CN110387814A - A kind of municipal administration Bridge guardrail and its construction method - Google Patents

A kind of municipal administration Bridge guardrail and its construction method Download PDF

Info

Publication number
CN110387814A
CN110387814A CN201910673396.9A CN201910673396A CN110387814A CN 110387814 A CN110387814 A CN 110387814A CN 201910673396 A CN201910673396 A CN 201910673396A CN 110387814 A CN110387814 A CN 110387814A
Authority
CN
China
Prior art keywords
pedestal
support rod
bridge
railing
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910673396.9A
Other languages
Chinese (zh)
Inventor
董祥磊
陈海云
程天乐
沈志平
项光成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Zhongxinjian Establishment Co Ltd
Original Assignee
Wenzhou Zhongxinjian Establishment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Zhongxinjian Establishment Co Ltd filed Critical Wenzhou Zhongxinjian Establishment Co Ltd
Priority to CN201910673396.9A priority Critical patent/CN110387814A/en
Publication of CN110387814A publication Critical patent/CN110387814A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of municipal Bridge guardrail and its construction methods, it is related to bridge construction technology field, its key points of the technical solution are that: including bridge pier and the railing being set between bridge pier, the bridge pier includes pedestal and support rod, arc groove is offered on the base, one end of the support rod is set as curved portion, the curved portion is rotatably dispose in arc groove, and the center of circle of curved portion is arranged in outside arc groove, the limit sliding part for being fixed on support rod on pedestal is provided between the support rod and pedestal, the connector for being fixed on bridge pier on bridge is provided on the bridge pier, the railing is rotatably dispose on the support rod;By will mutually assemble between pedestal, support rod and railing, have the function of improving its place applicable performance and construction efficiency.

Description

A kind of municipal administration Bridge guardrail and its construction method
Technical field
The present invention relates to bridge construction technology fields, more specifically, it relates to a kind of municipal administration Bridge guardrail and its construction Method.
Background technique
Many cities can build bridge to preferably keep the traffic moving, and bridge can be also built on river, but by In people's walking do not have on bridge floor guardrail will danger close, so the two sides of bridge are usually provided with guardrail, to carry out safety anti- Shield;In order to improve construction efficiency, guardrail is mostly the standard component processed according to drawing, transports directly on bridge and is combined peace Dress, is connected by screw bolts or welds, sound construction.
When carrying out the installation of guardrail on straight bridge, installation error is small, speed of application block;But the footbridge of step Beam or cambered surface bridge are due to angle problem, and difficulty of construction is big, or even can not install since component erroi is big, affect construction Efficiency.
Summary of the invention
In view of the deficienciess of the prior art, purpose of the present invention one is to provide a kind of municipal Bridge guardrail, have Improve the effect of its place applicable performance and construction efficiency.
To achieve the above object, the present invention provides the following technical scheme that
A kind of municipal administration Bridge guardrail, including bridge pier and the railing being set between bridge pier, the bridge pier includes pedestal and branch Strut, offers arc groove on the base, and one end of the support rod is set as curved portion, the curved portion rotation setting In in arc groove, and the center of circle of curved portion is arranged in outside arc groove, is provided between the support rod and pedestal for that will prop up Strut is fixed on the limit sliding part on pedestal, and the connection for being fixed on bridge pier on bridge is provided on the bridge pier Part, the railing are rotatably dispose on the support rod.
So set, according to landform and the gradient, by turning opposite between the curved portion of support rod and the arc groove of pedestal It is dynamic, and keep support rod in a vertical state always, finally support rod is fixed on pedestal by limit sliding part again, is reached The purpose of angle between support rod and pedestal is adjusted, while being rotated by the way that railing to be on support rod, reaches railing and is installed on Effect between two bridge piers;By mutually being assembled between pedestal, support rod and railing, having and improving its place applicable performance And the effect of construction efficiency.
Further setting: the limit sliding part includes the first tooth-like part being set on arc groove circumferential side wall, setting It is set in the second tooth-like part, the circular arc side plate that is fixedly installed on support rod side wall and the threads turn on curved portion circumferential side wall The clamping screw being placed on pedestal, the circular arc side plate and curved portion arranged for interval, offer arc on the circular arc side plate Through slot, the arc-shaped slot and curved portion are coaxially arranged, and the clamping screw is arranged in the arc-shaped slot.
So set, by the way that the second tooth-like part is engaged with the first tooth-like part, realize support rod and support rod and pedestal it Between the effect that is fixed to each other, the angle between support rod and pedestal can be adjusted, and keep support rod in a vertical state, circular arc side Plate is on clamping screw and is rotated by arc-shaped slot, after regulating, then by clamping screw circular arc side plate is fixed on pedestal On, achieve the purpose that adjust adjustment support rod and pedestal between angle after fixed.
Further setting: offering the arc holding tank matched with circular arc side plate on the side wall of the pedestal, described The rotation of circular arc side plate is arranged in arc holding tank, and the center of circle of circular arc side plate is in being arranged in outside arc holding tank.
So set, improving support rod and the direct contact area of pedestal, and the purpose of limit installation is played, makes circular arc side Plate only exists in the rotation of arc holding tank, improves the mounting stability between support rod and pedestal.
Further setting: it is mechanical that indexing is provided on the end face of the circular arc side plate.
So set, reaching the mesh for being easily installed municipal Bridge guardrail convenient for the angle between observation support rod and pedestal 's.
Further setting: the bridge pier is spliced by two pedestals and the support rod being respectively arranged on pedestal, two The first recessing groove and the second recessing groove, first recessing groove and the second recessing groove are offered on the side of the support rod respectively The installation through-hole for installing railing is formed, is fixedly installed fixing axle, the fixing axle in the slot bottom of first recessing groove The slot bottom of separate one end connecting with the first recessing groove and the second recessing groove contradicts, and the railing is rotatably dispose in the fixing axle On.
So set, by the way that pedestal and support rod are spliced respectively, while by railing rotational installation in two supports On the one hand the installation through-hole of the formation of bar makes its railing be in the purpose being rotatablely installed between two support rods, on the other hand improves Installation capability between support rod and pedestal improves the mounting stability between bridge pier and railing, is spelled by pedestal and support rod It connects, improves the Fast Installation of bridge pier surely.
Further setting: fixation hole is offered in the slot bottom of second recessing groove, the fixing axle is separate to be allowed with first One end of position slot connection is plugged in the fixation hole.
So set, by the way that fixing axle to be plugged in fixation hole, improves railing and be installed on and formed between two support rods The stability on support rod is rotatably dispose in by railing on Zhang Tongkong, is improved.
Further setting: it is fixedly connected with grafting block on the side wall of wherein one pedestal, on another pedestal The spliced eye matched with grafting block is offered, the grafting block is plugged in the spliced eye.
So set, being plugged in the spliced eye on another pedestal by the grafting block on a wherein pedestal, two bottoms are improved Contact area when seat splicing realizes the purpose of fixed splicing between two pedestals.
Further setting: the connector is successively arranged in spliced eye and grafting block arrangement.
So set, being on the one hand convenient for the effect that will be fixedly mounted between two pedestals by connector, while passing through connection Part also goes two pedestals due on bridge floor, and raising pedestal is installed on the stabilization installation capability on bridge floor.
Further setting: fastening screw, multiple positioning are fixedly installed on the end face of wherein one support rod Bolt offers a pair of with fastening screw one along the length direction equidistant placement of support rod on the end face of another support rod The positioning jack answered, the fastening screw are plugged in the positioning jack.
So set, being plugged in the positioning jack on another support rod respectively by the fastening screw on a wherein support rod It is interior, the contact area when splicing of two support rods is improved, realizes the purpose of fixed splicing between two support rods.
Another object of the present invention is to provide a kind of construction method of municipal Bridge guardrail, has and improve its municipal bridge The effect of guardrail construction quality.
The construction method of a kind municipal administration Bridge guardrail, comprising the following steps:
S1, precast pier module: precast base, and integrally formed with grafting block or spliced eye is offered on the side wall of pedestal, In The upper surface of pedestal is reserved with arc groove, and is prefabricated with the first tooth-like part on the circumferential groove bottom of arc groove, separate in pedestal It is reserved with arc holding tank on the side wall of grafting block or spliced eye, the bolt for installing earth stud is reserved on pedestal Through-hole, bolt hole communicate arrangement with arc groove or arrange through grafting block;
S2, precast support bar module: the upper end of support rod is prefabricated into rectangular portion, lower end is prefabricated into curved portion, and in curved portion Circumferential side wall on be prefabricated with the second tooth-like part, be prefabricated with circular arc side plate in the lower end of rectangular portion, and have curved portion arranged for interval, It is reserved with the recessing groove for installing railing on the side wall of rectangular portion, is preset with fixing axle or fixation in the cell wall of recessing groove Hole;
S3, prefabricated railing module: being prefabricated into rectangular strip or cylindrical bar for railing, is reserved with hinge hole at the both ends of railing;
S4, it is spliced to form Bridge guardrail: after spreading adhesive on the reserved steel bar on bridge floor, the pedestal of spliced eye will be had It is installed on bridge floor, and part reserved steel bar is passed through into the bolt hole on the pedestal, later fixes the curved portion of a support rod It is installed in the arc groove of the pedestal, and then the curved portion of another support rod is fixedly installed in the arc groove of another pedestal It is interior, railing is articulated in the fixing axle of support rod rectangular portion, finally the pedestal with grafting block is plugged in spliced eye Pedestal on, make the aligned in position between two pedestals and between two support rods, railing rotates in recessing groove;
Another bottom is fixedly installed on bridge floor by S5, installation connecting element, then repeat the above steps continue installation another group of bridge pier, Support rod and railing
So set, processing bridge pier and railing by above-mentioned construction method, the specific installation improved between bridge pier and bridge floor is steady Qualitative energy, does not only reach convenient for rapid processing, and improves the purpose of processing quality, equally, has and improves its municipal Bridge guardrail The effect of construction quality.
By using above-mentioned technical proposal, the present invention compares compared with the prior art, has the advantage that
1, by the way that pedestal and support rod are spliced respectively, while by railing rotational installation in the peace of the formation of two support rods Through-hole is filled, so that its railing is in the purpose being rotatablely installed between two support rods, on the other hand improves support rod and pedestal Between installation capability, improve the mounting stability between bridge pier and railing, be spliced by pedestal and support rod, raising bridge The Fast Installation of pier is surely;
2, it is plugged in the spliced eye on another pedestal by the grafting block on a wherein pedestal, connecing when improving the splicing of two pedestals Contacting surface product realizes the purpose of fixed splicing between two pedestals;
3, it is plugged in the positioning jack on another support rod respectively by the fastening screw on a wherein support rod, improves two Contact area when strut splices realizes the purpose of fixed splicing between two support rods.
Detailed description of the invention
Fig. 1 is structural schematic diagram when municipal Bridge guardrail is installed on horizontal plane;
Fig. 2 is state diagram when municipal Bridge guardrail is installed in slope surface;
Fig. 3 is the cross-sectional view in Fig. 2 at A-A;
Structural schematic diagram when Fig. 4 is bridge pier local expansion;
Fig. 5 is the cross-sectional view at bridge pier limit sliding part.
In figure: 1, bridge pier;11, pedestal;111, grafting block;112, spliced eye;113, bolt hole;114, arc groove; 115, arc holding tank;12, support rod;121, rectangular portion;122, curved portion;123, fastening screw;124, positioning jack;125, First recessing groove;126, the second recessing groove;127, installation through-hole;128, fixing axle;129, fixation hole;2, railing;3, connector; 4, sliding part is limited;41, the first tooth-like part;42, the second tooth-like part;43, circular arc side plate;431, arc-shaped slot;432, indexing is carved Plate;44, clamping screw.
Specific embodiment
Municipal Bridge guardrail and its construction method are described further referring to attached drawing.
Embodiment 1: a kind of municipal administration Bridge guardrail, as depicted in figs. 1 and 2, including bridge pier 1, the column being set between bridge pier 1 It bar 2 and is set on bridge pier 1 for the connector 3 that is fixed on bridge pier 1 on bridge;Each bridge pier 1 by two pedestals 11 and The support rod 12 being respectively arranged on pedestal 11 is spliced, and railing 2 is rotatably dispose on two support rods 12;Connector 3 is to connect Ground bolt, and be respectively arranged on two pedestals 11, specific introduction is done with one group of bridge pier 1 below.
As shown in Figure 2 and Figure 4, integrally formed with grafting block 111 or spliced eye 112 is offered on the side wall of pedestal 11, When installation, it is plugged in another pedestal 11 with spliced eye 112 by the pedestal 11 with grafting block 111, makes its grafting block 111 fixations are plugged in spliced eye 112, are realized and are spliced fixed effect between two pedestals 11;It opens up on the pedestal 11 useful In the bolt hole 113 of installation earth stud, bolt hole 113 communicates arrangement with spliced eye 112 or through 111 cloth of grafting block It sets, when pedestal 11 is installed on bridge floor, the hole wall and grafting block 111 in spliced eye 112 is sequentially passed through by earth stud, It realizes the effect being fixed to each other between two pedestals 11, and two pedestals 11 is fixed on the purpose on bridge simultaneously.
As shown in Figure 3 and Figure 4, support rod 12 includes the rectangular portion 121 and curved portion 122 being wholely set, in pedestal 11 Upper surface on offer arc groove 114, the curved portion 122 of two support rods 12 is rotatably dispose in the arc of two pedestals 11 respectively In slot 114, and the center of circle of curved portion 122 is arranged in outside arc groove 114;Meanwhile it being provided between support rod 12 and pedestal 11 Limit sliding part 4 for being fixed on support rod 12 on pedestal 11.
As shown in Figure 3 and Figure 4, limit sliding part 4 includes the first dentation being integrally formed on 114 circumferential side wall of arc groove Portion 41, is integrally formed on 121 lateral wall of rectangular portion the second tooth-like part 42 being integrally formed on 122 circumferential side wall of curved portion Circular arc side plate 43 and threads turn be set to the clamping screw 44 of 11 lateral wall of pedestal;Circular arc side plate 43 and curved portion 122 Arranged for interval offers arc-shaped slot 431 on circular arc side plate 43, and arc-shaped slot 431 and curved portion 122 are coaxially arranged, and locks Tight bolt 44 is arranged in arc-shaped slot 431 and is fixed on circular arc side plate 43 on the cell wall of arc groove 114.
As shown in Figure 4 and Figure 5, the arc holding tank matched with circular arc side plate 43 is offered on the side wall of pedestal 11 115, the rotation of circular arc side plate 43 is arranged in arc holding tank 115, and the center of circle of circular arc side plate 43 is arranged in arc holding tank 115 Outside;44 threads turn of clamping screw is connected on the cell wall of arc holding tank 115, and the lateral wall of circular arc side plate 43 and pedestal 11 Lateral wall flush arrangement, for the ease of the corner dimension that is formed between observation pedestal 11 and support rod 12, in circular arc side plate 43 End face on be carved with indexing mechanical 432.
As shown in Figure 4 and Figure 5, fastening screw 123 is fixedly installed in the wherein rectangular portion 121 of a support rod 12, it is more Length direction equidistant placement of a fastening screw 123 along support rod 12;Offered in the rectangular portion 121 of another support rod 12 with The one-to-one positioning jack 124 of fastening screw 123, is plugged in positioning jack 124 respectively by fastening screw 123, is realized The purpose of fixed splicing between two support rods 12.
As shown in Figure 4 and Figure 5, the first recessing groove 125 and second is offered respectively on the opposite flank of two support rods 12 Recessing groove 126, the first recessing groove 125 and the second recessing groove 126 form the installation through-hole 127 for installing railing 2;And first The slot bottom of recessing groove 125 is fixedly installed fixing axle 128, and one end of railing 2 is rotatably dispose in fixing axle 128;Meanwhile second The slot bottom of recessing groove 126 offers fixation hole 129, and the separate one end connecting with the first recessing groove 125 of fixing axle 128 is plugged in solid Determine in hole 129, realizes the purpose being rotatably dispose in railing 2 in the installation through-hole 127 between two support rods 12.
Working principle: firstly, the pedestal 11 with spliced eye 112 is installed on bridge floor, by the arc of a support rod 12 Portion 122 is fixedly installed in the arc groove 114 of a pedestal 11, and according to landform and the gradient, makes its support rod 12 and pedestal 11 Between relatively rotate, then by limit sliding part 4 support rod 12 is fixed on pedestal 11, keep support rod 12 be in vertical shape State;Then, the curved portion 122 of another support rod 12 is fixedly installed in the arc groove 114 of another pedestal 11, and by railing 2 It is articulated in fixing axle 128, is plugged in its pedestal 11 with grafting block 111 on the pedestal 11 with spliced eye 112, grafting The fixation of block 111 is plugged in spliced eye 112, makes the aligned in position between two pedestals 11 and between two support rods 12, and 2 turns of railing It moves in installation through-hole 127, achieving the purpose that quickly to splice installation between bridge pier 1 and railing 2;Finally, connector 3 is by another bottom It is fixedly installed on bridge floor, repeats above-mentioned steps and continue another group of bridge pier 1 of installation, support rod 12 and railing 2;By the bottom of by It is mutually assembled between seat 11, support rod 12 and railing 2, has the function of improving its place applicable performance and construction efficiency.
Embodiment 2: a kind of for installing the construction method of municipal Bridge guardrail in embodiment 1, comprising the following steps:
S1,1 module of precast pier: precast base 11, and integrally formed with grafting block 111 or offered slotting on the side wall of pedestal 11 Hole 112 is connect, is reserved with arc groove 114 in the upper surface of pedestal 11, and be prefabricated with first on the circumferential groove bottom of arc groove 114 Tooth-like part 41 is reserved with arc holding tank 115 on side wall of the pedestal 11 far from grafting block 111 or spliced eye 112, in pedestal The bolt hole 113 for installing earth stud is reserved on 11, bolt hole 113 communicates arrangement with arc groove 114 or runs through Grafting block 111 is arranged.
S2,12 module of precast support bar: the upper end of support rod 12 is prefabricated into rectangular portion 121, lower end is prefabricated into curved portion 122, and the second tooth-like part 42 is prefabricated on the circumferential side wall of curved portion 122, circular arc side is prefabricated in the lower end of rectangular portion 121 Plate 43, and have 122 arranged for interval of curved portion, the recessing groove for installing railing 2 is reserved on the side wall of rectangular portion 121, Fixing axle 128 or fixation hole 129 are preset in the cell wall of recessing groove.
S3,2 module of prefabricated railing: being prefabricated into rectangular strip or cylindrical bar for railing 2, is reserved at the both ends of railing 2 Hinge hole.
S4, it is spliced to form Bridge guardrail: after spreading adhesive on the reserved steel bar on bridge floor, spliced eye will be had 112 pedestal 11 is installed on bridge floor, and part reserved steel bar is passed through the bolt hole 113 on the pedestal 11, later by one The curved portion 122 of strut 12 is fixedly installed in the arc groove 114 of the pedestal 11, and then by the curved portion of another support rod 12 122 are fixedly installed in the arc groove 114 of another pedestal 11, and railing 2 is articulated with to the fixing axle of 12 rectangular portion 121 of support rod On 128, finally the pedestal 11 with grafting block 111 is plugged on the pedestal 11 with spliced eye 112, is made between two pedestals 11 And two aligned in position between support rod 12, railing 2 rotate in recessing groove.
Another bottom is fixedly installed on bridge floor by S5, installation connecting element 3, is repeated above-mentioned steps and is continued another group of bridge of installation Pier 1, support rod 12 and railing 2.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of municipal administration Bridge guardrail, including bridge pier (1) and the railing (2) being set between bridge pier (1), it is characterised in that: The bridge pier (1) includes pedestal (11) and support rod (12), is offered on the pedestal (11) arc groove (114), described One end of support rod (12) is set as curved portion (122), and the curved portion (122) is rotatably dispose in arc groove (114), and arc The center of circle in shape portion (122) is arranged in arc groove (114) outside, is provided between the support rod (12) and pedestal (11) for inciting somebody to action Support rod (12) is fixed on the limit sliding part (4) on pedestal (11), is provided on the bridge pier (1) for by bridge pier (1) The connector (3) being fixed on bridge, the railing (2) are rotatably dispose on the support rod (12).
2. a kind of municipal Bridge guardrail according to claim 1, it is characterised in that: the limit sliding part (4) includes setting The first tooth-like part (41) being placed on arc groove (114) circumferential side wall, the second tooth being set on curved portion (122) circumferential side wall Shape portion (42), the circular arc side plate (43) being fixedly installed on support rod (12) side wall and threads turn are set on pedestal (11) Clamping screw (44), the circular arc side plate (43) and curved portion (122) arranged for interval open up on the circular arc side plate (43) Have arc-shaped slot (431), the arc-shaped slot (431) and curved portion (122) are coaxially arranged, and the clamping screw (44) is worn In the arc-shaped slot (431).
3. a kind of municipal Bridge guardrail according to claim 2, it is characterised in that: opened on the side wall of the pedestal (11) Equipped with the arc holding tank (115) matched with circular arc side plate (43), circular arc side plate (43) rotation is arranged in arc receiving In slot (115), and the center of circle of circular arc side plate (43) is arranged in arc holding tank (115) outside.
4. a kind of municipal Bridge guardrail according to claim 3, it is characterised in that: in the end face of the circular arc side plate (43) On be provided with index mechanical (432).
5. a kind of municipal Bridge guardrail according to any one of claims 1-4, it is characterised in that: the bridge pier (1) by Two pedestals (11) and the support rod (12) being respectively arranged on pedestal (11) are spliced, in the side of two support rods (12) The first recessing groove (125) and the second recessing groove (126) are offered on face respectively, first recessing groove (125) and second are stepped down Slot (126) forms the installation through-hole (127) for installing railing (2), is fixedly installed in the slot bottom of first recessing groove (125) Have fixing axle (128), described separate one end being connect with the first recessing groove (125) of fixing axle (128) and the second recessing groove (126) Slot bottom contradict, the railing (2) is rotatably dispose on the fixing axle (128).
6. a kind of municipal Bridge guardrail according to claim 5, it is characterised in that: in second recessing groove (126) Slot bottom offers fixation hole (129), and described separate one end connecting with the first recessing groove (125) of fixing axle (128) is plugged in institute It states in fixation hole (129).
7. a kind of municipal Bridge guardrail according to claim 5, it is characterised in that: the side of a pedestal (11) wherein It is fixedly connected with grafting block (111) on wall, offers the grafting matched with grafting block (111) on another pedestal (11) Hole (112), the grafting block (111) are plugged in the spliced eye (112).
8. a kind of municipal Bridge guardrail according to claim 7, it is characterised in that: the connector (3) is successively arranged in Spliced eye (112) and grafting block (111) arrangement.
9. a kind of municipal Bridge guardrail according to claim 5, it is characterised in that: a support rod (12) wherein It is fixedly installed on end face fastening screw (123), multiple fastening screws (123) are equidistant along the length direction of support rod (12) Arrangement offers and fastening screw (123) one-to-one positioning jack on the end face of another support rod (12) (124), the fastening screw (123) is plugged in the positioning jack (124).
10. a kind of construction method of municipal administration Bridge guardrail, which comprises the following steps:
S1, precast pier (1) module: precast base (11), and on the side wall of pedestal (11) integrally formed with grafting block (111) or Spliced eye (112) are offered, are reserved with arc groove (114) in the upper surface of pedestal (11), and the circumference in arc groove (114) The first tooth-like part (41) are prefabricated on slot bottom, it is pre- on the side wall of pedestal (11) far from grafting block (111) or spliced eye (112) There are arc holding tank (115), the bolt hole (113) for installing earth stud is reserved on pedestal (11), bolt is logical Hole (113) communicates arrangement with arc groove (114) or arranges through grafting block (111);
S2, precast support bar (12) module: the upper end of support rod (12) is prefabricated into rectangular portion (121), the prefabricated camber in lower end Portion (122), and the second tooth-like part (42) are prefabricated on the circumferential side wall of curved portion (122), it is pre- in the lower end of rectangular portion (121) Circular arc side plate (43) are formed with, and have curved portion (122) arranged for interval, are reserved on the side wall of rectangular portion (121) for pacifying The recessing groove for filling railing (2), is preset with fixing axle (128) or fixation hole (129) in the cell wall of recessing groove;
S3, prefabricated railing (2) module: being prefabricated into rectangular strip or cylindrical bar for railing (2), reserved at the both ends of railing (2) There is hinge hole;
S4, it is spliced to form Bridge guardrail: after spreading adhesive on the reserved steel bar on bridge floor, spliced eye (112) will be had Pedestal (11) be installed on bridge floor, and part reserved steel bar is passed through into the bolt hole (113) on the pedestal (11), later by one The curved portion (122) of support rod (12) is fixedly installed in the arc groove (114) of the pedestal (11), and then by another support rod (12) curved portion (122) is fixedly installed in the arc groove (114) of another pedestal (11), and railing (2) is articulated with support rod (12) in the fixing axle (128) of rectangular portion (121), finally the pedestal (11) with grafting block (111) is plugged in grafting On the pedestal (11) in hole (112), make the aligned in position between two pedestals (11) and between two support rods (12), railing (2) turns It moves in recessing groove;
Another bottom is fixedly installed on bridge floor by S5, installation connecting element (3), then continues another group of bridge of installation repeating the above steps Pier (1), support rod (12) and railing (2).
CN201910673396.9A 2019-07-24 2019-07-24 A kind of municipal administration Bridge guardrail and its construction method Pending CN110387814A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910673396.9A CN110387814A (en) 2019-07-24 2019-07-24 A kind of municipal administration Bridge guardrail and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910673396.9A CN110387814A (en) 2019-07-24 2019-07-24 A kind of municipal administration Bridge guardrail and its construction method

Publications (1)

Publication Number Publication Date
CN110387814A true CN110387814A (en) 2019-10-29

Family

ID=68287418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910673396.9A Pending CN110387814A (en) 2019-07-24 2019-07-24 A kind of municipal administration Bridge guardrail and its construction method

Country Status (1)

Country Link
CN (1) CN110387814A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112921826A (en) * 2021-01-27 2021-06-08 太仓市路桥工程有限公司 Annular corridor pedestrian bridge of quick construction
CN113756180A (en) * 2021-10-18 2021-12-07 周口市公路勘察设计院 Combined structure bridge and construction method thereof

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1423927A (en) * 1919-05-31 1922-07-25 Michael Pfaff Fitting for railings and the like
GB2117423B (en) * 1982-03-31 1985-08-14 British Aluminium Co Ltd Adjustable post structure and panel for railings or balustrade
US4928930A (en) * 1989-11-02 1990-05-29 Chung Yu Kuei Balustrade
DE4309041A1 (en) * 1992-03-28 1993-09-30 Ulrich Pitzl Balustrade or fence post assembly - with column base located over stud projection and screw connected through slots in column
JPH09268729A (en) * 1996-04-01 1997-10-14 Swan Shoji Co Ltd Bracket with freely adjustable angle for handrail post
JPH1054121A (en) * 1996-08-12 1998-02-24 Swan Shoji Co Ltd Bracket with its handrail support angle adjustable
US6299143B1 (en) * 1999-01-26 2001-10-09 Valentine & Company Coupling spool
CN200943296Y (en) * 2006-09-09 2007-09-05 杨春荣 Banister
GB2444928A (en) * 2006-12-20 2008-06-25 Jeld Wen Uk Ltd Banister assembly
WO2009157652A3 (en) * 2008-06-24 2010-02-25 주식회사 석강 Pillar for mesh fence
KR20120001426U (en) * 2010-08-20 2012-02-29 (주)도경이앤씨 A Crossbar Coupling Device of Handrail
KR20120026710A (en) * 2010-09-10 2012-03-20 나원이엔지(주) A handrail with the regulation of angle
KR101204913B1 (en) * 2011-04-06 2012-11-26 주식회사 전일산업 A prefabricated fence
CN203320866U (en) * 2013-07-05 2013-12-04 浙江元森态家具有限公司 Guardrail assembly
CN204282689U (en) * 2014-11-07 2015-04-22 福清市辉华不锈钢制品有限公司 For the adjusting device of People's Bank of China's guardrail
CN204370733U (en) * 2014-12-29 2015-06-03 湖州格林特木塑材料有限公司 A kind of connecting piece for guard rail
CN105464308A (en) * 2015-12-28 2016-04-06 武汉沿程科技有限公司 Column angle adjusting base
KR101991026B1 (en) * 2018-12-11 2019-06-19 가온조경건설 주식회사 Deck road handrail structure and construction method

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1423927A (en) * 1919-05-31 1922-07-25 Michael Pfaff Fitting for railings and the like
GB2117423B (en) * 1982-03-31 1985-08-14 British Aluminium Co Ltd Adjustable post structure and panel for railings or balustrade
US4928930A (en) * 1989-11-02 1990-05-29 Chung Yu Kuei Balustrade
DE4309041A1 (en) * 1992-03-28 1993-09-30 Ulrich Pitzl Balustrade or fence post assembly - with column base located over stud projection and screw connected through slots in column
JPH09268729A (en) * 1996-04-01 1997-10-14 Swan Shoji Co Ltd Bracket with freely adjustable angle for handrail post
JPH1054121A (en) * 1996-08-12 1998-02-24 Swan Shoji Co Ltd Bracket with its handrail support angle adjustable
US6299143B1 (en) * 1999-01-26 2001-10-09 Valentine & Company Coupling spool
CN200943296Y (en) * 2006-09-09 2007-09-05 杨春荣 Banister
GB2444928A (en) * 2006-12-20 2008-06-25 Jeld Wen Uk Ltd Banister assembly
WO2009157652A3 (en) * 2008-06-24 2010-02-25 주식회사 석강 Pillar for mesh fence
KR20120001426U (en) * 2010-08-20 2012-02-29 (주)도경이앤씨 A Crossbar Coupling Device of Handrail
KR20120026710A (en) * 2010-09-10 2012-03-20 나원이엔지(주) A handrail with the regulation of angle
KR101204913B1 (en) * 2011-04-06 2012-11-26 주식회사 전일산업 A prefabricated fence
CN203320866U (en) * 2013-07-05 2013-12-04 浙江元森态家具有限公司 Guardrail assembly
CN204282689U (en) * 2014-11-07 2015-04-22 福清市辉华不锈钢制品有限公司 For the adjusting device of People's Bank of China's guardrail
CN204370733U (en) * 2014-12-29 2015-06-03 湖州格林特木塑材料有限公司 A kind of connecting piece for guard rail
CN105464308A (en) * 2015-12-28 2016-04-06 武汉沿程科技有限公司 Column angle adjusting base
KR101991026B1 (en) * 2018-12-11 2019-06-19 가온조경건설 주식회사 Deck road handrail structure and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯锡兰: "《工程力学》", 31 July 2017, 北京航空航天大学出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112921826A (en) * 2021-01-27 2021-06-08 太仓市路桥工程有限公司 Annular corridor pedestrian bridge of quick construction
CN112921826B (en) * 2021-01-27 2022-08-02 太仓市路桥工程有限公司 Annular corridor pedestrian bridge of quick construction
CN113756180A (en) * 2021-10-18 2021-12-07 周口市公路勘察设计院 Combined structure bridge and construction method thereof

Similar Documents

Publication Publication Date Title
CN110387814A (en) A kind of municipal administration Bridge guardrail and its construction method
CN105604185B (en) A kind of earthquake-resistant structure support connection structure and attaching method thereof
BR112021006805A2 (en) single axis adapter, assembly and tracker
CN108489473A (en) A kind of total station prism
CN110607751A (en) Straddle type monorail track beam linear adjusting system and adjusting method thereof
CN110925493B (en) Petroleum pipeline erects and uses strutting arrangement
CN217461366U (en) Adjustable support of full hall support is set up to slope
CN216615456U (en) Public road bridge roof beam stop device that falls is prevented to bridge
CN111893902A (en) End-to-end connection structure of rotating bridge
CN217400547U (en) Municipal administration protection rail
CN107654005B (en) On-land type outer circulation bilayer curved surface curtain wall and its mounting process
CN210482076U (en) Bridge formwork support device
CN206251024U (en) A kind of adjustable load-bearing beam assembly
CN108678144A (en) Support system and its installation method for prefabricated balcony
CN213143961U (en) Support arrangement at scenic spot water drift assembled glass slide bend department
CN214062310U (en) Steel pipe fixing device for subway construction
CN208981197U (en) Dismountable town road repairs warning sign
CN208235877U (en) The aerial leveling component in ground
KR20220001273A (en) Railing brace for inspection railing of angle-adjusted bridges
CN217352090U (en) Movable construction access road for river channel treatment
CN206602489U (en) Support base for solar photovoltaic assembly
CN209384105U (en) A kind of road and bridge cable connection
CN200940320Y (en) Newel post having glass clamping base
CN218991034U (en) Auxiliary supporting frame
CN207314627U (en) A kind of roof mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191029