CN110355217A - A kind of solution detecting the problem of instrument testing result is transient pulse - Google Patents
A kind of solution detecting the problem of instrument testing result is transient pulse Download PDFInfo
- Publication number
- CN110355217A CN110355217A CN201910523607.0A CN201910523607A CN110355217A CN 110355217 A CN110355217 A CN 110355217A CN 201910523607 A CN201910523607 A CN 201910523607A CN 110355217 A CN110355217 A CN 110355217A
- Authority
- CN
- China
- Prior art keywords
- detection instrument
- power supply
- measured object
- testing result
- instrument
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B38/00—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Investigating Or Analyzing Materials Using Thermal Means (AREA)
- Radiation Pyrometers (AREA)
Abstract
The present invention provides a kind of solution for detecting the problem of instrument testing result is transient pulse, belongs to metallurgical automation control technology field.This method passes through the curve that iba checks detection instrument measured result first, if it find that measured object exists for a long time but instrument only detects an instantaneous pulse, then increases to the power supply capacity of detection instrument power supply.Using this method, electrical personnel are by checking iba curve, and replacement can be quickly by troubleshooting to the power supply of detection instrument power supply, downtime caused by reducing because of failure.
Description
Technical field
The present invention relates to metallurgical automation control technology field, particularly relating to a kind of detection instrument testing result is instantaneous arteries and veins
The solution for the problem of rushing.
Background technique
Some hot rolling mills will appear once in a while some detection instrument under certain conditions testing result be pulse the problem of, than
Such as, roughing exports pyrometer, and when rolling non-extreme trace time, pyrometer testing result is normal, but when rolling extreme trace time, Ben Ying
Milling train, which stings steel occiput arrival pyrometer to roughing mill extreme trace secondary dish out, can detect always slab this period, but practical high temperature
Meter only detects a pulse, influences second level to finish rolling and issues setting data, to influence normal production.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of solutions for detecting the problem of instrument testing result is transient pulse
Certainly method.
It is as follows that the method comprising the steps of:
(1) curve of detection instrument measured result is checked by iba;
(2) time that confirmation measured object is placed in the measurement point of the detection instrument is greater than the pulse letter that the N times of instrument detects
Number time;
(3) by the way that the power supply to detection instrument power supply is changed in the power supply settlement steps to deal (2) of 2 times of former power supply capacity
Problem.
Further, the detection instrument is one of pyrometer, hot metal detector or cold metal detector.
Further, the method that the confirmation measured object is placed in the time of the measurement point of detection instrument is moved using measured object
The length of dynamic speed and measured object calculates measured object by the time needed for the detection instrument, or checks and the detector
Epitope set the measurement result of other similar detecting elements and the movement speed confirmation measured object of measured object and meanwhile be located at this two
The time of a detection instrument.
Further, the N >=1000.
The advantageous effects of the above technical solutions of the present invention are as follows:
In above scheme, electrical personnel by checking iba curve, replacement to detection instrument power supply power supply can quickly by
Troubleshooting, downtime caused by reducing because of failure.
Detailed description of the invention
Fig. 1 is to illustrate that detection instrument testing result of the invention is instantaneous arteries and veins in the embodiment of the present invention by taking pyrometer as an example
The measured result curve synoptic diagram for the problem of rushing.
Specific embodiment
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool
Body embodiment is described in detail.
The present invention provides a kind of solution for detecting the problem of instrument testing result is transient pulse.
It is as follows that the method comprising the steps of:
(1) curve of detection instrument measured result is checked by iba;
(2) time that confirmation measured object is placed in the measurement point of the detection instrument is greater than the pulse letter that the N times of instrument detects
Number time;
(3) by the way that the power supply to detection instrument power supply is changed in the power supply settlement steps to deal (2) of 2 times of former power supply capacity
Problem.
In a particular application, this method is firstly the need of the history curve for checking detection instrument testing result, if measured object
The time of the measurement point of the detection instrument is placed in much larger than the time for the pulse signal that the instrument detects, this method can be used,
It is increased to the power supply capacity of detection instrument power supply.
As shown in Figure 1, pyrometer is identical with heat inspection installation site after machine after roughing mill by taking pyrometer as an example, heat inspection detection
As a result normal, but the testing result of pyrometer is rolling non-extreme trace time Shi Zhengchang, when rolling extreme trace is secondary, pyrometer is only detected
One pulse solves above-mentioned pyrometer by increasing the power supply capacity powered to pyrometer as a result, and only detects in extreme trace time
To the problem of a pulse.
This method has been successfully applied to the detection instrument issue handling of multiple hot rolling mills, the favorable comment by user.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art
For, without departing from the principles of the present invention, several improvements and modifications can also be made, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (4)
1. a kind of solution for the problem of detection instrument testing result is transient pulse, it is characterised in that: comprise the following steps that
(1) curve of detection instrument measured result is checked by iba;
(2) time that confirmation measured object is placed in the measurement point of the detection instrument is greater than the pulse signal that the N times of instrument detects
Time;
(3) by the way that the power supply to detection instrument power supply is changed to asking in the power supply settlement steps to deal (2) of 2 times of former power supply capacity
Topic.
2. the solution for the problem of detection instrument testing result according to claim 1 is transient pulse, feature exist
In: the detection instrument is one of pyrometer, hot metal detector or cold metal detector.
3. the solution for the problem of detection instrument testing result according to claim 1 is transient pulse, feature exist
In: it is mobile using measured object to be placed in the method for the time of the measurement point of detection instrument for confirmation measured object in the step (2)
The length of speed and measured object calculates measured object by the time needed for the detection instrument, or checks and the detector epitope
It sets the measurement result of other similar detecting elements and the movement speed confirmation measured object of measured object while being located at the two inspections
Survey the time of instrument.
4. the solution for the problem of detection instrument testing result according to claim 1 is transient pulse, feature exist
In: N in the step (2) >=1000.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910523607.0A CN110355217B (en) | 2019-06-17 | 2019-06-17 | Method for solving problem that detection result of last pass instrument of roughing mill is instantaneous pulse |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910523607.0A CN110355217B (en) | 2019-06-17 | 2019-06-17 | Method for solving problem that detection result of last pass instrument of roughing mill is instantaneous pulse |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110355217A true CN110355217A (en) | 2019-10-22 |
CN110355217B CN110355217B (en) | 2020-10-30 |
Family
ID=68216284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910523607.0A Active CN110355217B (en) | 2019-06-17 | 2019-06-17 | Method for solving problem that detection result of last pass instrument of roughing mill is instantaneous pulse |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110355217B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU564021A1 (en) * | 1976-03-10 | 1977-07-05 | Государственный Проектный Институт "Электротяжхимпроект" | Device for determining position of rolled steel witn periodically recurring corrugations |
CN101693257A (en) * | 2009-09-30 | 2010-04-14 | 唐山国丰钢铁有限公司 | Method for realizing continuous feedback control by duality of hot finishing outlet instruments |
CN201787994U (en) * | 2010-09-07 | 2011-04-06 | 中冶华天南京自动化工程有限公司 | Billet signal detection device for lower roller bed of charging table |
CN202667271U (en) * | 2012-07-03 | 2013-01-16 | 中冶华天南京自动化工程有限公司 | Measuring system for length of steel billet on roller bed |
CN202795699U (en) * | 2011-11-22 | 2013-03-13 | 山西博纳科技有限公司 | Wireless intelligent electronic anti-theft and anti-damage system for cemetery tombstones |
CN103331310A (en) * | 2013-07-13 | 2013-10-02 | 吉林大学 | Magnesium alloy plate rolling parameter monitoring and fault diagnosing system and method |
CN104475461A (en) * | 2014-11-06 | 2015-04-01 | 中冶南方(武汉)自动化有限公司 | Combination measurement method for elongation rate of online band steel |
CN105363800A (en) * | 2014-08-29 | 2016-03-02 | 宝山钢铁股份有限公司 | Precise plate shape value obtaining method based on sectional shape |
CN106877515A (en) * | 2017-03-22 | 2017-06-20 | 北京大学 | The EMS suitable for friction generator based on LC vibrations |
-
2019
- 2019-06-17 CN CN201910523607.0A patent/CN110355217B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU564021A1 (en) * | 1976-03-10 | 1977-07-05 | Государственный Проектный Институт "Электротяжхимпроект" | Device for determining position of rolled steel witn periodically recurring corrugations |
CN101693257A (en) * | 2009-09-30 | 2010-04-14 | 唐山国丰钢铁有限公司 | Method for realizing continuous feedback control by duality of hot finishing outlet instruments |
CN201787994U (en) * | 2010-09-07 | 2011-04-06 | 中冶华天南京自动化工程有限公司 | Billet signal detection device for lower roller bed of charging table |
CN202795699U (en) * | 2011-11-22 | 2013-03-13 | 山西博纳科技有限公司 | Wireless intelligent electronic anti-theft and anti-damage system for cemetery tombstones |
CN202667271U (en) * | 2012-07-03 | 2013-01-16 | 中冶华天南京自动化工程有限公司 | Measuring system for length of steel billet on roller bed |
CN103331310A (en) * | 2013-07-13 | 2013-10-02 | 吉林大学 | Magnesium alloy plate rolling parameter monitoring and fault diagnosing system and method |
CN105363800A (en) * | 2014-08-29 | 2016-03-02 | 宝山钢铁股份有限公司 | Precise plate shape value obtaining method based on sectional shape |
CN104475461A (en) * | 2014-11-06 | 2015-04-01 | 中冶南方(武汉)自动化有限公司 | Combination measurement method for elongation rate of online band steel |
CN106877515A (en) * | 2017-03-22 | 2017-06-20 | 北京大学 | The EMS suitable for friction generator based on LC vibrations |
Also Published As
Publication number | Publication date |
---|---|
CN110355217B (en) | 2020-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100552371C (en) | A kind of hot rolling slab camber and sideslip on-line detection method | |
CN203772787U (en) | Real-time metal structure crack monitoring device | |
CN102818545B (en) | Bearing ring bore is full-parameter measuring system for ultrahigh and the method for conical bore | |
CN104190963A (en) | Device and method of tool setting of digital controlled lathe based on machine vision | |
CN105107849B (en) | A kind of hot continuous rolling workpiece thickness computational methods | |
US20130218320A1 (en) | Method and apparatus for maintaining cutting quality | |
CN109623493A (en) | A method of determining the real-time thermal deformation posture of main shaft | |
CN102699033B (en) | Rolling mill SONY magneto-scale online redundancy method | |
CN106402090B (en) | The pressure sensitive device and its control method of hydraulic electric control system | |
CN105312329A (en) | Method for conducting automatic monitoring on states of cold continuous mill thickness meters | |
CN110355217A (en) | A kind of solution detecting the problem of instrument testing result is transient pulse | |
CN102297893A (en) | On-line surface detection apparatus and method for continuous casting billet | |
CN108856303A (en) | Reliable hot-rolling finishing mill frame stings steel signal control method | |
CN113607041A (en) | Online creep monitoring method for pipeline weld joint of ultra-supercritical coal-fired generator | |
CN102821882B (en) | Steel pipe production method | |
CN101776646A (en) | Automatic crack detection system and method for medium-thick plate | |
KR100368491B1 (en) | Method of sensing a shape of slab and controlling a dynamic width rolling | |
CN104931798A (en) | RPN source range pulse measuring device and detecting and positioning method thereof | |
CN206073922U (en) | Steel pipe scans horizontal metroscope online | |
CN108004389A (en) | A kind of method that slab cloth positioning can be carried out according to steel grade and trimmed size | |
CN103212828B (en) | Medical bracket pipe diameter tolerance compensates process equipment automatically | |
CN104415977A (en) | Plate electronic detecting control system | |
CN106269904A (en) | A kind of scaling method of mill roll-gap | |
CN116728159B (en) | Fault monitoring method of numerical control machine tool | |
CN114515764A (en) | Wall thickness and high temperature on-line measuring system of hot-rolled steel pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |