CN110359444A CN201910767013.4A CN201910767013A CN110359444A CN 110359444 A CN110359444 A CN 110359444A CN 201910767013 A CN201910767013 A CN 201910767013A CN 110359444 A CN110359444 A CN 110359444A
Authority
CN
China
Prior art keywords
horizontal drainage
subgrade
general pipeline
branch
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910767013.4A
Other languages
Chinese (zh)
Inventor
黄明生
李少旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Fengda Construction Co Ltd
Original Assignee
Guangzhou Fengda Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Fengda Construction Co Ltd filed Critical Guangzhou Fengda Construction Co Ltd
Priority to CN201910767013.4A priority Critical patent/CN110359444A/en
Publication of CN110359444A publication Critical patent/CN110359444A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Sewage (AREA)

Abstract

The invention particularly discloses a kind of horizontal drainage systems for solidification soft foundation, including several vertical collector pipes, several four-way water parts, several horizontal drainage branch, several horizontal drainage general pipeline and at least one sump module;Vertical collector pipe collects the underground water of the subgrade squeezed by gravity heap pressurized layer;Four-way water part is connected to vertical collector pipe and branch drain road;The water that vertical collector pipe is collected is guided to horizontal drainage general pipeline by horizontal drainage branch;The water being collected into is guided to sump module by horizontal drainage general pipeline;Sump module is for storing the underground water being collected into.The present invention discloses a kind of construction method of horizontal drainage system for solidification soft foundation the following steps are included: measurement markers again;Grooving and heatable adobe sleeping platform;Install sump module and horizontal drainage general pipeline;It is laid with vertical collector pipe;Four-way water part is installed;Horizontal drainage branch is installed;Stacking pressure gravity heap pressurized layer.The present invention has the advantages that drainage efficiency is high, construction cost is low.

Description

A kind of horizontal drainage system and its construction method for solidification soft foundation
Technical field
The present invention relates to soft foundation consolidation technical field of drainage, and in particular to a kind of horizontal drainage for solidification soft foundation System and its construction method.
Background technique
Draining concretion method is often used during soft foundation consolidation, draining concretion method is within the scope of subgrade to be processed After vertical implantation row (filter) aquaporin, the heap loading of the certain absolute altitude of preloading above penetrates into row with the moisture content in extrusion soil It after (filter) aquaporin, is discharged by horizontal sand bedding course, achievees the purpose that subgrade is firm.Traditional draining concretion method has vacuum pre- Engineering methods, the principles such as pressure, piling prepressing and combined vacuum and surcharge preloading are the plastic draining board that will have water filtering function in advance Moisture in the soil body of the soft stream plasticity of (band) implantation, then in the top of soil body progress preloading, soil is through plastic draining board stream Enter interlayer-sand bedding course in heap loading and the soil body, the french drain sump in sand bedding course is infiltrated into through sand bedding course, to increase The bearing capacity of the strong soil body and the stability for improving the soil body.All kinds of corrupt practices creep in for traditional draining concretion method tool: 1, must use sand pad Layer, but cause construction cost big due to sand scarcity of resources;2, sand bedding course can cause in the construction process because of cross-operation Secondary pollution, clean sand is contaminated primary (pollutant includes the soil that mechanical equipment carries) after paving originally, is spreading If be contaminated once when plastic draining board again, the water permeability of sand bedding course is made to have a greatly reduced quality;3, the sand bedding course difficulty that paves is big.
Summary of the invention
In view of this, it is necessary to for above-mentioned problem, propose a kind of horizontal drainage system for solidification soft foundation and Its construction method needs the highly difficult big and material of sand bedding course, construction cost to set to solve discharging consolidation in above-mentioned background technique Standby disadvantage at high cost.
To achieve the above object, the present invention takes technical solution below:
A kind of horizontal drainage system for solidification soft foundation is equipped with gravity heap pressurized layer, the gravity heap in the system For pressurized layer for squeezing subgrade, which includes several vertical collector pipes, several four-way water parts, several horizontal drainages Branch pipe, several horizontal drainage general pipeline and at least one sump module;One end of each vertical collector pipe of item protrudes from The rest part on subgrade ground, each vertical collector pipe of item is vertically embedded in subgrade;Each four-way water part paving is set to On the ground of subgrade;Each horizontal drainage branch paving is on the ground of subgrade;Each horizontal drainage general pipeline paving is all provided with In subgrade ground excavate with the one-to-one groove of horizontal drainage general pipeline in;Each sump module is set to softly Base face excavate in the one-to-one heatable adobe sleeping platform of sump module, it is horizontal that the shaft bottom face of each sump module is below each item Branch drain and each horizontal drainage general pipeline;
The four-way water part is set there are two the first outlet pass and two the second outlet passes, and two of each four-way water part First outlet pass is connected to one end of vertical collector pipe for protruding from subgrade ground correspondingly with the first outlet pass, Other two second outlet pass is connected to an end with the one-to-one horizontal drainage branch of the second outlet pass;Wherein one The end of a horizontal drainage general pipeline is connected to sump module or another horizontal drainage general pipeline, each sump module with extremely The end connection of a few horizontal drainage general pipeline;Each second outlet pass is connected to by corresponding horizontal drainage branch into several Branch drain road, each branch drain road are connected to corresponding horizontal drainage general pipeline, are catchmented to be formed and converge at ponding The drainage network of well module;
The vertical collector pipe is used to collect the underground water of the subgrade squeezed by gravity heap pressurized layer;
The four-way water part is for being connected to vertical collector pipe and branch drain road;
The horizontal drainage branch is used to the water that vertical collector pipe is collected being guided to horizontal drainage general pipeline;
The horizontal drainage general pipeline is used to the water being collected into being guided to sump module;
The sump module is for storing the underground water being collected into.
Further, the sump module, which is set to, is intersected by four horizontal drainage general pipeline right-angled intersection formed or X Center.
Further, which further includes and the one-to-one well extension of sump module;The well extension Single port be located in sump module, another port pass through gravity heap pressurized layer.
Further, the sump module includes netted as the net metal cupuliform frame of well frame and for wrapping up The geotextiles of metal cup-shaped frame periphery and drainage.
Further, one is formed by a four-way water part and two vertical collector pipes being connected to the four-way water part A inverted U water collecting unit.
Further, which includes several inverted U water collecting units, and each inverted U water collecting unit is on subgrade ground On part in distributed matrix arrangement in region.
Further, several first draining branch pipe(tube)s, the first row are provided between two horizontal drainage general pipeline The successively adjacent four-way water part being arranged in a linear is connected in series by water branch pipe(tube) by several horizontal drainage branch, described First draining branch pipe(tube) one end be connected to a wherein horizontal drainage general pipeline, it is described first draining branch pipe(tube) the other end with separately Outer horizontal drainage general pipeline connection.
Further, it is provided between subgrade ground edge and the horizontal drainage general pipeline at close subgrade ground edge Several second draining branch pipe(tube)s, the second draining branch pipe(tube) will be in C font or mirror image C by several horizontal drainage branch The successively adjacent four-way water part of font arrangement is connected in series;One end of the second draining branch pipe(tube) is with close subgrade An open communication of the horizontal drainage general pipeline at face edge, the other end and the horizontal drainage close to subgrade ground edge are total Another open communication of pipe.
Further, which further includes at least one water pump;The pump mouth of the water pump is set in sump module; The water pump is used to take the ponding in sump module away.
A kind of construction method of the horizontal drainage system for solidification soft foundation as described above, the construction method include with Lower step:
Step 1, the measurement markers on the ground of subgrade, so that it is determined that sump module, horizontal drainage general pipeline and level The installation site of branch drain;
Step 2, and the corresponding groove of each horizontal drainage general pipeline and heatable adobe sleeping platform corresponding with each sump module is excavated;
Step 3, several sump modules are installed and is pacified in corresponding heatable adobe sleeping platform and by several horizontal drainage general pipeline In corresponding groove, interconnect each horizontal drainage general pipeline mutually by terminal or the realization of corresponding sump module Logical, each sump module is at least connected to the end of a horizontal drainage general pipeline;
Step 4, array is respectively laid with several vertical collector pipes in subgrade, makes the end of the vertical collector pipe of each item Subgrade ground is protruded from, the rest part of each vertical collector pipe of item is vertically embedded in subgrade;
Step 5, several four-way water parts are installed on the ground of subgrade, make the vertical collection for protruding from subgrade ground Water pipe end is connected to corresponding four-way water part;
Step 6, several horizontal drainage branch are installed on the ground of subgrade, each four-way water part is made to pass through correspondence Horizontal drainage branch form several branch drain roads, each branch drain road is connected to corresponding horizontal drainage general pipeline, To form the drainage network that ponding converges at sump module;
Step 7, the stacking pressure gravity heap pressurized layer above subgrade.
The invention has the benefit that
The present invention because do not use traditional solidification soft foundation drainage system sand bedding course, make entire drainage system material and Installation cost reduces 70% or more, substantially increases consolidation draining efficiency, and the sump to collect subgrade ponding Module is conducive to carry out big flow draining using water pump.The present invention has environmentally friendly (economizing on resources), at low cost, short time limit (factory Modular production, in-site installation) the advantages of.
Detailed description of the invention
Fig. 1 is a kind of structure principle chart for the horizontal drainage system of solidification soft foundation in embodiment 1 of the invention;
Fig. 2 is the stereoscopic schematic diagram of four-way water part of the invention;
Fig. 3 is the stereoscopic schematic diagram of inverted U water collecting unit of the invention;
Fig. 4 is a kind of vertical view for the horizontal drainage system of solidification soft foundation in embodiment 2 of the invention to structure Schematic diagram;
Fig. 5 is Fig. 4 in the partial schematic diagram of A-A visual direction;
Fig. 6 is a kind of vertical view for the horizontal drainage system of solidification soft foundation in embodiment 3 of the invention to structure Schematic diagram;
Description of symbols:
Vertical collector pipe --- 1;Four-way water part --- 2;Horizontal drainage branch --- 3;Horizontal drainage general pipeline --- 4; Sump module --- 5;First outlet pass --- 21;Second outlet pass --- 22;Water pump --- 6;Well extension --- 7; First level main sewer 41;Second horizontal drainage general pipeline 42.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with the embodiment of the present invention, to this hair Bright technical solution work further clearly and completely describes.It should be noted that described embodiment is only the present invention one Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
It is to be appreciated that the orientation or positional relationship of the instructions such as term " on ", "lower", "front", "rear", "left", "right" To be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description of the present invention and simplification of the description, rather than indicate or It implies that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as Limitation of the present invention.
The terms such as " first ", " second ", " third ", " the 4th " are used for description purposes only, and should not be understood as instruction or dark Show relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second ", " are defined as a result, Three ", " the 4th " feature can explicitly or implicitly include one or more of the features.
Embodiment 1
As shown in Figure 1-3, a kind of horizontal drainage system for solidification soft foundation, gravity heap pressurized layer is equipped in the system 200, for the gravity heap pressurized layer 200 for squeezing subgrade 100, which includes several vertical collector pipes 1, several four-ways Water part 2, several horizontal drainage branch 3, several horizontal drainage general pipeline 4 and at least one sump module 5;Each item is vertical One end of collector pipe 1 protrudes from 100 ground of subgrade, and the rest part of each vertical collector pipe 1 of item is vertically embedded in soft In ground 100;Each paving of four-way water part 2 is on the ground of subgrade 100;Each paving of horizontal drainage branch 3 is set to On the ground of subgrade 100;Each paving of horizontal drainage general pipeline 4 is total with horizontal drainage set on excavating on 100 ground of subgrade In the one-to-one groove of pipe 4;Each sump module 5 be set to 100 ground of subgrade excavate with sump module 5 one In one corresponding heatable adobe sleeping platform, the shaft bottom face of each sump module 5 is below each horizontal drainage branch 3 and each horizontal drainage is total Pipe 4;
The four-way water part 2 is set there are two the first outlet pass 21 and two the second outlet passes 22, each four-way water part 2 Two the first outlet passes 21 with the vertical collector pipe that protrudes from 100 ground of subgrade correspondingly with the first outlet pass 21 The connection of 1 one ends, other two second outlet pass 22 with the one-to-one horizontal drainage branch 3 of the second outlet pass 22 One end connection;The end of one of horizontal drainage general pipeline 4 and sump module 5 or another horizontal drainage general pipeline 4 Connection, each sump module 5 are connected to the end of at least one horizontal drainage general pipeline 4;Each second outlet pass 22 by pair The connection of horizontal drainage branch 3 answered at several branch drain roads, each branch drain road with corresponding horizontal drainage general pipeline 4 Connection, to form the drainage network for making ponding converge at sump module 5;
The vertical collector pipe 1 is used to collect the underground water of the subgrade 100 squeezed by gravity heap pressurized layer 200;
The four-way water part 2 is for being connected to vertical collector pipe 1 and branch drain road;
The horizontal drainage branch 3 is used to the water that vertical collector pipe 1 is collected being guided to horizontal drainage general pipeline 4;
The horizontal drainage general pipeline 4 is used to the water being collected into being guided to sump module 5;
The sump module 5 is for storing the underground water being collected into.
Further, the sump module 5 is set to is intersected by four horizontal drainage general pipeline 4 right-angled intersection formed or X Center.
Further, which further includes and the one-to-one well extension 7 of sump module 5;The well extends The Single port of pipe 7 is located in sump module 5, and another port passes through gravity heap pressurized layer 200.
Further, the sump module 5 includes as the net metal cupuliform frame of well frame and for parcel net The geotextiles of the metal cup-shaped frame periphery of shape and drainage.
Further, by a four-way water part 2 and two 1 group of vertical collector pipes being connected to the four-way water part 2 At an inverted U water collecting unit.
Further, which includes several inverted U water collecting units, and each inverted U water collecting unit is on 100 ground of subgrade Part on face is in distributed matrix arrangement in region.
Further, several first draining branch pipe(tube)s, the first row are provided between two horizontal drainage general pipeline 4 The successively adjacent four-way water part 2 being arranged in a linear is connected in series by water branch pipe(tube) by several horizontal drainage branch 3, institute The one end for stating the first draining branch pipe(tube) is connected to a wherein horizontal drainage general pipeline 4, the other end of the first draining branch pipe(tube) It is connected to an other horizontal drainage general pipeline 4.
Further, the edge on 100 ground of subgrade and the horizontal drainage general pipeline 4 close to 100 ground edge of subgrade Between be provided with several second draining branch pipe(tube)s, the second draining branch pipe(tube) will be in C by several horizontal drainage branch 3 Font or the successively adjacent four-way water part 2 of mirror image C font arrangement are connected in series;It is described second draining branch pipe(tube) one end with Close to 100 ground edge of subgrade horizontal drainage general pipeline 4 an open communication, the other end and this close to subgrade 100 Another open communication of the horizontal drainage general pipeline 4 at ground edge.
Further, which further includes at least one water pump 6;The pump mouth of the water pump 6 is set to sump module 5 It is interior;The water pump 6 is used to take the ponding in sump module 5 away.
A kind of construction method of the horizontal drainage system for solidification soft foundation as described above, the construction method include with Lower step:
Step 1, the measurement markers on the ground of subgrade 100, so that it is determined that sump module 5, horizontal drainage general pipeline 4 and The installation site of horizontal drainage branch 3;Specifically, it is marked by city's roads;
Step 2, and the corresponding groove of each horizontal drainage general pipeline 4 and soil corresponding with each sump module 5 is excavated Hole;In particular it is required that excavating the groove of 20-30cm depth;In particular it is required that excavating the groove of 20-30cm depth;
Step 3, several sump modules 5 are installed in corresponding heatable adobe sleeping platform and by several horizontal drainage general pipeline 4 It installs in realizing each horizontal drainage general pipeline 4 mutually by terminal or corresponding sump module 5 Connection, each sump module 5 are at least connected to the end of a horizontal drainage general pipeline 4;Specifically, sump module 5 makes It is directly mounted at corresponding heatable adobe sleeping platform after being transported to scene after the completion, then fills out rubble on 5 periphery of sump module, it is permeable to enhance Property;Specifically, it is directly mounted at corresponding heatable adobe sleeping platform after being transported to scene after the completion of sump module making, then in sump module Rubble is filled out on periphery, to enhance water penetration;
Step 4, array is respectively laid with several vertical collector pipes 1 in subgrade 100, makes the vertical collector pipe 1 of each item End protrude from 100 ground of subgrade, the rest part of each vertical collector pipe 1 of item is vertically embedded in subgrade 100;
Step 5, several four-way water parts 2 are installed on the ground of subgrade 100, make to protrude from 100 ground of subgrade 1 end of vertical collector pipe with corresponding four-way water part 2 be connected to;
Step 6, several horizontal drainage branch 3 are installed on the ground of subgrade 100, keep each four-way water part 2 logical It crosses corresponding horizontal drainage branch 3 and forms several branch drain roads, each branch drain road is total with corresponding horizontal drainage Pipe 4 is connected to, to form the drainage network that ponding converges at sump module 5;Specifically, it is connected using four-way water part 2 perpendicular To collector pipe 1 and horizontal drainage branch 3, the interface and four-way water part 2 and level of four-way water part 2 and vertical collector pipe 1 The interface of branch drain 3 is all made of wind nail and is reinforced with anti-dropout;Specifically, it is vertically catchmented using the connection of four-way water part Pipe and horizontal drainage branch, four-way water part and the interface and four-way water part of vertical collector pipe and connecing for horizontal drainage branch Wind nail is all made of at mouthful to be reinforced with anti-dropout;
Step 7, the stacking pressure gravity heap pressurized layer 200 above subgrade 100.
Further, sump module 5 is installed using modular, is provided for construction and installation conveniently, by prefabrication cement Pipe, sump pedestal, prefabricated component are standard size, and site operation requires the quantity of superposition pipe according to absolute altitude;Sump mould is installed When block 5, behind the position of first surveying setting-out positioning sump module 5, digs pit to depth and be slightly larger than the height of 5 pedestal of sump module Degree, the top of well seat and the top sustained height of soil, are superimposed one section of cement when keeping sump module 5 to be embedded in soil Pipe adds folded pipe of cement when preloading and pipe of cement are risen, and so on, until completing preloading height.
Embodiment 2
Embodiment 2 is the embodiment advanced optimized on the basis of embodiment 1;
As shown in Figs. 1-5, a kind of horizontal drainage system for solidification soft foundation is equipped with gravity heap pressurized layer in the system 200, for the gravity heap pressurized layer 200 for squeezing subgrade 100, which includes several vertical collector pipes 1, several four-ways Water part 2, several horizontal drainage branch 3, several horizontal drainage general pipeline 4 and at least one sump module 5;Each item is vertical One end of collector pipe 1 protrudes from 100 ground of subgrade, and the rest part of each vertical collector pipe 1 of item is vertically embedded in soft In ground 100;Each paving of four-way water part 2 is on the ground of subgrade 100;Each paving of horizontal drainage branch 3 is set to On the ground of subgrade 100;Each paving of horizontal drainage general pipeline 4 is total with horizontal drainage set on excavating on 100 ground of subgrade In the one-to-one groove of pipe 4;Each sump module 5 be set to 100 ground of subgrade excavate with sump module 5 one In one corresponding heatable adobe sleeping platform, the shaft bottom face of each sump module 5 is below each horizontal drainage branch 3 and each horizontal drainage is total Pipe 4;
The four-way water part 2 is set there are two the first outlet pass 21 and two the second outlet passes 22, each four-way water part 2 Two the first outlet passes 21 with the vertical collector pipe that protrudes from 100 ground of subgrade correspondingly with the first outlet pass 21 The connection of 1 one ends, other two second outlet pass 22 with the one-to-one horizontal drainage branch 3 of the second outlet pass 22 One end connection;All horizontal drainage general pipeline 4 are divided to for two classes, and one type is first level main sewer 41, and in addition one Class is the second horizontal drainage general pipeline 42;The end of every or every two or every three or every four first level main sewers 41 with Corresponding sump module 5 is connected to, and each sump module 5 is connected to the end of at least one first level main sewer 41; Second horizontal drainage general pipeline 42 makes to be connected to from different sump modules 5 to be connected to different first level main sewers 41 Each horizontal drainage general pipeline 4 further be connected to, make draining it is more smooth, avoid because of one or more horizontal drainage general pipeline therein 4 block and drainage system are caused to be paralysed;Each second outlet pass 22 is connected to by corresponding horizontal drainage branch 3 and is arranged at several Water branch pipe(tube), each branch drain road are connected to corresponding horizontal drainage general pipeline 4, so that being formed makes ponding converge at sump The drainage network of module 5;
The vertical collector pipe 1 is used to collect the underground water of the subgrade 100 squeezed by gravity heap pressurized layer 200;
The four-way water part 2 is for being connected to vertical collector pipe 1 and branch drain road;
The horizontal drainage branch 3 is used to the water that vertical collector pipe 1 is collected being guided to horizontal drainage general pipeline 4;
The horizontal drainage general pipeline 4 is used to the water being collected into being guided to sump module 5;
The sump module 5 is for storing the underground water being collected into.
Embodiment 3
Embodiment 3 is the embodiment advanced optimized on the basis of embodiment 1;
As shown in Fig. 1-3, Fig. 6, a kind of horizontal drainage system for solidification soft foundation is equipped with gravity heap in the system Pressurized layer 200, the gravity heap pressurized layer 200 for squeezing subgrade 100, the system include several vertical collector pipes 1, several Four-way water part 2, several horizontal drainage branch 3, several horizontal drainage general pipeline 4 and at least one sump module 5;Each item One end of vertical collector pipe 1 protrudes from 100 ground of subgrade, and the rest part of each vertical collector pipe 1 of item vertically buries In in subgrade 100;Each paving of four-way water part 2 is on the ground of subgrade 100;Each horizontal drainage branch 3 is spread On the ground of subgrade 100;Each paving of horizontal drainage general pipeline 4 is set to excavate on 100 ground of subgrade and horizontal row In the one-to-one groove of supply mains 4;Each sump module 5 be set to 100 ground of subgrade excavate with sump mould In the one-to-one heatable adobe sleeping platform of block 5, the shaft bottom face of each sump module 5 is below each horizontal drainage branch 3 and each item is horizontal Main sewer 4;
The four-way water part 2 is set there are two the first outlet pass 21 and two the second outlet passes 22, each four-way water part 2 Two the first outlet passes 21 with the vertical collector pipe that protrudes from 100 ground of subgrade correspondingly with the first outlet pass 21 The connection of 1 one ends, other two second outlet pass 22 with the one-to-one horizontal drainage branch 3 of the second outlet pass 22 One end connection;Every or every two or every three or every four horizontal drainage general pipeline 4 ends and corresponding sump mould Block 5 is connected to, and each sump module 5 is connected to the end of at least one horizontal drainage general pipeline 4;Each second outlet pass 22 passes through At several branch drain roads, each branch drain road is total with corresponding horizontal drainage for the corresponding connection of horizontal drainage branch 3 Pipe 4 is connected to, to form the drainage network for making ponding converge at sump module 5;
The vertical collector pipe 1 is used to collect the underground water of the subgrade 100 squeezed by gravity heap pressurized layer 200;
The four-way water part 2 is for being connected to vertical collector pipe 1 and branch drain road;
The horizontal drainage branch 3 is used to the water that vertical collector pipe 1 is collected being guided to horizontal drainage general pipeline 4;
The horizontal drainage general pipeline 4 is used to the water being collected into being guided to sump module 5;
The sump module 5 is for storing the underground water being collected into.
The working principle of the invention:
The vertical collector pipe for having water filtering function is implanted into the subgrade of soft stream plasticity by the present invention, then in the upper of subgrade Fang Jinhang heap carrying force stacking pressure layer, moisture in subgrade soil through vertical collector pipe, by multiple horizontal drainage branch with it is multiple The branch drain road of four-way water part branch drain road composition flows into corresponding horizontal drainage general pipeline, and underground water is total through horizontal drainage Pipe flows into sump module, and the ponding in sump module is taken away by water pump, to enhance bearing capacity and the improvement of subgrade The stability of subgrade.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of horizontal drainage system for solidification soft foundation, gravity heap pressurized layer, the gravity stacking pressure are equipped in the system Layer is for squeezing subgrade, which is characterized in that the system includes several vertical collector pipes, several four-way water parts, several Horizontal drainage branch, several horizontal drainage general pipeline and at least one sump module;One end of each vertical collector pipe of item Portion protrudes from subgrade ground, and the rest part of each vertical collector pipe of item is vertically embedded in subgrade;Each four-way water guide Part paving is on the ground of subgrade;Each horizontal drainage branch paving is on the ground of subgrade;Each horizontal drainage General pipeline paving be set to subgrade ground excavate with the one-to-one groove of horizontal drainage general pipeline in;Each sump module is equal Set on subgrade ground excavate with the one-to-one heatable adobe sleeping platform of sump module in, the shaft bottom face of each sump module is low In each horizontal drainage branch and each horizontal drainage general pipeline;
The four-way water part is set there are two the first outlet pass and two the second outlet passes, and two first of each four-way water part Outlet pass is connected to one end of vertical collector pipe for protruding from subgrade ground correspondingly with the first outlet pass, in addition Two the second outlet passes are connected to an end with the one-to-one horizontal drainage branch of the second outlet pass;One of water The end of flat raft supply mains is connected to sump module or another horizontal drainage general pipeline, each sump module and at least one The end connection of horizontal drainage general pipeline;Each second outlet pass is connected to by corresponding horizontal drainage branch and is drained at several Branch pipe(tube), each branch drain road are connected to corresponding horizontal drainage general pipeline, so that being formed makes ponding converge at sump mould The drainage network of block;
The vertical collector pipe is used to collect the underground water of the subgrade squeezed by gravity heap pressurized layer;
The four-way water part is for being connected to vertical collector pipe and branch drain road;
The horizontal drainage branch is used to the water that vertical collector pipe is collected being guided to horizontal drainage general pipeline;
The horizontal drainage general pipeline is used to the water being collected into being guided to sump module;
The sump module is for storing the underground water being collected into.
2. the horizontal drainage system according to claim 1 for solidification soft foundation, which is characterized in that the sump mould Block is set to the center intersected by four horizontal drainage general pipeline right-angled intersection formed or X.
3. the horizontal drainage system according to claim 1 for solidification soft foundation, which is characterized in that the system further includes With the one-to-one well extension of sump module;The Single port of the well extension is located in sump module, another Single port passes through gravity heap pressurized layer.
4. the horizontal drainage system according to claim 1 for solidification soft foundation, which is characterized in that the sump mould Block includes the geotextiles as the net metal cupuliform frame of well frame and for wrapping up netted metal cup-shaped frame periphery and drainage.
5. the horizontal drainage system according to claim 1 for solidification soft foundation, which is characterized in that by four admittances Water part and two vertical collector pipes being connected to the four-way water part form an inverted U water collecting unit.
6. the horizontal drainage system according to claim 5 for solidification soft foundation, which is characterized in that if the system includes Dry inverted U water collecting unit, each inverted U water collecting unit is in the part on subgrade ground in distributed matrix row in region Column.
7. the horizontal drainage system according to claim 1 for solidification soft foundation, which is characterized in that in two horizontal rows Several first draining branch pipe(tube)s are provided between supply mains, the first draining branch pipe(tube) passes through several horizontal drainage branch The successively adjacent four-way water part being arranged in a linear is connected in series, described first drains one end of branch pipe(tube) and wherein one The other end of horizontal drainage general pipeline connection, the first draining branch pipe(tube) is connected to an other horizontal drainage general pipeline.
8. the horizontal drainage system according to claim 1 for solidification soft foundation, which is characterized in that on subgrade ground Edge and several second draining branch pipe(tube)s are provided between the horizontal drainage general pipeline at subgrade ground edge, described second The successively adjacent four-way water guide that branch drain road will be arranged by several horizontal drainage branch in C font or mirror image C font Part is connected in series;It is opened with one of the horizontal drainage general pipeline close to subgrade ground edge one end of the second draining branch pipe(tube) Mouthful connection, another open communication of the other end and the horizontal drainage general pipeline close to subgrade ground edge.
9. the horizontal drainage system according to claim 1 for solidification soft foundation, which is characterized in that the system further includes At least one water pump;The pump mouth of the water pump is set in sump module;The water pump is for taking away in sump module Ponding.
10. a kind of construction method of the horizontal drainage system for solidification soft foundation as described in claim 1-9 is any, special Sign is, the construction method the following steps are included:
Step 1, the measurement markers on the ground of subgrade, so that it is determined that sump module, horizontal drainage general pipeline and horizontal drainage The installation site of branch pipe;
Step 2, and the corresponding groove of each horizontal drainage general pipeline and heatable adobe sleeping platform corresponding with each sump module is excavated;
Step 3, by several sump modules install in corresponding heatable adobe sleeping platform and by several horizontal drainage general pipeline install in In corresponding groove, realizes each horizontal drainage general pipeline by terminal or corresponding sump module and be interconnected, often A sump module is at least connected to the end of a horizontal drainage general pipeline;
Step 4, array is respectively laid with several vertical collector pipes in subgrade, keeps the end of the vertical collector pipe of each item prominent For subgrade ground, the rest part of each vertical collector pipe of item is vertically embedded in subgrade;
Step 5, several four-way water parts are installed on the ground of subgrade, make the vertical collector pipe for protruding from subgrade ground End is connected to corresponding four-way water part;
Step 6, several horizontal drainage branch are installed on the ground of subgrade, each four-way water part is made to pass through corresponding water Flat branch drain forms several branch drain roads, and each branch drain road is connected to corresponding horizontal drainage general pipeline, thus Form the drainage network that ponding converges at sump module;
Step 7, the stacking pressure gravity heap pressurized layer above subgrade.
CN201910767013.4A 2019-08-20 2019-08-20 A kind of horizontal drainage system and its construction method for solidification soft foundation Pending CN110359444A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910767013.4A CN110359444A (en) 2019-08-20 2019-08-20 A kind of horizontal drainage system and its construction method for solidification soft foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910767013.4A CN110359444A (en) 2019-08-20 2019-08-20 A kind of horizontal drainage system and its construction method for solidification soft foundation

Publications (1)

Publication Number Publication Date
CN110359444A true CN110359444A (en) 2019-10-22

Family

ID=68224032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910767013.4A Pending CN110359444A (en) 2019-08-20 2019-08-20 A kind of horizontal drainage system and its construction method for solidification soft foundation

Country Status (1)

Country Link
CN (1) CN110359444A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585228A (en) * 2021-08-03 2021-11-02 河北地质大学 Horizontal drainage system for consolidating soft foundation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585228A (en) * 2021-08-03 2021-11-02 河北地质大学 Horizontal drainage system for consolidating soft foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN114319401A (en) Foundation pit slope drainage system
CN102322054B (en) Method for processing ultra-soft soil through combining shallow-surface-layer intermittent strong water-pumping/draining with short-term air-curing
CN107869179A (en) Integrate the concave herbaceous field structure and method for accelerating diafiltration and water storage
CN206667420U (en) Sponge city high-effective penetrating type greenery patches constructs
CN207469222U (en) The pre-buried vacuum drainage system in reclamation by pumping filling area
CN208346836U (en) A kind of hidden drainage system
CN110359444A (en) A kind of horizontal drainage system and its construction method for solidification soft foundation
CN102726141A (en) Saline-alkali soil improvement facility and method
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems
CN205077527U (en) Drainage system is dredged to basement bottom plate release water buoyancy method
CN109339095B (en) Retaining wall drainage system and wall back inverted filter layer construction method thereof
CN207121911U (en) A kind of foundation ditch horizontal tube precipitation system
CN109930632A (en) Basement underground water self-balancing anti-floating system based on base-rock shallow slope area
CN211498867U (en) A envelope for underground works excavation foundation ditch engineering on a large scale
CN211036611U (en) Road surface structure in sponge city
CN105672334B (en) Segmented roadbed dash construction method is carried out in hypsography low-lying area using water fender
CN209652992U (en) Basement underground water self-balancing anti-floating system based on base-rock shallow slope area
CN208152219U (en) A kind of dry depression for sponge city
CN110924381A (en) Seepage-proofing structure of geotechnical engineering side slope
CN109355995A (en) A kind of road greenbelt and its construction method
CN214302128U (en) Building foundation drainage device
CN217710890U (en) Pressure reduction and drainage device for dock construction
CN213867176U (en) Can collect permeable pavement of rainwater
CN110036880A (en) It is a kind of to be afforested based on the hillside fields vertically regulated and controled from irrigation system and construction method
CN220579959U (en) System for consolidating weak area of fine particle size of closed reservoir of tailing pond

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination