CN110359695A - A kind of splicing attachment type raise scaffold - Google Patents
A kind of splicing attachment type raise scaffold Download PDFInfo
- Publication number
- CN110359695A CN110359695A CN201910677297.8A CN201910677297A CN110359695A CN 110359695 A CN110359695 A CN 110359695A CN 201910677297 A CN201910677297 A CN 201910677297A CN 110359695 A CN110359695 A CN 110359695A
- Authority
- CN
- China
- Prior art keywords
- pedal
- connecting hole
- scaffold
- prefabricated
- adjusting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000001681 protective effect Effects 0.000 claims description 12
- 230000009545 invasion Effects 0.000 description 15
- 238000010586 diagram Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000002910 structure generation Methods 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Abstract
The present invention relates to the technical fields of attaching scaffold, specifically disclose a kind of splicing attachment type raise scaffold, including several prefabricated scaffolds, several adjusting pedals for being used to adjust positional distance between the adjacent two prefabricated scaffold;It is provided with positioning pedal on the prefabricated scaffold, passes through between the adjacent positioning pedal and connects the adjusting pedal to form passageway;The two sides for adjusting pedal are horizontally disposed several fixed structures, and the adjusting pedal is removably disposed on the prefabricated scaffold by the fixed structure.The present invention is by being substituted for multiple independent prefabricated scaffolds for traditional attaching scaffold and connecting each other by pedal is adjusted, the two sides for adjusting pedal are horizontally disposed several fixed structures, so that the positioning pedal on adjacent prefabricated scaffold is connected to and can be relatively close or separate.
Description
Technical field
The present invention relates to the technical field of attaching scaffold, in particular to a kind of splicing attachment type raise scaffold.
Background technique
Currently, it is super high-rise building that the mark post building in China city is most, structure type becomes increasingly complex, part superelevation
The alien invasion structure of layer building is vertical at special alien invasion, such as oblique facade, circular arc type facade, evagination from conventional vertical form evolution
Face inside contracts facade etc..
And traditional whole be segmented when promoting erection has just been connected, it can only be in the constant structure of alien invasion
When the case where creeping, changing for alien invasion structure with the variation of the number of plies, the prefabricated scaffold that is connected can not be with
The variation of outside vertical surface of building and adjust its surround building structure whole perimeter, thus can not be suitable for alien invasion change
Building.
Summary of the invention
For overcome the deficiencies in the prior art, the present invention provides a kind of splicing attachment type raise scaffold, the prefabricated foot hand
Frame can adjust it around the perimeter of the alien invasion of building according to the alien invasion structure change of building.
In order to achieve the above object, the invention adopts the following technical scheme:
A kind of splicing attachment type raise scaffold, including it is several prefabricated scaffolds, several for adjust adjacent two described pre-
The adjusting pedal of positional distance between scaffold processed;Positioning pedal is provided on the prefabricated scaffold, adjacent is described fixed
By connecting the adjusting pedal to form passageway between the pedal of position;If the two sides for adjusting pedal are horizontally disposed to be had
Dry fixed structure, the adjusting pedal are removably disposed on the prefabricated scaffold by the fixed structure.
Compared with prior art, the present invention is by being arranged to several solely for traditional attaching scaffold being connected
Vertical prefabricated scaffold, by adjusting pedal connection, two lateral edges for adjusting pedal between the single prefabricated scaffold
Horizontally arranged to have several fixed structures, the adjusting pedal is detachably mounted to adjacent institute by the fixed structure
It states on prefabricated scaffold;When the alien invasion structure of building changes it is as elongated such as the perimeter of outwardly convex, building external when, pass through
The fixed structure connecting on the adjusting pedal with the prefabricated scaffold is replaced, the hanging distance for adjusting pedal is increased,
So that the adjacent prefabricated scaffold is relatively distant from, so that the length of the splicing attachment type raise scaffold becomes
It is long, and then it is applicable in the variation for the alien invasion protrusion that should be built;Conversely, introversion, building external occur for the alien invasion structure when building
Perimeter when shortening, by replace it is described adjust the fixed structure connecting on pedal with the prefabricated scaffold, reduce the tune
The hanging distance of pedal is saved, so that the adjacent prefabricated scaffold is relatively close, and then it is prefabricated to shorten the spliced attachment
The entire length of scaffold, to be applicable in the variation for the alien invasion introversion that should be built.
Preferably, further including several connectors;
The fixed structure is the first connecting hole, is provided with several second connecting holes on the prefabricated scaffold;
The adjusting pedal is fixed on by the connector across first connecting hole and the second connecting hole described pre-
On scaffold processed.
Preferably, the prefabricated scaffold further includes the upright bar that the positioning pedal two sides are symmetrically arranged in;
Second connecting hole along the vertical direction interval of the upright bar setting in the upright bar.
Preferably, setting of second connecting hole along the horizontal direction interval of the positioning pedal is stepped in the positioning
On the two sides of plate.
Preferably, the connector includes the first connection bulk-breaking for being provided with connecting rod, it is provided with and tightens on the connecting rod
Screw thread.
Preferably, the first connection bulk-breaking is connecting-rod bolts or stay-bolt.
Preferably, the connector further includes several second connection bulk-breakings;
The end for adjusting pedal is provided at least two protrusions, and the second connecting hole setting is in the protrusion;
The positioning pedal is articulated and connected by the second connection bulk-breaking and the positioning pedal plate.
Preferably, the second connection bulk-breaking includes the 5th side, joint face, the 6th side, the 5th side is logical
It crosses the joint face to connect with the 6th side, and the 5th side, the joint face, the 6th side are in step type
Connection;
Described second connects the third connecting hole for being provided with no less than two being spaced on bulk-breaking, passes through on the 5th side
It wears and is equipped with the third connecting hole;The third connecting hole is provided through on 6th side;
The adjusting pedal passes through first connecting hole, the second connecting hole, third by the first connection bulk-breaking and connects
Hole is connect to be fixedly connected with the positioning pedal.
Preferably, the vertical of the second connection bulk-breaking being connected on the adjusting pedal and the positioning pedal is cut
Face is L-shaped.
Preferably, further including the protective net being arranged between the adjacent prefabricated scaffold, the protective net is located at
The inside of the splicing attachment type raise scaffold.
Detailed description of the invention
Now in conjunction with attached drawing, the invention will be further described with specific embodiment:
The simple plan view of scaffold Fig. 1 adjacent when being non-installation and adjustment pedal of the invention;
The simple plan view of scaffold Fig. 2 adjacent when being installation and adjustment pedal of the present invention;
Fig. 3 is the structural schematic diagram that one end of the positioning pedal on scaffold of the present invention is mounted in upright bar;
Fig. 4 is the structural schematic diagram that one end of adjusting pedal of the invention is mounted in upright bar;
Fig. 5 is the structural schematic diagram that one end of adjusting pedal of the invention is mounted on positioning pedal;
Fig. 6 is the structural schematic diagram that protrusion is provided on present invention positioning pedal;
Fig. 7 is that one end of adjusting pedal is mounted on the structural schematic diagram positioned on pedal in Fig. 6;
Fig. 8 is the structural schematic diagram of the second connection bulk-breaking in Fig. 7.
In figure:
1, prefabricated scaffold;11, upright bar;12, the second connecting hole;13, pedal is positioned;14, raised;2, pedal is adjusted;21,
First connecting hole;3, connecting-rod bolts;4, stay-bolt;5, the second connection bulk-breaking;51, third connecting hole;53, the 5th side;54,
Joint face;55, the 6th side;6, standard protective net;7, protective net.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein
Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
As shown in Fig. 1~8, the present invention provides a kind of splicing attachment type raise scaffold, including several prefabricated scaffolds 1,
Several adjusting pedals 2 for being used to adjust positional distance between the adjacent two prefabricated scaffold 1;On the prefabricated scaffold 1
It is provided with positioning pedal 13, by connecting the adjusting pedal 2 to form passageway between the adjacent positioning pedal 13;It is described
The two sides of adjusting pedal 2 are horizontally disposed several fixed structures, and the adjusting pedal 2 is removable by the fixed structure
It is arranged in unloading on the prefabricated scaffold 1.
Compared with prior art, the present invention is by being arranged to several solely for traditional attaching scaffold being connected
Vertical prefabricated scaffold 1 is connected by adjusting pedal 2 between the single prefabricated scaffold 1, described to adjust the two of pedal 2
Lateral edge is horizontally arranged several fixed structures, and the adjusting pedal 2 is detachably mounted to phase by the fixed structure
On the adjacent prefabricated scaffold 1;When the alien invasion structure of building changes such as the perimeter change of outwardly convex 14, building external
When long, by replacing the fixed structure connecting on the adjusting pedal 2 with the prefabricated scaffold 1, increase the adjusting pedal 2
Hanging distance so that the adjacent prefabricated scaffold 1 is relatively distant from, so that the splicing attachment type raise scaffold
Length become long, and then be applicable in the variation for the alien invasion protrusion 14 that should be built;Conversely, when in the alien invasion structure generation of building
Incline, when the perimeter of building external shortens, passes through that replacement is described to adjust the fixed knot connecting on pedal 2 with the prefabricated scaffold 1
Structure reduces the hanging distance for adjusting pedal 2, so that the adjacent prefabricated scaffold 1 is relatively close, and then described in shortening
The entire length of the spliced prefabricated scaffold 1 of attachment, to be applicable in the variation for the alien invasion introversion that should be built.
As shown in figure 3 to figure 7, splicing attachment type raise scaffold of the invention further includes several connectors;The fixed knot
Structure is the first connecting hole 21, is provided with several second connecting holes 12 on the prefabricated scaffold 1;The adjusting pedal 2 passes through institute
Connector is stated to be fixed on the prefabricated scaffold 1 across first connecting hole 21 and the second connecting hole 12.Wherein, the company
Fitting includes the first connection bulk-breaking for being provided with connecting rod, is provided on the connecting rod and tightens screw thread;Preferably, first connection
Bulk-breaking is connecting-rod bolts 3 or stay-bolt 4.
As shown in Figure 3,4, the prefabricated scaffold 1 further includes the upright bar that positioning 13 two sides of pedal are symmetrically arranged in
11, second connecting hole 12 along the vertical direction interval of the upright bar 11 setting in the upright bar 11.
2 two sides of adjusting pedal pass through the tune by first connection bulk-breaking (connecting-rod bolts 3 or stay-bolt 4)
First connecting hole 21 on section pedal 2, second connecting hole 12 in the upright bar 11 are fixed on the prefabricated foot hand
On frame 1.
When needing to adjust the spacing of the adjacent prefabricated scaffold 1, by selecting the difference for adjusting 2 two sides of pedal
First connecting hole 21 adjusts the pendulous tank for adjusting pedal 2 between the adjacent prefabricated scaffold 1, can be adjusted
The distance between adjacent described prefabricated scaffold 1.
As shown in figure 3 to figure 7, second connecting hole 12 is along the setting at the horizontal direction interval of the positioning pedal 13 in institute
On the two sides for stating positioning pedal 13;The connector further includes several second connection bulk-breakings 5;Between on the second connection bulk-breaking 5
Every the third connecting hole 51 for being provided with no less than two, wherein it is described second connection bulk-breaking 5 it is preferably plate-like.
The second connection bulk-breaking 5 is passed through thereon by first connection bulk-breaking (connecting-rod bolts 3 or stay-bolt 4)
Second connecting hole 12 on third connecting hole 51, the positioning pedal 13 is fixedly connected with the positioning pedal 13;It is described
The two sides of positioning pedal 13 are all connected with the second connection bulk-breaking 5;
The two sides for adjusting pedal 2 are passed through thereon by first connection bulk-breaking (connecting-rod bolts 3 or stay-bolt 4)
The first connecting hole 21, the third connecting hole 51 on the second connection bulk-breaking 5 connect bulk-breaking 5 with described second and is fixedly connected;
And then realize removably connecting with the positioning pedal 13 for the adjusting pedal 2.
As shown in Figure 6,7, the end for adjusting pedal 2 is provided at least two protrusions 14, is arranged on described raised 14
There is second connecting hole 12;The adjusting pedal 2 is hingedly connected by the second connection bulk-breaking 5 with 13 plate of positioning pedal
It connects.
Wherein, the second connection bulk-breaking 5 includes the 5th side 53, joint face 54, the 6th side 55, the 5th side
53 pass through the joint face 54 and the 6th side 55, and the 5th side 53, the joint face 54, the 6th side
55 in stepped connection;Preferably, when being connected on the adjusting pedal 2 and the positioning pedal 13, second connection point
The vertical cross-section of part 5 is L-shaped;
The third connecting hole 51 for being provided with no less than two being spaced on the second connection bulk-breaking 5, the 5th side
The third connecting hole 51 is all provided through on 53 and on the 6th side 55;
The adjusting pedal 2 passes through first connecting hole 21, the second connecting hole 12, the by the first connection bulk-breaking
Three connecting holes 51 are fixedly connected with the positioning pedal 13.
Specifically, the first connection bulk-breaking (connecting-rod bolts 3 or stay-bolt 4) is described on the 5th side 53
Second connecting hole 12 (in protrusion 14), another 5th side 53 on third connecting hole 51, the positioning pedal 13
On the third connecting hole 51 make the positioning pedal 13 with described second connect bulk-breaking 5 be articulated and connected;
First connection bulk-breaking (connecting-rod bolts 3 or stay-bolt 4) passes through described the on corresponding 6th side 55
Three connecting holes 51, first connecting hole 21 adjusted on pedal 2, the third on another 6th side 55 connect
Connecing hole 51 makes the adjusting pedal 2 connect the articulated connection of bulk-breaking 5 with described second;And then realize the adjusting pedal 2 and institute
Positioning pedal 13 is stated to be articulated and connected.
When adjusting the distance between adjacent described prefabricated scaffold 1, the adjusting pedal 2 and a prefabricated foot are unclamped
The connection of hand cradle 1, the adjusting pedal 2 are rotated and are superimposed upon around first connection bulk-breaking (connecting-rod bolts 3 or stay-bolt 4)
On the positioning pedal 13 of another prefabricated scaffold 1, and then avoids the adjusting pedal 2 and removed completely and zero
The technical issues of other Collection and conservation of part, improve spliced attached lifting scaffold and it is described adjust pedal 2 install it is convenient
Property.
As shown in Fig. 2, further including the protective net 7 being arranged between the adjacent prefabricated scaffold 1, the protective net 7
Positioned at the inside of the splicing attachment type raise scaffold.
Specifically, the protective net 7 is removably fixed in the adjacent upright bar 11, and it is located at the spliced attachment
The inside of elevating scaffold.
The standard protective net 6 of scaffold is mounted on the outside of scaffold in the prior art, when scaffold has been mounted on building
On object and when needing to adjust the length of spliced attached lifting scaffold, first leads to any of the above-described mode and the adjusting pedal 2 is set,
Recycle the supportive for adjusting pedal 2 that the protective net 7 is installed in the inside of spliced attached lifting scaffold, so that
While the spliced attached lifting scaffold meets national safety standard, improve safety that the protective net 7 is installed and
Convenience.
The invention is not limited to above embodiment, if not departing from the present invention to various changes or modifications of the invention
Spirit and scope, if these modification and variations belong within the scope of claim and equivalent technologies of the invention, then this hair
It is bright to be also intended to encompass these changes and change.
Claims (10)
1. a kind of splicing attachment type raise scaffold, which is characterized in that including several prefabricated scaffolds, it is several for adjust it is adjacent
The adjusting pedal of positional distance between the two prefabricated scaffolds;
It is provided with positioning pedal on the prefabricated scaffold, is stepped between the adjacent positioning pedal by connecting the adjusting
Plate is to form passageway;
The two sides for adjusting pedal are horizontally disposed several fixed structures, and the adjusting pedal passes through the fixed knot
Structure is removably disposed on the prefabricated scaffold.
2. splicing attachment type raise scaffold according to claim 1, which is characterized in that further include several connectors;
The fixed structure is the first connecting hole, is provided with several second connecting holes on the prefabricated scaffold;
The adjusting pedal passes through first connecting hole by the connector and the second connecting hole is fixed on the prefabricated foot
In hand cradle.
3. splicing attachment type raise scaffold according to claim 2, which is characterized in that
The prefabricated scaffold further includes the upright bar that the positioning pedal two sides are symmetrically arranged in;
Second connecting hole along the vertical direction interval of the upright bar setting in the upright bar.
4. splicing attachment type raise scaffold according to claim 2, which is characterized in that second connecting hole is described in
Position being arranged on the two sides of the positioning pedal for the horizontal direction interval of pedal.
5. splicing attachment type raise scaffold according to claim 2, which is characterized in that the connector includes being provided with
The first of connecting rod connects bulk-breaking, is provided on the connecting rod and tightens screw thread.
6. splicing attachment type raise scaffold according to claim 5, which is characterized in that the first connection bulk-breaking is to connect
Bar bolt or stay-bolt.
7. splicing attachment type raise scaffold according to claim 5 or 6, which is characterized in that the connector further includes
Several second connection bulk-breakings;
The end for adjusting pedal is provided at least two protrusions, is provided with second connecting hole in the protrusion;
The adjusting pedal is articulated and connected by the second connection bulk-breaking and the positioning pedal.
8. splicing attachment type raise scaffold according to claim 7, which is characterized in that described second, which connects bulk-breaking, includes
5th side, joint face, the 6th side, the 5th side are connect by the joint face with the 6th side, and described
5th side, the joint face, the 6th side are in stepped connection;
Described second connects the third connecting hole for being provided with no less than two being spaced on bulk-breaking, runs through on the 5th side and sets
It is equipped with the third connecting hole;The third connecting hole is provided through on 6th side;
The adjusting pedal passes through first connecting hole, the second connecting hole, third connecting hole by the first connection bulk-breaking
It is fixedly connected with the positioning pedal.
9. splicing attachment type raise scaffold according to claim 8, which is characterized in that be connected to the adjusting pedal and
The vertical cross-section of the second connection bulk-breaking on the positioning pedal is L-shaped.
10. splicing attachment type raise scaffold according to claim 1, which is characterized in that further include be arranged in it is adjacent
Protective net between the prefabricated scaffold, the protective net are located at the inside of the splicing attachment type raise scaffold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910677297.8A CN110359695A (en) | 2019-07-25 | 2019-07-25 | A kind of splicing attachment type raise scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910677297.8A CN110359695A (en) | 2019-07-25 | 2019-07-25 | A kind of splicing attachment type raise scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110359695A true CN110359695A (en) | 2019-10-22 |
Family
ID=68221605
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910677297.8A Pending CN110359695A (en) | 2019-07-25 | 2019-07-25 | A kind of splicing attachment type raise scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110359695A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004116193A (en) * | 2002-09-27 | 2004-04-15 | Daisan:Kk | Structure of narrow ground scaffold and footboard for narrow ground scaffold |
JP3155968U (en) * | 2009-09-26 | 2009-12-10 | 株式会社竹中工務店 | Corner frame scaffolds and frame scaffolds used therefor |
CN102108784A (en) * | 2011-03-18 | 2011-06-29 | 北城致远集团有限公司 | Special attached lifting scaffold |
CN204754176U (en) * | 2015-06-01 | 2015-11-11 | 保定同益建筑工程设备技术开发有限公司 | A anti -slip bottom plate for inserted lift scaffold |
CN206635945U (en) * | 2017-02-28 | 2017-11-14 | 广州市第二建筑工程有限公司 | A kind of steel construction for improving building structure stability |
CN109812006A (en) * | 2019-02-01 | 2019-05-28 | 深圳市特辰科技股份有限公司 | Climbing frame aisle and its connection regulating part and assemble method |
CN210342623U (en) * | 2019-07-25 | 2020-04-17 | 广州市第二建筑工程有限公司 | Spliced attached lifting scaffold |
-
2019
- 2019-07-25 CN CN201910677297.8A patent/CN110359695A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004116193A (en) * | 2002-09-27 | 2004-04-15 | Daisan:Kk | Structure of narrow ground scaffold and footboard for narrow ground scaffold |
JP3155968U (en) * | 2009-09-26 | 2009-12-10 | 株式会社竹中工務店 | Corner frame scaffolds and frame scaffolds used therefor |
CN102108784A (en) * | 2011-03-18 | 2011-06-29 | 北城致远集团有限公司 | Special attached lifting scaffold |
CN204754176U (en) * | 2015-06-01 | 2015-11-11 | 保定同益建筑工程设备技术开发有限公司 | A anti -slip bottom plate for inserted lift scaffold |
CN206635945U (en) * | 2017-02-28 | 2017-11-14 | 广州市第二建筑工程有限公司 | A kind of steel construction for improving building structure stability |
CN109812006A (en) * | 2019-02-01 | 2019-05-28 | 深圳市特辰科技股份有限公司 | Climbing frame aisle and its connection regulating part and assemble method |
CN210342623U (en) * | 2019-07-25 | 2020-04-17 | 广州市第二建筑工程有限公司 | Spliced attached lifting scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103422663B (en) | Attached lift scaffold | |
WO2020052291A1 (en) | Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor | |
CN105401714A (en) | Attachment type lifting scaffold and lifting method | |
CN208650540U (en) | The fixed device of the adjustment of steel column butt joint installation | |
CN205100531U (en) | Lift scaffold support body assembly | |
CN208122047U (en) | It is a kind of can it is multi-faceted adjust installation dimension unit hanger system | |
CN110359696A (en) | A kind of adjustable attachment type raise scaffold and its tiltedly climb method | |
CN110359695A (en) | A kind of splicing attachment type raise scaffold | |
CN210305508U (en) | Alignment structure and reinforcing bar alignment subassembly | |
CN208981167U (en) | Suspension type constructing tie beam device | |
CN107165419A (en) | A kind of installation method of steel roof truss | |
CN204145954U (en) | The framework of LED display | |
CN203499191U (en) | Tilted stone cladding structure | |
CN112249855B (en) | Projection curtain hoisting structure and hoisting method thereof | |
CN205933000U (en) | External swing arm tower crane in superelevation layer strutting arrangement that climbs | |
CN205046848U (en) | Gate -type steel sheet mould holder | |
CN211312974U (en) | Architectural decoration curtain and wall connection structure convenient to installation is fixed | |
CN107879239A (en) | A kind of out-hung panel hanging method | |
CN207363063U (en) | A kind of connection structure of glass curtain wall | |
CN113293923A (en) | Lifting point dislocation adjusting structure of keel and mounting method | |
CN209067234U (en) | A kind of truss-like synovial membrane constructing device suitable for mid-board | |
CN208533805U (en) | The connector of curtain wall round bar and main structure | |
CN205712160U (en) | A kind of steel frame basis column foot installs leveling pier nose | |
CN211974266U (en) | A adjustable guard plate subassembly for climbing frame | |
CN207334530U (en) | The Landscape Lamp of convenient installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |