CN110387817A - Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage - Google Patents
Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage Download PDFInfo
- Publication number
- CN110387817A CN110387817A CN201910747600.7A CN201910747600A CN110387817A CN 110387817 A CN110387817 A CN 110387817A CN 201910747600 A CN201910747600 A CN 201910747600A CN 110387817 A CN110387817 A CN 110387817A
- Authority
- CN
- China
- Prior art keywords
- main rope
- arrangement
- cable saddle
- tunnel anchorage
- anchoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000004873 anchoring Methods 0.000 claims abstract description 30
- 238000004804 winding Methods 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 238000004088 simulation Methods 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 239000004744 fabric Substances 0.000 claims 1
- 238000007796 conventional method Methods 0.000 abstract description 2
- 239000002356 single layer Substances 0.000 abstract description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
The invention discloses one kind to meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage, implementation through the invention: (1) will maximize in tunnel anchorage using space;(2) it is necessary to ensure that under the premise of main rope radical and safety coefficient, effective solution in narrow space tunnel anchorage can not single layer be arranged side by side main rope the problem of;(3) the characteristics of space is utilized by Accurate Analysis and rationally, can effectively avoid the problem that the main rope being likely to occur due to hierarchical design anchoring connector and the conflict of adjacent main rope;(4) by specific main rope cabling sequence, influence when effectively reducing main rope sag adjustment to anchoring temporarily main rope;(5) anchor system utilizes the male cone body of permanent structure, does not need as conventional method, and independent prestress anchoraging system is arranged at hole, greatly reduced project amount, also further ensured that the safety of anchor system.
Description
Technical field
The present invention relates to field of civil engineering, are specifically a kind of easy suitable for main rope relative position in narrow tunnel anchorage
The construction area of conflict meets the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage.
Background technique
Currently, domestic Tunnel-Type Anchorage of Suspension Bridge cable crane main rope anchoring, general using in the side of hole setting prestress anchoraging
Formula, methods engineering amount is big, needs individually to pour anchored concrete, while also needing prestressed anchor system, and the later period is also
There may be remove anchoring temporarily.It is generally existing for current large-span suspension bridge tunnel anchorage hole using space compared with
Small situation, traditional mode are not well positioned to meet site operation, so needing us to provide a kind of can preferably solve
The certainly method of these problems.
Summary of the invention
The purpose of the present invention is to provide one kind to meet the main track cable of CABLEWAY ERECTION SYSTEM point in narrow space tunnel anchorage
The system and method for layer arrangement is avoided that due in the individually designed anchoring temporarily system in tunnel anchorage hole, and increased a large amount of works
Cheng Liang;It also can solve in narrow tunnel anchorage simultaneously, layered arrangement main rope, it is ensured that phase does not occur between main rope and main rope
Mutually the problem of conflict;The invention remarkable in economical benefits, high to space utilization rate in tunnel anchorage, anchor system safety is good.
The invention is realized in this way a kind of meet the main track cable layering of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage
Arrangement system, it is characterised in that: anchor face anchors steel band according to the simulation layered arrangement of spatial position before tunnel anchorage and anchoring is slided
Vehicle, tunnel face turn cable saddle and are designed as bilayer, are conducive to dissipate cable saddle two sides and preceding anchor face arrangement sufficient amount in narrow tunnel anchorage
Main rope, and avoid the conflict area between each main rope.
One kind meeting the main track cable layered arrangement method of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage, mainly arranges
Include:
Arrangement one: the arrangement of anchor face anchoring coaster before tunnel anchorage:
The arrangement for anchoring coaster can be designed as according to preceding anchor face using the size of area and the design requirement of anchoring coaster specification
Layering point column arrangement.Spacing herein needs to consider main rope anchoring connector and the influence that conflicts between adjacent main rope and its connector.
Arrangement two: tunnel anchorage hole bilayer steering cable saddle:
Since there are scattered cable saddle and scattered cable saddle door frame in tunnel anchorage hole, in order to avoid main track cable and scattered cable saddle and scattered cable saddle door frame rush
It is prominent, the double-deck steering cable saddle is usually arranged in scattered cable saddle two sides.The position and height for dissipating cable saddle should carry out Accurate Analysis, need to consider
To two linings thickness and ensure whether to exist between steering cable saddle and preceding anchor face anchoring coaster after main rope layered arrangement and hand over
Pitch conflict area.
Arrangement three: main track cable winding sequence arrangement:
It is more concatenated forms for main track cable, the main track cable of selective analysis is needed to turn in the double-deck steering cable saddle and preceding anchor face
Winding sequence between coaster.Ensure that after main rope is layered be not in rope anchoring connector and conflicting between adjacent main rope and its connector
The case where.
Meet cable crane in narrow space tunnel anchorage the present invention has the advantages that the purpose of the present invention is to provide one kind
The system and method for the main track cable layered arrangement of dress system is avoided that due in the individually designed anchoring temporarily system in tunnel anchorage hole
System, and increased great amount of work;It also can solve in narrow tunnel anchorage simultaneously, layered arrangement main rope, it is ensured that main rope
The problem of not conflicted with each other between main rope;The invention remarkable in economical benefits, anchoring high to space utilization rate in tunnel anchorage
Security of system is good.The present invention also has the following advantages that;
(1) it will be maximized in tunnel anchorage using space;
(2) it is necessary to ensure that under the premise of main rope radical and safety coefficient, effective solution nothing in narrow space tunnel anchorage
Method single layer be arranged side by side main rope the problem of;
(3) the characteristics of space is utilized by Accurate Analysis and rationally, can effectively avoid being likely to occur due to hierarchical design
Main rope anchors the problem of connector and conflict of adjacent main rope;
(4) by specific main rope cabling sequence, influence when effectively reducing main rope sag adjustment to anchoring temporarily main rope;
(5) anchor system utilizes the male cone body of permanent structure, does not need as conventional method, and independent pre- answer is arranged at hole
Power anchor system, greatly reduced project amount, also further ensure that the safety of anchor system.
Detailed description of the invention
Fig. 1 be main rope cabling and arrangement schematic diagram (wherein 1. ~ 6.-anchoring coaster number:~Main rope cabling sequence
Number);
Fig. 2 is anchoring coaster layout drawing;
Fig. 3 is to turn cable saddle layout drawing.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 3, the present invention is described in detail, technical solution in the embodiment of the present invention into
Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities
Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work
Every other embodiment, shall fall within the protection scope of the present invention.
As shown in the picture: the purpose of the present invention is to provide one kind to meet CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage
Main track cable layered arrangement system is avoided that due in the individually designed anchoring temporarily system in tunnel anchorage hole, and increased a large amount of
Project amount;It also can solve in narrow tunnel anchorage simultaneously, layered arrangement main rope, it is ensured that do not occur between main rope and main rope
The problem of conflicting with each other;The invention remarkable in economical benefits, high to space utilization rate in tunnel anchorage, anchor system safety is good.
One kind meeting the main track cable layered arrangement method of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage, mainly arranges
Include:
Arrangement one: the arrangement of anchor face anchoring coaster before tunnel anchorage:
The arrangement for anchoring coaster can be designed as according to preceding anchor face using the size of area and the design requirement of anchoring coaster specification
Layering point column arrangement.Spacing herein needs to consider main rope anchoring connector and the influence that conflicts between adjacent main rope and its connector.
Arrangement two: tunnel anchorage hole bilayer steering cable saddle:
Since there are scattered cable saddle and scattered cable saddle door frame in tunnel anchorage hole, in order to avoid main track cable and scattered cable saddle and scattered cable saddle door frame rush
It is prominent, the double-deck steering cable saddle is usually arranged in scattered cable saddle two sides.The position and height for dissipating cable saddle should carry out Accurate Analysis, need to consider
To two linings thickness and ensure whether to exist between steering cable saddle and preceding anchor face anchoring coaster after main rope layered arrangement and hand over
Pitch conflict area.
Arrangement three: main track cable winding sequence arrangement:
It is more concatenated forms for main track cable, the main track cable of selective analysis is needed to turn in the double-deck steering cable saddle and preceding anchor face
Winding sequence between coaster.Ensure that after main rope is layered be not in rope anchoring connector and conflicting between adjacent main rope and its connector
The case where.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to consistent with principle disclosed herein and features of novelty
Widest scope.
Claims (2)
1. one kind meets the main track cable layered arrangement system of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage, it is characterised in that:
Anchor face anchors steel band and anchoring coaster according to the simulation layered arrangement of spatial position before tunnel anchorage, and tunnel face turns cable saddle and is designed as
Bilayer is conducive to dissipate cable saddle two sides and preceding anchor face in narrow tunnel anchorage and arranges sufficient amount of main rope, and avoids between each main rope
Conflict area.
2. one kind according to claim 1 meets the main track cable layering cloth of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage
Method is set, specific arrangement is as follows:
Arrangement one: the arrangement of anchor face anchoring coaster before tunnel anchorage: anchoring the arrangement of coaster, can utilize the big of area according to preceding anchor face
Small and anchoring coaster specification design requirement, is designed as layering point column arrangement;Spacing herein needs to consider that main rope anchors connector
The influence that conflicts between adjacent main rope and its connector;
Arrangement two: tunnel anchorage hole bilayer steering cable saddle: since there are scattered cable saddle and scattered cable saddle door frame in tunnel anchorage hole, in order to avoid
Main track cable conflicts with scattered cable saddle and scattered cable saddle door frame, and the double-deck steering cable saddle is usually arranged in scattered cable saddle two sides;Dissipate cable saddle
Whether position and height should carry out Accurate Analysis, need to consider the thickness of two linings and can turn to after ensuring main rope layered arrangement
There are intersection conflict regions between cable saddle and preceding anchor face anchoring coaster;
Arrangement three: main track cable winding sequence arrangement: it is more concatenated forms for main track cable, needs the main load-bearing of selective analysis
Rope winding sequence between the double-deck steering cable saddle and preceding anchor face corner block;Ensure that after main rope is layered be not in rope anchoring connector
Between adjacent main rope and its connector the case where conflict.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910747600.7A CN110387817A (en) | 2019-08-14 | 2019-08-14 | Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910747600.7A CN110387817A (en) | 2019-08-14 | 2019-08-14 | Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110387817A true CN110387817A (en) | 2019-10-29 |
Family
ID=68288774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910747600.7A Pending CN110387817A (en) | 2019-08-14 | 2019-08-14 | Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110387817A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1342343A (en) * | 1970-01-23 | 1974-01-03 | Grant Alan B | Spanning of bodies of water |
CN105672129A (en) * | 2016-02-05 | 2016-06-15 | 中国电建集团贵阳勘测设计研究院有限公司 | Laying method for main cable of flat tension cable bridge and applied double-layer cable saddle |
CN106835944A (en) * | 2017-04-13 | 2017-06-13 | 中国电建集团成都勘测设计研究院有限公司 | Double-deck main rope cable way bridge |
CN206986723U (en) * | 2017-04-14 | 2018-02-09 | 中交二公局第二工程有限公司 | A kind of anchor of load bearing ropes of cable crane parallel structure |
CN109973112A (en) * | 2019-04-26 | 2019-07-05 | 四川路桥华东建设有限责任公司 | A kind of narrow space tunnel anchorage in super large inclination angle dissipates cable saddle portal frame system and its installation method |
-
2019
- 2019-08-14 CN CN201910747600.7A patent/CN110387817A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1342343A (en) * | 1970-01-23 | 1974-01-03 | Grant Alan B | Spanning of bodies of water |
CN105672129A (en) * | 2016-02-05 | 2016-06-15 | 中国电建集团贵阳勘测设计研究院有限公司 | Laying method for main cable of flat tension cable bridge and applied double-layer cable saddle |
CN106835944A (en) * | 2017-04-13 | 2017-06-13 | 中国电建集团成都勘测设计研究院有限公司 | Double-deck main rope cable way bridge |
CN206986723U (en) * | 2017-04-14 | 2018-02-09 | 中交二公局第二工程有限公司 | A kind of anchor of load bearing ropes of cable crane parallel structure |
CN109973112A (en) * | 2019-04-26 | 2019-07-05 | 四川路桥华东建设有限责任公司 | A kind of narrow space tunnel anchorage in super large inclination angle dissipates cable saddle portal frame system and its installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104818772B (en) | A kind of large span long cantilever conjoined structure and construction technology | |
WO2012079526A1 (en) | Prestressed concrete track slab of slab-type ballastless track | |
CN104631674B (en) | Composite floor slab and construction method thereof | |
CN203948108U (en) | A kind of concreting moulding form of the tunnel with withe and dividing plate | |
CN203238780U (en) | Prefabricated stirrup cage of beam column core area | |
CN105926766A (en) | Prefabricated shear wall toothed groove type connecting structure assembling construction method | |
CN107245953A (en) | The bent device and crossed construction method of a kind of multilayer bridge structure | |
JPH083920A (en) | Mountain suspension bridge | |
CN109024234A (en) | A kind of single-screw arch and suspension cable combined bridge structural system | |
CN109184029B (en) | Assembled shear wall superimposed structure system convenient to mount and mounting method | |
CN109680797B (en) | Ring reinforcement buckling anchoring assembly type shear wall superposed structure system and installation method | |
CN107130716A (en) | After pour teeth groove and be linked and packed formula building roof system | |
CN110387817A (en) | Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage | |
CN105275486B (en) | A kind of anchor shaft anchor cable combined support structure and its construction method | |
CN205804237U (en) | A kind of recycling roadbed concrete guardrail | |
CN108086481A (en) | A kind of metro depot upper cover Estate Development Self-resetting integral structure and method | |
CN100434631C (en) | Frame embedding brick, frame embedding body building and method for constructing the frame embedding body building | |
CN205000463U (en) | Long cantilever disjunctor structure of large -span | |
CN205894366U (en) | Two board connected node of shingle nail and post suitable for super high -rise building | |
CN207260605U (en) | A kind of super plane structure construction material transport system | |
CN211171621U (en) | Layered arrangement system for main bearing cables of cable hoisting system in narrow space tunnel anchor | |
CN209742149U (en) | Flexible connecting device of assembled block wall with aluminum sleeve | |
CN109184033B (en) | Assembled shear wall superimposed structure system convenient to construct and installation method | |
CN209620310U (en) | Nuclear power plant's steel plate concrete-reinforced concrete structure wall crosses connection structure | |
CN206625854U (en) | A kind of outside overhung construction for tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |