CN110374198A - A kind of the steel building component and construction method of Fast Installation - Google Patents
A kind of the steel building component and construction method of Fast Installation Download PDFInfo
- Publication number
- CN110374198A CN110374198A CN201910668331.5A CN201910668331A CN110374198A CN 110374198 A CN110374198 A CN 110374198A CN 201910668331 A CN201910668331 A CN 201910668331A CN 110374198 A CN110374198 A CN 110374198A
- Authority
- CN
- China
- Prior art keywords
- connection board
- header
- groups
- hole
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2466—Details of the elongated load-supporting parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a kind of steel building components of Fast Installation, including main column, No.1 header board and No. two header boards, the H-shaped structure welding part that the main column is made of web and flange plate, the No.1 header board is identical with the shape and structure of No. two header boards, the leading exterior surface of the web is welded with No.1 connection board slot, one side external surface of the flange plate is welded with No. two connection board slots, and the No.1 connection board slot is identical with the shape and structure of No. two connection board slots.The steel building component and construction method of a kind of Fast Installation of the present invention, it can be realized the Fast Installation to header board, installation is fixed in No.1 header board and No.1 connection board slot, realize Fast Installation, it can similarly fast implement and installation is fixed in No. two header boards and No. two connection board slots, installation cost is saved, the installation effectiveness of steel building component is improved, brings better prospect of the application.
Description
Technical field
The present invention relates to steel building component field, in particular to the steel building component of a kind of Fast Installation and apply
Work method.
Background technique
The structure that steel building component is made of steel material is one of main building construction types.Structure master
Will the components such as the joist steel made of fashioned iron and steel plate etc., steel column, steel truss form, and dried using silanization, pure manganese phosphatization, washing
The derusting rust-proofings technique such as dry, zinc-plated.Weld seam, bolt or rivet interlacement are generallyd use between each component or component.Because its self weight compared with
Gently, and easy construction, it is widely used in the fields such as large-sized workshop, venue, Super High;
There are certain drawbacks in existing steel building component, traditional steel building component mostly uses weldering when in use
Seam, bolt or rivet are attached, and weld seam is needed by tools such as welding guns, and welding is influenced by environment high, inconvenient
In realize Fast Installation, bolt install as rivet interlacement, be required to one one carry out tighten installation, need to expend people
Power and material resources are also not easy to realize Fast Installation, certain influence are brought to the installation process of people, for this purpose, it is proposed that
A kind of the steel building component and construction method of Fast Installation.
Summary of the invention
The main purpose of the present invention is to provide the steel building component and construction method of a kind of Fast Installation, Ke Yiyou
Effect solves the problems in background technique.
To achieve the above object, the technical scheme adopted by the invention is as follows:
A kind of steel building component of Fast Installation, including main column, No.1 header board and No. two header boards, the main column
The H-shaped structure welding part being made of web and flange plate, the shape and structure of the No.1 header board and No. two header boards are complete
Identical, the leading exterior surface of the web is welded with No.1 connection board slot, and a side external surface of the flange plate is welded with No. two
Connection board slot, the No.1 connection board slot is identical with the shape and structure of No. two connection board slots, and the two of No. two header boards
End bottom is fixedly installed with No.1 link block and No. two link blocks respectively, and peace is also fixed in the both ends bottom of No.1 header board respectively
Equipped with No.1 link block and No. two link blocks, the No.1 link block is identical with the shape and structure of No. two link blocks.
Preferably, the bottom of No. two header boards is also welded with two groups of margin plates, and two groups of margin plates are located at one
The two sides of number link block and No. two link blocks, the gap between margin plate described in two groups and No. two link blocks are cavity, described one
The bottom of number header board is also welded with two groups of margin plates.
Preferably, the No.1 link block on No. two header boards is connected to the inside of No. two connection board slots, and No. two companies
The two sidewalls of fishplate bar slot are connected to the inside of the cavity on No. two header boards, the No.1 link block clamping on the No.1 header board
The inside of the cavity on No.1 header board, institute are connected in the two sidewalls of the inside of No.1 connection board slot, and No.1 connection board slot
It states No. two header boards and is fixedly connected with main column by No. two connection board slots, the No.1 header board and main column are connected by No.1
Fishplate bar slot is fixedly connected.
Preferably, the upper and lower ends of the main column, which are respectively welded, is equipped with No.1 engagement plate and No. two engagement plates, and one
Four groups of mounting holes are offered on number engagement plate and No. two engagement plates.
Preferably, the lower end between the No.1 connection board slot and web is equipped with No.1 L shape angle steel, No. two connections
Lower end between board slot and flange plate is equipped with No. two L shape angle steel, and the shape and structure of No.1 L shape angle steel and No. two L shape angle steel
Identical, the inside of the No.1 L shape angle steel and No. two L shape angle steel is welded with reinforcing rib.
Preferably, the bosom position of No. two link blocks is fixedly installed with mounting plate, close to the mounting plate
Two sides are opened up there are six through-hole, and six through-holes are evenly distributed on the inside of No. two link blocks, two groups of institutes in 2 × 3 array
No. two through holes there are six opening up on margin plate are stated, and six No. two through holes are evenly distributed on margin plate in 2 × 3 array
On, it is opened up in No. two connection board slots there are six No.1 through hole, and six No.1 through holes uniformly divide in 2 × 3 array
In No. two connection board slots, the center line of the No.1 through hole, No. two through holes and through-hole is located on the same line cloth.
Preferably, the upper end of No. two link blocks offers two groups of plate chambers, and the inside of plate chamber described in two groups is inserted
It is connected to baffle, the two sides of the mounting plate are fixedly installed with six groups of springs, and spring described in six groups is located at six through-holes
Inside, the side of the spring is fixedly installed with bolt, and bolt is located at the inside of through-hole, and the bolt and through-hole activity connect
It connects, the bolt is located at the side of baffle.
Preferably, the construction method of the steel building component of a kind of Fast Installation, described specific step is as follows:
A: main column is installed to designated position by No. two engagement plates of bottom end and is fixed, can according to need several groups
Main column carries out splicing installation by No.1 engagement plate and No. two engagement plates, is fixed by bolt, meets desired height;
B: the No.1 link block of No.1 header board one end is connected to the inside of No.1 connection board slot, and the two of No.1 connection board slot
Side wall is connected to the inside of the cavity on No.1 header board, while making the center line of No.1 through hole, No. two through holes and through-hole
As for two groups of baffles on same straight line, are pulled out, six groups of springs just will drive bolt and pass through across through-hole, No. two through holes and No.1
No.1 header board and No.1 connection board slot are fixed installation, realize Fast Installation by perforation;
The No.1 link block of No. two header board one end: being connected to the inside of No. two connection board slots referring to step by C, similarly can be real
Installation now is fixed in No. two header boards and No. two connection board slots.
Compared with prior art, the invention has the following beneficial effects:
By the No.1 link block of setting and No. two link blocks, the Fast Installation to header board can be realized, by No.1 header board
The No.1 link block of one end is connected to the inside of No.1 connection board slot, and the two sidewalls of No.1 connection board slot are connected to No.1 cross at this time
Then the inside of cavity on beam slab makes the center line of No.1 through hole, No. two through holes and through-hole as on same straight line,
Two groups of baffles are pulled out, six groups of springs just will drive bolt across through-hole, No. two through holes and No.1 through hole, by No.1 header board
Installation is fixed with No.1 connection board slot, realizes Fast Installation, can similarly fast implement No. two header boards and No. two companies
Installation is fixed in fishplate bar slot, saves installation cost, improves the installation effectiveness of steel building component.
Part is not directed in the device to be the same as those in the prior art or can be realized by using the prior art.
Detailed description of the invention
Fig. 1 is a kind of overall structure diagram of the steel building component of Fast Installation of the present invention;
Fig. 2 is a kind of explosive view of the steel building component of Fast Installation of the present invention;
Fig. 3 is a kind of partial enlarged view of No. two header boards of the steel building component of Fast Installation of the present invention;
Fig. 4 is the sectional view of A-A in a kind of Fig. 3 of the steel building component of Fast Installation of the present invention.
In figure: 1, main column;2, web;3, flange plate;4, No.1 engagement plate;5, No. two engagement plates;6, No.1 header board;
7, No. two header boards;8, No.1 connection board slot;9, No. two connection board slots;10, No.1 through hole;11, No.1 L shape angle steel;12, two
Number L shape angle steel;13, reinforcing rib;14, No.1 link block;15, No. two link blocks;16, margin plate;17, mounting hole;18, No. two pass through
Perforation;19, baffle;20, plate chamber;21, cavity;22, through-hole;23, mounting plate;24, spring;25, bolt.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to
Specific embodiment, the present invention is further explained.
Embodiment 1
As shown in Figs 1-4, the steel building component of a kind of Fast Installation, including main column 1, No.1 header board 6 and No. two cross
Beam slab 7, the H-shaped structure welding part that main column 1 is made of web 2 and flange plate 3, No.1 header board 6 and No. two header boards 7
Shape and structure is identical, and the leading exterior surface of web 2 is welded with No.1 connection board slot 8, the side external surface welding of flange plate 3
There are No. two connection board slots 9, No.1 connection board slot 8 is identical with the shape and structure of No. two connection board slots 9, No. two header boards 7
Both ends bottom is fixedly installed with No.1 link block 14 and No. two link blocks 15 respectively, and the both ends bottom of No.1 header board 6 is also divided
It is not fixedly installed with No.1 link block 14 and No. two link blocks 15, No.1 link block 14 and the shape and structure of No. two link blocks 15 are complete
It is exactly the same, the installation corresponding with No.1 connection board slot 8 of No.1 link block 14, No. two connection board slots 9 peace corresponding with No. two link blocks 15
Dress.
As shown in Figure 2 and Figure 3, the bottom of No. two header boards 7 is also welded with two groups of margin plates 16, and two groups of margin plates 16 divide
Not Wei Yu No.1 link block 14 and No. two link blocks 15 two sides, the gap between two groups of margin plates 16 and No. two link blocks 15 is
Cavity 21, the bottom of No.1 header board 6 are also welded with two groups of margin plates 16, and the setting of two groups of margin plates 16 is easy to implement and No.1
The location and installation of connection board slot 8.
No.1 link block 14 on No. two header boards 7 is connected to the inside of No. two connection board slots 9, and No. two connection board slots 9
Two sidewalls be connected to the inside of the cavity 21 on No. two header boards 7, the No.1 link block 14 on No.1 header board 6 is connected to one
The inside of number connection board slot 8, and the two sidewalls of No.1 connection board slot 8 are connected to the inside of the cavity 21 on No.1 header board 6, two
Number header board 7 is fixedly connected with main column 1 by No. two connection board slots 9, and No.1 header board 6 is connect with main column 1 by No.1
Board slot 8 is fixedly connected.
The upper and lower ends of main column 1, which are respectively welded, is equipped with No.1 engagement plate 4 and No. two engagement plates 5, and No.1 engagement plate 4
No.1 is connected when two groups or more of main column 1 needs to connect with four groups of mounting holes 17 are offered on No. two engagement plates 5
Plate 4 is attached with No. two engagement plates 5 by screw rod and bolt, and assembling can be completed.
As shown in Figure 1-3, the lower end between No.1 connection board slot 8 and web 2 is equipped with No.1 L shape angle steel 11, No. two companies
Lower end between fishplate bar slot 9 and flange plate 3 is equipped with No. two L shape angle steel 12, and No.1 L shape angle steel 11 and No. two L shape angle steel 12
Shape and structure it is identical, the inside of No.1 L shape angle steel 11 and No. two L shape angle steel 12 is welded with reinforcing rib 13, main column
1, No.1 header board 6 uses all-weld joint, by one from No. two header boards 7 as different components in factory floor respectively
Number connection board slot 8 is welded on web 2, and No. two connection board slots 9 are welded on flange plate 3, then transport to construction site into
Row assembled construction operation, and respectively by No.1 L shape angle steel 11 and No. two L shape angle steel 12 to No.1 connection board slot 8 and No. two
Connection board slot 9 is reinforced.
As shown in figure 4, the bosom position of No. two link blocks 15 is fixedly installed with mounting plate 23, close to mounting plate 23
Two sides are opened up there are six through-hole 22, and six through-holes 22 are evenly distributed on the inside of No. two link blocks 15 in 2 × 3 array,
No. two through holes 18 there are six being opened up on two groups of margin plates 16, and six No. two through holes 18 are evenly distributed in 2 × 3 array
It on margin plate 16, is opened up in No. two connection board slots 9 there are six No.1 through hole 10, and six No.1 through holes 10 are in 2 × 3 battle array
Column are evenly distributed in No. two connection board slots 9, and the center line of 10, No. two through holes 18 of No.1 through hole and through-hole 22 is located at same
On straight line, six groups of No.1 through holes, 10, six groups of No. two through holes 18 corresponded to each other with six groups of 22 positions of through-hole be realize it is quick
The key of installation.
The upper end of No. two link blocks 15 offers two groups of plate chambers 20, and the inside of two groups of plate chambers 20 is plugged with baffle
19, the two sides of mounting plate 23 are fixedly installed with six groups of springs 24, and six groups of springs 24 are located at the inside of six through-holes 22, bullet
The side of spring 24 is fixedly installed with bolt 25, and bolt 25 is located at the inside of through-hole 22, and bolt 25 is flexibly connected with through-hole 22, inserts
Pin 25 is located at the side of baffle 19.
By using above-mentioned technical proposal: the No.1 link block 14 of setting and No. two link blocks 15 can be realized to crossbeam
The No.1 link block 14 of 6 one end of No.1 header board is connected to the inside of No.1 connection board slot 8 by the Fast Installation of plate, and at this time one
The two sidewalls of number connection board slot 8 are connected to the inside of the cavity 21 on No.1 header board 6, then make No.1 through hole 10, two
The center line of through hole 18 and through-hole 22 just will drive slotting as two groups of baffles 19, six groups of springs 24 on same straight line, are pulled out
Pin 25 passes through 22, No. two through holes 18 of through-hole and No.1 through hole 10, and No.1 header board 6 and No.1 connection board slot 8 are consolidated
Dingan County's dress, realizes Fast Installation, can similarly fast implement No. two header boards 7 and No. two connection board slots 9 installation is fixed,
Installation cost is saved, the installation effectiveness of steel building component is improved.
Embodiment 2
A kind of construction method of the steel building component of Fast Installation, it is characterised in that: specific step is as follows:
A: main column 1 is installed to designated position by No. two engagement plates 5 of bottom end and is fixed, can according to need will be several
Group main column 1 carries out splicing installation by No.1 engagement plate 4 and No. two engagement plates 5, is fixed by bolt, high needed for meeting
Degree;
B: the No.1 link block 14 of 6 one end of No.1 header board is connected to the inside of No.1 connection board slot 8, and No.1 connection board slot
8 two sidewalls are connected to the inside of the cavity 21 on No.1 header board 6, at the same make 10, No. two through holes 18 of No.1 through hole with
As for two groups of baffles 19 on same straight line, are pulled out, six groups of springs 24 just will drive bolt 25 and pass through to be led to the center line of through-hole 22
No.1 header board 6 and No.1 connection board slot 8 are fixed installation, realized by the through hole 18 of hole 22, two and No.1 through hole 10
Fast Installation;
C: the No.1 link block 14 of No. two 7 one end of header board is connected to the inside of No. two connection board slots 9 referring to step B, similarly
It can be realized and installation is fixed in No. two header boards 7 and No. two connection board slots 9.
By using above-mentioned technical proposal: assemble method is simple, weld seam, the spiral shell used than traditional steel building component
Bolt or rivet interlacement are more convenient, and when installation only needs to make the center line of 10, No. two through holes 18 and through-hole 22 of No.1 through hole
As for two groups of baffles 19 on same straight line, are pulled out, assembling can be completed, meanwhile, it can be according to building demand to different number
Main column 1, No.1 header board 6 assembled with No. two header boards 7.
It should be noted that the present invention is the steel building component and construction method of a kind of Fast Installation, when in use,
It is fixed firstly, main column 1 is installed to designated position by No. two engagement plates 5 of bottom end, can according to need will be several
Group main column 1 carries out splicing installation by No.1 engagement plate 4 and No. two engagement plates 5, is fixed by bolt, high needed for meeting
Degree, main column 1, No.1 header board 6, as different components, are welded in factory floor using complete respectively from No. two header boards 7
Connection, No.1 connection board slot 8 is welded on web 2, No. two connection board slots 9 are welded on flange plate 3, is then transported to applying
Work scene carries out fabricated construction operation, and respectively by No.1 L shape angle steel 11 and No. two L shape angle steel 12 to No.1 connection board slot
8 are reinforced with No. two connection board slots 9, and the No.1 link block 14 of setting and No. two link blocks 15 can be realized to header board
The No.1 link block 14 of 6 one end of No.1 header board is connected to the inside of No.1 connection board slot 8 by Fast Installation, and No.1 connects at this time
The two sidewalls of fishplate bar slot 8 are connected to the inside of the cavity 21 on No.1 header board 6, then make No.1 through hole 10, two to run through
The center line of hole 18 and through-hole 22 just will drive bolt 25 as two groups of baffles 19, six groups of springs 24 on same straight line, are pulled out
Across 22, No. two through holes 18 of through-hole and No.1 through hole 10, peace is fixed in No.1 header board 6 and No.1 connection board slot 8
Dress realizes Fast Installation, can similarly fast implement No. two header boards 7 and No. two connection board slots 9 installation is fixed, and saves
Installation cost improves the installation effectiveness of steel building component, and assemble method is simple, what traditional steel building component used
Weld seam, bolt or rivet interlacement are more convenient, and when installation only needs to make 10, No. two through holes 18 of No.1 through hole and through-hole 22
Assembling can be completed as two groups of baffles 19 on same straight line, are pulled out in center line, meanwhile, it can be according to building demand to not
It is assembled with the main column 1 of quantity, No.1 header board 6 with No. two header boards 7, it is more practical.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (8)
1. a kind of steel building component of Fast Installation, including main column (1), No.1 header board (6) and No. two header boards
(7), the H-shaped structure welding part that the main column (1) is made of web (2) and flange plate (3), the No.1 header board (6)
Identical with the shape and structure of No. two header boards (7), the leading exterior surface of the web (2) is welded with No.1 connection board slot
(8), a side external surface of the flange plate (3) is welded with No. two connection board slots (9), the No.1 connection board slot (8) with No. two
The shape and structure of connection board slot (9) is identical, it is characterised in that: the both ends bottom of No. two header boards (7) is fixed respectively
No.1 link block (14) and No. two link blocks (15) are installed, and the both ends bottom of No.1 header board (6) is also fixedly mounted respectively
There are No.1 link block (14) and No. two link blocks (15), the shape and structure of the No.1 link block (14) and No. two link blocks (15)
It is identical.
2. a kind of steel building component of Fast Installation according to claim 1, it is characterised in that: No. two crossbeams
The bottom of plate (7) is also welded with two groups of margin plates (16), and two groups of margin plates (16) are located at No.1 link block (14) and two
The two sides of number link block (15), the gap between margin plate described in two groups (16) and No. two link blocks (15) are cavity (21), institute
The bottom for stating No.1 header board (6) is also welded with two groups of margin plates (16).
3. a kind of steel building component of Fast Installation according to claim 2, it is characterised in that: No. two crossbeams
No.1 link block (14) on plate (7) is connected to the inside of No. two connection board slots (9), and the two sidewalls of No. two connection board slots (9)
It is connected to the inside of the cavity (21) on No. two header boards (7), No.1 link block (14) clamping on the No.1 header board (6)
The cavity on No.1 header board (6) is connected in the two sidewalls of the inside of No.1 connection board slot (8), and No.1 connection board slot (8)
(21) inside, No. two header boards (7) are fixedly connected with main column (1) by No. two connection board slots (9), and the No.1 is horizontal
Beam slab (6) is fixedly connected with main column (1) by No.1 connection board slot (8).
4. a kind of steel building component of Fast Installation according to claim 1, it is characterised in that: the main column
(1) upper and lower ends, which are respectively welded, is equipped with No.1 engagement plate (4) and No. two engagement plates (5), and No.1 engagement plate (4) and No. two
Four groups of mounting holes (17) are offered on engagement plate (5).
5. a kind of steel building component of Fast Installation according to claim 1, it is characterised in that: the No.1 connection
Lower end between board slot (8) and web (2) is equipped with No.1 L shape angle steel (11), No. two connection board slots (9) and flange plate
(3) lower end between is equipped with No. two L shape angle steel (12), and the shape knot of No.1 L shape angle steel (11) and No. two L shape angle steel (12)
Structure is identical, and the inside of the No.1 L shape angle steel (11) and No. two L shape angle steel (12) is welded with reinforcing rib (13).
6. a kind of steel building component of Fast Installation according to claim 2, it is characterised in that: No. two connections
The bosom position of block (15) is fixedly installed with mounting plate (23), close to the mounting plate (23) two sides open up there are six
Through-hole (22), and six through-holes (22) are evenly distributed on the inside of No. two link blocks (15), side described in two groups in 2 × 3 array
No. two through holes (18) there are six being opened up on listrium (16), and six No. two through holes (18) are evenly distributed in 2 × 3 array
On margin plate (16), opened up on No. two connection board slots (9) there are six No.1 through hole (10), and six No.1 through holes
(10) it is evenly distributed on No. two connection board slots (9) in 2 × 3 array, the No.1 through hole (10), No. two through holes (18)
It is located on the same line with the center line of through-hole (22).
7. a kind of steel building component of Fast Installation according to claim 6, it is characterised in that: No. two connections
The upper end of block (15) offers two groups of plate chambers (20), and the inside of plate chamber (20) described in two groups is plugged with baffle (19), institute
The two sides for stating mounting plate (23) are fixedly installed with six groups of springs (24), and spring described in six groups (24) is located at six through-holes
(22) side of inside, the spring (24) is fixedly installed with bolt (25), and bolt (25) is located at the inside of through-hole (22),
The bolt (25) is flexibly connected with through-hole (22), and the bolt (25) is located at the side of baffle (19).
8. the construction method of the steel building component of -7 any a kind of Fast Installations according to claim 1, feature
Be: described specific step is as follows:
A: being installed to designated position by No. two engagement plates (5) of bottom end for main column (1) and be fixed, can according to need by
Several groups main column (1) carries out splicing installation by No.1 engagement plate (4) and No. two engagement plates (5), is fixed by bolt,
Meet desired height;
B: the No.1 link block (14) of No.1 header board (6) one end is connected to the inside of No.1 connection board slot (8), and No.1 connects
The two sidewalls of fishplate bar slot (8) are connected to the inside of the cavity (21) on No.1 header board (6), at the same make No.1 through hole (10),
The center line of No. two through holes (18) and through-hole (22) is as on same straight line, pulling out two groups of baffles (19), six groups of springs
(24) bolt (25) just be will drive across through-hole (22), No. two through holes (18) and No.1 through hole (10), by No.1 header board
(6) installation is fixed with No.1 connection board slot (8), realizes Fast Installation;
C: the No.1 link block (14) of No. two header board (7) one end is connected to the interior of No. two connection board slots (9) referring to step (B)
Portion similarly can be realized No. two header boards (7) and No. two connection board slots (9) installation be fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910668331.5A CN110374198B (en) | 2019-07-23 | 2019-07-23 | Quickly-installed steel structure building assembly and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910668331.5A CN110374198B (en) | 2019-07-23 | 2019-07-23 | Quickly-installed steel structure building assembly and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110374198A true CN110374198A (en) | 2019-10-25 |
CN110374198B CN110374198B (en) | 2021-04-02 |
Family
ID=68255293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910668331.5A Active CN110374198B (en) | 2019-07-23 | 2019-07-23 | Quickly-installed steel structure building assembly and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110374198B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519760A (en) * | 2020-04-28 | 2020-08-11 | 广州信佳地坪工程有限公司 | Assembled steel structure and machining method thereof |
CN112095918A (en) * | 2020-09-28 | 2020-12-18 | 宿迁小鲤工业设计有限公司 | Steel structure combination beam for assembled building |
CN118110333A (en) * | 2024-04-28 | 2024-05-31 | 山东鑫海矿业技术装备股份有限公司 | Steel platform connecting component |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5938367A (en) * | 1997-08-08 | 1999-08-17 | United Fixtures Company | Automatic piston lock mechanism |
CN201778420U (en) * | 2010-08-03 | 2011-03-30 | 叶鹏智 | Framework curtain wall crossbeam connecting part |
CN204570941U (en) * | 2015-04-25 | 2015-08-19 | 成都金海豚装饰设计有限公司 | Auto-bolting formula curtain wall cross beam connected system |
CN204959990U (en) * | 2015-08-25 | 2016-01-13 | 广东大潮建筑装饰工程有限公司 | Beam assembly |
CN107476434A (en) * | 2017-08-25 | 2017-12-15 | 孔金河 | Beam column antidetonation connecting node and attaching method thereof |
CN109322394A (en) * | 2018-12-11 | 2019-02-12 | 辰信重工(江苏)有限公司 | A kind of connection structure of steel structure column and steel structure girder |
-
2019
- 2019-07-23 CN CN201910668331.5A patent/CN110374198B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5938367A (en) * | 1997-08-08 | 1999-08-17 | United Fixtures Company | Automatic piston lock mechanism |
CN201778420U (en) * | 2010-08-03 | 2011-03-30 | 叶鹏智 | Framework curtain wall crossbeam connecting part |
CN204570941U (en) * | 2015-04-25 | 2015-08-19 | 成都金海豚装饰设计有限公司 | Auto-bolting formula curtain wall cross beam connected system |
CN204959990U (en) * | 2015-08-25 | 2016-01-13 | 广东大潮建筑装饰工程有限公司 | Beam assembly |
CN107476434A (en) * | 2017-08-25 | 2017-12-15 | 孔金河 | Beam column antidetonation connecting node and attaching method thereof |
CN109322394A (en) * | 2018-12-11 | 2019-02-12 | 辰信重工(江苏)有限公司 | A kind of connection structure of steel structure column and steel structure girder |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519760A (en) * | 2020-04-28 | 2020-08-11 | 广州信佳地坪工程有限公司 | Assembled steel structure and machining method thereof |
CN112095918A (en) * | 2020-09-28 | 2020-12-18 | 宿迁小鲤工业设计有限公司 | Steel structure combination beam for assembled building |
CN118110333A (en) * | 2024-04-28 | 2024-05-31 | 山东鑫海矿业技术装备股份有限公司 | Steel platform connecting component |
CN118110333B (en) * | 2024-04-28 | 2024-07-09 | 山东鑫海矿业技术装备股份有限公司 | Steel platform connecting component |
Also Published As
Publication number | Publication date |
---|---|
CN110374198B (en) | 2021-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110374198A (en) | A kind of the steel building component and construction method of Fast Installation | |
CN101137784B (en) | Washing machine support structure | |
KR101549781B1 (en) | Hybrid Composite Beam Having Reinforcing Bottom Plate | |
CN103993659B (en) | A kind of floor structure module and assembling method thereof | |
CN106555433B (en) | House frame | |
CN207672751U (en) | One kind being conveniently detached formula steel construction | |
CN109898644B (en) | Modularized steel structure node | |
CN207959499U (en) | A kind of steel construction | |
CN113250318B (en) | Modularization steel frame connection structure | |
CN212129503U (en) | Steel construction building connecting device | |
KR100963586B1 (en) | Attachment of Unit Modular System, Modular Unit And Manufacturing Method of The Modular Unit | |
CN212534809U (en) | Novel welding cross column | |
CN213926767U (en) | Splicing and connecting device for steel structure house | |
CN210032084U (en) | Modularization steel structure node | |
CN203878744U (en) | Floor structural module | |
CN211948874U (en) | T-shaped node beam column connecting structure formed by two steel beams | |
CN208870277U (en) | The limited wallboard assembly in operating space | |
CN110145854A (en) | A kind of modularization air-conditioning siding and modularization air-conditioning | |
CN209011301U (en) | Connection structure between steel construction piece | |
KR100963583B1 (en) | Attachment of Unit Modular System, Modular Unit And Manufacturing Method of The Modular Unit | |
CN203827670U (en) | Proximate matter for cabinet frame | |
CN218177436U (en) | Connection structure, coupling assembling, plunger pump device and generator device | |
CN211918977U (en) | Load diffusion joint connected with wing spar | |
CN108547837A (en) | A kind of intelligent locking connection member of hollow furniture plate body | |
CN219100404U (en) | Anti-seismic firm steel structure outer wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 212300 Danyang High-tech Innovation Park, South Third Ring Road, Yunyang Street, Danyang City, Zhenjiang City, Jiangsu Province Applicant after: Danyang Legong Steel Structure Co., Ltd. Address before: Room 081, building 3, logistics market, DanJin Road, Yunyang street, Danyang City, Yancheng City, Jiangsu Province Applicant before: Danyang Legong Steel Structure Co., Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |