CN110387817A - Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage - Google Patents

Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage Download PDF

Info

Publication number
CN110387817A
CN110387817A CN201910747600.7A CN201910747600A CN110387817A CN 110387817 A CN110387817 A CN 110387817A CN 201910747600 A CN201910747600 A CN 201910747600A CN 110387817 A CN110387817 A CN 110387817A
Authority
CN
China
Prior art keywords
main rope
arrangement
cable saddle
tunnel anchorage
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910747600.7A
Other languages
Chinese (zh)
Inventor
徐国挺
唐中波
胡盼
王星
彭伟
张天余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Original Assignee
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN LUQIAO HUADONG BUILDING CO Ltd filed Critical SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority to CN201910747600.7A priority Critical patent/CN110387817A/en
Publication of CN110387817A publication Critical patent/CN110387817A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses one kind to meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage, implementation through the invention: (1) will maximize in tunnel anchorage using space;(2) it is necessary to ensure that under the premise of main rope radical and safety coefficient, effective solution in narrow space tunnel anchorage can not single layer be arranged side by side main rope the problem of;(3) the characteristics of space is utilized by Accurate Analysis and rationally, can effectively avoid the problem that the main rope being likely to occur due to hierarchical design anchoring connector and the conflict of adjacent main rope;(4) by specific main rope cabling sequence, influence when effectively reducing main rope sag adjustment to anchoring temporarily main rope;(5) anchor system utilizes the male cone body of permanent structure, does not need as conventional method, and independent prestress anchoraging system is arranged at hole, greatly reduced project amount, also further ensured that the safety of anchor system.

Description

Meet CABLEWAY ERECTION SYSTEM main track cable layered arrangement system in narrow space tunnel anchorage System and method
Technical field
The present invention relates to field of civil engineering, are specifically a kind of easy suitable for main rope relative position in narrow tunnel anchorage The construction area of conflict meets the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage.
Background technique
Currently, domestic Tunnel-Type Anchorage of Suspension Bridge cable crane main rope anchoring, general using in the side of hole setting prestress anchoraging Formula, methods engineering amount is big, needs individually to pour anchored concrete, while also needing prestressed anchor system, and the later period is also There may be remove anchoring temporarily.It is generally existing for current large-span suspension bridge tunnel anchorage hole using space compared with Small situation, traditional mode are not well positioned to meet site operation, so needing us to provide a kind of can preferably solve The certainly method of these problems.
Summary of the invention
The purpose of the present invention is to provide one kind to meet the main track cable of CABLEWAY ERECTION SYSTEM point in narrow space tunnel anchorage The system and method for layer arrangement is avoided that due in the individually designed anchoring temporarily system in tunnel anchorage hole, and increased a large amount of works Cheng Liang;It also can solve in narrow tunnel anchorage simultaneously, layered arrangement main rope, it is ensured that phase does not occur between main rope and main rope Mutually the problem of conflict;The invention remarkable in economical benefits, high to space utilization rate in tunnel anchorage, anchor system safety is good.
The invention is realized in this way a kind of meet the main track cable layering of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage Arrangement system, it is characterised in that: anchor face anchors steel band according to the simulation layered arrangement of spatial position before tunnel anchorage and anchoring is slided Vehicle, tunnel face turn cable saddle and are designed as bilayer, are conducive to dissipate cable saddle two sides and preceding anchor face arrangement sufficient amount in narrow tunnel anchorage Main rope, and avoid the conflict area between each main rope.
One kind meeting the main track cable layered arrangement method of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage, mainly arranges Include:
Arrangement one: the arrangement of anchor face anchoring coaster before tunnel anchorage:
The arrangement for anchoring coaster can be designed as according to preceding anchor face using the size of area and the design requirement of anchoring coaster specification Layering point column arrangement.Spacing herein needs to consider main rope anchoring connector and the influence that conflicts between adjacent main rope and its connector.
Arrangement two: tunnel anchorage hole bilayer steering cable saddle:
Since there are scattered cable saddle and scattered cable saddle door frame in tunnel anchorage hole, in order to avoid main track cable and scattered cable saddle and scattered cable saddle door frame rush It is prominent, the double-deck steering cable saddle is usually arranged in scattered cable saddle two sides.The position and height for dissipating cable saddle should carry out Accurate Analysis, need to consider To two linings thickness and ensure whether to exist between steering cable saddle and preceding anchor face anchoring coaster after main rope layered arrangement and hand over Pitch conflict area.
Arrangement three: main track cable winding sequence arrangement:
It is more concatenated forms for main track cable, the main track cable of selective analysis is needed to turn in the double-deck steering cable saddle and preceding anchor face Winding sequence between coaster.Ensure that after main rope is layered be not in rope anchoring connector and conflicting between adjacent main rope and its connector The case where.
Meet cable crane in narrow space tunnel anchorage the present invention has the advantages that the purpose of the present invention is to provide one kind The system and method for the main track cable layered arrangement of dress system is avoided that due in the individually designed anchoring temporarily system in tunnel anchorage hole System, and increased great amount of work;It also can solve in narrow tunnel anchorage simultaneously, layered arrangement main rope, it is ensured that main rope The problem of not conflicted with each other between main rope;The invention remarkable in economical benefits, anchoring high to space utilization rate in tunnel anchorage Security of system is good.The present invention also has the following advantages that;
(1) it will be maximized in tunnel anchorage using space;
(2) it is necessary to ensure that under the premise of main rope radical and safety coefficient, effective solution nothing in narrow space tunnel anchorage Method single layer be arranged side by side main rope the problem of;
(3) the characteristics of space is utilized by Accurate Analysis and rationally, can effectively avoid being likely to occur due to hierarchical design Main rope anchors the problem of connector and conflict of adjacent main rope;
(4) by specific main rope cabling sequence, influence when effectively reducing main rope sag adjustment to anchoring temporarily main rope;
(5) anchor system utilizes the male cone body of permanent structure, does not need as conventional method, and independent pre- answer is arranged at hole Power anchor system, greatly reduced project amount, also further ensure that the safety of anchor system.
Detailed description of the invention
Fig. 1 be main rope cabling and arrangement schematic diagram (wherein 1. ~ 6.-anchoring coaster number:~Main rope cabling sequence Number);
Fig. 2 is anchoring coaster layout drawing;
Fig. 3 is to turn cable saddle layout drawing.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 3, the present invention is described in detail, technical solution in the embodiment of the present invention into Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work Every other embodiment, shall fall within the protection scope of the present invention.
As shown in the picture: the purpose of the present invention is to provide one kind to meet CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage Main track cable layered arrangement system is avoided that due in the individually designed anchoring temporarily system in tunnel anchorage hole, and increased a large amount of Project amount;It also can solve in narrow tunnel anchorage simultaneously, layered arrangement main rope, it is ensured that do not occur between main rope and main rope The problem of conflicting with each other;The invention remarkable in economical benefits, high to space utilization rate in tunnel anchorage, anchor system safety is good.
One kind meeting the main track cable layered arrangement method of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage, mainly arranges Include:
Arrangement one: the arrangement of anchor face anchoring coaster before tunnel anchorage:
The arrangement for anchoring coaster can be designed as according to preceding anchor face using the size of area and the design requirement of anchoring coaster specification Layering point column arrangement.Spacing herein needs to consider main rope anchoring connector and the influence that conflicts between adjacent main rope and its connector.
Arrangement two: tunnel anchorage hole bilayer steering cable saddle:
Since there are scattered cable saddle and scattered cable saddle door frame in tunnel anchorage hole, in order to avoid main track cable and scattered cable saddle and scattered cable saddle door frame rush It is prominent, the double-deck steering cable saddle is usually arranged in scattered cable saddle two sides.The position and height for dissipating cable saddle should carry out Accurate Analysis, need to consider To two linings thickness and ensure whether to exist between steering cable saddle and preceding anchor face anchoring coaster after main rope layered arrangement and hand over Pitch conflict area.
Arrangement three: main track cable winding sequence arrangement:
It is more concatenated forms for main track cable, the main track cable of selective analysis is needed to turn in the double-deck steering cable saddle and preceding anchor face Winding sequence between coaster.Ensure that after main rope is layered be not in rope anchoring connector and conflicting between adjacent main rope and its connector The case where.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to consistent with principle disclosed herein and features of novelty Widest scope.

Claims (2)

1. one kind meets the main track cable layered arrangement system of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage, it is characterised in that: Anchor face anchors steel band and anchoring coaster according to the simulation layered arrangement of spatial position before tunnel anchorage, and tunnel face turns cable saddle and is designed as Bilayer is conducive to dissipate cable saddle two sides and preceding anchor face in narrow tunnel anchorage and arranges sufficient amount of main rope, and avoids between each main rope Conflict area.
2. one kind according to claim 1 meets the main track cable layering cloth of CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage Method is set, specific arrangement is as follows:
Arrangement one: the arrangement of anchor face anchoring coaster before tunnel anchorage: anchoring the arrangement of coaster, can utilize the big of area according to preceding anchor face Small and anchoring coaster specification design requirement, is designed as layering point column arrangement;Spacing herein needs to consider that main rope anchors connector The influence that conflicts between adjacent main rope and its connector;
Arrangement two: tunnel anchorage hole bilayer steering cable saddle: since there are scattered cable saddle and scattered cable saddle door frame in tunnel anchorage hole, in order to avoid Main track cable conflicts with scattered cable saddle and scattered cable saddle door frame, and the double-deck steering cable saddle is usually arranged in scattered cable saddle two sides;Dissipate cable saddle Whether position and height should carry out Accurate Analysis, need to consider the thickness of two linings and can turn to after ensuring main rope layered arrangement There are intersection conflict regions between cable saddle and preceding anchor face anchoring coaster;
Arrangement three: main track cable winding sequence arrangement: it is more concatenated forms for main track cable, needs the main load-bearing of selective analysis Rope winding sequence between the double-deck steering cable saddle and preceding anchor face corner block;Ensure that after main rope is layered be not in rope anchoring connector Between adjacent main rope and its connector the case where conflict.
CN201910747600.7A 2019-08-14 2019-08-14 Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage Pending CN110387817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910747600.7A CN110387817A (en) 2019-08-14 2019-08-14 Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910747600.7A CN110387817A (en) 2019-08-14 2019-08-14 Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage

Publications (1)

Publication Number Publication Date
CN110387817A true CN110387817A (en) 2019-10-29

Family

ID=68288774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910747600.7A Pending CN110387817A (en) 2019-08-14 2019-08-14 Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage

Country Status (1)

Country Link
CN (1) CN110387817A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1342343A (en) * 1970-01-23 1974-01-03 Grant Alan B Spanning of bodies of water
CN105672129A (en) * 2016-02-05 2016-06-15 中国电建集团贵阳勘测设计研究院有限公司 Laying method for main cable of flat tension cable bridge and applied double-layer cable saddle
CN106835944A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 Double-deck main rope cable way bridge
CN206986723U (en) * 2017-04-14 2018-02-09 中交二公局第二工程有限公司 A kind of anchor of load bearing ropes of cable crane parallel structure
CN109973112A (en) * 2019-04-26 2019-07-05 四川路桥华东建设有限责任公司 A kind of narrow space tunnel anchorage in super large inclination angle dissipates cable saddle portal frame system and its installation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1342343A (en) * 1970-01-23 1974-01-03 Grant Alan B Spanning of bodies of water
CN105672129A (en) * 2016-02-05 2016-06-15 中国电建集团贵阳勘测设计研究院有限公司 Laying method for main cable of flat tension cable bridge and applied double-layer cable saddle
CN106835944A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 Double-deck main rope cable way bridge
CN206986723U (en) * 2017-04-14 2018-02-09 中交二公局第二工程有限公司 A kind of anchor of load bearing ropes of cable crane parallel structure
CN109973112A (en) * 2019-04-26 2019-07-05 四川路桥华东建设有限责任公司 A kind of narrow space tunnel anchorage in super large inclination angle dissipates cable saddle portal frame system and its installation method

Similar Documents

Publication Publication Date Title
CN104818772B (en) A kind of large span long cantilever conjoined structure and construction technology
WO2012079526A1 (en) Prestressed concrete track slab of slab-type ballastless track
CN104631674B (en) Composite floor slab and construction method thereof
CN203948108U (en) A kind of concreting moulding form of the tunnel with withe and dividing plate
CN203238780U (en) Prefabricated stirrup cage of beam column core area
CN105926766A (en) Prefabricated shear wall toothed groove type connecting structure assembling construction method
CN107245953A (en) The bent device and crossed construction method of a kind of multilayer bridge structure
JPH083920A (en) Mountain suspension bridge
CN109024234A (en) A kind of single-screw arch and suspension cable combined bridge structural system
CN109184029B (en) Assembled shear wall superimposed structure system convenient to mount and mounting method
CN109680797B (en) Ring reinforcement buckling anchoring assembly type shear wall superposed structure system and installation method
CN107130716A (en) After pour teeth groove and be linked and packed formula building roof system
CN110387817A (en) Meet the main track cable layered arrangement system and method for CABLEWAY ERECTION SYSTEM in narrow space tunnel anchorage
CN105275486B (en) A kind of anchor shaft anchor cable combined support structure and its construction method
CN205804237U (en) A kind of recycling roadbed concrete guardrail
CN108086481A (en) A kind of metro depot upper cover Estate Development Self-resetting integral structure and method
CN100434631C (en) Frame embedding brick, frame embedding body building and method for constructing the frame embedding body building
CN205000463U (en) Long cantilever disjunctor structure of large -span
CN205894366U (en) Two board connected node of shingle nail and post suitable for super high -rise building
CN207260605U (en) A kind of super plane structure construction material transport system
CN211171621U (en) Layered arrangement system for main bearing cables of cable hoisting system in narrow space tunnel anchor
CN209742149U (en) Flexible connecting device of assembled block wall with aluminum sleeve
CN109184033B (en) Assembled shear wall superimposed structure system convenient to construct and installation method
CN209620310U (en) Nuclear power plant's steel plate concrete-reinforced concrete structure wall crosses connection structure
CN206625854U (en) A kind of outside overhung construction for tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination