Topic or double-click navigate to issue list modify or intelligence quickly amendment.
13. system according to claim 12, which is characterized in that the step 1.1 specifically includes:
(1) temporally batch extracts listings data in user engineering, and upload server;
(2) wrong item will be present, the inventory group valence scheme filtering of multinomial and few item screens out;
It (3) is basic calculation note comprehensive unit price with inventory library, sequence, title, coding, unit, feature, taxation mode field
Hash;
(4) merge identical inventory comprehensive unit price according to Hash;
(5) inventory comprehensive unit price result is saved.
14. a kind of computer readable storage medium, is stored thereon with computer program, power is realized when which is executed by processor
Benefit requires the step of any one of 1-10 the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910648042.9A CN110390564B (en) | 2019-07-18 | 2019-07-18 | Method, system and computer readable storage medium for quick self-checking items in building pricing program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910648042.9A CN110390564B (en) | 2019-07-18 | 2019-07-18 | Method, system and computer readable storage medium for quick self-checking items in building pricing program |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110390564A true CN110390564A (en) | 2019-10-29 |
CN110390564B CN110390564B (en) | 2022-04-15 |
Family
ID=68285168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910648042.9A Active CN110390564B (en) | 2019-07-18 | 2019-07-18 | Method, system and computer readable storage medium for quick self-checking items in building pricing program |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110390564B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111400252A (en) * | 2020-03-11 | 2020-07-10 | 国网江西省电力有限公司信息通信分公司 | System, device, method and application for detecting compliance based on project acceptance |
CN111736971A (en) * | 2020-06-24 | 2020-10-02 | 广联达科技股份有限公司 | Data processing method and device |
CN111754193A (en) * | 2020-06-24 | 2020-10-09 | 精效新软新技术(北京)有限公司 | Automatic accounting method, system and medium for piece wage in production and processing process |
CN112084302A (en) * | 2020-08-24 | 2020-12-15 | 江苏易达捷信数字科技有限公司 | Method, system, device and storage medium for detecting list data of cost file |
CN112598375A (en) * | 2020-12-16 | 2021-04-02 | 中国建设银行股份有限公司 | Property inspection analysis method and device for intelligent park |
CN112734369A (en) * | 2020-12-31 | 2021-04-30 | 大为国际工程咨询有限公司 | Engineering cost management system based on big data |
CN112907218A (en) * | 2021-03-23 | 2021-06-04 | 广联达科技股份有限公司 | Engineering report generation method and device and electronic equipment |
CN112966486A (en) * | 2021-03-17 | 2021-06-15 | 机械工业第九设计研究院有限公司 | Intelligent engineering quantity list generation method and device, terminal and storage medium |
CN113762224A (en) * | 2021-11-09 | 2021-12-07 | 四川野马科技有限公司 | Engineering cost achievement quality inspection system and method thereof |
CN114493266A (en) * | 2022-01-26 | 2022-05-13 | 海天工程咨询有限公司 | Intelligent quality control method and system for engineering cost achievement |
CN117931992A (en) * | 2024-01-18 | 2024-04-26 | 国义招标股份有限公司 | Carbon emission data processing method and system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060010081A1 (en) * | 2001-03-01 | 2006-01-12 | Williams Charles W | Automated system for assisting the architectural process |
CN105719070A (en) * | 2016-01-18 | 2016-06-29 | 四川建设网有限责任公司 | Electronic auxiliary reviewing method and system |
CN105741011A (en) * | 2016-01-18 | 2016-07-06 | 四川建设网有限责任公司 | Engineering tender offer and evaluation method and engineering tender offer and evaluation system |
CN109034673A (en) * | 2018-09-07 | 2018-12-18 | 赣州和永软件开发有限责任公司 | A kind of method, system, equipment and storage medium for realizing the synchronous control of engineering construction project |
CN109857799A (en) * | 2019-01-29 | 2019-06-07 | 国网物资有限公司 | The automatic auditing system of tender price and method |
CN110008458A (en) * | 2019-04-11 | 2019-07-12 | 国网河北省电力有限公司物资分公司 | The structuring preparation method of electric power bidding document |
-
2019
- 2019-07-18 CN CN201910648042.9A patent/CN110390564B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060010081A1 (en) * | 2001-03-01 | 2006-01-12 | Williams Charles W | Automated system for assisting the architectural process |
CN105719070A (en) * | 2016-01-18 | 2016-06-29 | 四川建设网有限责任公司 | Electronic auxiliary reviewing method and system |
CN105741011A (en) * | 2016-01-18 | 2016-07-06 | 四川建设网有限责任公司 | Engineering tender offer and evaluation method and engineering tender offer and evaluation system |
CN109034673A (en) * | 2018-09-07 | 2018-12-18 | 赣州和永软件开发有限责任公司 | A kind of method, system, equipment and storage medium for realizing the synchronous control of engineering construction project |
CN109857799A (en) * | 2019-01-29 | 2019-06-07 | 国网物资有限公司 | The automatic auditing system of tender price and method |
CN110008458A (en) * | 2019-04-11 | 2019-07-12 | 国网河北省电力有限公司物资分公司 | The structuring preparation method of electric power bidding document |
Non-Patent Citations (1)
Title |
---|
禾沐: "广联达计价软件GB4.0中单位工程自检", 《服务新干线》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111400252B (en) * | 2020-03-11 | 2023-10-31 | 国网江西省电力有限公司信息通信分公司 | Project acceptance compliance-based detection system, device, detection method and application |
CN111400252A (en) * | 2020-03-11 | 2020-07-10 | 国网江西省电力有限公司信息通信分公司 | System, device, method and application for detecting compliance based on project acceptance |
CN111736971A (en) * | 2020-06-24 | 2020-10-02 | 广联达科技股份有限公司 | Data processing method and device |
CN111754193A (en) * | 2020-06-24 | 2020-10-09 | 精效新软新技术(北京)有限公司 | Automatic accounting method, system and medium for piece wage in production and processing process |
CN112084302A (en) * | 2020-08-24 | 2020-12-15 | 江苏易达捷信数字科技有限公司 | Method, system, device and storage medium for detecting list data of cost file |
CN112084302B (en) * | 2020-08-24 | 2024-04-30 | 江苏易达捷信数字科技有限公司 | Method, system, device and storage medium for detecting inventory data of cost file |
CN112598375A (en) * | 2020-12-16 | 2021-04-02 | 中国建设银行股份有限公司 | Property inspection analysis method and device for intelligent park |
CN112734369A (en) * | 2020-12-31 | 2021-04-30 | 大为国际工程咨询有限公司 | Engineering cost management system based on big data |
CN112966486A (en) * | 2021-03-17 | 2021-06-15 | 机械工业第九设计研究院有限公司 | Intelligent engineering quantity list generation method and device, terminal and storage medium |
CN112907218A (en) * | 2021-03-23 | 2021-06-04 | 广联达科技股份有限公司 | Engineering report generation method and device and electronic equipment |
CN113762224B (en) * | 2021-11-09 | 2022-04-29 | 四川野马科技有限公司 | Engineering cost achievement quality inspection system and method thereof |
CN113762224A (en) * | 2021-11-09 | 2021-12-07 | 四川野马科技有限公司 | Engineering cost achievement quality inspection system and method thereof |
CN114493266A (en) * | 2022-01-26 | 2022-05-13 | 海天工程咨询有限公司 | Intelligent quality control method and system for engineering cost achievement |
CN117931992A (en) * | 2024-01-18 | 2024-04-26 | 国义招标股份有限公司 | Carbon emission data processing method and system |
Also Published As
Publication number | Publication date |
---|---|
CN110390564B (en) | 2022-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110390564A (en) | Build project quick self-checking method, system and computer readable storage medium in pricing | |
JP6707564B2 (en) | Data quality analysis | |
Lu et al. | Discovering interacting artifacts from ERP systems | |
CN107515886B (en) | Data table identification method, device and system | |
English | Improving data warehouse and business information quality: methods for reducing costs and increasing profits | |
Murray | Tableau your data!: fast and easy visual analysis with tableau software | |
Washizaki et al. | Software-engineering design patterns for machine learning applications | |
CN111639480A (en) | Text labeling method based on artificial intelligence, electronic device and storage medium | |
CN104657274B (en) | software interface test method and device | |
CN106528511B (en) | Form analysis method and device | |
CN111145011B (en) | Banking system building method and device | |
CN109522013A (en) | A kind of code generating method and device of business function | |
CN106406835A (en) | Report generation method and report generation apparatus | |
CN111831868A (en) | Method and apparatus for financial product configuration | |
CN106796598B (en) | Computation of management hierarchy entities | |
US20230004477A1 (en) | Providing a pseudo language for manipulating complex variables of an orchestration flow | |
US20140149186A1 (en) | Method and system of using artifacts to identify elements of a component business model | |
Klijn et al. | Event Knowledge Graphs for Auditing: A Case Study | |
CN113052675B (en) | Data display method and device | |
CN117972115B (en) | Method, equipment and medium for constructing process automation rule base | |
RU2787261C1 (en) | System and method for engineering data management | |
US20240005343A1 (en) | Data interrogator for edi mapping and migration | |
CN111882294B (en) | Method and device for flow approval | |
US20240070354A1 (en) | System and methods for auditable corporate emission balancing | |
US20220121846A1 (en) | Line based matching of documents |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |