CN110361158A - The analogy method and device of hydrate reservoir silt particle removing migration in pressure reduction - Google Patents

The analogy method and device of hydrate reservoir silt particle removing migration in pressure reduction Download PDF

Info

Publication number
CN110361158A
CN110361158A CN201910564840.3A CN201910564840A CN110361158A CN 110361158 A CN110361158 A CN 110361158A CN 201910564840 A CN201910564840 A CN 201910564840A CN 110361158 A CN110361158 A CN 110361158A
Authority
CN
China
Prior art keywords
module
reservoir
hydrate
pressure
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910564840.3A
Other languages
Chinese (zh)
Other versions
CN110361158B (en
Inventor
李彦龙
陈强
刘昌岭
吴能友
董长银
孟庆国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Institute of Marine Geology
Original Assignee
Qingdao Institute of Marine Geology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Institute of Marine Geology filed Critical Qingdao Institute of Marine Geology
Priority to CN201910564840.3A priority Critical patent/CN110361158B/en
Publication of CN110361158A publication Critical patent/CN110361158A/en
Application granted granted Critical
Publication of CN110361158B publication Critical patent/CN110361158B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M10/00Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels

Abstract

The present invention discloses the analogy method and device of hydrate reservoir silt particle removing migration in a kind of pressure reduction, the simulator includes reservoir simulation module, supplying module, pressure control module, temperature control module and recycling module, reservoir simulation module peels off start-up course, including micro- visual module, purely radial stream reservoir simulation module and non-radial stream reservoir simulation module for loading unconsolidated sediment, generating hydrate reservoir and observing silt particle;This programme considers different streamline kenels, the hydrate regularity of distribution to the starting of hydrate reservoir sand grains, the influence of migration process, the hydrate reservoir under the conditions of different hydrate concentrations, different hydrate distribution patterns is prepared by reservoir, guarantee that hydrate is in undecomposed state in the experiment of subsequent Analysis of sanding mechanism, discussion, which is shaked out, critical pressure drop condition and shakes out kenel Evolution, predicts to provide technical support for practical recovery well Sanding Mechanism.

Description

The analogy method and device of hydrate reservoir silt particle removing migration in pressure reduction
Technical field
The invention belongs to ocean gas hydrate development fields, and in particular to can simulate and be hydrated under different flow field conditions Object is depressured the visual simulation method and system of silt particle peeling in recovery process, silt particle migration Meso process.
Background technique
With China's Gas Hydrate In Sea Areas pilot production for the first time success, shaking out in Gas Hydrate In Sea Areas recovery process And its Simulation of influence factor rapidly becomes studies in China hot spot.Current focus mainly passes through numerical simulation or reality The means for testing simulation answer the occuring regularity of reservoir silt particle in pressure reduction.It is real due to lacking live test data of actually shaking out Test the main means that simulation becomes exploitation of gas hydrates Analysis of sanding mechanism, Sanding Mechanism is predicted.Qingdao Haiyang geology is ground Study carefully institute's (patent publication No.: CN106950153A;CN106353069A), Chinese Sea Petroleum Group Co., Ltd (patent disclosure Number: CN108316913A), China Petroleum Univ.'s (patent publication No.: CN106680435A), Chinese Academy of Sciences's mechanics grind Study carefully the units such as institute's (patent publication No.: CN104950074A) and be directed to different hydrate exploitation operating conditions respectively and proposes hydrate point Sanding Mechanism experimental system for simulating and experimental method during solution output, the emphasis of these methods are to consider that hydrate exploitation produces Gas produces water process and produces the rule of sand interprocedual, and silt particle in hydrate recovery process can not be described from the angle of microcosmic mechanism and is being stored up Peeling, migration process in layer.
In fact, the mechanical property reduction of shake out process and reservoir during exploitation of gas hydrates is closely related, The sanding mechanism of hydrate reservoir and the mechanical property of reservoir develop closely related.For this purpose, Qingdao Inst of Marine Geology's (patent Publication number: CN107121359A) coupled relation that hydrate exploitation is shaked out with mechanical property is considered, it proposes based on three-axis force Learn hydrate sand production rate-shearing strength combined detecting method of basic test principle.But this method is shaked out from macroscopic perspective explanation Influence of the process to mechanical property, there is certain help to the peel off mechanism of hydrate reservoir sand grains, but still can not be from microcosmic Scale verifies the relationship of decomposition of hydrate process and silt particle starting migration.To solve the above-mentioned problems, patent publication No. CN109254137A attempts influence of the process to reservoir pore space of shaking out that hydrate reservoir is disclosed using X-CT technology.
These are beneficial to explore and all provides the foundation to the shake out research of process, sanding mechanism of the exploitation of hydrate, still Mostly it is to carry out under one-dimensional condition, that is, does not account for the influence that reservoir flow field peels off reservoir silt particle, starts migration process, Also it is difficult to realize visual simulation.
To sum up, the angle studied from gas hydrates production simulating sand, however it remains following problem:
(1) presently, there are weight-normality rule, light mechanism, reppear the feature of the behavior of sand result, light silt particle in reservoir, therefore need Reinforce the research of silt particle removing in the earth formation, starting migration, migration kenel etc.;
(2) Container Rock Sanding mechanism is explained from micro-scale although having segmentation scheme at present and recognizing, but still nothing Method inquires into decomposition of hydrate to the peeling of silt particle particle and its influence of migration process from visualization angle;
(3) influence of the special reservoir streamline kenel to hydrate reservoir sand migration is not accounted for, complexity is unable to satisfy and opens Mode is adopted, as the sand grains in the special seepage region around hydraulic slotted liner technique gap peels off, starting kenel description.
Therefore, it is based on problem above, it would be highly desirable to propose that one kind can inquire into the stripping of hydrate reservoir silt particle based on visualization means From, starting migration, migration kenel indoor simulation method and system, to fully consider decomposition of hydrate rate, decomposable process pair The influence that silt particle peels off, starting is migrated, and consider different near wellbore formation percolation laws, to explore decomposition of hydrate, reservoir stream Sanding Mechanism difference caused by the factors such as field provides technical support.
Summary of the invention
The present invention is to solve defect existing in the prior art, proposes hydrate reservoir silt particle removing in a kind of pressure reduction The analogy method and system of migration, exploring the factors such as decomposition of hydrate, reservoir flow field with visualization means causes to store up hydrate The control mechanism that layer shakes out provides technical support for the prediction of practical recovery well Sanding Mechanism.
The present invention, which is that the following technical solution is employed, to be realized:
The analogy method of hydrate reservoir silt particle removing migration in a kind of pressure reduction, comprising the following steps:
(1) the streamline model is selected:
Streamline kenel is determined according to practical gas hydrates reservoir conditions, and selects corresponding the streamline model, the stream Line model includes purely radial flow field simulation model and non-radial flow model, wherein non-radial flow model includes purely linear flow field simulation mould Type, linear gradient drop simulation model, power function pressure drop gradient simulation model, negative exponent pressure drop gradient simulation model;
(2) hydrate simulation reservoir preparation:
Step (1) selected the streamline model is installed to the simulation of hydrate reservoir silt particle removing migration in pressure reduction In device, controls Temperature-pressure Conditions and inject water into simulator, gas generates hydrate;It, will be micro- based on image Segmentation Technology The deposit cross-sectional image of visual module photograph carries out Threshold segmentation, with the regularity of distribution of quantitatively characterizing hydrate concentration;
The simulator of hydrate reservoir silt particle removing migration includes reservoir simulation module, supply mould in the pressure reduction Block, pressure control module, temperature control module and recycling module, reservoir simulation module, supplying module, pressure control module and recycling module are respectively provided with In temperature control module, supplying module, pressure control module and recycling module are connected with reservoir simulation module, the reservoir simulation module Start-up course is peeled off for loading unconsolidated sediment, generating hydrate reservoir and observing decomposition of hydrate and silt particle, including micro- Visual module, purely radial stream reservoir simulation module and non-radial stream reservoir simulation module, purely radial stream reservoir simulation module and non- Visual window is provided in radial flow reservoir simulation module, micro- visual module is oppositely arranged with visual window;
(3) decompression flow setting and simulation:
The inlet pressure for controlling reservoir simulation module is invariable, controls to adjust the outlet pressure of reservoir simulation module, makes The inlet pressure difference of reservoir simulation module remains constant always;In conjunction with supplying module, into reservoir simulation module injection and its The equal gas-liquid mixture of internal temperature guarantees that charge velocity can maintain model inlet pressure to stablize;
(4) sand grains starts critical decompression simulation:
It is poor to change the step reservoir simulation module inlet pressure in (3), observes fixed hydrate concentration and hydrate point Under the conditions of cloth, the sand grains at different location starts transport conditions, and incrementally increases mold passageway pressure difference using staged Mode observes the critical pressure differential of the silt particle particle starting migration in different hydrate concentration regions, to establish hydrate concentration Start the relationship between migration critical pressure drop with silt particle;
(5) hydrate reservoir shake out kenel evolution:
After step (4) observes the starting migration of silt particle particle, constant entrance pressure drop is persistently maintained, guarantees starting migration Silt particle output and collect;Observe the Evolution in silt particle particle migration path, migrating channels in real time based on micro- visual module, With formation sand production kenel under the constant production pressure drop of determination, certain hydrate concentration distribution occasion;
(6) control that streamline kenel shakes out to hydrate reservoir:
After the completion of above-mentioned steps (1)-(5), the streamline model is replaced, step (2)~(5) is repeated, verifies other streamline moulds The thin sight sanding mechanism of hydrate reservoir under type qualifications.
Further, in the step (3), in decompression flow setting and simulation process, guarantee reservoir simulation module Outlet, entrance absolute pressure value are above hydrate phase balance pressure, guarantee that the hydrate formed is in undecomposed state.
In addition the present invention also proposes a kind of simulator of hydrate reservoir silt particle removing migration in pressure reduction, including storage Layer analog module, supplying module, pressure control module, temperature control module and recycling module, the reservoir simulation module, supplying module, control Die block and recycling module are arranged in temperature control module, temperature needed for the temperature control module is used to maintain hydrate reservoir simulation Degree condition, the supplying module are used to supply high pressure gas and water to reservoir simulation module, and the pressure control module is to control storage Inlet pressure, outlet pressure and the system pressure of layer analog module, the recycling module is for recycling reservoir simulation module output Gas-liquid solid;
The reservoir simulation module is for loading unconsolidated sediment, generating hydrate reservoir and observe decomposition of hydrate and mud Sand peels off start-up course, including micro- visual module, purely radial stream reservoir simulation module and non-radial stream reservoir simulation module, pure Visual window, micro- visual module and visual window are provided in radial flow reservoir simulation module and non-radial stream reservoir simulation module It is oppositely arranged;Purely radial stream, which flows, is arranged purely radial flow field simulation model in reservoir simulation module, in non-radial stream reservoir simulation module Purely linear flow field simulation model, linear gradient drop simulation model, power function pressure drop gradient simulation model or negative exponent pressure drop are set Gradient simulation model.
Further, the reservoir simulation module includes epivalve shell, hypovalve shell, visual window, fluid-mixing entrance, mixes Fluid outlet, reservoir sedimentation object filling slot, confining pressure cavity, entrance guiding slot and outlet collection slot, the setting of entrance guiding slot is closed to exist Fluid-mixing arrival end, outlet collection slot are arranged in fluid-mixing outlet end;Epivalve shell and hypovalve shell are by fastening spiral shell It tethers and connects, the central location of epivalve shell is arranged in visual window;There is and the visual window etc. on epivalve shell design on hypovalve shell The groove of diameter, the filling slot setting of reservoir sedimentation object cooperate in the groove and with it, and reservoir sedimentation object fills setting inside slot Different the streamline models, and the structure of reservoir sedimentation object filling slot matches with the streamline model structure.
Further, for non-radial stream reservoir simulation module, reservoir sedimentation object fills the streamline model being arranged in slot It include: purely linear flow field simulation model, linear gradient Pressure Drop Model, power function pressure drop gradient model and negative exponent pressure drop gradient mould Type, and the outlet of fluid-mixing entrance, fluid-mixing is oppositely arranged on the side of reservoir simulation module.
Further, for the reservoir simulation module of purely radial stream, purely radial stream reservoir sedimentation object filling slot is generally round Dish type, and purely radial inflow entrance diversion trench, along the filling slot outer rim setting of purely radial stream reservoir sedimentation object, fluid-mixing outlet is located at The central location of hypovalve shell.
Further, pressure-resistant glass is installed above the entrance guiding slot and outlet collection slot, pressure-resistant glass outer rim with it is upper Valve shell is sealed by sliding ring, is confining pressure cavity above the pressure resistance glass, on confining pressure cavity and epivalve housing sidewall The connection of confining pressure entrance, confining pressure cavity top passes through visual window and epivalve shell secure fit.
Further, the supplying module includes gas supply module, feed flow module and gas-liquid mixing module, supplies module and confession Liquid module is connected with the arrival end of gas-liquid mixed module, and the outlet end of gas-liquid mixed module is connected with reservoir simulation module.
Further, the recycling module includes the first control recovery system and the second control recovery system, the first control Recovery system is connected with the outlet of non-radial stream reservoir simulation module, the second control recovery system and purely radial stream reservoir simulation mould The outlet of block is connected.
Further, the pressure control module includes inlet pressure control pump, first outlet pressure control pump and second outlet Pressure control pump, first outlet pressure control pump are connected with the first control recovery system, second outlet pressure control pump and second Recovery system is controlled to be connected.
Compared with prior art, the advantages and positive effects of the present invention are:
(1) the different streamline kenel of consideration is to the starting of hydrate reservoir sand grains, the influence of migration process, and designs corresponding Reservoir simulation modular structure and corresponding analogy method process, result of study propose the design directly to reservoir reconstruction leading edge kenel For support;
(2) by controlling different hydrate concentrations, different hydrate distribution patterns in reservoir preparation process, subsequent Guarantee that hydrate is in stable state in Analysis of sanding mechanism experiment, eliminates decomposition of hydrate process to Analysis of sanding mechanism knot The influence of fruit, to more can accurately react Container Rock Sanding kenel and its differentiation;
(3) when prepared by hydrate reservoir, using micro-image cutting techniques, it is applied to hydrate reservoir sand migration kenel It divides, hydrate concentration distribution, realizes that visual Simulation hydrate sand grains carefully sees starting migration;
This programme fully considers decomposition of hydrate rate, peels off in decomposable process to silt, the influence of starting migration, and examines Consider different near wellbore formation percolation laws, is mentioned to explore Sanding Mechanism difference caused by the factors such as decomposition of hydrate, reservoir flow field For technical support.
Detailed description of the invention
Fig. 1 is that hydrate silt particle peels off and migration Meso process simulator schematic diagram in the embodiment of the present invention 1;
Fig. 2 is the schematic cross-sectional view of purely radial stream reservoir simulation module described in the embodiment of the present invention 1;
Fig. 3 is different etching structural schematic diagram inside sediment filling slot described in the embodiment of the present invention 1;
Fig. 4 is that silt particle described in the embodiment of the present invention 2 peels off and migration Meso process analogy method flow diagram;
Wherein: 1, supplying module;2, feed flow module;3, gas-liquid mixed module;4, inlet pressure control pump;5, micro- visual Module;6-1, non-radial inflow entrance diversion trench;6-2, purely radial inflow entrance diversion trench;7-1, the filling of non-radial stream reservoir sedimentation object Slot;7-1-1, purely linear flow field simulation model;7-1-2, linear gradient pressure drop flow field simulation model;7-1-3, power function pressure drop gradient mould Analog model;7-1-4, negative exponent pressure drop gradient simulation model;7-2, purely radial stream reservoir sedimentation object fill slot;8-1, non-radial stream Outlet collection slot;8-2, purely radial outflux afflux groove;9-1, non-radial stream reservoir simulation module;9-2, purely radial stream reservoir mould Quasi- module;9-2-1, epivalve shell;9-2-2, hypovalve shell;9-2-3, fluid-mixing entrance;9-2-4, confining pressure entrance;9-2- 5, the sealing between reservoir simulation module body and confining pressure separation layer;9-2-6, visual window;9-2-7, confining pressure cavity;It is 9-2-8, resistance to Press glass;9-2-9, fastening bolt;9-2-10, fluid-mixing outlet;10-1, the first control recovery system;10-2, the second control Recovery system;11-1, first outlet pressure control pump;11-2, second outlet pressure control pump;12-1, the first confining pressure control pump; 12-2, the second confining pressure control pump;13, temperature control module;F1~F19, valve.
Specific embodiment
Above object and advantages of the invention are understood in order to clearer, with reference to the accompanying drawing to the specific reality of invention The mode of applying describes in detail:
The simulator of hydrate reservoir silt particle removing migration, is opened in embodiment 1, a kind of pressure reduction with hydrate decompression For adopting process, as shown in Figure 1, the simulator includes reservoir simulation module (9-1,9-2), supplying module (1,2,3), control Die block (4,11-1,11-2,12-1,12-2), temperature control module 13 and recycling module (10-1,10-2), the reservoir simulation mould Block (9-1,9-2), supplying module (1,2,3), pressure control module (4,11-1,11-2,12-1,12-2) and recycling module (10-1, It 10-2) is arranged in temperature control module 13, the temperature control module 13 is mainly used for cooling down to simulator, maintains hydrate reservoir Temperature condition needed for simulation;
It continues to refer to figure 1, the reservoir simulation module is for loading unconsolidated sediment, generating hydrate reservoir and observe water It closes object decomposition and peels off start-up course with silt particle, be the nucleus module of this system, including micro- visual module 5, purely radial stream reservoir Analog module 9-2 and non-radial stream reservoir simulation module 9-1, purely radial stream reservoir simulation module 9-2 and non-radial stream reservoir mould It is provided with visual window on quasi- module 9-1, micro- visual module 5 is oppositely arranged with visual window;
The supplying module includes gas supply module 1, feed flow module 2 and gas-liquid mixing module 3, supplies module 1 and feed flow mould Block 2 is connected with the arrival end of gas-liquid mixed module 3, and the outlet end of gas-liquid mixed module 3 is connected with reservoir simulation module, for Reservoir simulation module supplies high pressure gas and water;
The recycling module is mainly used for recycling the gas-liquid solid of reservoir simulation module output, including the first control recycling system Unite the control of 10-1 and second recovery system 10-2, and the first control recovery system 10-1 is with non-radial stream reservoir simulation module 9-1's Outlet is connected, and the second control recovery system 10-2 is connected with the outlet of purely radial stream reservoir simulation module 9-2;
The pressure control module includes inlet pressure control pump 4, first outlet pressure control pump 11-1 and second outlet pressure Control pump 11-2, the first confining pressure control pump 12-1 and the second confining pressure control pump 12-2, first outlet pressure control pump 11-1 and the One control recovery system 10-1 is connected, and second outlet pressure control pump 11-2 is connected with the second control recovery system 10-2, mainly Effect is inlet pressure, outlet pressure and the system pressure for controlling reservoir simulation module.First confining pressure control pump 12-1 and second Confining pressure control pump 12-2 flows reservoir simulation module 9-1 and the purely radial confining pressure flowed on reservoir simulation module 9-2 with non-radial respectively Cavity outlet connection, controls the confining pressure of reservoir simulation inside modules filling sedimentation object.
Reservoir simulation module described in the present embodiment includes that epivalve shell, hypovalve shell, visual window, fluid-mixing enter Mouth, fluid-mixing outlet, reservoir sedimentation object filling slot, confining pressure cavity, entrance guiding slot and outlet collection slot etc.;Epivalve shell and Hypovalve shell is to be connected by fastening bolt, and the central location of epivalve shell is arranged in visual window, and the window of visual window can cover Cover all reservoir sedimentation object filling slot ranges;Design has the groove isometrical with the visual window on epivalve shell on hypovalve shell, stores up Surface sediments filling slot is located in the groove, and the outer rim of reservoir sedimentation object filling slot and hypovalve housing groove cooperate, storage The streamline model being arranged inside surface sediments filling slot is designed according to the difference for simulating streamlined state, and the streamline model is base In the sediment filling slot of different shapes that the technologies such as 3D printing are formed, to have mature technology, it is not described here in detail, streamline mould The physical dimension of type is consistent with filling slot inner wall, and the inner edge of the streamline model is designed according to required streamline kenel to be simulated, mainly Including purely linear flow field simulation model 7-1-1, linear gradient pressure drop flow field simulation model 7-1-2, power function pressure drop gradient simulation model 7-1-3, negative exponent pressure drop gradient simulation model 7-1-4 etc..
Four kinds of the streamline models described above for non-radial stream reservoir simulation module 9-1 for, fluid-mixing enters Mouth, fluid-mixing outlet are oppositely arranged on the side of reservoir simulation module, the inner edge of corresponding reservoir sedimentation object filling slot Shape is corresponding with the outer rim of the streamline model, for purely linear flow field simulation model 7-1-1, injection end diversion channel and outflow end It is identical to shunt slot length, filling slot inner edge profile is standard rectangular configuration, for linear gradient Pressure Drop Model 7-1-2, from To outflow end diversion channel, the distance between model inner edge two sides boundary linearly reduces injection end diversion channel;Likewise, for power letter Number pressure drop gradient model 7-1-3 and negative exponent pressure drop gradient model 7-1-4, it is assumed that around the pit shaft or transformation crack on transformation stratum The flow pressure drop of surrounding meets power function form and negative exponent form, and the inner edge side boundaries of power function pressure drop gradient model are power Function, the inner edge side boundaries of negative exponent pressure drop gradient model are exponential function.
The streamline model of above-mentioned difference streamline kenel, diversion trench are mounted on fluid-mixing arrival end, guarantee fluid uniformly into Enter deposit section, diversion trench is connected with the fluid-mixing entrance of reservoir simulation module, and afflux groove is mounted on fluid-mixing and goes out Mouth end, afflux groove are connected with the fluid-mixing outlet end of reservoir simulation module.
And for purely radial stream reservoir simulation module, structure is similar to non-radial stream reservoir simulation module, such as Fig. 2 It is shown, including epivalve shell 9-2-1, hypovalve shell 9-2-2, visual window 9-2-6, fluid-mixing entrance 9-2-3, fluid-mixing go out Mouthful 9-2-10, purely radial stream reservoir sedimentation object fill slot 7-2, confining pressure cavity 9-2-7, purely radial inflow entrance diversion trench 6-2 and pure Radial flow exports afflux groove 8-2;Epivalve shell 9-2-1 is to be connected by fastening bolt 9-2-9 with hypovalve shell 9-2-2, visually The central location of epivalve shell 9-2-1 is arranged in window 9-2-6;On hypovalve shell 9-2-2 design have on epivalve shell 9-2-1 The isometrical groove of visual window, purely radial stream reservoir sedimentation object filling slot 7-2 are located in the groove, purely radial stream reservoir sedimentation Object fills the outer rim of slot 7-2 and hypovalve housing groove cooperates.With non-radial stream reservoir simulation module 9-1 the difference is that: The generally disc of sediment filling slot designed by its inside, entrance guiding slot 6-2 are arranged along disc excircle, mixing Fluid outlet 9-2-10 is located at the central location of hypovalve shell, in this way design mainly in view of purely radial flow model with it is described pure Linear flow simulation model, linear gradient Pressure Drop Model, power function pressure drop gradient model, negative exponent pressure drop gradient model become a mandarin Mouth, the installation of outflux position are totally different, can not be with purely linear flow field simulation model, linear gradient Pressure Drop Model, power function pressure drop gradient Model or the installation of negative exponent pressure drop gradient model interchange, thus it is slightly modified, devise two kinds of reservoir simulation modules.
In addition, for also installation pressure resistance above the sediment filling model, diversion trench, afflux groove of above-mentioned different streamline forms Glass 9-2-8, pressure-resistant glass 9-2-8 outer rim are sealed with the shoulder on epivalve shell by sliding ring 9-2-5, the pressure resistance It is confining pressure cavity 9-2-7 above glass, confining pressure cavity 9-2-7 is connect with the confining pressure entrance 9-2-4 in epivalve housing sidewall;It encloses The pressure top cavity 9-2-7 and epivalve shell secure fit are transparent visual window 9-2-6.
Embodiment 2, when it is implemented, consider following basic principle:
(1) under the conditions of same formation seepage flow speed, the convergence degree difference of streamline may cause the microcosmic stress balance of particle The change of condition.Therefore, under the conditions of identical rate of discharge (yield), the sand production rate of near wellbore formation is by around pit shaft or crack The influence in flow field.Therefore, by Controlling model flow boundary, different streamline conditions may be implemented to sand grains starting migration process Simulation;
(2) degree of consolidation of the silt particle particle at hydrate concentration differentia influence different location, hydrate is in reservoir Uneven distribution be to shake out one of non-uniform principal element in position in control stratum.Identical flow velocity (producing pressure differential) condition Under, the sand grains starting migration critical flow velocity at different location has differences, it can use in microscopic system observation hydrate reservoir, Sand grains starts the sequencing of migration position and the relationship of hydrate distribution, defines hydrate concentration and starts fortune to reservoir sand grains Move the influence of critical flow velocity;
(3) hydrate concentration distribution may be influence hydrate reservoir shake out kenel (hole liquefaction, earthworm hold, continuously Collapse) principal element.Under the conditions of ultramicroscopic observation within sweep of the eye hydrate concentration distribution, certain flow The microcosmic coupled relation therefore between hydrate distribution and kenel of shaking out can be obtained in sand grains migration path, migration rate.
Based on silt particle removing and fortune in the above basic test principle, with hydrate described in embodiment 1 decompression recovery process Move Meso process visual Simulation device accordingly, the present embodiment proposes silt particle removing in a kind of hydrate decompression recovery process With migration Meso process visual simulation method, as shown in Figure 4, comprising:
(1) select the streamline model: the well week being likely to occur according to practical exploitation of gas hydrates well flows around crack Ejector half state selects purely linear flow field simulation model, linear gradient drop simulation model, power function pressure drop gradient simulation model, negative finger Number pressure drop gradient simulation model or purely radial flow field simulation model, and actual deposition object is loaded in corresponding the streamline model, installation Instrument;
(2) simulation model of different streamline kenels hydrate simulation reservoir preparation: is installed to decompression described in embodiment 1 In the process in the simulator of hydrate reservoir silt particle removing migration, controls Temperature-pressure Conditions and inject aqueous vapor life into simulator At hydrate;Based on image Segmentation Technology, the deposit cross-sectional image of micro- visual module photograph is subjected to Threshold segmentation, it is quantitative Characterize the regularity of distribution of hydrate concentration;
(3) be depressured flowsheeting: the inlet pressure of control reservoir simulation module is invariable, controls to adjust reservoir simulation mould Block outlet pressure makes reservoir simulation module inlet pressure difference remain constant always;In conjunction with supplying module, to reservoir simulation module The middle injection gas-liquid mixture equal with its internal temperature;Charge velocity, which is subject to, can maintain model inlet pressure to stablize;
It should be noted that in step (3), it is necessary to assure the hydrate formed is in undecomposed state, due to The removing of silt particle described in the present embodiment is to explore the flow pattern of hydrate reservoir, hydrate saturation with migration process main purpose The influence of the removing of Degree distributions silt particle and starting migration and kenel of shaking out, the machine so that hydrate reservoir for exploring meso-scale shakes out Reason.If it is considered that hydrate is in dynamic Decomposition state simultaneously in sand grains starting migration process, the starting of verifying silt particle will be unable to Migration is finally to be only capable of obtaining hydrate reservoir to shake out rule caused by decomposition of hydrate or caused by hydrate distribution and streamline influence Rule, and more perfect explanation is then unable to get to the explanation of hydrate sanding mechanism.
(4) sand grains starting critical pressure drop simulation: changing the step mold passageway pressure difference in (3), observes fixed hydrate Under saturation degree and hydrate distribution occasion, the sand grains at different location starts transport conditions, incrementally increases model using staged The mode of inlet pressure observes the critical pressure differential of the sand grains starting migration in different hydrate concentration regions, to establish hydration Relationship between object saturation degree and silt particle starting migration critical pressure drop;(5) hydrate reservoir shake out kenel evolution: in step (4) After observing the starting migration of silt particle particle, constant entrance pressure drop is persistently maintained, guarantee the silt particle output of starting migration and is collected; The Evolution in silt particle particle migration path, migrating channels is observed in real time based on micro- visual module, so that it is determined that constant production Formation sand production kenel under pressure drop, certain hydrate concentration distribution occasion;
Especially it is emphasized that remaining that mold exit pressure absolute value is greater than in above-mentioned steps (4) simulation process The vapor pressure of hydrate, to exclude the cementing reduction of deposit caused by decomposition of hydrate to the shadow of sand grains starting migration process It rings.Therefore the present embodiment is to be developed by controlling the pressure difference of entrance and realizing to sand grains starting critical " pressure drop " and kenel of shaking out Simulation.This is consistent with the actual conditions of practical exploitation of gas hydrates reservoir: practical exploitation of gas hydrates process In, the principal element for influencing formation sand production situation is also due to the pressure difference that strata pressure and wellbore pressure are formed and acts on, not Stratum absolute pressure value.
(6) control that streamline kenel shakes out to hydrate reservoir: after the completion of above-mentioned steps (1)-(5), streamline mould is replaced Analog model repeats step (2)~(5), verifies the thin sight sanding mechanism of hydrate reservoir under other streamline qualifications.
In short, silt particle removes the visualization with migration process in the hydrate decompression recovery process that the present invention program is proposed Simulator and method can observe different streamline kenels to sand grains starting, the influence of migration process, realize visual observation The kenel of shaking out of hydrate reservoir under different hydrate concentrations and its distribution occasion, and the Evolution for kenel of shaking out;And Effectively simulation and evaluation hydrate concentration and its distribution start the influence of migration critical flow velocity condition to silt particle, and then realize Exploring the factors such as decomposition of hydrate, reservoir flow field with visualization means leads to the control mechanism to shake out to hydrate reservoir, is real Recovery well Sanding Mechanism prediction in border provides technical support.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc. It imitates embodiment and is applied to other fields, but without departing from the technical solutions of the present invention, according to the technical essence of the invention Any simple modification, equivalent variations and remodeling to the above embodiments, still fall within the protection scope of technical solution of the present invention.

Claims (10)

1. the analogy method of hydrate reservoir silt particle removing migration in pressure reduction, which comprises the following steps:
(1) the streamline model is selected:
Streamline kenel is determined according to practical gas hydrates reservoir conditions, and selects corresponding the streamline model, the streamline mould Type includes purely radial flow field simulation model and non-radial flow model, wherein non-radial flow model includes purely linear flow field simulation model, line Property gradient drop simulation model, power function pressure drop gradient simulation model, negative exponent pressure drop gradient simulation model;
(2) hydrate simulation reservoir preparation:
Step (1) selected the streamline model is installed to the simulator of hydrate reservoir silt particle removing migration in pressure reduction In, it controls Temperature-pressure Conditions and injects water into simulator, gas generates hydrate;It, will be micro- visual based on image Segmentation Technology The deposit cross-sectional image of module photograph carries out Threshold segmentation, with the regularity of distribution of quantitatively characterizing hydrate concentration;
In the pressure reduction hydrate reservoir silt particle removing migration simulator include reservoir simulation module, supplying module, Pressure control module, temperature control module and recycling module, reservoir simulation module, supplying module, pressure control module and recycling module are arranged at In temperature control module, supplying module, pressure control module and recycling module are connected with reservoir simulation module, and the reservoir simulation module is used In load unconsolidated sediment, generate hydrate reservoir and observe decomposition of hydrate and silt particle peeling start-up course, including it is micro- can Depending on module, purely radial stream reservoir simulation module and non-radial stream reservoir simulation module, purely radial stream reservoir simulation module and non-diameter It is provided with visual window in stream reservoir simulation module, micro- visual module is oppositely arranged with visual window;
(3) decompression flow setting and simulation:
The inlet pressure for controlling reservoir simulation module is invariable, controls to adjust the outlet pressure of reservoir simulation module, makes reservoir The inlet pressure difference of analog module remains constant always;In conjunction with supplying module, into reservoir simulation module injection with inside it The equal gas-liquid mixture of temperature guarantees that charge velocity can maintain model inlet pressure to stablize;
(4) sand grains starts critical decompression simulation:
It is poor to change the step reservoir simulation module inlet pressure in (3), observes fixed hydrate concentration and hydrate is distributed item Under part, the sand grains at different location starts transport conditions, and in such a way that staged incrementally increases mold passageway pressure difference, The critical pressure differential of the silt particle particle starting migration in different hydrate concentration regions is observed, to establish hydrate concentration and silt particle Relationship between starting migration critical pressure drop;
(5) hydrate reservoir shake out kenel evolution:
After step (4) observes the starting migration of silt particle particle, constant entrance pressure drop is persistently maintained, guarantees the mud of starting migration Sand output is simultaneously collected;The Evolution in silt particle particle migration path, migrating channels is observed, in real time based on micro- visual module with true Formation sand production kenel under fixed constant production pressure drop, certain hydrate concentration distribution occasion;
(6) control that streamline kenel shakes out to hydrate reservoir:
After the completion of above-mentioned steps (1)-(5), the streamline model is replaced, repeats step (2)~(5), verifies other the streamline models limit The thin sight sanding mechanism of hydrate reservoir under fixed condition.
2. the analogy method of hydrate reservoir silt particle removing migration, feature exist in pressure reduction according to claim 1 In: in the step (3), in decompression flow setting and simulation process, guarantee outlet, the entrance absolute pressure of reservoir simulation module Force value is above hydrate phase balance pressure, guarantees that the hydrate formed is in undecomposed state.
3. the simulator of hydrate reservoir silt particle removing migration in a kind of pressure reduction, it is characterised in that: including reservoir simulation Module, supplying module, pressure control module, temperature control module and recycling module, the reservoir simulation module, supplying module, pressure control module It is arranged in temperature control module with recycling module, temperature strip needed for the temperature control module is used to maintain hydrate reservoir simulation Part, the supplying module are used to supply high pressure gas and water to reservoir simulation module, and the pressure control module is to control reservoir mould Inlet pressure, outlet pressure and the system pressure of quasi- module, the recycling module are used to recycle the gas of reservoir simulation module output Liquid solid;
The reservoir simulation module is for loading unconsolidated sediment, generating hydrate reservoir and observing decomposition of hydrate and silt particle stripping Start-up course, including micro- visual module, purely radial stream reservoir simulation module and non-radial stream reservoir simulation module are fallen, it is purely radial It is provided with visual window in stream reservoir simulation module and non-radial stream reservoir simulation module, micro- visual module is opposite with visual window Setting;Purely radial flow field simulation model is set in purely radial stream stream reservoir simulation module, is arranged in non-radial stream reservoir simulation module Purely linear flow field simulation model, linear gradient drop simulation model, power function pressure drop gradient simulation model or negative exponent pressure drop gradient Simulation model.
4. the simulator of hydrate reservoir silt particle removing migration, feature exist in pressure reduction according to claim 3 In: the reservoir simulation module includes epivalve shell, hypovalve shell, visual window, fluid-mixing entrance, fluid-mixing outlet, storage Surface sediments fill slot, confining pressure cavity, entrance guiding slot and outlet collection slot, and entrance guiding slot is arranged in fluid-mixing entrance End, outlet collection slot are arranged in fluid-mixing outlet end;Epivalve shell is to be connected by fastening bolt with hypovalve shell, visual window The central location of epivalve shell is set;Design has the groove isometrical with the visual window on epivalve shell, reservoir on hypovalve shell The setting of sediment filling slot cooperates in the groove and with it, and reservoir sedimentation object, which fills, is arranged different streamline moulds inside slot Type, and the structure of reservoir sedimentation object filling slot matches with the streamline model structure.
5. the simulator of hydrate reservoir silt particle removing migration, feature exist in pressure reduction according to claim 4 In: for non-radial stream reservoir simulation module, it includes: purely linear stream mould that reservoir sedimentation object, which fills the streamline model being arranged in slot, Analog model, linear gradient Pressure Drop Model, power function pressure drop gradient model and negative exponent pressure drop gradient model, and fluid-mixing enters Mouth, fluid-mixing outlet are oppositely arranged on the side of reservoir simulation module.
6. the simulator of hydrate reservoir silt particle removing migration, feature exist in pressure reduction according to claim 4 In: for the reservoir simulation module of purely radial stream, purely radial stream reservoir sedimentation object fills slot generally disc, and purely radial stream For entrance guiding slot along the filling slot outer rim setting of purely radial stream reservoir sedimentation object, fluid-mixing outlet is located at the central position of hypovalve shell It sets.
7. the simulator of hydrate reservoir silt particle removing migration, feature in pressure reduction according to claim 5 or 6 It is: pressure-resistant glass is installed above the entrance guiding slot and outlet collection slot, pressure-resistant glass outer rim and epivalve shell passes through cunning Dynamic seal ring sealing, pressure resistance glass top is confining pressure cavity, the confining pressure entrance on confining pressure cavity and epivalve housing sidewall Connection, confining pressure cavity top pass through visual window and epivalve shell secure fit.
8. the simulator of hydrate reservoir silt particle removing migration, feature exist in pressure reduction according to claim 3 In: the supplying module includes gas supply module, feed flow module and gas-liquid mixing module, supplies module and feed flow module and gas-liquid is mixed The arrival end for molding block is connected, and the outlet end of gas-liquid mixed module is connected with reservoir simulation module.
9. the simulator of hydrate reservoir silt particle removing migration, feature exist in pressure reduction according to claim 3 In: the recycling module includes the first control recovery system and the second control recovery system, and first controls recovery system and non-diameter It is connected to the outlet of stream reservoir simulation module, the second control recovery system is connected with the outlet of purely radial stream reservoir simulation module.
10. the simulator of hydrate reservoir silt particle removing migration, feature exist in pressure reduction according to claim 3 In: the pressure control module include inlet pressure control pump, first outlet pressure control pump and second outlet pressure control pump, first Outlet pressure control pump is connected with the first control recovery system, second outlet pressure control pump and the second control recovery system phase Even.
CN201910564840.3A 2019-06-27 2019-06-27 Simulation method and device for stripping and migration of cement reservoir sand in depressurization process Active CN110361158B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910564840.3A CN110361158B (en) 2019-06-27 2019-06-27 Simulation method and device for stripping and migration of cement reservoir sand in depressurization process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910564840.3A CN110361158B (en) 2019-06-27 2019-06-27 Simulation method and device for stripping and migration of cement reservoir sand in depressurization process

Publications (2)

Publication Number Publication Date
CN110361158A true CN110361158A (en) 2019-10-22
CN110361158B CN110361158B (en) 2020-06-16

Family

ID=68217156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910564840.3A Active CN110361158B (en) 2019-06-27 2019-06-27 Simulation method and device for stripping and migration of cement reservoir sand in depressurization process

Country Status (1)

Country Link
CN (1) CN110361158B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111411934A (en) * 2020-03-29 2020-07-14 中国石油大学(华东) Horizontal well sand-water cooperative output and control and exploitation well completion multifunctional experimental system and experimental method thereof
CN111691881A (en) * 2020-07-03 2020-09-22 中国石油大学(北京) Hydrate-containing stratum heated settlement simulation experiment device and method
CN112014293A (en) * 2020-09-07 2020-12-01 中国石油大学(华东) Method and device for representing hydrate reservoir seepage capability
CN112253057A (en) * 2020-10-09 2021-01-22 青岛海洋地质研究所 Efficient exploitation method of pore filling type natural gas hydrate
CN112630407A (en) * 2020-12-09 2021-04-09 同济大学 Microcosmic visual simulation experiment device and method for seepage and sand production of hydrate reservoir
CN114059974A (en) * 2021-11-17 2022-02-18 北京大学 Sand prevention method, device and experimental method for sea area hydrate reservoir radial well composite liquid-solid phase change material
CN114961661A (en) * 2021-02-19 2022-08-30 中国石油天然气集团有限公司 Sea natural gas hydrate exploitation reservoir sand migration experimental device and experimental method
CN116752951A (en) * 2023-06-15 2023-09-15 中国矿业大学 Visual simulation device and method for coal dust migration monitoring in radial flow process of coal seam cracks

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510950A (en) * 2013-10-15 2014-01-15 西南石油大学 Complex-structural well formation flow and internal flow coupled flow experiment system
US20140041872A1 (en) * 2012-08-13 2014-02-13 Chevron U.S.A. Inc. Enhancing Production of Clathrates by Use of Thermosyphons
CN105675449A (en) * 2016-02-01 2016-06-15 青岛海洋地质研究所 Device and method for monitoring sand grain lateral migration rule for natural gas hydrate mining well
CN106353069A (en) * 2016-09-30 2017-01-25 青岛海洋地质研究所 Indoor test method and device for micro-migration process of sand in decomposition zone of marine natural gas hydrate
CN207554022U (en) * 2017-11-30 2018-06-29 青岛海洋地质研究所 Ocean gas hydrate producing well sand-carrying production rule analogue system
CN208350322U (en) * 2018-06-28 2019-01-08 青岛海洋地质研究所 Device based on silt particle transition process in CT simulating hydrate deposit
CN109599021A (en) * 2018-11-02 2019-04-09 广州海洋地质调查局 A kind of geologic reservoir radial flow simulator
CN109707377A (en) * 2019-01-28 2019-05-03 中国地质大学(武汉) Hydrate exploitation reservoir response and integrated simulation experiment system and method for shaking out

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140041872A1 (en) * 2012-08-13 2014-02-13 Chevron U.S.A. Inc. Enhancing Production of Clathrates by Use of Thermosyphons
CN103510950A (en) * 2013-10-15 2014-01-15 西南石油大学 Complex-structural well formation flow and internal flow coupled flow experiment system
CN105675449A (en) * 2016-02-01 2016-06-15 青岛海洋地质研究所 Device and method for monitoring sand grain lateral migration rule for natural gas hydrate mining well
CN106353069A (en) * 2016-09-30 2017-01-25 青岛海洋地质研究所 Indoor test method and device for micro-migration process of sand in decomposition zone of marine natural gas hydrate
CN207554022U (en) * 2017-11-30 2018-06-29 青岛海洋地质研究所 Ocean gas hydrate producing well sand-carrying production rule analogue system
CN208350322U (en) * 2018-06-28 2019-01-08 青岛海洋地质研究所 Device based on silt particle transition process in CT simulating hydrate deposit
CN109599021A (en) * 2018-11-02 2019-04-09 广州海洋地质调查局 A kind of geologic reservoir radial flow simulator
CN109707377A (en) * 2019-01-28 2019-05-03 中国地质大学(武汉) Hydrate exploitation reservoir response and integrated simulation experiment system and method for shaking out

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘昌岭,李彦龙,孙建业,吴能友: "天然气水合物试采:从实验模拟到场地实施", 《海洋地质与第四纪地质》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111411934A (en) * 2020-03-29 2020-07-14 中国石油大学(华东) Horizontal well sand-water cooperative output and control and exploitation well completion multifunctional experimental system and experimental method thereof
CN111691881A (en) * 2020-07-03 2020-09-22 中国石油大学(北京) Hydrate-containing stratum heated settlement simulation experiment device and method
CN111691881B (en) * 2020-07-03 2023-12-22 中国石油大学(北京) Device and method for simulating thermal settlement of hydrate-containing stratum
CN112014293A (en) * 2020-09-07 2020-12-01 中国石油大学(华东) Method and device for representing hydrate reservoir seepage capability
CN112253057A (en) * 2020-10-09 2021-01-22 青岛海洋地质研究所 Efficient exploitation method of pore filling type natural gas hydrate
CN112630407A (en) * 2020-12-09 2021-04-09 同济大学 Microcosmic visual simulation experiment device and method for seepage and sand production of hydrate reservoir
CN114961661A (en) * 2021-02-19 2022-08-30 中国石油天然气集团有限公司 Sea natural gas hydrate exploitation reservoir sand migration experimental device and experimental method
CN114059974A (en) * 2021-11-17 2022-02-18 北京大学 Sand prevention method, device and experimental method for sea area hydrate reservoir radial well composite liquid-solid phase change material
CN116752951A (en) * 2023-06-15 2023-09-15 中国矿业大学 Visual simulation device and method for coal dust migration monitoring in radial flow process of coal seam cracks
CN116752951B (en) * 2023-06-15 2023-11-21 中国矿业大学 Visual simulation device and method for coal dust migration monitoring in radial flow process of coal seam cracks

Also Published As

Publication number Publication date
CN110361158B (en) 2020-06-16

Similar Documents

Publication Publication Date Title
CN110361158A (en) The analogy method and device of hydrate reservoir silt particle removing migration in pressure reduction
CN107478809A (en) A kind of weak cementing sandstone oil reservoir microcosmic shake out visual Simulation experimental provision and its application
CN108680340B (en) Simulation experiment device and method for accelerating formation of underground fresh water in hydraulic reclamation land area
CN106437639A (en) Carbon dioxide mixed-phase flushing efficiency and remaining oil distribution evaluation method and isolated plant
CN207554022U (en) Ocean gas hydrate producing well sand-carrying production rule analogue system
CN106353069B (en) The microcosmic migration process Experimental Method in Laboratory of ocean gas hydrate resolver sand grains and device
CN108035700A (en) Ocean gas hydrate producing well sand-carrying production rule analogue system and method
CN103510950B (en) A kind of complex structural well formation flow and Bottomhole pressure Coupled Flow experimental system
CN107355201A (en) A kind of application method of gas hydrates exploitation analogue experiment installation
An et al. The microscale analysis of reverse displacement based on digital core
CN112630407A (en) Microcosmic visual simulation experiment device and method for seepage and sand production of hydrate reservoir
CN111691881B (en) Device and method for simulating thermal settlement of hydrate-containing stratum
CN207215812U (en) A kind of anti-sand test reactor of exploitation of gas hydrates
CN109209359A (en) Gas hydrates drilling microcosmic Simulation device
Parmentier et al. A theoretical study of hydrothermal convection and the origin of the ophiolitic sulphide ore deposits of Cyprus
CN107514243A (en) A kind of gas hydrates develop analogue experiment installation
CN107575209A (en) A kind of large-scale visual virtual design experimental provision of fracture and vug carbonate reservoir and method
Li et al. Visual experimental study on hydrate occurrence patterns and growth habits in porous media
Jing et al. Mechanisms of remaining oil formation by water flooding and enhanced oil recovery by reversing water injection in fractured-vuggy reservoirs
CN109239311A (en) Blocking agent degree of filling test method
CN205089298U (en) Fracture type carbonate oil reservoir physical model , displacement simulation experiment device and system
CN202348259U (en) Supercritical carbon dioxide well bore multi-phase flow simulation test device
CN105957441B (en) The drafting of plane drift net and seepage principle teaching testing device and test method
CN112444472A (en) Experimental method for simulating gas phase blockage in groundwater recharge process
CN109344508B (en) Fracture-cavity carbonate reservoir model building method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant