KR101991026B1 - Deck road handrail structure and construction method - Google Patents

Deck road handrail structure and construction method Download PDF

Info

Publication number
KR101991026B1
KR101991026B1 KR1020180159108A KR20180159108A KR101991026B1 KR 101991026 B1 KR101991026 B1 KR 101991026B1 KR 1020180159108 A KR1020180159108 A KR 1020180159108A KR 20180159108 A KR20180159108 A KR 20180159108A KR 101991026 B1 KR101991026 B1 KR 101991026B1
Authority
KR
South Korea
Prior art keywords
column
groove
bracket
protrusion
transverse
Prior art date
Application number
KR1020180159108A
Other languages
Korean (ko)
Inventor
박정희
Original Assignee
가온조경건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 가온조경건설 주식회사 filed Critical 가온조경건설 주식회사
Priority to KR1020180159108A priority Critical patent/KR101991026B1/en
Application granted granted Critical
Publication of KR101991026B1 publication Critical patent/KR101991026B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • E04H17/1447Details of connections between rails and posts
    • E04H17/1448Adjustable, angled or hinged connections
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • E04H17/1447Details of connections between rails and posts
    • E04H17/1452Details of connections between rails and posts the ends of the rails are fixed on the lateral sides of the posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Posts therefor anchoring means therefore, e.g. specially-shaped parts entering the ground; struts or the like 
    • E04H2017/1452
    • E04H2017/1491

Abstract

The present invention relates to a deck road handrail structure, which is a handrail structure installed on a deck road. The present invention includes: a pillar (1); a horizontal member (2) installed between the pillars (1); a connecting member (3) connecting the pillar (1) and the horizontal member (2); and a lower joint bracket (600) installed on a lower portion of the pillar (1).

Description

데크로드 난간 구조체 및 그 시공방법{Deck road handrail structure and construction method}[0001] The present invention relates to a deck road handrail structure,

본 발명은, 데크로드에 설치되는 난간 구조체 및 그 시공방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a balustrade structure provided on a deck rod and a construction method thereof.

도심 공원, 수변공원, 해안가, 등산로, 산책로, 전원주택 등에 목재 등을 이용한 데크 조립체를 많이 시공하고 있다. There are a lot of deck assemblies using timber, etc. in urban parks, waterside parks, coastal areas, trails, walkways, and powerhouses.

목재 등을 활용한 데크로드는 환경에의 악영향이 적고, 시공이 빠르며, 시공비용이 저렴하고, 구조적으로 안정적이라는 장점이 있어, 최근 들어 많이 건설되고 있는 추세이다. Deck rods utilizing wood, etc. have the advantage of less adverse effect on the environment, fast construction, low construction cost, and stable structure, and they are being built in recent years.

일반적으로 건설되고 있는 데크로드는, 프레임 위에 다수 개의 데크를 데크로드 길이방향으로 배열하고 고정한 후, 보행자들의 안전을 위하여 난간을 설치하게 된다. 목재 데크를 시공하면, 바닥이 보행자의 보행 충격을 흡수하므로 관절 등의 보호에 매우 유리하다. 그리고 목재 데크가 시공된 현장은 자연과도 잘 조화되고, 도시 내에서도 딱딱한 환경을 부드럽게 바꾸어 준다.In general, a deck road is constructed by arranging and fixing a plurality of decks on the frame in the direction of the deck load length, and then installing the railing for the safety of pedestrians. When the wooden deck is installed, the bottom absorbs the walking impact of the pedestrian, which is very advantageous for protecting the joints and the like. And the site where the wooden deck is installed is harmonized with nature, and it changes the hard environment smoothly even in the city.

목재 데크의 가장자리에는 보행자가 떨어지지 않도록 막아주는 난간이 설치되는 것이 일반적이다. 목재 데크는 데크를 시공하는 바닥의 형상에 대응하여 평평한 형태로 시공될 뿐만 아니라, 계단, 경사로, 등산로 등에도 설치되고 있다. 그런데 계단이나 경사로, 등산로 등에 설치된 목재 데크의 가장자리에 난간을 설치할 때에는, 평지에 설치할 때와는 다른 많은 문제가 존재한다. 이럴 때 난간 구조체는 데크로드의 선형과 경사를 따라 기둥과 가로부재를 서로 연결하여 시공되는데, 데크로드가 수평과 직선을 유지하지 않고, 곡률과 경사를 가지기 때문에 기둥과 가로부재 역시 곡률과 경사를 반영하여 설치하여야 한다. The edge of the wooden deck is generally provided with a guardrail that prevents the pedestrian from falling off. The wooden deck is not only constructed in a flat shape corresponding to the shape of the floor on which the deck is to be installed, but also installed on stairs, ramps, trails and the like. However, there are many problems that arise when installing the railings on the edge of the wooden deck installed on the stairs, the ramps, In this case, the balustrade structure is constructed by connecting the columns and the horizontal members along the linear and inclined sides of the deck rods. Since the deck rods do not maintain the horizontal and straight lines but have curvature and inclination, Should be reflected and installed.

따라서 기둥이 기울어지는 경우도 있고, 기둥 사이의 간격이 달라질 수도 있는데, 종래의 난간은 이러한 곡률과 경사를 반영하지 못하고, 달라지는 기둥간격에 적절히 대응할 수 없어서, 매 현장마다 기둥을 설치하고, 가로부재의 길이를 일일이 절단하고, 가공하여 설치할 수 밖에 없었다. 따라서 종래에는 현장마다 기둥과 가로부재를 절단하고 용접하는데 시간과 비용이 많이 소요되었고, 숙련된 작업자를 필요로 한다는 단점이 있었다. Therefore, the column may be inclined or the interval between the columns may be different. The conventional railing does not reflect such curvature and inclination, and can not properly cope with the spacing of the columns. Thus, It is necessary to cut and cut the length of the wire. Therefore, conventionally, it took a lot of time and cost to cut and weld the column and the lateral member at each site, and there is a disadvantage that a skilled worker is required.

또한 난간의 하단부는 지면에 고정되는데, 경사면의 경우 지면이 경사져 있지만, 난간의 지주는 연직 방향으로 세워져야 한다.In addition, the lower part of the handrail is fixed to the ground. In case of the inclined surface, the ground is inclined, but the support of the handrail must be set up in the vertical direction.

그러나 종래의 난간 지주는 주로 바닥이 평평한 곳에 수직으로 세워지는 것만을 예정하고 있기 때문에, 난간이 설치되는 환경에 유연하게 대응하지 못하고, 이는 현장 시공성을 크게 떨어뜨리는 문제가 있다. 즉 숙련되지 않은 작업자가 난간을 작업할 경우, 난간의 완성도가 매우 떨어지게 된다.However, since the conventional balustrade is mainly intended to stand vertically on a flat floor, it can not flexibly cope with the environment in which the balustrade is installed, which causes a problem of drastically decreasing the workability in the field. That is, when an untrained worker works on the railing, the finish of the railing becomes very poor.

이러한 점을 감안하여 난간 지주의 각도를 조절하는 다양한 기술이 개발되어 왔으나, 이들 역시 여전히 현장 환경이나 여건에 유연하게 대응하지 못한다는 문제가 있었다.In consideration of this, various techniques for controlling the angle of the railing have been developed, but they still have problems in that they can not flexibly cope with the environment or the environment.

따라서 곡률과 경사에 따라 가로부재를 쉽게 결합할 수 있고, 시공이 간편하며, 교체가 용이한 난간 구조체와 그 시공방법의 개발이 요구되었다. Therefore, it is required to develop a rail structure and a construction method thereof that can easily join the lateral members according to the curvature and the inclination, can be easily installed, and can be easily replaced.

이에 출원인은 난간 구조체를 개발하여 한국에 특허 출원한바 있다(특허출원 제2018-108572호).The applicant has developed a railed structure and applied for a patent in Korea (Patent Application No. 2018-108572).

한국등록특허공보 제1506953호Korean Patent Registration No. 1506953 한국등록특허공보 제1569888호Korean Patent Registration No. 1569888 한국등록특허공보 제1582118호Korean Patent Registration No. 1582118 한국등록특허공보 제1429116호Korean Patent Registration No. 1429116 한국등록실용신안공보 제458474호Korean Registered Utility Model No. 458474 한국등록실용신안공보 제236192호Korean Registered Utility Model No. 236192

위와 같은 종래기술의 문제점을 개선하기 위해, 본 발명에서는, 가로부재의 길이를 달리 하지 않고도 연결부재의 삽입깊이를 조절함으로써 달라지는 기둥 간격에 상관없이 쉽게 시공할 수 있는 난간 구조체 및 그 시공방법을 제공하는 것을 목적으로 한다.In order to solve the problems of the prior art as described above, the present invention provides a handrail structure and a construction method thereof that can be easily applied irrespective of the column spacing, which is varied by adjusting the insertion depth of the connecting member without varying the lengths of the lateral members .

아울러 일부 가로부재의 파손이 있는 경우, 교체가 간편한 난간 구조체를 제공하는 것을 목적으로 한다.Another object of the present invention is to provide a handrail structure that is easy to replace when some of the lateral members are damaged.

또한 본 발명은, 난간 지주를 원하는 방향과 각도로 간편하고 정확하게 설치할 수 있어, 난간의 설치가 용이한 난간 지주 구조와 그 시공방법을 제공하는 것을 목적으로 한다.It is another object of the present invention to provide a railed pillar structure and a construction method thereof that can easily and accurately install a railing support in a desired direction and angle, and can easily install a railing.

본 발명에서는, 데크로드에 설치되는 난간 구조체에 있어서, 기둥(1); 상기 기둥(1) 사이에 설치되는 가로부재(2); 상기 기둥(1)과 가로부재(2)를 연결하는 연결부재(3); 및 상기 기둥(1)의 하부에 설치되는 하부관절브래킷(600);을 포함하는 데크로드 난간 구조체를 제공한다.In the present invention, in a balustrade structure provided on a deck rod, a column (1); A transverse member (2) installed between the columns (1); A connecting member 3 connecting the column 1 and the transverse member 2; And a lower joint bracket (600) installed at a lower portion of the column (1).

상기 기둥(1)은, 기둥재결합부(12), 연결부재결합부(13), 보강대결합부(15)가 형성된 기둥프레임(11)을 포함하고, 상기 가로부재(2)는, 가로재결합부(22)가 형성된 가로프레임(21) 및 제1브래킷(23)을 포함하며, 상기 연결부재(3)는, 상기 연결부재결합부(13)에 결합되는 바디(31) 및 상기 제1브래킷(23)에 볼트(52)에 의해 체결되는 커넥터(32)를 포함한다.The column 1 includes a column frame 11 on which a column recombination part 12, a connection part recombination part 13 and a reinforcing bar connection part 15 are formed. The cross member 2 includes a horizontal recombination part The connecting member 3 includes a body 31 coupled to the connection part recombination part 13 and a first bracket 23 coupled to the connection part 3 and the first bracket 23, And a connector 32 which is fastened by a bolt 52 to the connector.

상기 하부관절브래킷(600)은, 데크로드 쪽에 고정되는 제2브래킷(610) 및 상기 기둥(1)의 하부에 연결되는 제3브래킷(630)을 포함한다.The lower joint bracket 600 includes a second bracket 610 fixed to the deck rod side and a third bracket 630 connected to the lower portion of the column 1. [

상기 연결부재결합부(13)는, 기둥프레임(11)의 길이방향으로 서로 마주보는 양측에 형성된 제1돌기(131), 제2돌기(132), 제3돌기(133), 제1홈(134), 제2홈(135), 제3홈(136)을 포함하고, 상기 제1돌기(131)는 상기 제1홈(134)과 제2홈(135) 사이에 위치하고, 상기 제2돌기(132)는 상기 제2홈(135)과 제3홈(136) 사이에 위치하며, 상기 제3돌기(133)는 상기 제3홈(136) 옆에 위치하고, 상기 바디(31)의 길이방향 양측에는, 제1돌출부(311), 제2돌출부(312), 제3돌출부(313), 제1홈부(314), 제2홈부(315), 단턱부(316)가 형성되고, 상기 제1돌출부(311)와 제2돌출부(312) 사이에 상기 제1홈부(314)가 위치하고, 상기 제2돌출부(312)와 제3돌출부(313) 사이에 상기 제2홈부(315)가 위치하며, 상기 제3돌출부(313) 옆에 상기 단턱부(316)가 위치하고, 상기 제1돌출부(311)는 상기 제1홈(134) 또는 상기 제2홈(135)에 끼워질 수 있는 것을 특징으로 한다. The connection unit re-combination unit 13 includes a first projection 131, a second projection 132, a third projection 133, a first projection 134, and a second projection 133 formed on opposite sides of the column frame 11 in the longitudinal direction thereof. A second groove 135 and a third groove 136. The first projection 131 is located between the first groove 134 and the second groove 135 and the second projection 135 132 are positioned between the second groove 135 and the third groove 136 and the third projection 133 is located beside the third groove 136. The third projection 133 is located on both sides in the longitudinal direction of the body 31 The first protrusion 311, the second protrusion 312, the third protrusion 313, the first groove 314, the second groove 315 and the step 316 are formed, The first groove 314 is positioned between the first protrusion 311 and the second protrusion 312 and the second groove 315 is positioned between the second protrusion 312 and the third protrusion 313, The stepped portion 316 is located next to the third protrusion 313 and the first protrusion 311 is fitted into the first groove 134 or the second groove 135 That is characterized.

상기 난간 구조체는, 제1돌출부(411), 제2돌출부(412), 제3돌출부(413), 제1홈부(414), 제2홈부(415), 단턱부(416)가 형성되어 있는 1개 이상의 간격재(4)를 더 포함하되, 상기 간격재(4)가 상기 연결부재(3) 사이에 설치됨으로써 상기 가로부재(2)의 상하 간격을 조절할 수 있는 것을 특징으로 한다.The handrail structure has a first protruding portion 411, a second protruding portion 412, a third protruding portion 413, a first groove portion 414, a second groove portion 415 and a stepped portion 416 Wherein the spacing member 4 is provided between the connecting members 3 so that the vertical spacing of the lateral members 2 can be adjusted.

상기 기둥재결합부(12)에 기둥재(14)가 결합되되, 상기 기둥재결합부(12)에는 걸림돌기(121)가 형성되어 있고, 상기 기둥재(14)에는 걸림홈(141)이 형성되어 있어, 상기 걸림홈(141)에 상기 걸림돌기(121)가 안착되는 것을 특징으로 한다. A columnar member 14 is coupled to the column recombination unit 12 and a locking protrusion 121 is formed in the column recombination unit 12. An engagement groove 141 is formed in the column member 14 And the locking protrusion 121 is seated in the locking groove 141.

상기 가로재결합부(22)에 가로재(24)가 결합되되, 상기 가로재결합부(22)에는 걸림돌기(221)가 형성되어 있고, 상기 가로재(24)에는 걸림홈(241)이 형성되어 있어, 상기 걸림홈(241)에 상기 걸림돌기(221)가 안착되는 것을 특징으로 한다. The transverse member 24 is coupled to the transverse recombination unit 22 and the transverse recombination unit 22 is provided with a locking protrusion 221. The transverse member 24 is formed with a latching groove 241 And the latching protrusion 221 is seated in the latching groove 241.

상기 보강대결합부(15)에는 보강대(6)가 삽입되어 상기 기둥(1)을 데크로드에 고정시키는 것을 특징으로 한다.A reinforcing bar 6 is inserted into the reinforcing bar coupling part 15 to fix the column 1 to the deck rod.

상기 커넥터(32)에는 볼트공(321)이 형성되고, 상기 제1브래킷(23)은, 삽입부(231); 볼트공(233)이 형성된 연결부(232)를 포함하며, 상기 연결부재(3)와 상기 제1브래킷(23)은, 상기 볼트공(321)과 상기 볼트공(233)에 볼트(52)가 삽입됨으로써 연결되고, 상기 삽입부(231)에는, 상기 가로프레임(21) 및 상기 가로프레임(21)에 결합되는 가로재(24)가 삽입되는 것을 특징으로 한다.A bolt hole 321 is formed in the connector 32, and the first bracket 23 includes an insertion portion 231; The connecting member 3 and the first bracket 23 are fixed to the bolt hole 321 and the bolt hole 233 by bolts 52 And a transverse member 24 coupled to the transverse frame 21 and the transverse frame 21 is inserted into the inserting unit 231.

상기 제2브래킷(610)과 제3브래킷(630)은 회동 가능하게 연결된다.The second bracket 610 and the third bracket 630 are rotatably connected.

상기 제2브래킷(610)은, 상기 데크로드와 마주하는 바닥판(611) 및 상기 바닥판(611)의 중앙부에서 상방으로 연장되는 제1수직판(612)을 포함하고, 상기 제3브래킷(630)은, 상기 기둥(1)과 마주하는 연결판(639) 및 상기 연결판(639)의 중앙부에서 하방으로 연장되는 제2수직판(631)을 포함한다.The second bracket 610 includes a bottom plate 611 facing the deck rod and a first vertical plate 612 extending upward from a central portion of the bottom plate 611, 630 includes a connection plate 639 facing the column 1 and a second vertical plate 631 extending downward from a central portion of the connection plate 639. [

상기 제1수직판(612)과 제2수직판(631)에는, 상기 제1수직판과 제2수직판을 포함하는 평면에 대한 법선 방향으로 관통된 관통홀이 구비되고, 상기 두 수직판(612, 631)의 관통홀은, 상기 두 수직판(612, 631)을 그 회동 중심에 대해 정렬하였을 때 서로 마주한다.The first vertical plate 612 and the second vertical plate 631 are provided with through holes penetrating in the normal direction to the plane including the first vertical plate and the second vertical plate, 612, and 631 are opposed to each other when the two vertical plates 612 and 631 are aligned with respect to their pivot centers.

상기 제1수직판(612)의 관통홀(6123)과 제2수직판(631)의 관통홀 중 적어도 어느 하나의 수직판에 형성된 관통홀은, 두 수직판(612, 631)의 회동 중심에 대한 호 형상의 장공이다.The through holes formed in the vertical plate of at least one of the through holes 6123 of the first vertical plate 612 and the through holes of the second vertical plate 631 are located at the center of rotation of the two vertical plates 612 and 631 It is the long arc of the arc shape.

상기 두 수직판(612, 631)의 회동각을 조정한 후 상기 관통홀을 통해 볼트(52)와 너트(51)를 체결하면 두 수직판(612, 631)이 회동되지 않도록 고정할 수 있다.When the bolts 52 and the nuts 51 are fastened through the through holes after adjusting the rotation angle of the two vertical plates 612 and 631, the two vertical plates 612 and 631 can be fixed so as not to rotate.

상기 보강대(6)는 상기 연결판(639)에 마련되고, 상기 보강대(6)는 상기 연결판(639)의 중앙부에서 상방으로 연장될 수 있다. 이에 따라 상기 기둥(1)은 상기 하부관절브래킷을 통해 상기 데크로드에 고정될 수 있다.The reinforcing bar 6 may be provided on the connecting plate 639 and the reinforcing bar 6 may extend upward from a central portion of the connecting plate 639. [ So that the column 1 can be fixed to the deck rod via the lower joint bracket.

본 발명에서는, 상기 난간 구조체를 시공하는 방법에 있어서, a) 복수 개의 하부관절브래킷(600)을 준비하고, 복수 개의 상기 하부관절브래킷(600)을 데크로드에 고정하는 단계; b) 복수 개의 기둥(1)을 준비하고, 복수 개의 기둥(1)을 데크로드에 고정하는 단계; c) 복수 개의 가로부재(2)를 준비하고, 복수 개의 가로부재(2)의 양 끝에 연결부재(3)를 체결하는 단계; d) 상기 연결부재결합부(13)에 연결부재(3)를 결합시킴으로써 상기 복수 개의 가로부재(2)를 기둥(1) 사이에 고정하는 단계; 및 e) 상기 기둥(1)의 상부에 상부캡(7)을 고정하는 단계를 포함하는 데크로드 난간 구조체의 시공방법을 제공한다.According to the present invention, there is provided a method for constructing a balustrade structure, comprising: a) preparing a plurality of lower joint brackets 600 and fixing a plurality of the lower joint brackets 600 to a deck load; b) preparing a plurality of columns (1) and fixing the plurality of columns (1) to the deck rods; c) preparing a plurality of transverse members (2) and fastening the connecting members (3) to both ends of the plurality of transverse members (2); d) fixing the plurality of transverse members (2) between the columns (1) by connecting the connecting member (3) to the connecting portion re-combination unit (13); And e) securing the top cap (7) to the top of the column (1).

상기 d)단계에서, 연결부재(3)의 상하 간격 사이에 간격재(4)를 끼워넣는 것을 특징으로 한다.In the step (d), the spacing member (4) is sandwiched between upper and lower spaces of the connecting member (3).

본 발명의 데크로드 난간 구조체 및 그 시공방법은 다음과 같은 효과가 있다.The deck road railing structure of the present invention and its construction method have the following effects.

첫째, 연결부재에 복수개의 돌출부와 홈부를 구비하고, 연결부재결합부에 복수개의 돌기와 홈을 구비하여, 돌출부와 홈의 결합 위치를 변경시킴으로써 설치되는 가로부재의 길이가 달라도 쉽게 조립할 수 있고, 경사진 데크로드(기둥이 경사진 경우)에도 위, 아래의 가로부재의 길이를 다르게 하여 쉽게 설치할 수 있다. First, a plurality of protrusions and grooves are provided in the connecting member, and a plurality of protrusions and grooves are provided in the connecting portion. By changing the positions of the protrusions and the grooves, it is easy to assemble even if the lengths of the cross- Deck rods (when the columns are inclined) can be easily installed by changing the lengths of the upper and lower horizontal members.

둘째, 기둥프레임에 연결부재를 삽입함으로써 난간 구조체를 완성할 수 있으므로, 현장에서 시공이 간편하고 빠르며, 작업자의 숙련도가 필요하지 않아 인건비가 줄어들어 비용이 감소된다. Second, since the railing structure can be completed by inserting the connecting member into the column frame, the construction is simple and quick in the field, and the labor cost is reduced because the skill of the worker is not required, and the cost is reduced.

셋째, 조립과 해체가 쉬우므로, 일부 가로부재가 파손되더라도 파손된 가로부재만 간편하게 교체할 수 있다. Third, since assembly and disassembly are easy, even if some of the horizontal members are broken, only the broken horizontal members can be easily replaced.

넷째, 가로부재가 제1브래킷에 의해 기둥에 연결되고, 제1브래킷은 힌지와 같이 연결부재에 연결되어 있으므로 경사진 데크로드에도 그대로 적용할 수 있다. Fourth, since the horizontal member is connected to the column by the first bracket, and the first bracket is connected to the connecting member like the hinge, it can be applied to the inclined deck rod as it is.

다섯째, 데크로드가 경사져 있더라도 경사진 면에 하부관절브래킷을 사용함으로써 별다른 어려움 없이 기둥을 연직 방향으로 세울 수 있다.Fifth, even if the deck road is inclined, the column can be set up in the vertical direction without any difficulty by using the lower joint bracket on the inclined surface.

상술한 효과와 더불어 본 발명의 구체적인 효과는 이하 발명을 실시하기 위한 구체적인 사항을 설명하면서 함께 기술한다.The above and other objects, features and advantages of the present invention will be more apparent from the following detailed description taken in conjunction with the accompanying drawings, in which: FIG.

도 1은 본 발명의 제1실시예에 따른 난간 구조체의 분해도이다.
도 2는 기둥과 가로부재의 연결부 사시도이다.
도 3은 기둥프레임의 단면도이다.
도 4는 기둥프레임과 연결부재의 결합 단면도이다.
도 5는 연결부재와 제1브래킷의 결합 단면도이다.
도 6은 연결부재의 측면도이다.
도 7은 제1브래킷의 사시도이다.
도 8은 간격재의 단면도이다.
도 9는 간격재의 측면도이다.
도 10은 기둥프레임과 기둥재의 결합 단면도이다.
도 11은 가로프레임과 가로재의 결합단면도이다.
도 12는 보강대의 측면도이다.
도 13은 제1실시예의 난간 조립체의 설치 모습이다.
도 14 내지 17은 종래기술이다.
도 18은 본 발명의 제2실시예에 따른 난간 구조체의 기둥과 개로부재의 연결부와 하부관절브래킷의 사시도이다.
도 19는 기둥과 하부관절브래킷의 설치 과정을 나타낸 정면도이다.
도 20은 하부관절브래킷의 측면도이다.
도 21은 하부관절브래킷의 정면도이다.
도 22는 하부관절브래킷의 각도를 조정한 상태를 나타낸 측면도이다.
도 23은 제2실시예의 난간조립체의 설치 모습이다.
1 is an exploded view of a balustrade structure according to a first embodiment of the present invention.
2 is a perspective view of the connection between the column and the transverse member.
3 is a sectional view of the column frame.
4 is an assembled sectional view of the column frame and the connecting member.
5 is an assembled cross-sectional view of the connecting member and the first bracket;
6 is a side view of the connecting member.
7 is a perspective view of the first bracket;
8 is a cross-sectional view of the spacer.
9 is a side view of the spacer.
10 is an assembled cross-sectional view of the column frame and the column member.
11 is an assembled cross-sectional view of a transverse frame and a transverse member.
12 is a side view of the reinforcing bar.
13 is a view showing the installation of the handrail assembly of the first embodiment.
14-17 are prior art.
18 is a perspective view of a connection part between a column and an opening member of a balustrade structure and a lower joint bracket according to a second embodiment of the present invention.
19 is a front view showing the installation process of the column and the lower joint bracket.
20 is a side view of the lower joint bracket;
21 is a front view of the lower joint bracket;
22 is a side view showing a state in which the angle of the lower joint bracket is adjusted.
23 is a view showing the installation of the handrail assembly of the second embodiment.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 쉽게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다. 명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. 이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily carry out the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention, parts not related to the description are omitted, and similar parts are denoted by like reference characters throughout the specification. Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 데크로드에 설치되는 난간 구조체 및 난간 구조체의 시공방법에 관한 것이다. FIELD OF THE INVENTION The present invention relates to a balustrade structure installed on a deck rod and a method of constructing a balustrade structure.

<제1실시예>&Lt; Embodiment 1 >

도 1에는 본 발명의 난간 구조체를 이루는 각 구성들의 분해도가 도시되어 있다. FIG. 1 shows an exploded view of each structure of the balustrade structure of the present invention.

기둥(1) 사이에, 제1브래킷(23)과 연결부재(3)를 매개로 하여 가로부재(2)가 설치된다. 상기 가로부재(2)는 연결부재(3)에 의해 기둥에 고정되는데, 연결부재(3)는 삽입되는 위치를 달리 함으로써 달라지는 기둥 사이의 거리에도 적절히 대응할 수가 있다. The transverse member 2 is provided between the columns 1 via the first bracket 23 and the connecting member 3. The transverse member 2 is fixed to a column by a connecting member 3, which can appropriately cope with the distance between the columns due to different positions of the connecting member 3. [

상기 가로부재(2)의 상하 간격을 조절하기 위해, 상기 연결부재(3)의 상하에 간격재(4)를 설치할 수 있다(도 2, 8, 9 참조). 간격재(4)의 길이(도 9의 화살표 방향)는 난간의 제원에 따라 적절히 결정하여 가로부재의 상하간격과 높이를 조절할 수 있다. 보다 세밀한 간격조절을 위해서는 간격재의 길이를 작게 제작하여 가로부재의 상하간격을 조절할 수 있다. 아울러 간격재는 연결부재를 아래에서 위로 지지하여 가로부재가 기울어지거나 아래로 가라앉지 않도록 한다. In order to adjust the vertical spacing of the transverse member 2, spacers 4 may be provided above and below the connecting member 3 (see Figs. 2, 8 and 9). The length (the direction of the arrow in Fig. 9) of the spacers 4 can be appropriately determined according to the specifications of the railing so that the vertical spacing and height of the lateral members can be adjusted. For a finer spacing adjustment, the length of the spacing member can be made smaller to adjust the vertical spacing of the lateral members. In addition, the spacer supports the connecting member from below to the top so that the transverse member does not slant or sink downward.

도 8, 9에는 간격재(4)의 일실시예가 도시되어 있는데, 연결부재와 마찬가지로, 제1돌출부(411), 제2돌출부(412), 제3돌출부(413), 제1홈부(414), 제2홈부(415), 단턱부(416)가 형성되어 있다. 8 and 9 show an embodiment of the spacer 4 in which a first protrusion 411, a second protrusion 412, a third protrusion 413, a first groove 414, A second trench 415, and a step portion 416 are formed.

간격재의 제1돌출부(411)는 제1홈(134)에 삽입되고, 제2돌출부(412)는 제2홈(135)에 삽입될 수 있는데, 간격재의 일부가 기둥프레임 밖으로 돌출되도록 할 때에는, 제1돌출부(411)를 제2홈(135)에 삽입할 수도 있다.The first protrusion 411 of the spacer can be inserted into the first groove 134 and the second protrusion 412 can be inserted into the second groove 135. When a part of the gap material protrudes outside the column frame, The first protrusion 411 may be inserted into the second groove 135.

도 2를 보면 기둥(1)에 연결부재(3)가 삽입되어 있고, 연결부재(3)에는 제1브래킷(23)이 연결되어 있고, 연결부재(3)의 위아래에는 간격재(4)가 설치되어 있는 것이 도시되어 있다. 2, the connecting member 3 is inserted into the column 1, the first bracket 23 is connected to the connecting member 3, and the spacing member 4 is provided above and below the connecting member 3 Is installed.

이하에서는 본 발명의 난간 구조체를 구성하는 세부 구성인, 기둥(1), 가로부재(2), 연결부재(3), 간격재(4)에 대해 상세히 설명한다.Hereinafter, the pillar 1, the transverse member 2, the connecting member 3, and the spacing member 4, which are the detailed constituent members of the balustrade structure of the present invention, will be described in detail.

상기 기둥(1)은 기둥프레임(11), 기둥재결합부(12), 연결부재결합부(13), 기둥재(14), 보강대결합부(15)를 포함한다. The column 1 includes a column frame 11, a column recombination unit 12, a connection unit recombination unit 13, a column member 14, and a bar connection unit 15.

도 3에는 기둥프레임(11)의 단면도가 도시되어 있는데, 상기 기둥재결합부(12)는 기둥재(14)가 결합되는 구성으로, 상기 기둥재(14)에는 걸림홈(141)이 형성되어 있고, 상기 기둥재결합부(12)에는 걸림돌기(121)가 형성되어 있어, 상기 걸림홈(141)에 상기 걸림돌기(121)가 안착됨으로써 기둥재(14)가 결합된다(도 10 참조). 3 shows a cross-sectional view of the column frame 11. The column re-combination unit 12 has a structure in which the column member 14 is coupled, and the column member 14 has a latching groove 141 formed therein And the pillar recombination unit 12 is formed with a locking protrusion 121 so that the locking protrusion 121 is seated in the locking groove 141 so that the pillar member 14 is engaged.

도 3에 도시되어 있는 것과 같이, 연결부재결합부(13)는 기둥프레임(11)의 길이방향으로 서로 마주보는 양측에 형성된 제1돌기(131), 제2돌기(132), 제3돌기(133), 제1홈(134), 제2홈(135), 제3홈(136)을 포함하고, 상기 제1돌기(131)는 상기 제1홈(134)과 제2홈(135) 사이에 위치하고, 상기 제2돌기(132)는 상기 제2홈(135)과 제3홈(136) 사이에 위치하며, 상기 제3돌기(133)는 상기 제3홈(136) 옆에 위치한다. 3, the connection part recombination part 13 includes first projections 131, second projections 132, third projections 133 formed on opposite sides of the column frame 11 facing each other in the longitudinal direction of the column frame 11, And the first protrusion 131 is formed between the first groove 134 and the second groove 135. The first groove 134 is formed in the first groove 134 and the second groove 135, And the second protrusion 132 is located between the second groove 135 and the third groove 136 and the third protrusion 133 is positioned beside the third groove 136.

그리고 상기 연결부재결합부(13)에 결합되는 연결부재(3)는 바디(31)와 커넥터(32)로 이루어져 있다. The connection member 3 coupled to the connection unit re-combination unit 13 includes a body 31 and a connector 32.

도 5, 6에 도시되어 있는 것과 같이, 상기 바디(31)의 길이방향 양측에는, 제1돌출부(311), 제2돌출부(312), 제3돌출부(313), 제1홈부(314), 제2홈부(315), 단턱부(316)가 형성된다. 5 and 6, a first protrusion 311, a second protrusion 312, a third protrusion 313, a first groove 314, and a second protrusion 313 are formed on both sides in the longitudinal direction of the body 31, The second trench 315 and the step portion 316 are formed.

연결부재(3)의 상기 제1돌출부(311)는 상기 제1홈(134)에 끼워질 수도 있고, 상기 제2홈(135)에 끼워질 수도 있다. 이렇게 제1돌출부(311)가 끼워지는 위치를 조절함으로써 기둥 사이의 거리에 맞도록 조절하여 가로부재를 설치할 수 있는 것이다. The first protrusion 311 of the connecting member 3 may be fitted in the first groove 134 and the second groove 135. By adjusting the position where the first projection 311 is fitted, it is possible to adjust the distance between the pillars to provide the lateral member.

즉, 기둥 사이의 간격이 작을 경우에는 상기 제1돌출부(311)를 상기 제1홈(134)에 끼우고, 기둥 사이의 간격이 클 경우에는 상기 제1돌출부(311)를 상기 제2홈(135)에 끼울 수 있다. 이러한 방식으로 조금씩 달라질 수 밖에 없는 기둥 사이의 간격에도 적절히 대응하여 쉽게 가로부재를 설치할 수 있게 된다. That is, when the interval between the columns is small, the first protrusion 311 is inserted into the first groove 134, and when the interval between the first and second protrusions 311 is large, 135, respectively. In this way, it is possible to easily install the lateral members correspondingly to the spacing between the pillars, which must be varied little by little.

또한 본 실시예에서는 홈의 수와 돌출부의 수를 세 개로 한 것을 예시하였는데, 좀 더 세밀한 간격조절을 위해서는 돌출부와 홈의 수를 4 이상 둘 수 있다. In this embodiment, the number of the grooves and the number of the protrusions are three. However, in order to control the gap more precisely, the number of protrusions and grooves can be set to 4 or more.

도 4에는 상기 연결부재결합부(13)에 연결부재(3)가 결합되어 있는 것이 도시되어 있는데, 도 4의 우측에는 제1돌출부(311)가 제1홈(134)에 끼워진 것을 도시하고 있고, 도 4의 좌측에는 제1돌출부(311)가 제2홈(135)에 끼워진 것을 도시하고 있다. 4 shows that the connection member 3 is coupled to the connection unit recombination unit 13. In the right side of FIG. 4, the first protrusion 311 is shown inserted into the first groove 134, 4 shows that the first projection 311 is fitted in the second groove 135 in the left side of FIG.

또한 기둥프레임(11)에는 보강대결합부(15)도 형성되어 있는데, 상기 보강대결합부에는 보강대(6)가 삽입되고, 상기 보강대가 데크로드에 결합되어 기둥 전체를 지지하게 된다.Also, the column frame 11 is provided with a reinforcing bar coupling portion 15. The reinforcing bar coupling portion is inserted into the reinforcing bar coupling portion 6, and the reinforcing bar is coupled to the deck rod to support the entire column.

기둥프레임 내부에 설치되는 보강대(6)는 기둥프레임 길이와 같게 설치될 수도 있으나, 도 1 및 도 12에 도시되어 있는 것과 같이 기둥 길이의 2/5 ~ 3/5 정도 삽입되도록 설치하면 된다. The reinforcing bars 6 provided inside the column frame may be installed to be equal to the length of the column frame, but they may be installed so as to be inserted into the column from 2/5 to 3/5 of the column length as shown in FIGS.

보강대는 아연도각관을 사용할 수 있다.Reinforcing bars can be made of galvanized steel pipes.

난간을 형성하는 가로부재(2)는 제1브래킷(23)에 삽입되어 고정되고, 상기 제1브래킷(23)은, 삽입부(231); 볼트공(233)이 형성된 연결부(232)를 포함하며, 상기 연결부재(3)의 커넥터(32)에는 볼트공(321)이 형성되어 있어, 상기 볼트공(321)과 상기 볼트공(233)에 볼트(52)가 삽입되고, 와셔(53)와 너트(51)로 체결하여 상기 연결부재(3)와 상기 제1브래킷(23)이 연결된다. The transverse member (2) forming the rail is inserted and fixed to the first bracket (23), and the first bracket (23) includes an insertion portion (231); And a bolt hole 231 is formed in the connector 32 of the connecting member 3. The bolt hole 321 and the bolt hole 233 are formed in the connector 32 of the connecting member 3, The bolts 52 are inserted into the first bracket 23 and the washer 53 and the nuts 51 are fastened to each other so that the connecting member 3 and the first bracket 23 are connected.

상기 연결부재와 제1브래킷은 서로 힌지결합 되어 있으므로 가로부재를 경사지게 설치할 수 있다. 따라서 경사진 데크로드에서도 가로부재를 쉽게 설치할 수 있는 것이다.Since the connecting member and the first bracket are hinged to each other, the horizontal member can be inclined. Therefore, it is easy to install the transverse member even on inclined deck rods.

그리고 상기 삽입부(231)에, 가로부재의 구성인 가로프레임(21)과 상기 가로프레임(21)에 결합되는 가로재(24)가 삽입된다. A transverse frame 21, which is a component of the transverse member, and a transverse member 24, which is coupled to the transverse frame 21, are inserted into the insertion portion 231.

상기 가로프레임에는 가로재결합부(22)가 형성되어 있어 상기 가로재결합부에 가로재(24)가 결합된다. 상기 가로재결합부(22)에는 걸림돌기(221)가 형성되어 있고, 상기 가로재(24)에는 걸림홈(241)이 형성되어 있어, 상기 걸림홈(241)에 상기 걸림돌기(221)가 안착됨으로써 결합된다. In the transverse frame, a transverse recombination unit 22 is formed to connect the transverse material 24 to the transverse recombination unit. The transverse member 24 is formed with a latching groove 241 and the latching protrusion 221 is seated in the latching groove 241 .

상기 상부캡, 하부캡은 합성수지, 고무, 실리콘, 우레탄 소재를 사용할 수 있고, 기둥재 및 가로재는 하드우드, 목재, 합성수지, 알루미늄 등을 사용할 수 있으며, 상기 기둥프레임, 가로프레임, 연결부재, 간격재는 합성수지, 금속을 사용할 수 있는데, 알루미늄이 바람직하다. The upper and lower caps may be made of synthetic resin, rubber, silicone, or urethane. The columns and the horizontal members may be formed of hard wood, wood, synthetic resin, aluminum, Synthetic resins and metals can be used as the material, preferably aluminum.

이하에서는 본 발명의 난간 구조체 시공방법에 대해 설명한다.Hereinafter, a method for constructing a balustrade structure according to the present invention will be described.

기둥(1)을 이루는 구성인 기둥프레임(11)과 기둥재(14)를 준비하고 기둥(1)을 조립하여 필요로 하는 수의 기둥(1)을 데크로드에 고정하고, 하부캡(8)을 씌운다. A column frame 11 and a column 14 constituting the column 1 are prepared and the columns 1 are assembled to fix a required number of columns 1 to the deck rod, .

그리고 가로프레임(21)에 가로재(24)를 결합하고, 이것을 제1브래킷(23)의 삽입부(231)에 삽입하여 가로부재(2)를 복수 개 준비하고, 상기 제1브래킷(23)에 연결부재(3)를 연결한다. A plurality of horizontal members 2 are prepared by inserting the transverse member 24 into the transverse frame 21 and inserting the transverse member 24 into the insertion portion 231 of the first bracket 23, The connecting member 3 is connected.

여기서 '기둥을 준비하고 데크로드에 고정하는 과정'과 '가로부재를 준비하고 연결부재를 체결하는 과정'은 동시에 진행될 수도 있고, 가로부재를 먼저 준비하고 기둥을 준비할 수도 있을 것이다.Here, the process of preparing the column and fixing it to the deck rod, and the process of preparing the transverse member and fastening the connecting member may be performed at the same time, or the transverse member may be prepared first and the column may be prepared.

기둥, 가로부재, 연결부재가 준비되어 있으므로 고정된 기둥의 상기 연결부재결합부(13)에 연결부재(3)를 결합시킴으로써 복수 개의 가로부재(2)를 기둥(1) 사이에 고정하게 된다. A plurality of the transverse members 2 are fixed between the columns 1 by connecting the connecting member 3 to the connecting portion recombination unit 13 of the fixed column.

이때 가로부재의 적절한 상하간격을 조절하고, 연결부재를 튼튼하게 지지하기 위해 복수 개의 연결부재의 상하 간격 사이에 간격재(4)를 끼워넣는다. At this time, the spacing member (4) is inserted between the upper and lower spaces of the plurality of connecting members so as to adjust the upper and lower intervals of the horizontal member and to firmly support the connecting member.

필요로 하는 연결부재와 간격재가 설치되고 나면 기둥(1)의 상부에 상부캡(7)을 고정하게 된다. After the necessary connecting members and spacers are installed, the upper cap 7 is fixed to the upper portion of the column 1.

그리고 보다 견고한 난간 구조체를 만들기 위해, 제1브래킷(23)의 삽입부(231)에 가로프레임(21)과 가로재(24)가 삽입된 부분, 기둥프레임에 연결부재가 삽입된 부분, 상부캡(7)이 씌워진 부분에는 스크류나사(9)를 체결할 수 있다(도 9 참조).A portion where the horizontal frame 21 and the horizontal member 24 are inserted into the insertion portion 231 of the first bracket 23, a portion where the connection member is inserted into the column frame, The screw thread 9 can be fastened to the part covered with the screw 7 (see FIG. 9).

난간 구조체를 사용하다가 일부 가로부재가 파손되거나, 내구성에 문제가 생겼을 때에는 간편하게 문제가 되는 해당 가로부재만 교체가 가능하다. When using a balustrade structure, when some of the horizontal members are damaged or durability problems occur, only the corresponding horizontal members can be replaced easily.

위에서 설명한 시공과정의 역순으로 교체하면 되는데, 즉 상부캡(7)을 분리하고, 파손된 가로부재의 위에 있는 가로부재와 간격재를 분리한 후, 파손된 가로부재를 교체하고, 가로부재, 간격재, 상부캡을 원상태대로 조립하면 교체가 완료된다.In other words, the upper cap 7 is removed, and the horizontal member and the spacing member on the broken horizontal member are separated from each other. Then, the broken horizontal member is replaced, and the horizontal member, Replace ash and upper cap as they were.

<제2실시예>&Lt; Embodiment 2 >

이하 도 18 내지 도 23을 참조하여 제1실시예의 변형예인 제2실시예를 설명한다. 제2실시예를 설명함에 있어서 제1실시예와 중복되는 사항에 대한 설명은 생략한다.A second embodiment, which is a modification of the first embodiment, will now be described with reference to Figs. 18 to 23. Fig. In the following description of the second embodiment, the description of the elements overlapping with those of the first embodiment will be omitted.

기둥프레임(11)의 보강대결합부(15)에 삽입되는 보강대(6)는 하부관절브래킷(600)을 통해 데크로드에 결합된다.The reinforcing bar 6 inserted into the reinforcing bar coupling portion 15 of the column frame 11 is coupled to the deck rod via the lower joint bracket 600. [

상기 기둥(1)의 하단부에는 하부관절브래킷(600)이 연결된다. 상기 보강대(6)는 하부관절브래킷(600)에서 상방으로 연장된다.A lower joint bracket 600 is connected to the lower end of the column 1. [ The reinforcing bar 6 extends upward from the lower joint bracket 600.

하부관절브래킷(600)은 서로 회동가능하게 연결되는 제2브래킷(610)과 제3브래킷(630)을 포함한다. 제2브래킷(610)은 데크로드에 고정되고, 제3브래킷(630)은 기둥(10)에 연결 고정된다.The lower joint bracket 600 includes a second bracket 610 and a third bracket 630 that are pivotally connected to each other. The second bracket 610 is fixed to the deck rod, and the third bracket 630 is fixedly connected to the pillar 10.

상기 제2브래킷(610)은 상기 데크로드와 마주하는 바닥판(611) 및 상기 바닥판(611)의 중앙부에서 상방으로 연장되는 제1수직판(612)을 포함한다.  The second bracket 610 includes a bottom plate 611 facing the deck rod and a first vertical plate 612 extending upward from the center of the bottom plate 611.

바닥판(611)은 데크로드에 고정될 수 있다. 바닥판(611)이 데크로드에 고정된다는 개념은, 바닥판(611)이 데크로드에 직접 접하여 고정되는 것뿐만 아니라, 다른 구성을 통해 고정되는 것을 포함하는 개념이다. 가령 바닥판(611)은 하부캡(8)의 상부면에 고정되고, 하부캡(8)이 데크로드에 고정되는 방식으로, 바닥판(611)이 데크로드에 고정될 수도 있다. 물론 바닥판(611)이 직접 데크로드에 고정되고, 하부캡(8)은 데크로드에 고정된 하부관절브래킷(600)을 커버하여 외부로부터 보이지 않도록 가리는 방식으로 고정될 수도 있다.The bottom plate 611 can be fixed to the deck rod. The concept that the bottom plate 611 is fixed to the deck load is a concept including that the bottom plate 611 is fixed not only directly in contact with the deck load, but also through other configurations. The bottom plate 611 may be fixed to the upper surface of the lower cap 8 and the bottom plate 611 may be fixed to the deck rod in such a manner that the lower cap 8 is fixed to the deck rod. Of course, the bottom plate 611 may be directly fixed to the deck rod, and the lower cap 8 may be fixed in such a manner as to cover the lower joint bracket 600 fixed to the deck rod so as to be hidden from the outside.

제1수직판(612)은 상기 바닥판(611)의 중앙부에서 상방으로 연장된다. 상기 제1수직판(612)은 소정의 간격을 두고 한 쌍 구비될 수 있다. 제1수직판의 상단부는 둥근 반원형으로 마무리될 수 있다. 또한 상기 제1수직판의 상단부는 도시된 바와 같이 후술할 연결판(639)의 저면과 이격되어 있을 수 있다. 이와 달리 상기 제1수직판의 상단부는 연결판(639)의 저면과 접할 수도 있다.The first vertical plate 612 extends upward from the central portion of the bottom plate 611. The first vertical plates 612 may be provided at a predetermined interval. The upper end of the first vertical plate may be finished in a round semicircular shape. In addition, the upper end of the first vertical plate may be spaced apart from the lower surface of the connection plate 639, which will be described later. Alternatively, the upper end of the first vertical plate may be in contact with the bottom of the connection plate 639.

상기 제1수직판에는 복수 개의 관통홀(6123)이 마련된다. 상기 복수 개의 관통홀(6123)은 상기 제1수직판을 포함하는 평면에 대한 법선 방향으로 관통되어 있다. 복수 개의 상기 관통홀(6123)은, 제1수직판의 상단부의 둥근 반원의 중심에 대해, 동일한 거리에 배치된다. 상기 제1수직판(612)의 관통홀(6123)은 원호 형상의 장공일 수 있다. 상기 관통홀(6123)은 상기 제1수직판의 상단부의 둥근 반원의 중심에 대해 방사 상으로 배치될 수 있다.The first vertical plate is provided with a plurality of through holes 6123. The plurality of through holes 6123 pass through in the normal direction to the plane including the first vertical plate. The plurality of through holes 6123 are arranged at the same distance with respect to the center of a round semicircle of the upper end of the first vertical plate. The through hole 6123 of the first vertical plate 612 may be an arc-shaped slot. The through-hole 6123 may be arranged radially with respect to the center of the round semicircle of the upper end of the first vertical plate.

상기 제3브래킷(630)은 상기 기둥(1)의 하단부와 마주하는 연결판(639) 및 상기 연결판(639)의 중앙부에서 하방으로 연장되는 제2수직판(631)을 포함한다. The third bracket 630 includes a connecting plate 639 facing the lower end of the column 1 and a second vertical plate 631 extending downward from the center of the connecting plate 639.

연결판(639)은 기둥(1)에 고정될 수 있다. 상기 보강대(6)는 상기 연결판(639)의 중앙부에서 상방으로 연장될 수 있다. 따라서 상기 보강대(6)를 상기 기둥프레임(11)의 보강대결합부(15)에 삽입하면, 상기 기둥(1)과 상기 연결판(939)는 상호 연결된다.The connecting plate 639 can be fixed to the column 1. [ The reinforcing bar 6 may extend upward from a central portion of the connecting plate 639. [ Therefore, when the reinforcing bar 6 is inserted into the bar connecting portion 15 of the column frame 11, the column 1 and the connecting plate 939 are connected to each other.

제2수직판(631)은 상기 연결판(639)의 중앙부에서 하방으로 연장된다. 상기 제2수직판(631)은 상기 한 쌍의 제1수직판(612) 사이에 삽입되도록 하나 구비될 수 있다. 물론 제2수직판(631)은 상기 한 쌍의 제1수직판(612)이 사이 사이에 끼워지도록 3개 구비될 수도 있다. 아울러 제1수직판(612)이 하나 구비되고, 제2수직판(631)이 2개 구비될 수도 있음은 물론이다. 즉 수직판의 개수는 특별히 제한되지 않을 수 있다.The second vertical plate 631 extends downward from the central portion of the connecting plate 639. [ The second vertical plate 631 may be inserted between the pair of first vertical plates 612. Of course, three second vertical plates 631 may be provided so as to sandwich the pair of first vertical plates 612 therebetween. It goes without saying that one first vertical plate 612 may be provided and two second vertical plates 631 may be provided. That is, the number of vertical plates may not be particularly limited.

상기 제2수직판의 하단부는 둥근 반원형으로 마무리될 수 있다. 또한 상기 제2수직판의 하단부는 도시된 바와 같이 바닥판(611)의 상면과 이격되어 있을 수 있다. 이와 달리 상기 제2수직판의 하단부는 바닥판(611)의 상면과 접할 수도 있다.The lower end of the second vertical plate may be finished in a round semicircular shape. The lower end of the second vertical plate may be spaced apart from the upper surface of the bottom plate 611 as shown in FIG. Alternatively, the lower end of the second vertical plate may be in contact with the upper surface of the bottom plate 611.

상기 제2수직판에는 복수 개의 관통홀(미도시)이 마련된다. 상기 복수 개의 관통홀은 상기 제2수직판을 포함하는 평면에 대한 법선 방향으로 관통되어 있다. 복수 개의 상기 관통홀은, 제2수직판의 하단부의 둥근 반원의 중심에 대해, 동일한 거리에 배치된다. 상기 제2수직판의 관통홀은 원호 형상의 장공일 수 있다. 상기 관통홀은 상기 제2수직판의 하단부의 둥근 반원의 중심에 대해 방사 상으로 배치될 수 있다.The second vertical plate is provided with a plurality of through holes (not shown). And the plurality of through holes penetrate in a normal direction to a plane including the second vertical plate. The plurality of through-holes are arranged at the same distance with respect to the center of a round semicircle of the lower end of the second vertical plate. The through hole of the second vertical plate may be an arc-shaped slot. The through-hole may be arranged radially with respect to the center of the round semicircle of the lower end of the second vertical plate.

상기 제1수직판과 제2수직판의 관통홀 중 적어도 어느 하나의 수직판에 마련된 관통홀은 원호 형상의 장공일 수 있다. 즉 두 수직판 모두 장공 형상의 관통홀을 구비하거나, 두 수직판 중 어느 하나의 수직판은 장공 형상의 관통홀을 구비하고 다른 하나의 수직판은 원형의 관통홀을 구비할 수 있다.The through hole provided in the vertical plate of at least one of the first vertical plate and the through-hole of the second vertical plate may be an arc-shaped slot. In other words, both of the vertical plates may have through holes of the elongated shape, or one of the two vertical plates may have the elongated through hole, and the other vertical plate may have the circular through hole.

상기 두 수직판(612, 631)의 관통홀은, 상기 두 수직판(612, 631)을 그 회동 중심에 대해 정렬하였을 때 서로 마주하게 된다. 즉 제1수직판(612)의 상단부의 둥근 반원의 중심과, 제2수직판(631)의 하단부의 둥근 반원의 중심이 일치하도록 정렬한 상태에서, 상기 두 수직판의 관통홀을 서로 마주하게 된다. 즉 상기 제1수직판(612)의 상단부의 둥근 반원의 중심과, 제2수직판(631)의 하단부의 둥근 반원의 중심은 제2브래킷(610)과 제3브래킷(630)의 회동 중심이 된다.The through holes of the two vertical plates 612 and 631 face each other when the two vertical plates 612 and 631 are aligned with respect to the center of rotation thereof. The center of the round semicircle of the upper end of the first vertical plate 612 and the center of the round semicircle of the lower end of the second vertical plate 631 are aligned so as to face each other, do. That is, the center of the round semicircle at the upper end of the first vertical plate 612 and the center of the round semicircle at the lower end of the second vertical plate 631 are set such that the center of rotation of the second bracket 610 and the third bracket 630 do.

상기 두 수직판(612, 631)의 회동각을 조정한 후 서로 마주하는 상기 두 수직판의 관통홀들을 통해 볼트(52)와 너트(51)를 체결하여 두 브래킷의 수직판(612, 631)을 조이면, 두 브래킷이 회동되지 않도록 고정된다.After adjusting the rotation angle of the two vertical plates 612 and 631, the bolts 52 and the nuts 51 are fastened to each other through the through holes of the two vertical plates facing each other so that the vertical plates 612 and 631 of the two brackets, The two brackets are fixed so as not to rotate.

이하에서는 본 발명의 제2실시예의 난간 구조체 시공방법에 대해 설명한다. 물론 제1실시예와 중복되는 설명은 생략한다.Hereinafter, a method of constructing a balustrade structure according to a second embodiment of the present invention will be described. Of course, the description overlapping with the first embodiment will be omitted.

기둥(1)을 이루는 구성인 기둥프레임(11)과 기둥재(14)를 준비하고 기둥(1)을 조립하여 필요로 하는 수의 기둥(1)을 데크로드에 고정하고, 하부캡(8)을 씌운다.A column frame 11 and a column 14 constituting the column 1 are prepared and the columns 1 are assembled to fix a required number of columns 1 to the deck rod, .

상기 기둥(1)을 데크로드에 고정할 때, 상술한 하부관절브래킷(600)을 통해 고정한다. 하부관절브래킷(600)의 제2브래킷(610)과 제3브래킷(630)은 가조립된 상태로 준비될 수 있다. 즉 하부관절브래킷(600)은 제1수직판과 제2수직판의 관통홀을 통해 볼트(52)와 너트(51)를 느슨하게 체결함으로써 제2브래킷과 제3브래킷이 상대적으로 회동 가능한 상태로 준비될 수 있다.When the column 1 is fixed to the deck rod, it is fixed through the lower joint bracket 600 described above. The second bracket 610 and the third bracket 630 of the lower joint bracket 600 can be prepared in a state where they are assembled together. That is, the lower joint bracket 600 loosely fastens the bolt 52 and the nut 51 through the through holes of the first vertical plate and the second vertical plate so that the second bracket and the third bracket can be prepared .

이와 같이 하부관절브래킷(600)을 준비한 상태에서, 제2브래킷(610)의 바닥판(611)을 데크로드에 고정하고, 제3브래킷(630)의 보강대(6)를 기둥프레임(11)의 보강대결합부(15)에 삽입하여 연결한다.The bottom plate 611 of the second bracket 610 is fixed to the deck rod and the reinforcing bar 6 of the third bracket 630 is fixed to the bottom of the column frame 11 And inserted into the reinforcing bar coupling portion 15 to be connected.

그리고 가로프레임(21)에 가로재(24)를 결합하고, 이것을 제1브래킷(23)의 삽입부(231)에 삽입하여 가로부재(2)를 복수 개 준비하고, 상기 제1브래킷(23)에 연결부재(3)를 연결한다. A plurality of horizontal members 2 are prepared by inserting the transverse member 24 into the transverse frame 21 and inserting the transverse member 24 into the insertion portion 231 of the first bracket 23, The connecting member 3 is connected.

여기서 '기둥을 준비하고 데크로드에 고정하는 과정'과 '가로부재를 준비하고 연결부재를 체결하는 과정'은 동시에 진행될 수도 있고, 가로부재를 먼저 준비하고 기둥을 준비할 수도 있을 것이다.Here, the process of preparing the column and fixing it to the deck rod, and the process of preparing the transverse member and fastening the connecting member may be performed at the same time, or the transverse member may be prepared first and the column may be prepared.

기둥의 상기 연결부재결합부(13)에 연결부재(3)를 결합시킴으로써 복수 개의 가로부재(2)를 기둥(1) 사이에 고정하되, 복수 개의 연결부재의 상하 간격 사이에 간격재(4)를 끼워 넣어 가로부재(2)의 간격을 유지할 수 있다.A plurality of transverse members (2) are fixed between the columns (1) by connecting the connecting member (3) to the connecting portion reunion portion (13) of the column, So that the gap between the transverse members 2 can be maintained.

상기 하부관절브래킷(600)은 이러한 시공 과정 중 적절한 시점에, 회동되지 않도록 고정될 수 있다.The lower joint bracket 600 can be fixed so as not to rotate at an appropriate time during the construction process.

제2실시예에 따르면, 기둥(1) 사이의 가로부재(2)가 연결부재(3)에 의해 거리 조절 가능하고, 기둥(1)과 가로부재(2)가 연결부재(3)와 제1브래킷(23)에 의해 각도 조절 가능하며, 기둥(1)과 데크로드가 하부관절브래킷(600)을 통해 각도 조절 가능하다. 따라서 데크 시공 현장에 경사면이 있더라도, 시공이 매우 간편하다.According to the second embodiment, the transverse member 2 between the columns 1 is adjustable in distance by the connecting member 3 and the column 1 and the transverse member 2 are connected to the connecting member 3 and the first The column 1 and the deck rod are adjustable in angle through the lower joint bracket 600. Therefore, even if there is a slope on the deck construction site, construction is very easy.

이상과 같이 본 발명에 대해서 예시한 도면을 참조로 하여 본 발명을 설명하였으나, 본 명세서에 개시된 실시예와 도면에 의해 본 발명이 한정되는 것은 아니며, 본 발명의 기술사상의 범위 내에서 통상의 기술자에 의해 다양한 변형이 이루어질 수 있음은 자명하다. 아울러 앞서 본 발명의 실시예를 설명하면서 본 발명의 구성에 따른 작용 효과를 명시적으로 기재하여 설명하지 않았을 지라도, 해당 구성에 의해 예측 가능한 효과 또한 인정되어야 함은 당연하다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, It will be understood that various modifications may be made by those skilled in the art. Although the embodiments of the present invention have been described in detail above, the effects of the present invention are not explicitly described and described, but it is needless to say that the effects that can be predicted by the configurations should also be recognized.

1. 기둥
11. 기둥프레임 12. 기둥재결합부
121. 걸림돌기
13. 연결부재결합부 131. 제1돌기
132. 제2돌기 133. 제3돌기
134. 제1홈 135. 제2홈
136. 제3홈 14. 기둥재
141. 걸림홈 15. 보강대결합부
2. 가로부재 21. 가로프레임
22. 가로재결합부 221. 걸림돌기
23. 제1브래킷 231. 삽입부
232. 연결부 233. 볼트공
24. 가로재 241. 걸림홈
3. 연결부재 31. 바디
32. 커넥터 311. 제1돌출부
312. 제2돌출부 313. 제3돌출부
314. 제1홈부 315. 제2홈부
316. 단턱부 321. 볼트공
4. 간격재 41. 바디
411. 제1돌출부 412. 제2돌출부
413. 제3돌출부 414. 제1홈부
415. 제2홈부 416. 단턱부
51. 너트 52. 볼트
53. 와셔
6. 보강대 600. 하부관절브래킷
610. 제2브래킷 611. 바닥판
612: 제1수직판 6123. 관통홀
630. 제3브래킷 631: 제2수직판
639: 연결판
7. 상부캡
8. 하부캡 9. 스크류나사
1. Column
11. Column Frame 12. Column Reassembly
121. Strapping
13. Re-connection part 131. First protrusion
132. Second projection 133. Third projection
134. First groove 135. Second groove
136. Third groove 14. Column
141. Retaining groove 15. Reinforcement block engaging portion
2. Horizontal member 21. Horizontal frame
22. Horizontal recombination unit 221. Locking unit
23. First bracket 231. Insert
232. Connection 233. Bolt hole
24. Lateral Fittings 241. Fitting Holes
3. Connecting member 31. Body
32. Connector 311. First protrusion
312. Second protrusion 313. Third protrusion
314. First groove 315. Second groove
316. Step jaw 321. Bolt ball
4. Interval 41. Body
411. First protrusion 412. Second protrusion
413. Third protrusion 414. First groove
415. Second groove portion 416. Short-
51. Nuts 52. Bolts
53. Washers
6. Rib 600. Lower joint bracket
610. Second bracket 611. Bottom plate
612: first vertical plate 6123. through hole
630. Third bracket 631: second vertical plate
639: Connection plate
7. Upper cap
8. Lower cap 9. Screw screw

Claims (9)

기둥(1); 상기 기둥(1) 사이에 설치되는 가로부재(2); 상기 기둥(1)과 가로부재(2)를 연결하는 연결부재(3); 및 상기 기둥(1)의 하부에 설치되는 하부관절브래킷(600);을 포함하는 데크로드 난간 구조체에 있어서,
상기 기둥(1)은,
기둥재결합부(12), 연결부재결합부(13), 및 보강대결합부(15)가 형성된 기둥프레임(11)을 포함하고,
상기 가로부재(2)는,
가로재결합부(22)가 형성된 가로프레임(21) 및 제1브래킷(23)을 포함하며,
상기 연결부재(3)는,
상기 연결부재결합부(13)에 결합되는 바디(31) 및 상기 제1브래킷(23)에 볼트(52)에 의해 체결되는 커넥터(32)를 포함하되,
상기 연결부재결합부(13)는,
기둥프레임(11)의 길이방향으로 서로 마주보는 양측에 형성된 제1돌기(131), 제2돌기(132), 제3돌기(133), 제1홈(134), 제2홈(135), 제3홈(136)을 포함하고,
상기 제1돌기(131)는 상기 제1홈(134)과 제2홈(135) 사이에 위치하고, 상기 제2돌기(132)는 상기 제2홈(135)과 제3홈(136) 사이에 위치하며, 상기 제3돌기(133)는 상기 제3홈(136) 옆에 위치하고,
상기 바디(31)의 길이방향 양측에는,
제1돌출부(311), 제2돌출부(312), 제3돌출부(313), 제1홈부(314), 제2홈부(315), 단턱부(316)가 형성되고,
상기 제1돌출부(311)와 제2돌출부(312) 사이에 상기 제1홈부(314)가 위치하고, 상기 제2돌출부(312)와 제3돌출부(313) 사이에 상기 제2홈부(315)가 위치하며, 상기 제3돌출부(313) 옆에 상기 단턱부(316)가 위치하고,
상기 제1돌출부(311)는 상기 제1홈(134) 또는 상기 제2홈(135)에 끼워질 수 있고,
상기 하부관절브래킷(600)은,
데크로드 쪽에 고정되는 제2브래킷(610) 및 상기 기둥(1)의 하부에 연결되는 제3브래킷(630)을 포함하는 것을 특징으로 하는 데크로드 난간 구조체.
A column 1; A transverse member (2) installed between the columns (1); A connecting member 3 connecting the column 1 and the transverse member 2; And a lower joint bracket (600) installed at a lower portion of the column (1), the deck rod guardrail structure
The column (1)
And a column frame (11) formed with a column re-joining portion (12), a joining portion re-joining portion (13), and a rack joining portion (15)
The transverse member (2)
A horizontal frame 21 and a first bracket 23 on which the horizontal recombination unit 22 is formed,
The connecting member (3)
A body 31 coupled to the connector reassembling part 13 and a connector 32 fastened to the first bracket 23 by bolts 52,
The connection unit re-combination unit (13)
The first projections 131, the second projections 132, the third projections 133, the first grooves 134, the second grooves 135, and the second projections 131 formed on the opposite sides of the column frame 11 in the longitudinal direction, And a third groove (136)
The first protrusion 131 is located between the first groove 134 and the second groove 135 and the second protrusion 132 is located between the second groove 135 and the third groove 136 And the third projection 133 is positioned beside the third groove 136,
On both sides in the longitudinal direction of the body 31,
The first protrusion 311, the second protrusion 312, the third protrusion 313, the first groove 314, the second groove 315 and the step 316 are formed,
The first groove 314 is positioned between the first protrusion 311 and the second protrusion 312 and the second groove 315 is positioned between the second protrusion 312 and the third protrusion 313 The step portion 316 is positioned adjacent to the third protrusion 313,
The first protrusion 311 can be fitted into the first groove 134 or the second groove 135,
The lower joint bracket (600)
A second bracket (610) fixed to the deck rod side, and a third bracket (630) connected to a lower portion of the column (1).
삭제delete 청구항 1에 있어서,
상기 난간 구조체는,
제1돌출부(411), 제2돌출부(412), 제3돌출부(413), 제1홈부(414), 제2홈부(415), 단턱부(416)가 형성되어 있는 1개 이상의 간격재(4)를 더 포함하되,
상기 간격재(4)가 상기 연결부재(3) 사이에 설치됨으로써 상기 가로부재(2)의 상하 간격을 조절할 수 있는 것을 특징으로 하는 데크로드 난간 구조체.
The method according to claim 1,
The above-
(Not shown) having one or more first protrusions 411, second protrusions 412, third protrusions 413, first grooves 414, second grooves 415, 4)
Wherein the spacing member (4) is provided between the connecting members (3) to adjust the vertical spacing of the transverse member (2).
청구항 1에 있어서,
상기 기둥재결합부(12)에 기둥재(14)가 결합되되,
상기 기둥재결합부(12)에는 걸림돌기(121)가 형성되어 있고, 상기 기둥재(14)에는 걸림홈(141)이 형성되어 있어, 상기 걸림홈(141)에 상기 걸림돌기(121)가 안착되는 것을 특징으로 하는 데크로드 난간 구조체.
The method according to claim 1,
The column member (14) is coupled to the column recombination unit (12)
The pillar recombination unit 12 is provided with a locking protrusion 121 and a locking groove 141 is formed in the column member 14. The locking protrusion 121 is seated in the locking groove 141 Wherein the deck-load balancer structure is configured to receive the deck load balancer structure.
청구항 1에 있어서,
상기 가로재결합부(22)에 가로재(24)가 결합되되,
상기 가로재결합부(22)에는 걸림돌기(221)가 형성되어 있고, 상기 가로재(24)에는 걸림홈(241)이 형성되어 있어, 상기 걸림홈(241)에 상기 걸림돌기(221)가 안착되는 것을 특징으로 하는 데크로드 난간 구조체.
The method according to claim 1,
A transverse member (24) is coupled to the transverse recombination unit (22)
The transverse member 24 is formed with a latching groove 241 and the latching protrusion 221 is seated in the latching groove 241 Wherein the deck-load balancer structure is configured to receive the deck load balancer structure.
청구항 1에 있어서,
상기 커넥터(32)에는 볼트공(321)이 형성되고,
상기 제1브래킷(23)은, 삽입부(231); 볼트공(233)이 형성된 연결부(232)를 포함하며,
상기 연결부재(3)와 상기 제1브래킷(23)은, 상기 볼트공(321)과 상기 볼트공(233)에 볼트(52)가 삽입됨으로써 연결되고,
상기 삽입부(231)에는, 상기 가로프레임(21) 및 상기 가로프레임(21)에 결합되는 가로재(24)가 삽입되는 것을 특징으로 하는 데크로드 난간 구조체.
The method according to claim 1,
A bolt hole 321 is formed in the connector 32,
The first bracket 23 includes an insertion portion 231; And a connecting portion 232 formed with a bolt hole 233,
The connecting member 3 and the first bracket 23 are connected by inserting bolts 52 into the bolt hole 321 and the bolt hole 233,
And a transverse member (24) coupled to the transverse frame (21) and the transverse frame (21) is inserted into the insertion portion (231).
청구항 1에 있어서,
상기 제2브래킷(610)과 제3브래킷(630)은 회동 가능하게 연결되고,
상기 제2브래킷(610)은,
상기 데크로드와 마주하는 바닥판(611) 및 상기 바닥판(611)의 중앙부에서 상방으로 연장되는 제1수직판(612)을 포함하고,
상기 제3브래킷(630)은,
상기 기둥(1)과 마주하는 연결판(639) 및 상기 연결판(639)의 중앙부에서 하방으로 연장되는 제2수직판(631)을 포함하며,
상기 제1수직판(612)과 제2수직판(631)에는, 상기 제1수직판과 제2수직판을 포함하는 평면에 대한 법선 방향으로 관통된 관통홀이 구비되고,
상기 두 수직판(612, 631)의 관통홀은, 상기 두 수직판(612, 631)을 그 회동 중심에 대해 정렬하였을 때 서로 마주하며,
상기 제1수직판(612)의 관통홀(6123)과 제2수직판(631)의 관통홀 중 적어도 어느 하나의 수직판에 형성된 관통홀은, 두 수직판(612, 631)의 회동 중심에 대한 호 형상의 장공이며,
상기 두 수직판(612, 631)의 회동각을 조정한 후 상기 관통홀을 통해 볼트(52)와 너트(51)를 체결하여 두 수직판(612, 631)이 회동되지 않도록 고정할 수 있는 것을 특징으로 하는 데크로드 난간 구조체.
The method according to claim 1,
The second bracket 610 and the third bracket 630 are rotatably connected,
The second bracket (610)
A bottom plate 611 facing the deck rod, and a first vertical plate 612 extending upward from a central portion of the bottom plate 611,
The third bracket (630)
A connection plate 639 facing the column 1 and a second vertical plate 631 extending downward from a central portion of the connection plate 639,
The first vertical plate 612 and the second vertical plate 631 are provided with through holes penetrating in the normal direction to the plane including the first vertical plate and the second vertical plate,
The through holes of the two vertical plates 612 and 631 face each other when the two vertical plates 612 and 631 are aligned with respect to the center of rotation thereof,
The through holes formed in the vertical plate of at least one of the through holes 6123 of the first vertical plate 612 and the through holes of the second vertical plate 631 are located at the center of rotation of the two vertical plates 612 and 631 It is a long arc of the arc shape,
It is possible to fix the two vertical plates 612 and 631 so as not to rotate by fixing the rotation angle of the two vertical plates 612 and 631 and then fastening the bolts 52 and the nuts 51 through the through holes Features deck road railings.
청구항 7에 있어서,
상기 연결판(639)에는 그 중앙부에서 상방으로 연장되는 보강대(6)가 마련되고,
상기 보강대결합부(15)에 상기 보강대(6)가 삽입되어 상기 기둥(1)을 상기 하부관절브래킷에 고정시키는 것을 특징으로 하는 데크로드 난간 구조체.
The method of claim 7,
The connecting plate 639 is provided with a reinforcing bar 6 extending upward from its central portion,
Wherein the reinforcing bar (6) is inserted into the reinforcing bar coupling part (15) to fix the column (1) to the lower joint bracket.
청구항 1, 청구항 7 또는 청구항 8의 난간 구조체를 시공하는 방법에 있어서,
a) 복수 개의 하부관절브래킷(600)을 준비하고, 복수 개의 상기 하부관절브래킷(600)을 데크로드에 고정하는 단계;
b) 복수 개의 기둥(1)을 준비하고, 복수 개의 상기 기둥(1)을 상기 하부관절브래킷(600)에 고정하는 단계;
c) 복수 개의 가로부재(2)를 준비하고, 복수 개의 상기 가로부재(2)의 양 끝에 연결부재(3)를 체결하는 단계;
d) 상기 연결부재(3)를 연결부재결합부(13)에 결합시킴으로써 복수 개의 상기 가로부재(2)를 상기 기둥(1) 사이에 고정하는 단계; 및
e) 상기 기둥(1)의 상부에 상부캡(7)을 고정하는 단계를 포함하는 데크로드 난간 구조체의 시공방법.
A method of constructing a balustrade structure according to claim 1, claim 7 or claim 8,
a) preparing a plurality of lower joint brackets (600) and fixing the plurality of lower joint brackets (600) to the deck rods;
b) preparing a plurality of pillars (1) and fixing the plurality of pillars (1) to the lower joint bracket (600);
c) preparing a plurality of transverse members (2) and fastening the connecting members (3) to both ends of the plurality of transverse members (2);
d) fixing the plurality of transverse members (2) between the columns (1) by connecting the connecting member (3) to the connecting portion recombination unit (13); And
e) fixing the top cap (7) to the top of the column (1).
KR1020180159108A 2018-12-11 2018-12-11 Deck road handrail structure and construction method KR101991026B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180159108A KR101991026B1 (en) 2018-12-11 2018-12-11 Deck road handrail structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180159108A KR101991026B1 (en) 2018-12-11 2018-12-11 Deck road handrail structure and construction method

Publications (1)

Publication Number Publication Date
KR101991026B1 true KR101991026B1 (en) 2019-06-19

Family

ID=67104128

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180159108A KR101991026B1 (en) 2018-12-11 2018-12-11 Deck road handrail structure and construction method

Country Status (1)

Country Link
KR (1) KR101991026B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110387814A (en) * 2019-07-24 2019-10-29 温州众新建设有限公司 A kind of municipal administration Bridge guardrail and its construction method
KR102164209B1 (en) 2020-07-21 2020-10-12 (주)제이엠멀티 Banister struture for deck road
WO2021189140A1 (en) * 2020-03-24 2021-09-30 Peak Innovations Inc. Railing systems and brackets for same
KR102341317B1 (en) 2021-04-08 2021-12-17 조광덕 Construction Method of Deck Rod Railings with Inserted Flow Bracket

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100236192B1 (en) 1997-12-20 1999-12-15 이구택 Process and method for producing hot metal as produce from fine iron ore
KR100458474B1 (en) 1997-06-30 2005-01-27 주식회사 하이닉스반도체 Bitline of semiconductor device and fabricating method thereof to increase signal transfer speed and minimize contact resistance
KR101429116B1 (en) 2013-10-31 2014-08-13 주식회사 디자인큐나인 Fence junction coupling device
KR101506953B1 (en) 2014-07-24 2015-03-30 동아에스텍 주식회사 Base hardware for binding pillar of deckroad
KR101569888B1 (en) 2015-07-09 2015-11-17 주식회사 중동 Deck Wood Connection And Deck Wood Bridge Including Such Deck Wood Connection
KR101582118B1 (en) 2013-04-18 2016-01-04 가부시키가이샤 아오이 Free handrail
KR101930844B1 (en) * 2018-09-11 2018-12-19 아이앤지산업(주) Deck road handrail structure and construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100458474B1 (en) 1997-06-30 2005-01-27 주식회사 하이닉스반도체 Bitline of semiconductor device and fabricating method thereof to increase signal transfer speed and minimize contact resistance
KR100236192B1 (en) 1997-12-20 1999-12-15 이구택 Process and method for producing hot metal as produce from fine iron ore
KR101582118B1 (en) 2013-04-18 2016-01-04 가부시키가이샤 아오이 Free handrail
KR101429116B1 (en) 2013-10-31 2014-08-13 주식회사 디자인큐나인 Fence junction coupling device
KR101506953B1 (en) 2014-07-24 2015-03-30 동아에스텍 주식회사 Base hardware for binding pillar of deckroad
KR101569888B1 (en) 2015-07-09 2015-11-17 주식회사 중동 Deck Wood Connection And Deck Wood Bridge Including Such Deck Wood Connection
KR101930844B1 (en) * 2018-09-11 2018-12-19 아이앤지산업(주) Deck road handrail structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110387814A (en) * 2019-07-24 2019-10-29 温州众新建设有限公司 A kind of municipal administration Bridge guardrail and its construction method
WO2021189140A1 (en) * 2020-03-24 2021-09-30 Peak Innovations Inc. Railing systems and brackets for same
KR102164209B1 (en) 2020-07-21 2020-10-12 (주)제이엠멀티 Banister struture for deck road
KR102341317B1 (en) 2021-04-08 2021-12-17 조광덕 Construction Method of Deck Rod Railings with Inserted Flow Bracket

Similar Documents

Publication Publication Date Title
KR101991026B1 (en) Deck road handrail structure and construction method
KR101852360B1 (en) Deckroad system for installing construction easy
KR101973330B1 (en) Deck load system with improved assembly and aesthetics
KR101793243B1 (en) A Deck Road
KR101473157B1 (en) Connecting Structure for Handrail and Post of Fence Panel with Adjusting Joining Angle
KR100933528B1 (en) Prefabricated structure using profile
KR102122981B1 (en) Banister support fixing structure of deck rod
US11035147B2 (en) Raking barrier panel
KR200439417Y1 (en) Prefabricated balustrade
KR101385630B1 (en) Frame assembly for deck-road
KR101930844B1 (en) Deck road handrail structure and construction method
KR101952924B1 (en) Handrail coupling apparatus
KR101920252B1 (en) Stairway railing
KR20080005462U (en) A fence
KR101630189B1 (en) Flexible fence
KR102221132B1 (en) Cut-off slope inspection road and its construction method
KR102031079B1 (en) Lower part assembly of deckroad handrail
KR100373783B1 (en) A temporary bracket for construction of precast concrete beam bridge and the temporary work method using the same
KR200350314Y1 (en) assembling body for fence
CA2932974A1 (en) Surface mount post assembly,post clip, modular barrier system and related method for assembly
KR200438908Y1 (en) Deck frame for playing equipment
KR101178814B1 (en) A guardrail or a fence that can adjust an angle in the slope-ground
KR101712376B1 (en) Wood type support for guardrail
JP6998653B2 (en) Construction method of step floor support legs and step floor structure using them
KR101616229B1 (en) Assembly type fence

Legal Events

Date Code Title Description
N231 Notification of change of applicant
GRNT Written decision to grant