CN110374020A - Welding excision construction method and its appurtenance in reinforced concrete pile water - Google Patents

Welding excision construction method and its appurtenance in reinforced concrete pile water Download PDF

Info

Publication number
CN110374020A
CN110374020A CN201910534071.2A CN201910534071A CN110374020A CN 110374020 A CN110374020 A CN 110374020A CN 201910534071 A CN201910534071 A CN 201910534071A CN 110374020 A CN110374020 A CN 110374020A
Authority
CN
China
Prior art keywords
hole
floating
ring
reinforced concrete
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910534071.2A
Other languages
Chinese (zh)
Other versions
CN110374020B (en
Inventor
谢道强
徐娟
胡旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jiankai Construction Engineering Co Ltd
Original Assignee
Anhui Jiankai Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jiankai Construction Engineering Co Ltd filed Critical Anhui Jiankai Construction Engineering Co Ltd
Priority to CN201910534071.2A priority Critical patent/CN110374020B/en
Publication of CN110374020A publication Critical patent/CN110374020A/en
Application granted granted Critical
Publication of CN110374020B publication Critical patent/CN110374020B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/04Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by cutting-off under water

Abstract

The invention discloses welding excision construction method and its appurtenances in a kind of reinforced concrete pile water, sealing film including floating ring and sinking ring in upper floating ring, sinking ring, connection, the upper floating ring is spliced by least two floating bodies, sinking ring is at least spliced by two heavy bodies, floating body is identical with the quantity of heavy body and upper and lower correspondence, sealing film includes the membrane body for connecting corresponding floating body and heavy body, and adjacent membrane body is connected by waterproof slide fastener.Floating platform is first installed in water;Later by upper floating ring, sinking ring splice sleeve outside reinforced concrete pile to be cut, and membrane body is connected and to form sealing film, by sinking ring submerged, flocculant is put into the operating space that sealing film and reinforced concrete pile to be cut are formed, construction personnel slips into operating space and operates later.This programme carries out precipitation process due to foring an independent " locked in " operation space, and to the water in operating space, so that the water phase in operating space to limpid, operates convenient for construction personnel.

Description

Welding excision construction method and its appurtenance in reinforced concrete pile water
Technical field
The present invention relates to underwater piles to remove field, in particular to welding cuts off construction method in reinforced concrete pile water And its appurtenance.
Background technique
Bridge etc. is removed after reaching design service life, is removed difficult point and is underwater concrete pile.
Now, it removes underwater metal structure and reinforced concrete structure mainly uses subsea cutting technology, it is currently used Aerobic-flammable lancing of subsea cutting technology, underwater oxygen-arc cutting, metal-electric arc cutting, submarine mechanical cutting, water jet are cut It cuts, underwater plasma cutting, blast cutting etc..
Publication No. CN105064225A discloses welding excision construction work in a kind of old bridge reinforced concrete pile water Method, comprising the following steps: (one) riverbed soil layer at pier location is rinsed using high pressure water flow, reduce riverbed surface elevation;(2) it is marking Positioning, which is set, to be cut pile foundation cover to reinforcement and makes reinforcing steel bars exposed;(3) welding and cutting device cuts off reinforcing bar under water;(4) stake top applies horizontal Pile body concrete at power laser cutting removes the pile body of separation;(5) filling pit slot, leveling riverbed.
Above-mentioned steps are the general operation process of welding excision, and welding process mainly passes through diving personnel's dive and carries out, but In some waters, since water is more muddy, underwater visibility is low, therefore its construction is relatively difficult.
Summary of the invention
In view of the deficienciess of the prior art, the first object of the present invention is welding in a kind of reinforced concrete pile water Construction method appurtenance is cut off, construction personnel is suitble to construct in muddy waters.
Above-mentioned technical purpose of the invention, which has the technical scheme that in reinforced concrete pile water, welds Cut off except construction method appurtenance, the sealing film including floating ring and sinking ring in upper floating ring, sinking ring, connection, it is described on Floating ring is spliced by least two floating bodies, and the sinking ring is at least spliced by two heavy bodies, the quantity of floating body and heavy body Identical and upper and lower correspondence, sealing film include the membrane body for connecting corresponding floating body and heavy body, and adjacent membrane body is connected by waterproof slide fastener.
When muddy waters carries out welding operation, floating platform is first installed in water, floating platform is located at reinforcing bar to be cut By concrete pile;Mounting auxiliary later, by upper floating ring, sinking ring splice sleeve outside reinforced concrete pile to be cut, And membrane body is connected and to form sealing film, sinking ring submerged to sinking ring is abutted into the bottom, in sealing film and reinforcing bar to be cut Flocculant is put into the operating space that concrete-pile column is formed, construction personnel slips into operating space and operates later.This programme Precipitation process is carried out due to foring an independent " locked in " operation space, and to the water in operating space, so that in operating space Water phase to limpid, operated convenient for construction personnel.
Further, floating body is arranged two, is the first floating body and the second floating body, and the first floating body both ends are respectively set first and insert Block and the first slot, the both ends of the second floating body respectively correspond the first inserted block and the second slot, corresponding first slot setting second are arranged Inserted block;First inserted block opens up the first threaded hole, and the position of corresponding second slot of the second floating body opens up first through hole, and the first inserted block is inserted First through hole is coaxially set with the first threaded hole after entering the second slot;Second inserted block opens up the second threaded hole, the first floating body pair The position of the first slot is answered to open up the second through-hole, the second inserted block is inserted into the second through-hole and the second threaded hole coaxial line after the first slot Setting;It further include one passing through the first fastening bolt that first through hole connect with the first threaded hole, across the second through-hole and the second spiral shell Second fastening bolt of pit connection.
The splicing of upper floating ring is realized by way of the first floating body and the second floating body grafting and using fastening bolt connection.
Further, the body that sinks is arranged two, is the first heavy body and the second heavy body, the first company is respectively set in the first heavy body both ends Block and the first link slot are connect, the both ends of the second heavy body respectively correspond the first link block and the second link slot, corresponding first connection is arranged The second link block is arranged in slot;First link block opens up third threaded hole, and the position of corresponding second link slot of the second heavy body opens up the Three through-holes, third through-hole is coaxially set with third threaded hole after the first link block is inserted into the second link slot;Second link block is opened If the 4th threaded hole, the position of corresponding first link slot of the first heavy body opens up fourth hole, the first connection of the second link block insertion Fourth hole is coaxially set with the 4th threaded hole after slot;Further include one pass through third through-hole connect with third threaded hole first Fixing bolt, the second fixing bolt being connect across fourth hole with the 4th threaded hole.
The splicing of sinking ring is realized by way of the first heavy body and the second heavy body grafting and using fastening bolt connection.
Further, the upward floating ring direction of first link slot extends through the first heavy body, and the second link slot is to floating Ring direction extends through the second heavy body.
Such first heavy body and the second heavy body can be more convenient using vertical direction docking or horizontal direction docking, connection.
Further, sinking ring is fixed with conical protrusions away from an end face of upper floating ring.
Conical protrusions enter convenient for sinking ring in water-bed soil layer.
Further, location hole is offered on the sinking ring and upper floating ring, location hole is square hole.
Locating rod passes through in the water-bed soil of location hole insertion of sinking ring and upper floating ring, so that sinking ring and upper floating ring Center and the axis of reinforced concrete pile to be cut are consistent substantially, are carried out convenient for construction personnel in each of operating space Position is operated.
The second object of the present invention is to provide welding excision construction method in a kind of reinforced concrete pile water, is suitble to construction Personnel construct in muddy waters.
Welding cuts off construction method in a kind of reinforced concrete pile water, using welding in the reinforced concrete pile water It cuts off except construction method appurtenance.
Further, floating platform is first installed in water, floating platform is located at by reinforced concrete pile to be cut;Later Mounting auxiliary, by upper floating ring, sinking ring splice sleeve outside reinforced concrete pile to be cut, and membrane body connected to be formed it is close Sinking ring submerged to sinking ring is abutted the bottom by sealer, in the behaviour that sealing film and reinforced concrete pile to be cut are formed Make to put into flocculant in space, construction personnel slips into operating space and operates later.
Further, flocculant include at least alum, aluminum sulfate, aluminium chloride, ferric sulfate, iron chloride, aluminium polychloride its Middle one kind.
Above-mentioned flocculant is cheap, and pollutes few.
In conclusion the invention has the following advantages: the present invention can carry out construction welding in muddy waters, operation It is more convenient.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment 1;
Fig. 2 is the perspective view of the explosion one of upper floating ring;
Fig. 3 is the perspective view of the explosion two of upper floating ring;
Fig. 4 is the perspective view of the explosion of sinking ring.
Appended drawing reference: 1, upper floating ring;11, the first floating body;111, the first inserted block;112, the first slot;113, the first screw thread Hole;114, the second through-hole;115, first positioning hole;12, the second floating body;121, the second inserted block;122, the second slot;123, first Through-hole;124, the second threaded hole;13, the first fastening bolt;14, the second fastening bolt;2, sinking ring;21, the first heavy body;211, First link block;212, the first link slot;213, third threaded hole;214, fourth hole;215, second location hole;22, second Heavy body;221, the second link block;222, the second link slot;223, third through-hole;224, the 4th threaded hole;225, bundle hole;23, First fixing bolt;24, the second fixing bolt;25, conical protrusions;3, film is sealed;31, membrane body;32, the first serobila;33, Two serobilas;4, locating rod;5, reinforced concrete pile.
Specific embodiment
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.
Embodiment 1: welding cuts off construction method appurtenance in a kind of reinforced concrete pile water, such as Fig. 1, including upper Floating ring 1, sinking ring 2, in connection floating ring 1 and sinking ring 2 sealing film 3, upper floating ring 1 is spliced by least two floating bodies, under Heavy ring 2 is at least spliced by two heavy bodies, and floating body is identical with the quantity of heavy body and upper and lower correspondence, and sealing film 3 includes connection pair The connection of the membrane body 31 of floating body and heavy body, membrane body 31 and heavy body and floating body is answered to be all made of high viscous waterproof gluing knot.Adjacent membrane body 31 are connected by waterproof slide fastener, and membrane body 31 is made of PVC material or PE material etc..
Such as Fig. 1, floating body is arranged two, is the first floating body 11 and the second floating body 12, the first floating body 11 and the second floating body 12 are It is made of polyethylene, and can according to need and open up cavity inside the first floating body 11 and the second floating body 12 to promote buoyancy.Such as The first inserted block 111 and the first slot 112, the both ends difference of the second floating body 12 is respectively set in Fig. 2-3,11 both ends end face of the first floating body The second slot 122 is arranged in corresponding first inserted block 111, and the second inserted block 121 is arranged in corresponding first slot 112;First inserted block 111 opens up First threaded hole 113, the position of corresponding second slot 122 of the second floating body 12 open up first through hole 123, the insertion of the first inserted block 111 First through hole 123 is coaxially set with the first threaded hole 113 after second slot 122;Second inserted block 121 opens up the second threaded hole 124, the position of corresponding first slot 112 of the first floating body 11 opens up the second through-hole 114, and the second inserted block 121 is inserted into the first slot 112 The second through-hole 114 is coaxially set with the second threaded hole 124 afterwards;It further include one across first through hole 123 and the first threaded hole 113 First fastening bolt 13 of connection, the second fastening bolt 14 being connect across the second through-hole 114 with the second threaded hole 124.
Be arranged two as Fig. 1 sinks body, be the first heavy body 21 and the second heavy body 22, the first heavy body 21 and the second heavy body 22 by Stainless steel is made.Such as Fig. 4, the first heavy body 21 and the second heavy 22 bottom of body are integrally formed several conical protrusions 25.First is heavy The first link block 211 and the first link slot 212 is respectively set in 21 both ends of body, and the both ends of the second heavy body 22 respectively correspond the first connection The second link slot 222 is arranged in block 211, and the second link block 221 is arranged in corresponding first link slot 212;First link slot 212 is to floating 1 direction of ring extends through the first heavy body 21, and upward 1 direction of floating ring of the second link slot 222 extends through the second heavy body 22.First connects It connecing block 211 and opens up third threaded hole 213, the position of corresponding second link slot 222 of the second heavy body 22 opens up third through-hole 223, the Third through-hole 223 is coaxially set with third threaded hole 213 after one link block 211 is inserted into the second link slot 222;Second link block 221 open up the 4th threaded hole 224, and the position of corresponding first link slot 212 of the first heavy body 21 opens up fourth hole 214, and second connects Fourth hole 214 after block 221 is inserted into the first link slot 212 is connect to be coaxially set with the 4th threaded hole 224;It further include one passing through the The first fixing bolt 23 that three through-holes 223 are connect with third threaded hole 213 passes through fourth hole 214 and the 4th threaded hole 224 company The second fixing bolt 24 connect.
Such as Fig. 1, there are two membrane body 31 is correspondingly arranged, each 31 two sides of membrane body are respectively provided with the first serobila 32 and the second serobila 33, the first serobila 32 and the second serobila 33 form a waterproof slide fastener.Two 31 lower ends of membrane body are located at the first heavy body 21 With the inside of the second heavy body 22, the upper end of two membrane bodies 31 is each passed through after the first floating body 11 and the second floating body 12 that be higher by first floating Body 11 and the second floating body 12.
Such as Fig. 1, a corresponding location hole is opened up on upper floating ring 1 and sinking ring 2, is on specially the first floating body 11 A positioning hole 115 is second location hole 215 on first heavy body 21, and first positioning hole 115 and about 215 second location hole are right It answers, first positioning hole 115 and second location hole 215 are square hole.
Such as Fig. 4, one is also opened up on the second heavy body 22 for bundling the bundle hole 225 of chain sling.
Embodiment 2: welding cuts off construction method in a kind of reinforced concrete pile water, includes the following steps: in this programme Floating platform directlys adopt steamer.
Locating rod 4 is passed through first positioning hole 115 and second location hole by the installation that auxiliary tool is carried out on floating platform In the water-bed soil of 215 insertions, chain sling is bound in bundle hole 225;Later by upper floating ring 1,2 splice sleeve of sinking ring to be cut Outside reinforced concrete pile 5, and membrane body 31 is connected and forms sealing film 3,2 submerged of sinking ring to sinking ring 2 is abutted into water Bottom puts into flocculant in the operating space that sealing film 3 and reinforced concrete pile 5 to be cut are formed, uses in the present embodiment Be aluminium chloride, later construction personnel slip into operating space treat cutting reinforced concrete pile 5 concrete parts carry out brokenly It removes, welding is carried out to reinforcing bar again later;Reinforced concrete pile 5 is bundled after welding.
Sinking ring 2 is sling after cutting by chain sling, and sinking ring 2, upper floating ring 1 are removed, then by reinforced concrete Native pile 5 is sling.

Claims (9)

1. welding cuts off construction method appurtenance in a kind of reinforced concrete pile water, it is characterized in that: including upper floating ring (1), sinking ring (2), in connection floating ring (1) and sinking ring (2) sealing film (3), the upper floating ring (1) is by least two floating bodies It being spliced, the sinking ring (2) is at least spliced by two heavy bodies, and floating body is identical with the quantity of heavy body and upper and lower correspondence, Sealing film (3) includes the membrane body (31) for connecting corresponding floating body and heavy body, and adjacent membrane body (31) is connected by waterproof slide fastener.
2. welding cuts off construction method appurtenance, feature in reinforced concrete pile water according to claim 1 Be: floating body is arranged two, is the first floating body (11) and the second floating body (12), the first inserted block is respectively set in the first floating body (11) both ends (111) with the first slot (112), the both ends of the second floating body (12) the first inserted block (111) are respectively corresponded, the second slot is set (122), corresponding first slot (112) setting the second inserted block (121);First inserted block (111) opens up the first threaded hole (113), the The position of two floating bodies (12) corresponding second slot (122) opens up first through hole (123), and the first inserted block (111) is inserted into the second slot (122) first through hole (123) is coaxially set with the first threaded hole (113) afterwards;Second inserted block (121) opens up the second threaded hole (124), the position of the first floating body (11) corresponding first slot (112) opens up the second through-hole (114), the second inserted block (121) insertion The second through-hole (114) is coaxially set first slot (112) with the second threaded hole (124) afterwards;It further include one across first through hole (123) the first fastening bolt (13) for connecting with the first threaded hole (113) passes through the second through-hole (114) and the second threaded hole (124) the second fastening bolt (14) connected.
3. welding cuts off construction method appurtenance, feature in reinforced concrete pile water according to claim 1 Be: heavy body is arranged two, is the first heavy body (21) and the second heavy body (22), the first connection is respectively set in the first heavy body (21) both ends Block (211) and the first link slot (212), the both ends of the second heavy body (22) respectively correspond the first link block (211) setting second and connect Access slot (222), corresponding first link slot (212) setting the second link block (221);First link block (211) opens up third screw thread The position in hole (213), the second heavy body (22) corresponding second link slot (222) opens up third through-hole (223), the first link block (211) third through-hole (223) is coaxially set with third threaded hole (213) afterwards for insertion the second link slot (222);Second link block (221) the 4th threaded hole (224) is opened up, the position of the first heavy body (21) corresponding first link slot (212) opens up fourth hole (214), fourth hole (214) and the 4th threaded hole (224) are coaxial afterwards for the second link block (221) insertion the first link slot (212) Line setting;Further include one pass through third through-hole (223) connect with third threaded hole (213) the first fixing bolt (23), pass through The second fixing bolt (24) that fourth hole (214) is connect with the 4th threaded hole (224).
4. welding cuts off construction method appurtenance, feature in reinforced concrete pile water according to claim 1 Be: floating ring (1) direction extends through the first heavy body (21) to first link slot (212) upwards, and the second link slot (222) is upward Floating ring (1) direction extends through the second heavy body (22).
5. welding cuts off construction method appurtenance, feature in reinforced concrete pile water according to claim 1 Be: sinking ring (2) is fixed with conical protrusions (25) away from an end face of upper floating ring (1).
6. welding cuts off construction method appurtenance, feature in reinforced concrete pile water according to claim 1 It is: offers location hole on the sinking ring (2) and upper floating ring (1), location hole is square hole.
7. welding cuts off construction method in a kind of reinforced concrete pile water, it is characterized in that: any one using such as claim 1-6 Welding cuts off construction method appurtenance in reinforced concrete pile (5) water described in.
8. welding cuts off construction method in reinforced concrete pile water according to claim 7, it is characterized in that: first in water Floating platform is installed, it is other that floating platform is located at reinforced concrete pile to be cut (5);Mounting auxiliary later, by upper floating ring (1), sinking ring (2) splice sleeve reinforced concrete pile to be cut (5) outside, and by membrane body (31) connect formed sealing film (3), Sinking ring (2) submerged to the ring that sinks (2) is abutted into the bottom, in sealing film (3) and reinforced concrete pile to be cut (5) shape At operating space in put into flocculant, construction personnel slips into operating space and operates later.
9. welding cuts off construction method in reinforced concrete pile water according to claim 8, it is characterized in that: flocculant is extremely It is one of comprising alum, aluminum sulfate, aluminium chloride, ferric sulfate, iron chloride, aluminium polychloride less.
CN201910534071.2A 2019-06-20 2019-06-20 Welding-cutting-off construction method for reinforced concrete pile in water and auxiliary tool thereof Active CN110374020B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910534071.2A CN110374020B (en) 2019-06-20 2019-06-20 Welding-cutting-off construction method for reinforced concrete pile in water and auxiliary tool thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910534071.2A CN110374020B (en) 2019-06-20 2019-06-20 Welding-cutting-off construction method for reinforced concrete pile in water and auxiliary tool thereof

Publications (2)

Publication Number Publication Date
CN110374020A true CN110374020A (en) 2019-10-25
CN110374020B CN110374020B (en) 2020-11-03

Family

ID=68250471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910534071.2A Active CN110374020B (en) 2019-06-20 2019-06-20 Welding-cutting-off construction method for reinforced concrete pile in water and auxiliary tool thereof

Country Status (1)

Country Link
CN (1) CN110374020B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984002A (en) * 2020-01-17 2020-04-10 广东冠粤路桥有限公司 Bridge deck auxiliary structure and method for dismantling cantilever box girder of main bridge T-shaped structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0301113A1 (en) * 1987-07-28 1989-02-01 Menck Gmbh Device for cutting tubular foundation piles under water
US4808037A (en) * 1987-02-25 1989-02-28 Franklin C. Wade Method and apparatus for removal of submerged offshore objects
CN1342814A (en) * 2001-10-25 2002-04-03 上海交通大学 Underwater concrete pouring method for squeezing out mud sediment in muddy water
CN105837107A (en) * 2016-03-15 2016-08-10 青岛太平洋海洋工程有限公司 Underwater static crushing agent and preparation method thereof
CN107980073A (en) * 2015-06-25 2018-05-01 温贝托·莱昂尼德斯·西富恩特斯·桑切斯 Method for repairing storage dam water inlet
CN208049464U (en) * 2018-03-17 2018-11-06 冯越杨 A kind of road and bridge construction with can clear up multi-functional sedimentation basin automatically
CN109024660A (en) * 2018-07-17 2018-12-18 中国能源建设集团广东省电力设计研究院有限公司 Pile foundation method for dismounting and offshore foundation method for dismounting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4808037A (en) * 1987-02-25 1989-02-28 Franklin C. Wade Method and apparatus for removal of submerged offshore objects
EP0301113A1 (en) * 1987-07-28 1989-02-01 Menck Gmbh Device for cutting tubular foundation piles under water
CN1342814A (en) * 2001-10-25 2002-04-03 上海交通大学 Underwater concrete pouring method for squeezing out mud sediment in muddy water
CN107980073A (en) * 2015-06-25 2018-05-01 温贝托·莱昂尼德斯·西富恩特斯·桑切斯 Method for repairing storage dam water inlet
CN105837107A (en) * 2016-03-15 2016-08-10 青岛太平洋海洋工程有限公司 Underwater static crushing agent and preparation method thereof
CN208049464U (en) * 2018-03-17 2018-11-06 冯越杨 A kind of road and bridge construction with can clear up multi-functional sedimentation basin automatically
CN109024660A (en) * 2018-07-17 2018-12-18 中国能源建设集团广东省电力设计研究院有限公司 Pile foundation method for dismounting and offshore foundation method for dismounting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984002A (en) * 2020-01-17 2020-04-10 广东冠粤路桥有限公司 Bridge deck auxiliary structure and method for dismantling cantilever box girder of main bridge T-shaped structure

Also Published As

Publication number Publication date
CN110374020B (en) 2020-11-03

Similar Documents

Publication Publication Date Title
US3859806A (en) Offshore platform
JP2006249685A (en) Cofferdam construction method for underwater structure, and structure for cofferdam
CN108884647B (en) Shallow water base structure and method for installing a shallow water base structure
NO861452L (en) BOEYE WITH MINIMUM MOVEMENT CHARACTERISTICS.
US9254894B2 (en) Flotable subsea platform (FSP)
CN110374020A (en) Welding excision construction method and its appurtenance in reinforced concrete pile water
US6968795B2 (en) Very large vessel construction
GB2551949A (en) Method and apparatus for installation of a subsea tank
NO750551L (en)
JPH02214404A (en) Method of laying long member for floating plant in rising manner
RU2014243C1 (en) Method of industrial complex underwater exploitation of sea fields
USRE30823E (en) Offshore platform
Perrett et al. Tethered buoyant platform production system
CN100360377C (en) Semi submersible type under water construction flow blocking device
JPH0551918A (en) Operation caisson
CN203233875U (en) Tension leg type deep water net cage capable of heaving along with water level fluctuation
USRE30825E (en) Offshore platform joinder
JP2003119793A (en) Underwater working method, working can and working device
JPH02168805A (en) Subaqueous cable provided with joint
CN116927247A (en) Underwater tunnel with inverted pile pier and its construction method
Small et al. Submerged Weight Control for Submarine Pipeline Construction
Garmage et al. Marine Production Riser-A Subsystem of the Submerged Production System
JP2003003481A (en) Immersing caisson submersing method
KR101279839B1 (en) Prevention device fo a corruption
Day et al. Decommissioning of offshore oil and gas installations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant