CN110374109A - The application method in pipe gallery foundation pit is gone along with sb. to guard him in a kind of engineering method stake - Google Patents

The application method in pipe gallery foundation pit is gone along with sb. to guard him in a kind of engineering method stake Download PDF

Info

Publication number
CN110374109A
CN110374109A CN201910470723.0A CN201910470723A CN110374109A CN 110374109 A CN110374109 A CN 110374109A CN 201910470723 A CN201910470723 A CN 201910470723A CN 110374109 A CN110374109 A CN 110374109A
Authority
CN
China
Prior art keywords
profile steel
groove
fashioned iron
stake
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910470723.0A
Other languages
Chinese (zh)
Other versions
CN110374109B (en
Inventor
马栋
杨晋文
孙成龙
丁传峰
李慧
刘彬
赵永亮
朱开荣
肖春雷
高志
李明
张志勇
刘向楠
陈亚强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201910470723.0A priority Critical patent/CN110374109B/en
Publication of CN110374109A publication Critical patent/CN110374109A/en
Application granted granted Critical
Publication of CN110374109B publication Critical patent/CN110374109B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Abstract

The invention discloses a kind of engineering method stakes to go along with sb. to guard him the application method in pipe gallery foundation pit, mainly includes that construction lofting, guide groove excavate, positioning, drilling machine are in place, mud in slurries mixing and whitewashing stirring, H profile steel processing and insertion H profile steel, cleaning groove, arranges these steps of construction note.The present invention solves the problems, such as that impervious poor, duration anxiety, surrounding enviroment are affected and waste the underground space, by the way that H profile steel is recycled, improves resource utilization and solves the problem of cost is high, and permanent building enclosure causes Underground Space Resource to pollute.

Description

The application method in pipe gallery foundation pit is gone along with sb. to guard him in a kind of engineering method stake
Technical field
The present invention relates to construction techniques fields, it particularly relates to which a kind of engineering method stake is gone along with sb. to guard him in pipe gallery foundation pit Application method.
Background technique
Base pit engineering is first link of pipe gallery engineering construction, and foundation pit enclosure design relation to Pipe rack is constructed Safety, the progress of period, while also having larger impact to engineering overall cost.Excavation of foundation pit depth is to influence pipe gallery to go along with sb. to guard him One key factor of structure design, when pipe gallery vertical alignment design, structure roof earthing needs to consider road pavement, greening The requirements such as plantation, road athwartship leg are passed through, node interlayer is arranged, usual earthing add comprehensive pipe gallery structure in 1.5 ~ 3m Highly, cushion thickness etc., piping lane excavation of foundation pit depth about 5 ~ 8m of standard paragraphs.Part need to descend river crossing, avoid underground obstacle Object, or when being changed by hypsography, cutting depth can be more than 10m.Furthermore soil response mechanical property, groundwater state, week Surrounding environment etc. also determines the type selecting of foundation pit enclosure structure design.
The construction method of existing pipe gallery foundation pit, exists impervious poor, and cost is high, is affected to periphery bad border The problems such as.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Summary of the invention
For above-mentioned technical problem in the related technology, the present invention proposes that a kind of engineering method stake is gone along with sb. to guard him in pipe gallery foundation pit Application method carries out drilling to depth with fountain type drilling blender, forms the soil cement solidification rigid shape of H-type by drill bit jet cement At stiffness Composite Enclosure Structure.
To realize the above-mentioned technical purpose, the technical scheme of the present invention is realized as follows:
The application method in pipe gallery foundation pit is gone along with sb. to guard him in a kind of engineering method stake, comprising steps of
1) construction lofting;Carry out construction lofting work according to coordinate basis point and design drawing, after repetition measurement is errorless, carries out corresponding mark Will facilitates subsequent use, and supervision surveying technique check list is submitted to carry out review examination;
2) guide groove excavates;In order to determine initial guiding position and storage arch slurry, need to carry out pipe canal digging, channel excavation Ying Yifang Subject to the enclosure wall center line of sample positioning, groove width should determine that the depth of groove should be 1 meter, pass through according to fence structure thickness Air compressor removes underground obstacle;If gap is excessive, is backfilled and be compacted, and excavate guide groove again, with Ensure the smooth construction of SMW method stake;
3) it positions;Guide-localization fashioned iron need to be laid on the working channel two sides of excavation, according to drawing in guide-localization fashioned iron subscript The insertion position of bore position and H profile steel is outpoured, positioning fashioned iron need to be fixed, such as finds unstable, is mutually connected with spot welding Connect fixation;
4) drilling machine is in place;In place to the position determined, error ≯ 3cm in place levels platform with horizontal ruler, and carries out mobile stake machine Rack straightening guarantees rack perpendicularity deviation ≯ 1%, and the principle of drilling pipe and pile frame relative dislocation is utilized on drilling pipe, marks drilling The scale line of depth, it is ensured that drilling depth is up to standard under drilling pipe;
5) slurries mixing and whitewashing stirring;Slurries are prepared in strict accordance with proportion, need to be stirred, after the completion of slurries, are started Whitewashing is bored under jet, strict control running speed, and running speed is general ≯ 1m/min, and going down process grouting pressure generally exists Between 1.5MPa~2.5Mpa, to design stake bottom absolute altitude after need to be promoted and stir again, promoted speed it is general ≯ 2m/min;
6) H profile steel processing and insertion H profile steel;
1. the circular hole of an aperture about 8cm is being opened in fashioned iron top center using preceding, in fashioned iron for the ease of the lifting of H profile steel The stiffening plate that thickness is greater than 12mm is welded in two sides, and when fashioned iron curtailment, weld seam should be fully welded groove, and (groove degree is less than 45 Degree), postwelding should check whether weld seam has bubble, slag inclusion, flatness, and whether weld seam is qualified, unqualified to answer repair welding;Finally, using sand It takes turns weld grinding to level identical with type face;Meanwhile the dirt and iron rust on H profile steel surface are first removed, use preceding brush 1-3mm Anti-friction agent, heating electrically heated rod be completely melt it, and with stirring rod stirring keep the thickness of anti-friction agent uniform, be coated in H profile steel On, coating is uneven, is easy to peel off, is unfavorable for fashioned iron and pulls out;
2. cement mixing pile driving construction is close to tail end, crane is in place, the preparation of H profile steel lifting is carried out, with 50t crane lifting H-type Steel;Fashioned iron is horizontal in H profile steel positioning card to be accurately positioned and fixes;When pouring, H profile steel is leaned on along positioning card by H profile steel bottom centre Self weight insertion positive stake position center, H profile steel are slowly inserted into soil cement pile body;If being unsatisfactory for design requirement, H profile steel is slowly promoted It is inserted into, is inserted into designed elevation;During insertion, the verticality of monitored over time H profile steel is answered, it is ensured that its deviation is less than 0.5%;After the completion of fashioned iron insertion, it is fixed to solidification;
7) mud in groove is cleared up;Part of cement soil can be displaced in groove by cement grout and H profile steel, by the water in groove Soil cleans out groove using excavator, it is ensured that next process is gone on smoothly;To avoid generating mud contamination, outer abandon firmly is needed Soil cement is cleaned after change;
8) construction note is arranged;It records the sinking time of every pile, promote the underthrust situation of time, the situation and H profile steel of whitewashing.
Beneficial effects of the present invention: the present invention solves impervious poor, duration anxiety, surrounding enviroment are affected and waste The problem of the underground space improves resource utilization and solves cost height, permanent building enclosure by the way that H profile steel is recycled The problem of causing Underground Space Resource to pollute.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is that process flow chart in the application method of pipe gallery foundation pit is gone along with sb. to guard him in engineering method stake;
Fig. 2 is that pipe well structural map in the application of pipe gallery foundation pit is gone along with sb. to guard him in engineering method stake;
Fig. 3 is that groove locating slot steel figure in the application of pipe gallery foundation pit is gone along with sb. to guard him in engineering method stake;
Fig. 4 is that structural schematic diagram in the application of pipe gallery foundation pit is gone along with sb. to guard him in engineering method stake.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
As shown in Figs 1-4, the application in pipe gallery foundation pit is gone along with sb. to guard him in a kind of engineering method stake according to embodiments of the present invention Method, which is characterized in that comprising steps of
1) construction lofting;Carry out construction lofting work according to coordinate basis point and design drawing, after repetition measurement is errorless, carries out corresponding mark Will facilitates subsequent use, and supervision surveying technique check list is submitted to carry out review examination;
2) guide groove excavates;In order to determine initial guiding position and storage arch slurry, need to carry out pipe canal digging, channel excavation Ying Yifang Subject to the enclosure wall center line of sample positioning, groove width should determine that the depth of groove should be 1 meter, pass through according to fence structure thickness Air compressor removes underground obstacle;If gap is excessive, is backfilled and be compacted, and excavate guide groove again, with Ensure the smooth construction of SMW method stake;
3) it positions;Guide-localization fashioned iron need to be laid on the working channel two sides of excavation, according to drawing in guide-localization fashioned iron subscript The insertion position of bore position and H profile steel is outpoured, positioning fashioned iron need to be fixed, such as finds unstable, is mutually connected with spot welding Connect fixation;
4) drilling machine is in place;In place to the position determined, error ≯ 3cm in place levels platform with horizontal ruler, and carries out mobile stake machine Rack straightening guarantees rack perpendicularity deviation ≯ 1%, and the principle of drilling pipe and pile frame relative dislocation is utilized on drilling pipe, marks drilling The scale line of depth, it is ensured that drilling depth is up to standard under drilling pipe;
5) slurries mixing and whitewashing stirring;Slurries are prepared in strict accordance with proportion, need to be stirred, after the completion of slurries, are started Whitewashing is bored under jet, strict control running speed, and running speed is general ≯ 1m/min, and going down process grouting pressure generally exists Between 1.5MPa~2.5Mpa, to design stake bottom absolute altitude after need to be promoted and stir again, promoted speed it is general ≯ 2m/min;
6) H profile steel processing and insertion H profile steel;
1. the circular hole of an aperture about 8cm is being opened in fashioned iron top center using preceding, in fashioned iron for the ease of the lifting of H profile steel The stiffening plate that thickness is greater than 12mm is welded in two sides, and when fashioned iron curtailment, weld seam should be fully welded groove, and (groove degree is less than 45 Degree), postwelding should check whether weld seam has bubble, slag inclusion, flatness, and whether weld seam is qualified, unqualified to answer repair welding;Finally, using sand It takes turns weld grinding to level identical with type face;Meanwhile the dirt and iron rust on H profile steel surface are first removed, use preceding brush 1-3mm Anti-friction agent, heating electrically heated rod be completely melt it, and with stirring rod stirring keep the thickness of anti-friction agent uniform, be coated in H profile steel On, coating is uneven, is easy to peel off, is unfavorable for fashioned iron and pulls out;
2. cement mixing pile driving construction is close to tail end, crane is in place, the preparation of H profile steel lifting is carried out, with 50t crane lifting H-type Steel;Fashioned iron is horizontal in H profile steel positioning card to be accurately positioned and fixes;When pouring, H profile steel is leaned on along positioning card by H profile steel bottom centre Self weight insertion positive stake position center, H profile steel are slowly inserted into soil cement pile body;If being unsatisfactory for design requirement, H profile steel is slowly promoted It is inserted into, is inserted into designed elevation;During insertion, the verticality of monitored over time H profile steel is answered, it is ensured that its deviation is less than 0.5%;After the completion of fashioned iron insertion, it is fixed to solidification;
7) mud in groove is cleared up;Part of cement soil can be displaced in groove by cement grout and H profile steel, by the water in groove Soil cleans out groove using excavator, it is ensured that next process is gone on smoothly;To avoid generating mud contamination, outer abandon firmly is needed Soil cement is cleaned after change;
8) construction note is arranged;It records the sinking time of every pile, promote the underthrust situation of time, the situation and H profile steel of whitewashing.
The application method in pipe gallery foundation pit is gone along with sb. to guard him in a kind of engineering method stake of invention, is applied using three axis cement mixing pile machines Work, pile is using stirring the second gunite technique twice.The present invention solve it is impervious it is poor, the duration is nervous, surrounding enviroment influence compared with Big and the waste underground space the problem improves resource utilization and solves cost height, permanently by the way that H profile steel is recycled The problem of building enclosure causes Underground Space Resource to pollute.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (1)

1. the application method in pipe gallery foundation pit is gone along with sb. to guard him in a kind of engineering method stake, which is characterized in that comprising steps of
1) construction lofting;Carry out construction lofting work according to coordinate basis point and design drawing, after repetition measurement is errorless, carries out corresponding mark Will facilitates subsequent use;
2) guide groove excavates;In order to determine initial guiding position and storage arch slurry, need to carry out pipe canal digging, channel excavation Ying Yifang Subject to the enclosure wall center line of sample positioning, groove width should determine that the depth of groove should be 1 meter, pass through according to fence structure thickness Air compressor removes underground obstacle;If gap is excessive, is backfilled and be compacted, and excavate guide groove again, with Ensure the smooth construction of SMW method stake;
3) it positions;Guide-localization fashioned iron need to be laid on the working channel two sides of excavation, according to drawing in guide-localization fashioned iron subscript The insertion position of bore position and H profile steel is outpoured, positioning fashioned iron need to be fixed, such as finds unstable, is mutually connected with spot welding Connect fixation;
4) drilling machine is in place;In place to the position determined, error ≯ 3cm in place levels platform with horizontal ruler, and carries out mobile stake machine Rack straightening guarantees rack perpendicularity deviation ≯ 1%, and the principle of drilling pipe and pile frame relative dislocation is utilized on drilling pipe, marks drilling The scale line of depth, it is ensured that drilling depth is up to standard under drilling pipe;
5) slurries mixing and whitewashing stirring;Slurries are prepared in strict accordance with proportion, need to be stirred, after the completion of slurries, are started Whitewashing is bored under jet, strict control running speed, and running speed is general ≯ 1m/min, and going down process grouting pressure generally exists Between 1.5MPa~2.5Mpa, to design stake bottom absolute altitude after need to be promoted and stir again, promoted speed it is general ≯ 2m/min;
6) H profile steel processing and insertion H profile steel;
1. the circular hole of an aperture about 8cm is being opened in fashioned iron top center using preceding, in fashioned iron for the ease of the lifting of H profile steel The stiffening plate that thickness is greater than 12mm is welded in two sides, and when fashioned iron curtailment, weld seam should be fully welded groove, and (groove degree is less than 45 Degree), postwelding should check whether weld seam has bubble, slag inclusion, flatness, and whether weld seam is qualified, unqualified to answer repair welding;Finally, using sand It takes turns weld grinding to level identical with type face;Meanwhile the dirt and iron rust on H profile steel surface are first removed, use preceding brush 1-3mm Anti-friction agent, heating electrically heated rod be completely melt it, and with stirring rod stirring keep the thickness of anti-friction agent uniform, be coated in H profile steel On, if coating is uneven, it is easy to peel off, is unfavorable for fashioned iron and pulls out;
2. cement mixing pile driving construction is close to tail end, crane is in place, the preparation of H profile steel lifting is carried out, with 50t crane lifting H-type Steel;Fashioned iron is horizontal in H profile steel positioning card to be accurately positioned and fixes;When pouring, H profile steel is leaned on along positioning card by H profile steel bottom centre Self weight insertion positive stake position center, H profile steel are slowly inserted into soil cement pile body;If being unsatisfactory for design requirement, H profile steel is slowly promoted It is inserted into, is inserted into designed elevation;During insertion, the verticality of monitored over time H profile steel is answered, it is ensured that its deviation is less than 0.5%;After the completion of fashioned iron insertion, it is fixed to solidification;
7) mud in groove is cleared up;Part of cement soil can be displaced in groove by cement grout and H profile steel, by the water in groove Soil cleans out groove using excavator, it is ensured that next process is gone on smoothly;To avoid generating mud contamination, outer abandon firmly is needed Soil cement is cleaned after change;
8) construction note is arranged;It records the sinking time of every pile, promote the underthrust situation of time, the situation and H profile steel of whitewashing.
CN201910470723.0A 2019-05-31 2019-05-31 Application method of construction method pile enclosure in comprehensive pipe gallery foundation pit Active CN110374109B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910470723.0A CN110374109B (en) 2019-05-31 2019-05-31 Application method of construction method pile enclosure in comprehensive pipe gallery foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910470723.0A CN110374109B (en) 2019-05-31 2019-05-31 Application method of construction method pile enclosure in comprehensive pipe gallery foundation pit

Publications (2)

Publication Number Publication Date
CN110374109A true CN110374109A (en) 2019-10-25
CN110374109B CN110374109B (en) 2021-08-24

Family

ID=68249599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910470723.0A Active CN110374109B (en) 2019-05-31 2019-05-31 Application method of construction method pile enclosure in comprehensive pipe gallery foundation pit

Country Status (1)

Country Link
CN (1) CN110374109B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575768A (en) * 2020-12-17 2021-03-30 中铁二十二局集团轨道工程有限公司 SMW construction method pile applied to subway deep foundation pit engineering
CN115045299A (en) * 2022-07-26 2022-09-13 杭州市西站枢纽开发有限公司 Deep and large foundation pit side wall reinforcing structure with electroosmosis drainage function and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101768961A (en) * 2010-01-22 2010-07-07 中铁二十二局集团第六工程有限公司 Construction method of section-steel triaxial soil-cement mixing pile
CN101886393A (en) * 2010-07-03 2010-11-17 朱奎 Construction method of combined foundation ditch support
CN106894422A (en) * 2017-02-28 2017-06-27 南通华荣建设集团有限公司 Complex environment deep foundation pit supporting construction method
KR20180072305A (en) * 2016-12-21 2018-06-29 원병천 shaped steel beam and the structure using it
CN108560536A (en) * 2018-04-19 2018-09-21 江苏建宇建设集团有限公司 The continuous piling wall construction method of Soil-cement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101768961A (en) * 2010-01-22 2010-07-07 中铁二十二局集团第六工程有限公司 Construction method of section-steel triaxial soil-cement mixing pile
CN101886393A (en) * 2010-07-03 2010-11-17 朱奎 Construction method of combined foundation ditch support
KR20180072305A (en) * 2016-12-21 2018-06-29 원병천 shaped steel beam and the structure using it
CN106894422A (en) * 2017-02-28 2017-06-27 南通华荣建设集团有限公司 Complex environment deep foundation pit supporting construction method
CN108560536A (en) * 2018-04-19 2018-09-21 江苏建宇建设集团有限公司 The continuous piling wall construction method of Soil-cement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575768A (en) * 2020-12-17 2021-03-30 中铁二十二局集团轨道工程有限公司 SMW construction method pile applied to subway deep foundation pit engineering
CN115045299A (en) * 2022-07-26 2022-09-13 杭州市西站枢纽开发有限公司 Deep and large foundation pit side wall reinforcing structure with electroosmosis drainage function and construction method
CN115045299B (en) * 2022-07-26 2024-02-02 杭州市西站枢纽开发有限公司 Deep foundation pit side wall reinforcing structure with electroosmosis drainage function and construction method

Also Published As

Publication number Publication date
CN110374109B (en) 2021-08-24

Similar Documents

Publication Publication Date Title
CN104846829B (en) Shield-reserved penetration composite type foundation pit support wall and construction method thereof
WO2022096024A1 (en) Construction method for super-long small-diameter hole bored pile
CN108797587A (en) A kind of novel sinking construction technology of static pressed pile
CN106759379A (en) A kind of construction method of the asymmetric water-stop curtain of foundation ditch
AU2021106928A4 (en) Construction method for excavation of deep pit with triaxial mixing pile waterstop curtains and rotary bored cast-in-place pile supports
CN106088099B (en) A kind of subway foundation pit anchor cable processing method
CN109610470A (en) A kind of base pit stand construction using three axes agitating pile machine
CN109098175A (en) A kind of tri-axes deep mixing pile construction method
CN104747088A (en) Single-waist multi-leaf hose bit for bored pile and drilling construction method thereof
CN113235601A (en) Deep foundation pit construction risk control structure and method for collapsible loess adjacent building
CN103015429A (en) Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN110306531A (en) High water level erratic boulder stratum construction of diaphragm wall technique
CN111636455A (en) Comprehensive construction method of TRD (Top gas recovery device) and rotary drilling lead hole depth waterproof curtain
CN106988305A (en) A kind of pile-column pier construction method of underground integrated molding
CN110700293B (en) Rotary excavating leading hole steel sheet pile cofferdam construction method under deep water sloping rock environment
CN110374109A (en) The application method in pipe gallery foundation pit is gone along with sb. to guard him in a kind of engineering method stake
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN108824471A (en) A kind of deep water drift net multi-column pier foundation and its construction method
CN110747848A (en) Construction method of gravel layer foundation deep cement mixing pile diaphragm wall
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN113216215A (en) Deep groove support reverse construction method in complex environment
CN106869038B (en) The auxiliary device and its construction method for preventing overpass from settling
CN105239573B (en) The interplantation tube anchor rock construction method of shaped steel trestle
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ma Dong

Inventor after: Gao Zhi

Inventor after: Li Ming

Inventor after: Zhang Zhiyong

Inventor after: Liu Xiangnan

Inventor after: Chen Yaqiang

Inventor after: Yang Jinwen

Inventor after: Sun Chenglong

Inventor after: Ding Chuanfeng

Inventor after: Li Hui

Inventor after: Liu Bin

Inventor after: Zhao Yongliang

Inventor after: Zhu Kairong

Inventor after: Xiao Chunlei

Inventor before: Ma Dong

Inventor before: Gao Zhi

Inventor before: Li Ming

Inventor before: Zhang Zhiyong

Inventor before: Liu Xiangnan

Inventor before: Chen Yaqiang

Inventor before: Yang Jinwen

Inventor before: Sun Chenglong

Inventor before: Ding Chuanfeng

Inventor before: Li Hui

Inventor before: Liu Bin

Inventor before: Zhao Yongliang

Inventor before: Zhu Kairong

Inventor before: Xiao Chunlei