- CN110377979A CN110377979A CN201910581522.8A CN201910581522A CN110377979A CN 110377979 A CN110377979 A CN 110377979A CN 201910581522 A CN201910581522 A CN 201910581522A CN 110377979 A CN110377979 A CN 110377979A
- Authority
- CN
- China
- Prior art keywords
- equipment
- installation
- particularly serious
- restricted clearance
- place
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 33
- 238000000034 method Methods 0.000 title claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 8
- 239000010959 steel Substances 0.000 title claims abstract description 8
- 238000004458 analytical method Methods 0.000 claims abstract description 8
- 238000010276 construction Methods 0.000 claims abstract description 8
- 238000011900 installation process Methods 0.000 claims abstract description 6
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 238000006073 displacement reaction Methods 0.000 abstract description 10
- 238000005516 engineering process Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000005245 sintering Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Graphics (AREA)
- Software Systems (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The installation method of particularly serious Steel section member under specifically a kind of restricted clearance of the present invention, equipment;It is characterized in that: including workshop model construction;The building of large-scale hoisting machinery and restricted clearance inner periphery environment;Emulation animation production;A series of design of the auxiliary devices of particularly serious type component, equipment in transfer, in place and installation process;Hoisting Program is formulated;Wherein, imaginary components are carried out using BIM technology, large-scale hoisting machinery is carried out by AutoCAD software and component, equipment, environment carry out plane projection analysis, cartoon setting is carried out to the model in restricted clearance by Navisworks software, 3 D stereo reproduces displacement, in place and installation overall process.This method can be realized in newly constructing the factory buildings, displacement, the in place and installation of particularly serious type component, equipment and other items in restricted clearance, and not need the installation in advance for carrying out the high article of the precision requirements such as particularly serious type component, equipment in advance.
Description
Technical field
The present invention relates to steel constructions to build, equipment hoisting field, particularly serious Steel section member under specifically a kind of restricted clearance,
The installation method of equipment.
Background technique
In workshop or under restricted clearance, the displacement of the super-huge component of counterweight, equipment and other items and installation in place are to place
And space requirement is higher:
1, there is sufficient space around installation region to meet the operating of Large-scale Hoisting equipment;2, normal hanging method is leading
Carry out component in restricted clearance, equipment and other items it is in place, then complete again around and top workshop component installation;3, it counts
Drawing the component installed in place, equipment and other items will complete in advance and issue from producer, could not influence subsequent steel construction factory
The construction in room;4, leading component in place, equipment and other items will carry out necessary finished product protection, and cannot have any damage,
Traditional erection sequence in place is more demanding to finished product protection measure;5, according to traditional scheme, if the workshop of restricted clearance
It has completed or original reuses and carries out particularly serious type component in workshop, when equipment article is installed in place, needed to surrounding space
Workshop, building in region and surrounding other articles are removed, and traditional lifting requirements can be met.And such scheme is inevitable
The waste of the resources such as financial resource and material resource is caused, and risk is higher, the required duration is longer.
And it can be realized particularly serious type component, equipment and other items erector in place in reality in the short time under restricted clearance
It is necessary to meet following condition for work: 1, adequate space needed for meeting lifting installation in place;If 2, particularly serious type component, equipment
And other items construct the factory buildings inside in newly, to accelerate to promote workshop building, and do not need that particularly serious type component is installed in place, is set in advance
It is standby and other items;3, particularly serious type component, equipment and other items installation are carried out in workshop if it is reusing in original, and do not need to surrounding
In place, installation exercise can be completed in the dismounting of original workshop and other items in space.These problems are all urgent need to solve the problems.This
A little unfavorable factors not can effectively solve particularly serious type component under restricted clearance, sintering engineering driving using conventional construction method fastly
The demand of speed installation.
Summary of the invention
The purpose of the invention patent is to solve the above problems, and providing one kind can be real in the restricted clearances such as old workshop
Existing particularly serious type component, equipment and other items do not change surrounding space environment in displacement, in place and installation process, do not need factory yet
The peripheral structures such as room are removed to meet displacement, method in place and installation requirement.
In order to achieve the above object, the present invention is implemented as follows:
The installation method of particularly serious Steel section member under restricted clearance, equipment, including
Step 1, workshop model construction;
The building of step 2, large-scale hoisting machinery and restricted clearance inner periphery environment;
Step 3, emulation animation production;
A series of design of the auxiliary devices of step 4, particularly serious type component, equipment in transfer, in place and installation process;
Step 5, Hoisting Program are formulated;
Wherein, step 1 ~ 4 carry out imaginary components using BIM software, then under virtual environment in true reappearance restricted clearance
Particularly serious type component, the transfer of equipment and article, in place and installation environment carry out virtual analog;
Further, in step 1 ~ 4, large-scale hoisting machinery is carried out by AutoCAD software and component, equipment, environment carry out plane
Projection Analysis,
Further, in step 3, cartoon setting, 3 D stereo are carried out to the model in restricted clearance by Navisworks software
Displacement, in place and installation overall process are reproduced, realizes in Virtual Space particularly serious type component, equipment in dynamic observation restricted clearance
And other items transfer, in place and installation etc. it is a series of during correlations with ambient enviroment, carrying out lifting trajectory analysis
While, it analyzes and how to increase other auxiliary devices around existing facility;Selected Large-scale Hoisting equipment accurate simultaneously
Erect-position and lifting operation operating condition.
This method can be realized in newly constructing the factory buildings, displacement in restricted clearance of particularly serious type component, equipment and other items,
In place and installation, and the installation in advance for carrying out the high article of the precision requirements such as particularly serious type component, equipment in advance is not needed, into
And unnecessary finished product protection measure is reduced, and the resources such as human and material resources, financial resources during finished product protection are greatly saved, it is real
Existing environmentally protective engineering is gone on smoothly.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
The installation method of particularly serious type equipment under a kind of restricted clearance, including
Step 1, workshop model construction;
The building of step 2, large-scale hoisting machinery and restricted clearance inner periphery environment;
Step 3, emulation animation production;
A series of design of the auxiliary devices of step 4, particularly serious type component, equipment in transfer, in place and installation process;
Step 5, Hoisting Program are formulated;
Wherein, step 1 ~ 4 carry out imaginary components using BIM software, then under virtual environment in true reappearance restricted clearance
Particularly serious type component, the transfer of equipment and article, in place and installation environment carry out virtual analog;
Further, in step 1 ~ 4, large-scale hoisting machinery is carried out by AutoCAD software and component, equipment, environment carry out plane
Projection Analysis,
Further, in step 3, cartoon setting, 3 D stereo are carried out to the model in restricted clearance by Navisworks software
Displacement, in place and installation overall process are reproduced, realizes in Virtual Space particularly serious type component, equipment in dynamic observation restricted clearance
And other items transfer, in place and installation etc. it is a series of during correlations with ambient enviroment, carrying out lifting trajectory analysis
While, it analyzes and how to increase other auxiliary devices around existing facility;Selected Large-scale Hoisting equipment accurate simultaneously
Erect-position and lifting operation operating condition.
This method is compared with traditional lifting planning method and displacement, in-position installation method, by BIM technology to particularly serious
A series of processes such as the displacement of type component, equipment and other items, in place and installation carry out virtual analog and carry out planning analysis, precisely
Determine that the erect-position of hanging device, surrounding space environment are intuitively expressed, during Virtual Analysis, by assign model data,
It can analyze out particularly serious type component, equipment and other items transfer, in place and installation track data and auxiliary device to need to design
Size.And then strong data supporting is provided for the establishment of scheme.It can be used for constructing by three-dimensional tridimensional virtual simulation
The visualization of operation is told somebody what one's real intentions are, and it is every in displacement, in place and installation process intuitively to express particularly serious type component, equipment and other items
One details, and possible danger source in the process, and then to take reliable risk prevention measure in implementation process, finally reach
It being capable of efficient fast accurate to a series of processes such as displacement, in place and installations in similar particularly serious type component, equipment and other items
Complete a full set of content.
Claims (1)
1. the installation method of particularly serious Steel section member under a kind of restricted clearance, equipment, it is characterized in that: including
Step 1, workshop model construction;
The building of step 2, large-scale hoisting machinery and restricted clearance inner periphery environment;
Step 3, emulation animation production;
A series of design of the auxiliary devices of step 4, particularly serious type component, equipment in transfer, in place and installation process;
Step 5, Hoisting Program are formulated;
Wherein, step 1 ~ 4 carry out imaginary components using BIM software, then under virtual environment in true reappearance restricted clearance
Particularly serious type component, the transfer of equipment and article, in place and installation environment carry out virtual analog;
Further, in step 1 ~ 4, large-scale hoisting machinery is carried out by AutoCAD software and component, equipment, environment carry out plane
Projection Analysis,
Further, in step 3, cartoon setting, 3 D stereo are carried out to the model in restricted clearance by Navisworks software
Displacement, in place and installation overall process are reproduced, realizes in Virtual Space particularly serious type component, equipment in dynamic observation restricted clearance
And other items transfer, in place and installation etc. it is a series of during correlations with ambient enviroment, carrying out lifting trajectory analysis
While, it analyzes and how to increase other auxiliary devices around existing facility;Selected Large-scale Hoisting equipment accurate simultaneously
Erect-position and lifting operation operating condition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910581522.8A CN110377979A (en) | 2019-06-29 | 2019-06-29 | The installation method of particularly serious Steel section member under restricted clearance, equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910581522.8A CN110377979A (en) | 2019-06-29 | 2019-06-29 | The installation method of particularly serious Steel section member under restricted clearance, equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110377979A true CN110377979A (en) | 2019-10-25 |
Family
ID=68251382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910581522.8A Pending CN110377979A (en) | 2019-06-29 | 2019-06-29 | The installation method of particularly serious Steel section member under restricted clearance, equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110377979A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112010147A (en) * | 2020-07-22 | 2020-12-01 | 上海二十冶建设有限公司 | Rapid installation method of large-scale unit auxiliary equipment in limited space |
CN112380603A (en) * | 2020-11-13 | 2021-02-19 | 中建四局第六建设有限公司 | BIM-based large prefabricated part hoisting simulation method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060155402A1 (en) * | 2001-11-21 | 2006-07-13 | Dale Read | 3d virtual manufacturing process |
CN101714181A (en) * | 2009-12-04 | 2010-05-26 | 煤炭科学研究总院西安研究院 | Method for designing and drawing directional drilling trace under coal mine |
CN108710743A (en) * | 2018-05-15 | 2018-10-26 | 中国十七冶集团有限公司 | A kind of steel structure hoisting based on BIM technology construction method in place |
CN109918756A (en) * | 2019-02-28 | 2019-06-21 | 上海二十冶建设有限公司 | Application method of the BIM emulation technology in agglomerating chamber's driving installation exercise |
-
2019
- 2019-06-29 CN CN201910581522.8A patent/CN110377979A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060155402A1 (en) * | 2001-11-21 | 2006-07-13 | Dale Read | 3d virtual manufacturing process |
CN101714181A (en) * | 2009-12-04 | 2010-05-26 | 煤炭科学研究总院西安研究院 | Method for designing and drawing directional drilling trace under coal mine |
CN108710743A (en) * | 2018-05-15 | 2018-10-26 | 中国十七冶集团有限公司 | A kind of steel structure hoisting based on BIM technology construction method in place |
CN109918756A (en) * | 2019-02-28 | 2019-06-21 | 上海二十冶建设有限公司 | Application method of the BIM emulation technology in agglomerating chamber's driving installation exercise |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112010147A (en) * | 2020-07-22 | 2020-12-01 | 上海二十冶建设有限公司 | Rapid installation method of large-scale unit auxiliary equipment in limited space |
CN112380603A (en) * | 2020-11-13 | 2021-02-19 | 中建四局第六建设有限公司 | BIM-based large prefabricated part hoisting simulation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107832498A (en) | A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method | |
CN110377979A (en) | The installation method of particularly serious Steel section member under restricted clearance, equipment | |
CN103116822A (en) | Steel-making manufacturing execution management system based on visualized heat tracking | |
CN106408630A (en) | Method for simulating optimized operation parameters of pump station based on VR interaction technology | |
CN111177824A (en) | Aluminum alloy formwork construction method based on BIM technology | |
CN104063529A (en) | Simulation method of layout planning of digital automobile plant | |
CN102608919A (en) | Stamping single-station production simulating and verifying method | |
CN103680240A (en) | Universal type simulation system for nuclear power plant three-waste technical control | |
CN111047685A (en) | Method for realizing power plant BIM model panoramic roaming | |
CN106844840B (en) | Method for realizing rapid modeling of subway station based on BIM | |
CN110795789A (en) | Application method in scaffold engineering based on BIM (building information modeling) cooperation technology | |
CN105512414A (en) | Non-linear mathematical modeling method for control on blast furnace top pressure | |
CN112765711A (en) | BIM modeling method for green building simulation calculation | |
CN103544874A (en) | Method for building advanced manufacturing simulation factory | |
CN108589725A (en) | A kind of built-in fitting construction method based on BIM technology | |
CN111523166A (en) | BIM technology-based massive steel structure installation deepening construction method | |
CN111047688A (en) | Three-dimensional visual simulation method for power plant | |
CN103871108A (en) | Simulation method for full steel structure lifting process based on 3D (third-dimensional) visualization technology | |
CN106354933A (en) | BIM (building information modeling) technology based ultra-large steel making exhausted heat boiler pipeline pressure testing method | |
CN104299267A (en) | GRG three-dimensional digital modeling construction method and system thereof | |
CN104574476A (en) | Basement clearance detection method based on BIM model | |
Liu | Application of BIM technology in the reconstruction of switchyard of hydropower station | |
CN116258343A (en) | Building construction monitoring method | |
CN106698217A (en) | Tower crane operation virtual simulation monitoring system provided with head tracking functions | |
Li et al. | Application and research of 5G communication technology in intelligent coal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191025 |