CN110357210A - Pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed and method - Google Patents

Pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed and method Download PDF

Info

Publication number
CN110357210A
CN110357210A CN201910650000.9A CN201910650000A CN110357210A CN 110357210 A CN110357210 A CN 110357210A CN 201910650000 A CN201910650000 A CN 201910650000A CN 110357210 A CN110357210 A CN 110357210A
Authority
CN
China
Prior art keywords
resin
old
salt bed
container
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910650000.9A
Other languages
Chinese (zh)
Inventor
但胜洁
张良
孟兴晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
CGN Power Co Ltd
Daya Bay Nuclear Power Operations and Management Co Ltd
Lingdong Nuclear Power Co Ltd
Guangdong Nuclear Power Joint Venture Co Ltd
Lingao Nuclear Power Co Ltd
Original Assignee
China General Nuclear Power Corp
CGN Power Co Ltd
Daya Bay Nuclear Power Operations and Management Co Ltd
Lingdong Nuclear Power Co Ltd
Guangdong Nuclear Power Joint Venture Co Ltd
Lingao Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, CGN Power Co Ltd, Daya Bay Nuclear Power Operations and Management Co Ltd, Lingdong Nuclear Power Co Ltd, Guangdong Nuclear Power Joint Venture Co Ltd, Lingao Nuclear Power Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201910650000.9A priority Critical patent/CN110357210A/en
Publication of CN110357210A publication Critical patent/CN110357210A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/42Treatment of water, waste water, or sewage by ion-exchange
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00Apparatus for treatment of water, waste water or sewage
    • C02F2201/002Construction details of the apparatus
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00Apparatus for treatment of water, waste water or sewage
    • C02F2201/002Construction details of the apparatus
    • C02F2201/004Seals, connections
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/14Maintenance of water treatment installations

Abstract

The present invention relates to nuclear power station feed heating system technical fields, a kind of pressurized-water reactor nuclear power plant is provided except the old resin replacement device of salt bed, the resin replacement device includes that the first resin container, the second resin container and resin are lifted device, first resin container be connect with the first end that should remove salt bed, it is exclusively used in from this except salt bed draws off the old resin, second resin container is lifted device by the resin and connect with the second end that should remove salt bed, be exclusively used in this except salt bed is packed into new resin.The present invention also provides remove the method that the old resin of salt bed is replaced to pressurized-water reactor nuclear power plant using the more changing device.Pressurized-water reactor nuclear power plant provided by the invention can greatly reduce replacement workload except the old resin replacement device of salt bed and method, shorten the construction period, reduce pollution of the old resin to new resin, have reference to any pressurized-water reactor nuclear power plant.

Description

Pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed and method
Technical field
The present invention relates to nuclear power station feed heating system technical fields, and in particular to a kind of pressurized-water reactor nuclear power plant is old except salt bed Resin replacement device, and using more changing device replacement pressurized-water reactor nuclear power plant except the method for the old resin in salt bed.
Background technique
Pressurized-water reactor nuclear power plant condensate clean-up processing system can have aging phenomenon, condensed water except the long-time service of salt bed resin Cleaning treatment system has broken positive resin to enter nuclear power station secondary loop when running, and causes evaporator sulfate radical to increase, while this is The water production in periodic mode of system declines and the decline of negative resin volume-exchange capacity, therefore need to carry out integral replacing to except salt bed resin, with The potential equipment corrosion of secondary circuit heat power equipment is reduced, better ensures that unit operational safety.
Existing old resin is drawn off except the technique of salt bed is usually manually from except digging out old resin in salt bed, and by old resin It is carried to ground from the desalination bed platform of eminence, there are great workloads and industry security risk for this.Existing new resin dress Enter except the technique of salt bed is two new resin containers of setting for cleaning new resin, because newly resin is despite exempting from regenerative resin, It still needs to be fitted into after cleaning to conductivity qualification except in salt bed in resin regeneration tank.After be changed to use first new resin container In receiving from the old resin drawn off by pipeline except salt bed.But due to requiring to ensure that condensed water is net during resin replacement Change processing system and be in stand-by state, i.e., has during resin replacement except salt bed can be incorporated to secondary circuit operation at any time, therefore It is required that being packed into new resin on except salt bed as early as possible, therefore old resin is drawn off quickly after first old resin of new resin container receiving, It is packed into new resin.And old resin remaining in the clean resin regeneration tank of thorough cleaning is needed before being fitted into new resin, to prevent old tree Rouge pollutes new resin.But in fact cleaning is impossible to accomplish fully and completely to clear up each time, so that it is new to increase old resin stain The risk of resin, and frequently can opening clears up old resin, also increases workload, extends the duration.Therefore, it is necessary to presurized water reactor core Power station condensate clean-up processing system is improved except more changing jobs for salt bed resin, to reduce replacement workload, reduce operation Risk shortens the construction period and reduces pollution of the old resin to new resin.
Summary of the invention
In order to improve existing nuclear plant desalting bed resin replacement method there are the problem of, the purpose of the present invention is to provide A kind of pressurized-water reactor nuclear power plant is except the old resin replacement device of salt bed and using the more changing device to pressurized-water reactor nuclear power plant except salt bed is old The method that resin is replaced, replacement device and method of the invention can greatly reduce replacement workload, reduce operational risk, It shortens the construction period, reduces pollution of the old resin to new resin.
Therefore, in one aspect, the present invention provides a kind of pressurized-water reactor nuclear power plant except the old resin replacement device of salt bed, the resin More changing device includes that the first resin container, the second resin container and resin are lifted device, first resin container and the first end that should remove salt bed Connection is exclusively used in drawing off the old resin from this except salt bed, second resin container by the resin be lifted device with should be except the of salt bed The connection of two ends is exclusively used in this except salt bed is packed into new resin.
Further, which includes resin loading device, for loading the new resin to second resin container.
Further, which includes resin mixer and fluid ejector, the resin mixer with should Fluid ejector connection, the fluid ejector are connect with second resin container, which is used for the new resin and water Resin-aqueous mixtures are mixed to form, which is used to the resin-aqueous mixtures being loaded into second resin container.
The fluid ejector can be any can push the resin-water to mix by means of fluid media (medium) by fluid dynamic Logistics enters the device in second resin container.As a non-limiting example, which can be aqueous stream injectors. As another non-limiting example, which can be steam jet atomizer.
Further, which further includes resin displacer, for making the old resin from first resin container Discharge.As a non-limiting example, which is pipeline.As another non-limiting example, resin row Device is pump out.
Further, which further includes old plastic holding device, and the old plastic holding device and the resin displacer connect It connects, for concentrating the old resin received and be discharged from the resin displacer.
Further, resin lifting device is pump or blade.
In second aspect, the present invention provides a kind of pressurized-water reactor nuclear power plant except the old resin replacement method of salt bed, the resin replacement Method includes:
By the old resin from this except salt bed is discharged to and is somebody's turn to do the first resin container connecting except the first end of salt bed,
New resin is loaded into and is somebody's turn to do the second resin container connecting except the second end of salt bed, and
The new resin in second resin container, which is packed into, should remove salt bed.
Further, it includes passing through tree that new resin is loaded into the second resin container that should be connect except the second end of salt bed by this The new resin and water are mixed to form resin-aqueous mixtures by rouge mixer, and the fluid by connecting with the resin mixer sprays Resin-the aqueous mixtures are loaded into second resin container by emitter.The fluid ejector can be aqueous stream injectors or air-flow Injector.
Further, which further includes arranging the old resin from first resin container through resin displacer Out.
Further, which is discharged to from first resin container for concentrating the old resin for receiving the old resin to hold Device.
Further, which makes remain in first resin container one small after first resin container discharge Partially the old resin is retained in first resin container.
Further, which further includes that the new resin in second resin container is being packed into the desalination It before bed, is purged with compressed air to salt bed water cap is removed, remains in this except the old resin in salt bed water cap to remove.
Innovative point and beneficial effect of the invention is:
First resin container is exclusively used in old resin to draw off, the second resin container is exclusively used in new resin and is packed into, and can reduce old tree Rouge pollutes the probability of new resin.Will by except manually dig out in salt bed old resin be improved to will except in salt bed old resin be discharged to first It is then exhausted from after resin container, it is possible to reduce from except digging out the workload and work for being transported to ground after old resin from eminence platform in salt bed Industry security risk.By the way that the special resin loading device including resin mixer and fluid ejector is arranged, may be implemented pair The cleaning and fluid dynamic conveying of new resin.Resin displacer is set in the first resin container lower part, by old resin from the first resin Tank discharge, reduces personnel and enters in tank body the workload for digging out and carrying old resin and industry security risk.It will be except in salt bed Cleaning is changed to clear up in situ after water cap disassembly, can greatly reduce the workload of water cap demolition and installation.
Calculate through scene, using pressurized-water reactor nuclear power plant condensate clean-up processing system of the invention except the old resin in salt bed Resin replacement device and method it is dirty can to reduce old resin for having there are three the condensate clean-up processing system for removing salt bed New resin probability 75% is contaminated, the individual event workload that old resin is drawn off saves about 80%, the individual event workload section of new resin load About 18% is saved, the individual event workload for clearing up water cap saves about 68%.It is comprehensively compared, saves amount of work about 45%, improve work Efficiency, and person works' intensity is effectively reduced and evades industry security risk, the duration shortens about 40% than expected.
Detailed description of the invention
Fig. 1 shows pressurized-water reactor nuclear power plant condensate clean-up processing system according to the present invention except the old resin replacement device of salt bed Schematic diagram;
Fig. 2 shows pressurized-water reactor nuclear power plant condensate clean-up processing system according to the present invention except the old resin replacement device of salt bed In resin loading device schematic diagram;
Fig. 3 shows that pressurized-water reactor nuclear power plant condensate clean-up processing system removes the schematic diagram of salt bed.
Specific embodiment
Below by specific embodiment and in conjunction with attached drawing, invention is further described in detail.
Referring to Fig. 1, wherein schematically showing pressurized-water reactor nuclear power plant according to the present invention except the old resin replacement dress of salt bed Set, resin replacement device includes the first resin container 1 and the second resin container 2 and resin is lifted device 61, the first resin container 1 with remove salt bed 3 first end connection is exclusively used in from except salt bed 3 draws off old resin, and the second resin container 2 is lifted device 61 by resin and removes salt bed 3 Second end connection, be exclusively used in being packed into new resin except salt bed 3.
Show that three are removed salt bed 3 and the first resin container 1 and the second resin container 2, the first resin container 1 and the second tree in Fig. 1 Rouge tank 2 is located at ground, and except salt bed 3 is on platform of about 8 meters away from ground.Except in salt bed 3 have old resin to be replaced.It removes The first end of salt bed 3 is its lower end, the first resin container 1 is connected to by unloading resin pipeline 5, to unload old resin.Unload pitch tube Road 5 is equipped with valve (not shown), for controlling unloading for old resin.Except the second end of salt bed 3 is the upper end, pass through dress Resin pipeline 6 is connect with the second resin container 2, to be packed into new resin.It fills resin pipeline 6 and is equipped with valve (not shown), use In the loading for controlling new resin.Resin lifting device 61 is for promoting new resin to the second end for removing salt bed 3.Resin is lifted device 61 can Blade can also be used using pump.It can be run with Electric-motor driven pumps or blade, to promote new resin.
It is equipped with resin loading device 4 by the second resin container 2, is connect with the second resin container 2 by pipeline, is used for the Two resin containers 2 load new resin.It is equipped with resin displacer 7 in the lower part of the first resin container 1, for making old resin from the first resin Tank 1 is discharged.Resin displacer 7 can use the form of pipeline, and the old resin in the first resin container 1 is under the effect of gravity from the pipe Road naturally drains.Valve (not shown) is equipped on the pipeline, for controlling the discharge of old resin.Resin displacer 7 It can be using the form of pump.Pump can accelerate the discharge of the old resin in the first resin container 1, reduce the operating time.
The resin replacement device further includes old plastic holding device (not shown).The old plastic holding device is designed as water filtering Bulk container is connect with resin displacer 7, for concentrating the old resin received and be discharged from resin displacer 7.
Referring to fig. 2, wherein schematically showing resin loading device 4 comprising resin blending tank 41 and fluid injection Device 42.Water pipe 43 is mixed to form resin-water with the new resin additionally incorporated and mixes for adding water in resin blending tank 41 Object, the fluid dynamic that resin-aqueous mixtures pass through fluid ejector 42 again are transported to the second resin container 2.Resin blending tank 41 is Conical bottom mixing vessel, conical bottom is connect with fluid ejector 42 at one end by pipeline, in the other end and the second resin container 2 Connection.Fluid ejector 42 can be water flow jet or steam jet atomizer, connecting fluid source, for generating fluid dynamic. Aqueous stream injectors and steam jet atomizer are well known to field of chemical engineering, and those skilled in the art can be according to the promotion resin- The particular technique demand that aqueous mixtures flow into second resin container is chosen or is customized.Due to the formation of resin blending tank 41 Be resin-aqueous mixtures, fluid ejector 42 generallys use aqueous stream injectors, water source is connected, for generating flow dynamic.
Illustrate through the pressurized-water reactor nuclear power plant now in conjunction with Fig. 1 and Fig. 2 except the old resin replacement device of salt bed replaces old resin Method.In brief, this method includes main three processing steps: (1) by old resin from except salt bed 3 is discharged to the first resin container 1, new resin is loaded into the second resin container 2 by (2), and the new resin in the second resin container 2 is packed into and removes salt bed 3 by (3), and another It outside further include the cleaning in situ of (4) water cap.These processing steps are specifically described below.
(1) old resin is drawn off
It is that old resin is discharged to the first resin container 1 from except salt bed 3 is unloaded resin pipeline 5 that old resin, which draws off technique, then Old resin is discharged by resin displacer 7 (row's of being shown as resin pipeline 7 in figure), to carry out waste treatment.Arrange resin pipeline 7 The lower part form in the first resin container 1 can be set.The old resin of sub-fraction remained in the first resin container 1 passes through manually again It digs out.To save operation, the old resin of this sub-fraction need not can first be dug out, stay in the first resin container, and remaining space can hold It receives second set of old resin, does not interfere with the discharge of second set of old resin, can opening again after old resin discharge to the last a set of in this way Carry out thorough cleaning is dug out, can opening three times can be saved in this way and draw resin.That is, old resin makes residual after the discharge of the first resin container There are the old resins of sub-fraction in first resin container to be retained in the first resin container.
The advantages of technique, essentially consists in, and the old resin in the first resin container 1 can be when shorter in the case where water flow is transmitted It is interior to draw off old resin;Reduce personnel and frequently enter the workload for drawing resin in tank body, evades corresponding industry security risk;Cause For except salt bed 3, aloft platform (about 8 meters) and the first resin container 1 reduce at ground (0 meter) from except digging out old tree in salt bed 3 0 meter of workload is carried to from 8 meters of platforms again after rouge and evades related industries security risk.Through field statistics, old resin is drawn off Technique can reduce workload nearly 80% compared to common process.
Old resin is discharged in order to facilitate concentrating, old resin can be discharged to old plastic holding device through resin displacer 7 and (not show in figure Out).Old plastic holding device is the bulk container of water filtering, is connect with resin displacer 7, is arranged for concentrating to receive from the resin displacer Old resin out, is further reduced workload and duration.
(2) load of new resin
The loading process of new resin is to be loaded into new resin by being located at the resin loading device 4 on 2 side of the second resin container Second resin container 2.Specifically, it is added water in resin blending tank 41 by water pipe 43, position 44 in addition is added from new resin New resin is added into resin blending tank 41, water and new resin are mixed to form resin-aqueous mixtures.Resin-aqueous mixtures are from tree The conical bottom of rouge blending tank 41 is flowed out through pipeline, then the flow dynamic through aqueous stream injectors 42 is transported to the second resin container 2.
The loading process of new resin includes receiving carry new resin, tear every bag of new package resin open, add new resin from warehouse Enter into resin blending tank 41, aqueous stream injectors 42 convey the operation such as new resin, site clearing, through field statistics, new resin Working efficiency about 18% can be improved in loading process.
(3) loading of new resin
After resin-aqueous mixtures are transported to the second resin container 2 from resin blending tank 41, by the resin on dress resin pipeline 6 Lifting device 61 is transported to the upper end except salt bed 3, so that new resin be made to be fitted into except in salt bed 3.Resin-aqueous mixtures may be implemented newly The flow dynamic of resin conveys.Resin, which is lifted device 61, can also use blade using pump.Electric-motor driven pumps or paddle can be used Leaf operation, to promote new resin.
(4) cleaning in situ of water cap
Each of condensate clean-up processing system is except there are many a water caps for salt bed.Fig. 3 shows that pressurized-water reactor nuclear power plant is solidifying Bear water the structural schematic diagram that cleaning treatment system removes salt bed, including resin room 8, water chamber 9, water cap 10 and manhole 11.Except salt bed Spacing board of the water cap 10 in resin room 8 and water chamber 9 is upper in resin room 8.Resin room 8 is filled with the mixture of resin and water, tree Rouge carries out except salt treatment water.The function of water cap 10 is to pass through water, and prevent the resin in resin room 8 by causing to flow It loses.The top of water cap 10 is solid plate, and water is from water cap side surrounding by entering water chamber 9.
In order to prevent except the new resin that the old resin stain in salt bed is packed into, it is necessary to by old tree remaining in each water cap Rouge is cleaned out.Normal practice is that all disassembly is cleared up offline by water cap, i.e., the water cap removed is placed under the sun natural Drying reduces resin dehydration and falls off.By habitual thinking, the mode cleared up one by one after this disassembly, which can guarantee, to be cleaned out, but Since disassembly and installation workload is very big and very time-consuming, extend the duration.And in resin replacement method of the invention, remove salt bed Water cap uses Hand scarf.In short, opening after the old resin removed in salt bed is discharged to the first resin container 1 and removing salt bed The manhole 11 of middle part resin room 8 and the manhole 11 of bottom water chamber 9 will be cleaned out as far as possible except old resin remaining in salt bed, used Plastic flexible pipe one end connects compressed air, and the other end is passed through except salt bed water chamber 9 by the manhole 11 except salt bed water chamber 9, makes to remain in From 9 blowback of salt bed water chamber each water cap is removed, (so-called blowback is because being dehydrated atrophy, then with compressed air for resin in water cap gap Refer to that the flow direction of compressed air is opposite with the flow direction of water when desalination bed operating), while being entered by the manhole of resin room 8 11 except salt bed is used Dust catcher siphons away the resin that blowback is got off from water cap.The effect of this Hand scarf is unexpectedly very good, and exempts from In disassembly and installation, through field statistics, amount of work about 68% is saved than offline method of cleaning.
During certain pressurized-water reactor nuclear power plant condensate clean-up processing system removes salt bed resin replacement, it is faced with many challenges With require.Preferentially, which needs to have during resin replacement in stand-by state except salt bed can be incorporated at any time at any time Secondary circuit operation.The system three except there are two in operating status, another carries out the drawing off of old resin, new resin in salt bed Loading and except salt bed water cap clear up, to ensure that the system is in stand-by state.Secondly, manpower is few and short time limit.Present invention wound Technological improvement is carried out to the property made to the salt bed resin replacement operation sequence of removing of existing nuclear power station, innovative outstanding behaviours is in old resin It draws off, three aspects of the load of new resin and water cap Hand scarf.Especially, the first resin container old resin is exclusively used in draw off, the Two resin containers are exclusively used in new resin and are packed into, can be to avoid dirt of the old resin to new resin caused by existing replacement operation method Dye.Calculate through scene, reduce the new resin probability 75% of old resin stain, the individual event workload that old resin is drawn off is saved about 80%, the individual event workload of new resin load saves about 18%, and the individual event workload for clearing up water cap saves about 68%.Comprehensive ratio Compared with, amount of work about 45% is saved, working efficiency is improved, and person works' intensity is effectively reduced and evades industry security risk, The duration shortens about 40% than expected.Condensate clean-up processing system of the invention removes salt bed resin replacement device and method to any Pressurized-water reactor nuclear power plant has reference.
Use above specific example is expounded the present invention, is merely used to help understand the present invention, not to The limitation present invention.The design of those skilled in the art according to the present invention can also be made and several simply push away It drills, deform or replaces.These are deduced, deformation or alternative are also fallen into scope of the presently claimed invention.

Claims (15)

1. a kind of pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed, which is characterized in that the resin replacement device includes the One resin container, the second resin container and resin are lifted device, and first resin container connect with the first end except salt bed, is exclusively used in From described except salt bed draws off the old resin, second resin container is lifted device and described except the second of salt bed by the resin End connection is exclusively used in described except salt bed is packed into new resin.
2. resin replacement device according to claim 1, which is characterized in that second resin container includes resin load dress It sets, for loading the new resin to second resin container.
3. resin replacement device according to claim 2, which is characterized in that the resin loading device includes resin mixing Device and fluid ejector, the resin mixer are connect with the fluid ejector, the fluid ejector and second tree The connection of rouge tank, the resin mixer are used to the new resin and water being mixed to form resin-aqueous mixtures, the fluid injection Device is used to the resin-aqueous mixtures being loaded into second resin container.
4. resin replacement device according to claim 3, which is characterized in that the fluid ejector be aqueous stream injectors or Steam jet atomizer.
5. resin replacement device according to claim 1, which is characterized in that first resin container further includes resin discharge Device, for the old resin to be discharged from first resin container.
6. resin replacement device according to claim 5, which is characterized in that the resin displacer is pipeline or pump.
7. resin replacement device according to claim 5, which is characterized in that the resin replacement device further includes old resin Container, the old plastic holding device are connect with the resin displacer, for concentrate receive be discharged from the resin displacer it is old Resin.
8. resin replacement device according to claim 1, which is characterized in that the resin lifting device is pump or blade.
9. a kind of pressurized-water reactor nuclear power plant removes the old resin replacement method of salt bed, which is characterized in that the resin replacement method includes:
By the old resin from described except salt bed is discharged to the first resin container connecting with the first end except salt bed,
New resin is loaded into the second resin container connecting with the second end except salt bed, and
The new resin in second resin container is packed into described except salt bed.
10. resin replacement method according to claim 9, which is characterized in that described be loaded into new resin is removed with described Second resin container of the second end connection of salt bed includes that the new resin and water are mixed to form resin-water by resin mixer Mixture, and the resin-aqueous mixtures are loaded into described by the fluid ejector by connecting with the resin mixer Two resin containers.
11. resin replacement method according to claim 10, which is characterized in that the fluid ejector is aqueous stream injectors Or steam jet atomizer.
12. resin replacement method according to claim 9, which is characterized in that the resin replacement method further includes making institute Old resin is stated to be discharged from first resin container.
13. resin replacement method according to claim 12, which is characterized in that the old resin is from first resin container It is discharged to for concentrating the old plastic holding device for receiving the old resin.
14. resin replacement method according to claim 12, which is characterized in that the old resin is from first resin container After discharge, it is retained in old resin described in the sub-fraction remained in first resin container in first resin container.
15. resin replacement method described in any one of 0-14 according to claim 1, which is characterized in that the resin replacement side Method further include the new resin in second resin container is packed into it is described except salt bed before, with compressed air to removing salt bed Water cap is purged, and remains in the old resin except in salt bed water cap to remove.
CN201910650000.9A 2019-07-18 2019-07-18 Pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed and method Pending CN110357210A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910650000.9A CN110357210A (en) 2019-07-18 2019-07-18 Pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910650000.9A CN110357210A (en) 2019-07-18 2019-07-18 Pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed and method

Publications (1)

Publication Number Publication Date
CN110357210A true CN110357210A (en) 2019-10-22

Family

ID=68220577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910650000.9A Pending CN110357210A (en) 2019-07-18 2019-07-18 Pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed and method

Country Status (1)

Country Link
CN (1) CN110357210A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201296686Y (en) * 2008-10-27 2009-08-26 中芯国际集成电路制造(上海)有限公司 Resin replacement device
JP5293210B2 (en) * 2009-01-14 2013-09-18 栗田工業株式会社 Packed tower
CN107879126A (en) * 2017-10-25 2018-04-06 中国船舶重工集团公司第七〇九研究所 The automatic assembling and disassembling system and method for Geldart-D particle radioactivity resin
CN208667180U (en) * 2018-08-15 2019-03-29 广州圣安环保科技有限公司 A kind of device for replacing waste and old resin

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201296686Y (en) * 2008-10-27 2009-08-26 中芯国际集成电路制造(上海)有限公司 Resin replacement device
JP5293210B2 (en) * 2009-01-14 2013-09-18 栗田工業株式会社 Packed tower
CN107879126A (en) * 2017-10-25 2018-04-06 中国船舶重工集团公司第七〇九研究所 The automatic assembling and disassembling system and method for Geldart-D particle radioactivity resin
CN208667180U (en) * 2018-08-15 2019-03-29 广州圣安环保科技有限公司 A kind of device for replacing waste and old resin

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张志银: "《核电厂放射性废物最小化》", 31 July 2013, 原子能出版社 *
李正要: "《矿物化学处理》", 30 June 2015, 冶金工业出版社 *
陈家镛: "《湿法冶金手册》", 30 September 2005, 冶金工业出版社 *

Similar Documents

Publication Publication Date Title
US5068940A (en) Apparatus for cleaning sewers
KR102141236B1 (en) Various dredged soil purification system
CN210305011U (en) Shield constructs construction dregs processing system
CN111151530B (en) Cleaning method for oil storage tank
CN111072186A (en) System and method for cleaning commercial concrete mixing plant transportation tank car and purifying station sewage
CN101865601B (en) Pulse stream cleaning anti-blocking method and device of coal slurry centrifugal dehydrator
CN204473787U (en) Dust mud environmental protection clearing and retrieving device
CN110357210A (en) Pressurized-water reactor nuclear power plant removes the old resin replacement device of salt bed and method
CN211688622U (en) Commercial concrete mixing plant transportation tank car washs and station sewage purification system
CN111389828B (en) Cleaning equipment and process for external floating roof oil tank for recycling oil
CN111804662A (en) Sea sand desalination system and use method thereof
CN2913807Y (en) Pipe conveying apparatus for coating spreading machine
CN106703104A (en) Automatic dredging system for sump
CN215614040U (en) Shield muck lightweight treatment system
CN102351081B (en) Mutual recovery device and method of cement silos
CN111359966B (en) Continuous flushing machine for waste plastic fragments
CN206359260U (en) A kind of intelligent grid machine of gas-water mixed type
CN206978678U (en) Dragon fruit pulping device
CN106145573A (en) A kind of mud receives system and the method processing mud thereof
CN201301231Y (en) White water recovery device of pulpous state heavy calcium carbonate
JP6746853B2 (en) Screen transfer device
CN206027735U (en) A circulation system is recycled to harmless washing of non -pressure for catalyst regeneration project
CN218962051U (en) Dewatering screen with cleaning function and fine sand recycling device for commercial mixed wastewater
CN216320323U (en) Sludge conveying equipment
CN212760058U (en) Sea sand desalination system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191022

RJ01 Rejection of invention patent application after publication