CN110377979A - The installation method of particularly serious Steel section member under restricted clearance, equipment - Google Patents

The installation method of particularly serious Steel section member under restricted clearance, equipment Download PDF

Info

Publication number
CN110377979A
CN110377979A CN201910581522.8A CN201910581522A CN110377979A CN 110377979 A CN110377979 A CN 110377979A CN 201910581522 A CN201910581522 A CN 201910581522A CN 110377979 A CN110377979 A CN 110377979A
Authority
CN
China
Prior art keywords
equipment
installation
particularly serious
restricted clearance
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910581522.8A
Other languages
Chinese (zh)
Inventor
贾勇
林应存
袁志文
杨凤军
杨斌
任波
董渝平
薛国东
黄飞
林伟鹏
洪小雨
李靖
张贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai 20 Smelter Construction Co Ltd
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai 20 Smelter Construction Co Ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai 20 Smelter Construction Co Ltd, China MCC20 Group Corp Ltd filed Critical Shanghai 20 Smelter Construction Co Ltd
Priority to CN201910581522.8A priority Critical patent/CN110377979A/en
Publication of CN110377979A publication Critical patent/CN110377979A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The installation method of particularly serious Steel section member under specifically a kind of restricted clearance of the present invention, equipment;It is characterized in that: including workshop model construction;The building of large-scale hoisting machinery and restricted clearance inner periphery environment;Emulation animation production;A series of design of the auxiliary devices of particularly serious type component, equipment in transfer, in place and installation process;Hoisting Program is formulated;Wherein, imaginary components are carried out using BIM technology, large-scale hoisting machinery is carried out by AutoCAD software and component, equipment, environment carry out plane projection analysis, cartoon setting is carried out to the model in restricted clearance by Navisworks software, 3 D stereo reproduces displacement, in place and installation overall process.This method can be realized in newly constructing the factory buildings, displacement, the in place and installation of particularly serious type component, equipment and other items in restricted clearance, and not need the installation in advance for carrying out the high article of the precision requirements such as particularly serious type component, equipment in advance.

Description

The installation method of particularly serious Steel section member under restricted clearance, equipment
Technical field
The present invention relates to steel constructions to build, equipment hoisting field, particularly serious Steel section member under specifically a kind of restricted clearance, The installation method of equipment.
Background technique
In workshop or under restricted clearance, the displacement of the super-huge component of counterweight, equipment and other items and installation in place are to place And space requirement is higher:
1, there is sufficient space around installation region to meet the operating of Large-scale Hoisting equipment;2, normal hanging method is leading Carry out component in restricted clearance, equipment and other items it is in place, then complete again around and top workshop component installation;3, it counts Drawing the component installed in place, equipment and other items will complete in advance and issue from producer, could not influence subsequent steel construction factory The construction in room;4, leading component in place, equipment and other items will carry out necessary finished product protection, and cannot have any damage, Traditional erection sequence in place is more demanding to finished product protection measure;5, according to traditional scheme, if the workshop of restricted clearance It has completed or original reuses and carries out particularly serious type component in workshop, when equipment article is installed in place, needed to surrounding space Workshop, building in region and surrounding other articles are removed, and traditional lifting requirements can be met.And such scheme is inevitable The waste of the resources such as financial resource and material resource is caused, and risk is higher, the required duration is longer.
And it can be realized particularly serious type component, equipment and other items erector in place in reality in the short time under restricted clearance It is necessary to meet following condition for work: 1, adequate space needed for meeting lifting installation in place;If 2, particularly serious type component, equipment And other items construct the factory buildings inside in newly, to accelerate to promote workshop building, and do not need that particularly serious type component is installed in place, is set in advance It is standby and other items;3, particularly serious type component, equipment and other items installation are carried out in workshop if it is reusing in original, and do not need to surrounding In place, installation exercise can be completed in the dismounting of original workshop and other items in space.These problems are all urgent need to solve the problems.This A little unfavorable factors not can effectively solve particularly serious type component under restricted clearance, sintering engineering driving using conventional construction method fastly The demand of speed installation.
Summary of the invention
The purpose of the invention patent is to solve the above problems, and providing one kind can be real in the restricted clearances such as old workshop Existing particularly serious type component, equipment and other items do not change surrounding space environment in displacement, in place and installation process, do not need factory yet The peripheral structures such as room are removed to meet displacement, method in place and installation requirement.
In order to achieve the above object, the present invention is implemented as follows:
The installation method of particularly serious Steel section member under restricted clearance, equipment, including
Step 1, workshop model construction;
The building of step 2, large-scale hoisting machinery and restricted clearance inner periphery environment;
Step 3, emulation animation production;
A series of design of the auxiliary devices of step 4, particularly serious type component, equipment in transfer, in place and installation process;
Step 5, Hoisting Program are formulated;
Wherein, step 1 ~ 4 carry out imaginary components using BIM software, then under virtual environment in true reappearance restricted clearance Particularly serious type component, the transfer of equipment and article, in place and installation environment carry out virtual analog;
Further, in step 1 ~ 4, large-scale hoisting machinery is carried out by AutoCAD software and component, equipment, environment carry out plane Projection Analysis,
Further, in step 3, cartoon setting, 3 D stereo are carried out to the model in restricted clearance by Navisworks software Displacement, in place and installation overall process are reproduced, realizes in Virtual Space particularly serious type component, equipment in dynamic observation restricted clearance And other items transfer, in place and installation etc. it is a series of during correlations with ambient enviroment, carrying out lifting trajectory analysis While, it analyzes and how to increase other auxiliary devices around existing facility;Selected Large-scale Hoisting equipment accurate simultaneously Erect-position and lifting operation operating condition.
This method can be realized in newly constructing the factory buildings, displacement in restricted clearance of particularly serious type component, equipment and other items, In place and installation, and the installation in advance for carrying out the high article of the precision requirements such as particularly serious type component, equipment in advance is not needed, into And unnecessary finished product protection measure is reduced, and the resources such as human and material resources, financial resources during finished product protection are greatly saved, it is real Existing environmentally protective engineering is gone on smoothly.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
The installation method of particularly serious type equipment under a kind of restricted clearance, including
Step 1, workshop model construction;
The building of step 2, large-scale hoisting machinery and restricted clearance inner periphery environment;
Step 3, emulation animation production;
A series of design of the auxiliary devices of step 4, particularly serious type component, equipment in transfer, in place and installation process;
Step 5, Hoisting Program are formulated;
Wherein, step 1 ~ 4 carry out imaginary components using BIM software, then under virtual environment in true reappearance restricted clearance Particularly serious type component, the transfer of equipment and article, in place and installation environment carry out virtual analog;
Further, in step 1 ~ 4, large-scale hoisting machinery is carried out by AutoCAD software and component, equipment, environment carry out plane Projection Analysis,
Further, in step 3, cartoon setting, 3 D stereo are carried out to the model in restricted clearance by Navisworks software Displacement, in place and installation overall process are reproduced, realizes in Virtual Space particularly serious type component, equipment in dynamic observation restricted clearance And other items transfer, in place and installation etc. it is a series of during correlations with ambient enviroment, carrying out lifting trajectory analysis While, it analyzes and how to increase other auxiliary devices around existing facility;Selected Large-scale Hoisting equipment accurate simultaneously Erect-position and lifting operation operating condition.
This method is compared with traditional lifting planning method and displacement, in-position installation method, by BIM technology to particularly serious A series of processes such as the displacement of type component, equipment and other items, in place and installation carry out virtual analog and carry out planning analysis, precisely Determine that the erect-position of hanging device, surrounding space environment are intuitively expressed, during Virtual Analysis, by assign model data, It can analyze out particularly serious type component, equipment and other items transfer, in place and installation track data and auxiliary device to need to design Size.And then strong data supporting is provided for the establishment of scheme.It can be used for constructing by three-dimensional tridimensional virtual simulation The visualization of operation is told somebody what one's real intentions are, and it is every in displacement, in place and installation process intuitively to express particularly serious type component, equipment and other items One details, and possible danger source in the process, and then to take reliable risk prevention measure in implementation process, finally reach It being capable of efficient fast accurate to a series of processes such as displacement, in place and installations in similar particularly serious type component, equipment and other items Complete a full set of content.

Claims (1)

1. the installation method of particularly serious Steel section member under a kind of restricted clearance, equipment, it is characterized in that: including
Step 1, workshop model construction;
The building of step 2, large-scale hoisting machinery and restricted clearance inner periphery environment;
Step 3, emulation animation production;
A series of design of the auxiliary devices of step 4, particularly serious type component, equipment in transfer, in place and installation process;
Step 5, Hoisting Program are formulated;
Wherein, step 1 ~ 4 carry out imaginary components using BIM software, then under virtual environment in true reappearance restricted clearance Particularly serious type component, the transfer of equipment and article, in place and installation environment carry out virtual analog;
Further, in step 1 ~ 4, large-scale hoisting machinery is carried out by AutoCAD software and component, equipment, environment carry out plane Projection Analysis,
Further, in step 3, cartoon setting, 3 D stereo are carried out to the model in restricted clearance by Navisworks software Displacement, in place and installation overall process are reproduced, realizes in Virtual Space particularly serious type component, equipment in dynamic observation restricted clearance And other items transfer, in place and installation etc. it is a series of during correlations with ambient enviroment, carrying out lifting trajectory analysis While, it analyzes and how to increase other auxiliary devices around existing facility;Selected Large-scale Hoisting equipment accurate simultaneously Erect-position and lifting operation operating condition.
CN201910581522.8A 2019-06-29 2019-06-29 The installation method of particularly serious Steel section member under restricted clearance, equipment Pending CN110377979A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910581522.8A CN110377979A (en) 2019-06-29 2019-06-29 The installation method of particularly serious Steel section member under restricted clearance, equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910581522.8A CN110377979A (en) 2019-06-29 2019-06-29 The installation method of particularly serious Steel section member under restricted clearance, equipment

Publications (1)

Publication Number Publication Date
CN110377979A true CN110377979A (en) 2019-10-25

Family

ID=68251382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910581522.8A Pending CN110377979A (en) 2019-06-29 2019-06-29 The installation method of particularly serious Steel section member under restricted clearance, equipment

Country Status (1)

Country Link
CN (1) CN110377979A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112010147A (en) * 2020-07-22 2020-12-01 上海二十冶建设有限公司 Rapid installation method of large-scale unit auxiliary equipment in limited space
CN112380603A (en) * 2020-11-13 2021-02-19 中建四局第六建设有限公司 BIM-based large prefabricated part hoisting simulation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060155402A1 (en) * 2001-11-21 2006-07-13 Dale Read 3d virtual manufacturing process
CN101714181A (en) * 2009-12-04 2010-05-26 煤炭科学研究总院西安研究院 Method for designing and drawing directional drilling trace under coal mine
CN108710743A (en) * 2018-05-15 2018-10-26 中国十七冶集团有限公司 A kind of steel structure hoisting based on BIM technology construction method in place
CN109918756A (en) * 2019-02-28 2019-06-21 上海二十冶建设有限公司 Application method of the BIM emulation technology in agglomerating chamber's driving installation exercise

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060155402A1 (en) * 2001-11-21 2006-07-13 Dale Read 3d virtual manufacturing process
CN101714181A (en) * 2009-12-04 2010-05-26 煤炭科学研究总院西安研究院 Method for designing and drawing directional drilling trace under coal mine
CN108710743A (en) * 2018-05-15 2018-10-26 中国十七冶集团有限公司 A kind of steel structure hoisting based on BIM technology construction method in place
CN109918756A (en) * 2019-02-28 2019-06-21 上海二十冶建设有限公司 Application method of the BIM emulation technology in agglomerating chamber's driving installation exercise

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112010147A (en) * 2020-07-22 2020-12-01 上海二十冶建设有限公司 Rapid installation method of large-scale unit auxiliary equipment in limited space
CN112380603A (en) * 2020-11-13 2021-02-19 中建四局第六建设有限公司 BIM-based large prefabricated part hoisting simulation method

Similar Documents

Publication Publication Date Title
CN107832498A (en) A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method
CN110377979A (en) The installation method of particularly serious Steel section member under restricted clearance, equipment
CN103116822A (en) Steel-making manufacturing execution management system based on visualized heat tracking
CN106408630A (en) Method for simulating optimized operation parameters of pump station based on VR interaction technology
CN111177824A (en) Aluminum alloy formwork construction method based on BIM technology
CN104063529A (en) Simulation method of layout planning of digital automobile plant
CN102608919A (en) Stamping single-station production simulating and verifying method
CN103680240A (en) Universal type simulation system for nuclear power plant three-waste technical control
CN111047685A (en) Method for realizing power plant BIM model panoramic roaming
CN106844840B (en) Method for realizing rapid modeling of subway station based on BIM
CN110795789A (en) Application method in scaffold engineering based on BIM (building information modeling) cooperation technology
CN105512414A (en) Non-linear mathematical modeling method for control on blast furnace top pressure
CN112765711A (en) BIM modeling method for green building simulation calculation
CN103544874A (en) Method for building advanced manufacturing simulation factory
CN108589725A (en) A kind of built-in fitting construction method based on BIM technology
CN111523166A (en) BIM technology-based massive steel structure installation deepening construction method
CN111047688A (en) Three-dimensional visual simulation method for power plant
CN103871108A (en) Simulation method for full steel structure lifting process based on 3D (third-dimensional) visualization technology
CN106354933A (en) BIM (building information modeling) technology based ultra-large steel making exhausted heat boiler pipeline pressure testing method
CN104299267A (en) GRG three-dimensional digital modeling construction method and system thereof
CN104574476A (en) Basement clearance detection method based on BIM model
Liu Application of BIM technology in the reconstruction of switchyard of hydropower station
CN116258343A (en) Building construction monitoring method
CN106698217A (en) Tower crane operation virtual simulation monitoring system provided with head tracking functions
Li et al. Application and research of 5G communication technology in intelligent coal mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191025