CN110348738A - hospital environment influence factor evaluation method - Google Patents

hospital environment influence factor evaluation method Download PDF

Info

Publication number
CN110348738A
CN110348738A CN201910628977.0A CN201910628977A CN110348738A CN 110348738 A CN110348738 A CN 110348738A CN 201910628977 A CN201910628977 A CN 201910628977A CN 110348738 A CN110348738 A CN 110348738A
Authority
CN
China
Prior art keywords
environmental impact
factor
project
class
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910628977.0A
Other languages
Chinese (zh)
Other versions
CN110348738B (en
Inventor
杨柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Xinjiangcheng Environmental Affairs Consulting Co ltd
Original Assignee
Wuhan Xinjiangcheng Environmental Affairs Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Xinjiangcheng Environmental Affairs Consulting Co ltd filed Critical Wuhan Xinjiangcheng Environmental Affairs Consulting Co ltd
Priority to CN201910628977.0A priority Critical patent/CN110348738B/en
Publication of CN110348738A publication Critical patent/CN110348738A/en
Application granted granted Critical
Publication of CN110348738B publication Critical patent/CN110348738B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a hospital environment influence factor evaluation method, which comprises the steps of determining environment influence factors participating in evaluation, constructing a technical evaluation index system, and determining evaluation index correction parameters of the environment influence factors; calculating the weight of each environmental influence factor evaluation index according to evaluation index parameters of different environmental influence factors; establishing an evaluation index grading coefficient of each environmental influence factor; based on the weight and the grading coefficient, obtaining the influence score of each environmental influence factor, and obtaining an influence total score according to the influence score of each environmental influence factor, so as to judge whether the environmental influence factor evaluation of the hospital main body passes or not; through the arrangement, all items to be evaluated in the ring evaluation process are listed and corresponding evaluation index parameters are given, so that the items participate in evaluation in a weight mode, and meanwhile, environmental influence factors with different importance degrees are separated according to the grading coefficient, so that the evaluation is more reasonable and regular.

Description

Hospital's class environmental impact factor appraisal procedure
Technical field
The present invention relates to environmental impact assessment technical fields, in particular to hospital's class environmental impact factor appraisal procedure.
Background technique
As living standards of the people and requirements of health care are continuously improved, people are also more next to the medical environmental requirement of hospital It is higher.The development trend of Hospitals at Present project is mainly: the area that the poor rural area of medical environment and city expand outwardly The project that newly-built hospital occurs in domain is more;The incomplete hospital of conditions such as longer, hardware facility of many building times goes out in city Existing reorganization and expansion or even the project relocated are more;Besides more and more private hospitals, section hospital's project are because of relevant policies Relax and also gradually increase.No. 44 " Environmental Impact Assessment of Construction Items Classification Management register " is enabled according to Environmental Protection Department The project that regulation in (correction on April 28th, 2018) is newly-built, enlarging bed 500 is opened or more need to work out environmental impact statement Book, other (except 20 beds are below) projects need to work out environmental impact statement table.Hospital's intermediate item environmental impact assessment begins It is classified management register eventually to be scheduled in higher opinion rating, it is seen that the high request that the complexity of this intermediate item and environmental impact assessment are write.
And the Environmental assessment technology review activities on market today is most of due to policy requirements, is specialized in gradually by original The environmental science institute that the enterprise of technology evaluation is transferred to local government is uniformly taken back progress, regardless of enterprise or cause list Position lacks always a science, reasonable, effective system sex work method for the environmental impact factor evaluation work of hospital's class, It mostly works with the experience of practitioner and the resolution at scene, goes out hospital's class environmental impact factor evaluation work Now many lack of standardization and repetitive works, cause the both sides to environmental impact assessment to bring difficulty.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of hospital's class environmental impact factor assessment Method, easy to operate reasonable, environmental impact assessment work more standardizes.
Above-mentioned technical purpose of the invention technical scheme is that, hospital's class environmental impact factor is commented Estimate method, method includes:
It determines the environmental impact factor for participating in assessment, constructing technology evaluation index system, and determines commenting for each environmental impact factor Estimate index corrected parameter;
The weight of each environmental impact factor evaluation index is calculated according to the evaluation index parameter of different environmental impact factors;
Construct the evaluation index gradation factor of each environmental impact factor;
Weight and gradation factor based on each environmental impact factor obtain the influence score of each environmental impact factor, according to The influence score of each environmental impact factor obtains influencing total score, to judge that hospital's human subject environmental impact factor assesses whether Pass through;
Wherein, the environmental impact factor for participating in assessment includes: project profile, project analysis, environmental impact prediction and evaluation, pollution Control measure, clean manufacturing, construction fugitive dust, construction waste water, construction noise, construction period solid waste, sewage, exhaust gas, noise, Between solid waste during operation, dangerous waste are temporary, the influence to project of infectious disease region, environmental risk, external environment, radiation pollution;
Evaluation index gradation factor is divided into I grade, II grade, III grade, and belonging to each environmental impact factor coefficient in I grade is 1.0, The each environmental impact factor coefficient belonged in II grade is 0.5, and each environmental impact factor coefficient belonged in III grade is 0.2.
By using above-mentioned technical proposal, the structure of technology evaluation index system is carried out to the environmental impact factor for participating in assessment It builds, so as to quantify the influence degree that each environmental impact factor assesses hospital's class environmental impact factor, while leading to again The gradation factor for crossing evaluation index is carried out a degree of differentiation, so as to filter out the factor of different significance levels, So that it is had different influence degrees, and be embodied in specific numerical value, it is easy to operate and standardization it is higher, it is each it is independent because Influence relationship between element and result is very clear, very intuitively.
The further setting of the present invention are as follows: each environmental impact factor is set when constructing technology evaluation index system and is marked Quasi- value, evaluation index parameter are the correction value of standard value, and the upper limit for obtaining permissible value is standard value+correction value, obtain permissible value Lower limit be standard value-correction value, then the weight for calculating evaluation index is the ratio of measured value and standard value, and works as measured value When the upper limit greater than permissible value or the lower limit less than permissible value, weight is denoted as 0.
By using above-mentioned technical proposal, established standards value and correction value can be into according to specific environmental impact factor Row is specific to be required to carry out definite value, and the range that floats up and down of correction value can be identical or not identical, and allows when measured value is greater than The upper limit of value or less than permissible value lower limit when, weight is denoted as 0, i.e. this is in unqualified state, and measured value can pass through power Restore intuitive reflection.
The further setting of the present invention are as follows: the environmental impact factor for belonging to I grade includes: construction fugitive dust, construction waste water, construction Between solid waste during noise, construction period solid waste, sewage, exhaust gas, noise, operation, dangerous waste are temporary, infectious disease region.
By using above-mentioned technical proposal, weight that I grade of environmental impact factor assesses hospital's class environmental impact factor The property wanted and influence degree are larger, are the projects paid close attention to.
The further setting of the present invention are as follows: the environmental impact factor for belonging to II grade includes: environmental risk, external environment to project Influence, radiation pollution.
The further setting of the present invention are as follows: the environmental impact factor for belonging to III grade includes project profile, project analysis, environment Influence prediction and evaluation, pollution prevention measure, clean manufacturing.
By using above-mentioned technical proposal, weight that II grade and III grade of environmental impact factor assesses environmental impact factor It wants degree to want slightly lower, but is also indispensable project, and be also the important component of total evaluation.
The further setting of the present invention are as follows: the project profile includes following sub-project: project basic condition, project are overall Plan the relationship of situation, project construction content, general layout, quasi- construction project and external environment and original land used situation, public Engineering and environment-friendly engineering;The environmental impact prediction and evaluation include following sub-project: environmental impact prediction, external environment are to proposed Cross-impact analysis between the influence and inside of project.
By using above-mentioned technical proposal, project profile and environmental impact prediction and evaluation are required to be refined to subitem The calculating of weight can also be proceeded to the level of word project, obtain more accurate data by more careful division by mesh.
The further setting of the present invention are as follows: skill is constructed to the sub-project that project profile and environmental impact prediction and evaluation include Art evaluation index system, and determine the evaluation index parameter of each sub-project, according to the evaluation index parameter meter of different sub-projects The weight of each sub-project is calculated, each sub-project weight, which is averaged, can be obtained project profile and environmental impact prediction and evaluation Weight.
By using above-mentioned technical proposal, the influence by above-mentioned sub-project for project profile is also specially numerical value, and is led to It crosses weight to reflect, makes evaluator more intuitive, convenient for final judgement.
The further setting of the present invention are as follows: skill is constructed to the sub-project that project profile and environmental impact prediction and evaluation include To each environmental impact factor established standards value when art evaluation index system, evaluation index parameter is the correction value of standard value, The upper limit for obtaining permissible value is standard value+correction value, and the lower limit for obtaining permissible value is standard value-correction value, then calculates assessment The weight of index is the ratio of measured value and standard value, and when the upper limit of the measured value greater than permissible value or the lower limit less than permissible value When, weight is denoted as 0.
By using above-mentioned technical proposal, established standards value and correction value can be into according to specific environmental impact factor Row is specific to be required to carry out definite value, and the range that floats up and down of correction value can be identical or not identical, and allows when measured value is greater than The upper limit of value or less than permissible value lower limit when, weight is denoted as 0, i.e. this is in unqualified state, and measured value can pass through power Restore intuitive reflection.
The further setting of the present invention are as follows: when calculating influence total score, deviation factor is set, it is first when the deviation factor calculates The ratio of measured value and standard value is calculated, and obtains the difference between the ratio and 1 of measured value and standard value, is accounted for and is repaired by difference The ratio of positive value judges: 0-20% belongs to A class, and 20-50% belongs to B class, and 50-100% belongs to C class, then deviation factor are as follows: A class environment Influence factor quantity is 1 when accounting for total environment influence factor number 100%;A class environmental impact factor quantity accounts for total environment influence factor 90% or more number and when C class is 5% or less is 0.95;A class environmental impact factor quantity account for total environment influence factor number 75% with Upper and C class is 0.9 when being 10% or less;A class environmental impact factor quantity accounts for 60% or more total environment influence factor number and C class is It is 0.85 when 15% or less;A class environmental impact factor quantity accounts for 40% or more total environment influence factor number and C class is 25% or less When be 0.75;The deviation factor of remaining situation is 0.7.
By using above-mentioned technical proposal, deviation factor is set to can further reflect measured value and standard value Between difference, and by distinguish A, B, C three classes allow the measured value for meeting permissible value further to be divided, more carefully It causes and accurate.
The further setting of the present invention are as follows: standard value P, correction value Pi, measured value M, weight N, gradation factor I, environment shadow It rings factor number Z, deviation factor Q, influence total score F, then influence total score F=[(N1+N2+N3+ ...) * I1+(N4+N5+N6+…)*I2+ (N7+N8+N9+…)*I3] * Q, wherein work as M>P+Pi when calculating each weight N, or, when M<P-Pi, this environmental impact factor Weight N be denoted as 0, obtain influence total score F after, calculate influence total score F and environmental impact factor number Z between ratio, when than Value is greater than 0.7 and belongs to the environmental impact factor of I grade and II grade gradation factor there is no be determined as qualification when weight is 0.
By using above-mentioned technical proposal, weight N=M/P, so as to not calculated each for 0 environmental impact factor It obtains weight N, and is calculated according to the corresponding gradation factor, finally obtain influencing by the amendment of deviation factor after superposition total Point, and be used as further according to the environmental impact factor for influencing total score and I grade and II grade gradation factor there is no weight for 0 and determine to close Standard whether lattice can allow operator directly to be calculated according to above-mentioned formula, can be by each environmental impact factor All quantization becomes numerical value, and obtains final result.
In conclusion the invention has the following advantages: constructing technology evaluation index system, and determine that each environment influences The evaluation index corrected parameter of factor, then can be specific by each environmental impact factor by the calculating of weight and gradation factor Quantization becomes judgment basis, is convenient for unified operation and management, while also more standardizing, and the deviation factor being arranged is also further Result is subdivided into a variety of more specific and intuitive final result, be conducive to help hospital's class environmental impact factor assessment more Add the progress of smooth and simple specification.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
A kind of hospital's class environmental impact factor appraisal procedure, as shown in Figure 1, the content for including are as follows:
1. determine the environmental impact factor for participating in assessment, constructing technology evaluation index system, and determine each environmental impact factor Evaluation index corrected parameter.
Wherein, participate in assessment environmental impact factor include: project profile, project analysis, environmental impact prediction and evaluation, Pollution prevention measure, clean manufacturing, construction fugitive dust, construction waste water, construction noise, construction period solid waste, sewage, exhaust gas, Between solid waste during noise, operation, dangerous waste are temporary, influence, the radiation of infectious disease region, environmental risk, external environment to project Pollution.
It is described as follows:
1.1 project profile
Need the content handed over comprehensively careful Hospital Project because this is the source of pollution node analysis, mainly from Lower several respects are started with.Pay attention to being equipped with general arrangement plan simultaneously, it is necessary to which, including analysis, Reconstruction Project, which must provide, to be changed Before and after enlarging, surrounding enviroment schematic diagram, inside and outside water supply network figure, drainage path figure, stream of people's logistic car flow path line chart etc..
1.1.1 project basic condition
Illustrate project construction background, basic condition and composition, specify the property of hospital, be general hospital, infectious hospital or Whether section hospital, non-infective disease hospital are related to lazaretto ward again.
1.1.2 project overall planning situation
If project is built by separate periods or projects awaiting construction are the sub-project of overall construction project, it should illustrate the planning of overall construction project Relationship between situation and projects awaiting construction and overall construction project, and define overall construction progress;Built by separate periods is by stages checked and accepted Project will provide the production blowdown analysis content of each phase and table is checked and accepted in environmental protection " San Tong method ".
1.1.3 project construction content
According to project characteristic, the total land area of descriptive item purpose, overall floorage, superstructure area, hypogee area, door The amount of examining, bedspace, the distribution of each building and horizontal layout situation, floor and using the detailed economic and technical norms such as function, it is clear Department or diagnosis and treatment subject facilities specify partitioning scenario in institute, i.e. lesion and non-lesion, lazaretto ward and non-infectious ward. It is noted that Number of Outpatients and bedspace are the important indicators of hospital's intermediate item, Environmental impact assessment document should be illustrated according to project verification file It is clear, it cannot omit.
1.1.4 general layout
Illustrate principal element, design principle and design scheme that planning design of item considers.Each main body for providing item design is built It builds, accessory building, such as boiler room, oxygen station, laundry etc., the Total combining ability scheme of public utility and road traffic, The special placement scheme of the facilities such as parking lot.
1.1.5 the relationship and original land used situation of projects awaiting construction and external environment
(1) project external environment basic condition
Using chart and be equipped with explanatory note project surrounding enviroment situation, including but not limited to the main line of communication, residential area, public set It applies, factory and enterprise, water body in lake etc..It stresses that project construction whether there is conditionality factor, including this project may be made At the external environment of influence, such as periphery is existing or is building setting of the enterprise there are width of sanitary protection zone, and peripheral path environmental impact assessment is Specific planning control required distance etc., and may be by the external environment basic condition that this project is influenced, such as infectious hospital Itself there is its construction specification requirement.
(2) project land character and status
Illustrate project land used Historic Evolution and current status situation: no environment leftover problem is only needed to illustrate land current situation, be related to And should supplementing for original place block removal hands over removal main body, removal scale and removing and resettlement situation;There is should saying for environment leftover problem Bright original land used Historic Evolution, plant area, old enterprise horizontal layout and each production unit function distribution, production technology, product side Case, primary pollution source distribution situation, pollutant emission situation, pollution prevention measure, each functional areas of genuine and projects awaiting construction are planned Each structures corresponding relationship and related soil repair situation, and have soil remediation report can directly quote its conclusion, purpose It is to illustrate whether the plot can be used for Hospital Project construction.
1.1.6 public work
Illustrate project power supply, plumbing, cooling and warming, air cleaning system (filtering, disinfection etc.), smoke evacuation and ventilation, medical air The basic conditions such as body supply system, bedding and clothing washing, logistics and traffic, garbage collection system.
For that should combine in sewage treatment plant's capture range but project that periphery current municipal drainage pipeline networks is not perfect Region municipal drainage planning and construction progress, implement each section of pipe network and related facility in project drainage path, such as pumping plant, build If situation, and illustrate the timing joining relation with project construction;If can not confirm construction progress, environmental impact assessment need to be according to close, remote Phase drains two kinds of situations and carries out pollution prevention measure design and Analysis to reach standard.
1.1.7 environment-friendly engineering
Illustrate between project Sewage Disposal, general solid waste are temporary and medical dangerous waste it is temporary between, waste gas pollution control and treatment facility and environmental management The basic condition of system etc..
1.2 project analysis
Construction time construction link and clearly each link pollution sources are analyzed, the analysis operation phase builds each functional areas primary pollution source;Point Construction time and operation phase provide project pollution source distribution and calculate pollution far stronger, and the quasi- environmental protective measure taken.This One chapters and sections include following chart substantially: construction link and the dirty node schematic diagram of production, operation phase primary pollution source distribution map, operation phase Water balance figure, the construction time produces dirty analytical table, the Project in Operation phase produces dirty analytical table, construction time earthworks calculation table, project plumbing Balance sheet, pollution far stronger and production list, pollutant emission situation summarize list.
1.3 environmental impact predictions and evaluation
1.3.1 environmental effect forecast evaluation
For item characteristic and project region environmental quality, select water environment, atmospheric environment, acoustic environment, groundwater environment, Solid waste, soil erosion, eco-environmental impact carry out special topic prediction and evaluation to construction time and operation phase.It should be noted that It is, according to the regulation of " environmental impact assessment fire protection technology groundwater environment " (HJ 610-2016), the underground water of Grade A hospital Evaluation classification be III class, related underground water environmental impact analysis content compared with general Hospital Project environmental impact assessment depth more very.
1.3.2 the cross-impact analysis between influence and inside of the external environment to projects awaiting construction
Hospital needs to provide quiet, harmonious diagnosis and treatment and just to medical staff and sufferer etc. as special social building type Environment is cured, itself is generally considered as Sensitive Buildings, it is more demanding to surrounding enviroment;Therefore outer ring is usually required supplementation in environmental impact assessment Environment during Hospital Project is runed in border influences, and is mainly the following situation:
(1) can evaluation analysis traffic noise or the influence vibrated to projects awaiting construction meet sound environment quality requirement: illustrate to face friendship Lead to the building title of sense main line, using function, layer height, scale, positional relationship etc., analysis prediction is faced by what noise and vibration were influenced Can road building faces road side acoustic environment meet functional areas standard requirements, if exceeded it should be understood that the exceeded range of noise, exceeded journey Degree;For not being able to satisfy the region of functional areas standard, [2010] No. 7 text " traffic above-ground noise abatement skills should be sent out according to ring Art policy " principle that is proposed, adopting an effective measure makes its indoor acoustical environment reach " Code for sound insulation design of civil buildings " (GB 50118-2010) the requirement in corresponding medical room.
(2) evaluation analysis periphery industrial enterprise, municipal public engineering, such as sewage treatment plant, refuse transfer station etc. are special Project atmosphere pollution and noise pollution are on the influence of the surrounding air of projects awaiting construction and Environmental Acoustic Effect.
(3) reference has the evaluation of unit measured data or the analogy analysis surrounding enviroment mesohigh corridor, power transformation of monitoring qualification Stand, microwave tower, radio and television transmitting etc. facilities on the environment such as the electromagnetic radiation of projects awaiting construction and radio interference influence.
(4) if the case where project is checked and accepted there are built by separate periods by stages, later period engineering construction is analyzed to preliminary project operation Environment influence.
1.4 pollution prevention measure
It gives duration and operation phase, the characteristics of integration project, following all or part of special topic is selected to carry out environmental protective measure Analysis: prevention and control of air pollution measure, useless (dirt) water harnessing measure, noise and Vibration Treatment measure, municipal solid wastes disposal are arranged It applies, ground water protection measure, water-and-soil conservation measures, ecological protection measure etc., environmental risk prevention measure;Demonstration project is quasi- to be taken The feasibility of environmental protective measure, and technologically advanced, applicable, effective principle is pressed, multi-scheme is carried out when necessary than choosing, is recommended most Good scheme.
1.5 other
1.5.1 about the analysis on Clean Production of hospital
According to Article 24 in the Law of the People's Republic of China on Promoting Clean Production: " architectural engineering should be using energy saving, water-saving Etc. architectural design scheme, construction and decoration material, building components and fittings and the equipment for being conducive to environment and resources protection." hospital Purpose analysis on Clean Production can be from " selection of building and finishing material ", " energy conservation ", " water-saving ", " saving land ", " section material ", " ozone The level of clean production of project is discussed in layer protection " etc., and proposes recommendation on improvement for insufficient.Due to hospital draining it is special Property, it is therefore an objective to cross-infection is avoided, it is general it is not recommended that hospital carries out Treated sewage reusing, therefore this does not often change in clean manufacturing Into the column of suggestion.
1.5.2 the Total combining ability analysis on its rationality of hospital
According to waste it is temporary between, Sewage Disposal, boiler room, oxygen station, logistics stream of people route, pump house, cooling tower, blower etc. set Standby position of the facility in total figure, analyzes the reasonability of its layout.Mainly from the presence or absence of cross-infection, if can be quick to periphery Feel target and hospital internal sensitive spot, such as inpatient department or Inpatient Building, the aspect analyzing impacted.
The basic content that 2 pairs of Hospital Project environmental impact assessments examine
2.1 construction time Major environment impacts and control measure
Hospital Project construction time environment influences mainly to include construction fugitive dust, construction waste water, construction noise and solid waste pollution etc..
(1) construction fugitive dust: removing (if being related to) mainly from original Old building, excavation of earthwork, backfill, transhipment, Building wood Expect onsite moving and stack the fugitive dust generated and haulage vehicle dust on the roads etc..It should qualitatively or quantitatively predict fugitive dust to big in evaluation The influence in compression ring border, the especially influence to periphery sensitive spot, small scale, the project of short construction period can suitably simplify.Usually It takes the totally-enclosed enclosing of setting, clean the control measure such as construction site, timing watering dust suppression in time, reduce it to extraneous pollution Degree and coverage.
(2) construction waste water: main includes construction production waste water and construction personnel's sanitary sewage.Production waste water requires to collect as far as possible Middle collection is precipitated, is recycled after oil removal processing or for watering and lowering dust;For the sanitary sewage that construction personnel generates, week Pipe network perfect project in side can be discharged into urban sewage pipe nearby, and the project that cannot be connected with sewage treatment plant can take dry pail latrine Or the measure of moving environment protection closet is disorderly arranged to avoid untreated sewage.
(3) construction noise: mainly including construction machinery noise and transport and communications noise.It, should be according to applying for mega project The type and quantity of work machinery analyze strength of sound source, influence of the quantitative forecast to boundary and sensitive spot, small scale, construction period Short project can suitably simplify.Usually by lowering strength of sound source, increase enclosing, sensitive target protection, increasing attenuation, night The means such as construction are forbidden to mitigate its influence to periphery sensitive spot.
(4) solid waste: include mainly building waste, spoir and construction personnel's house refuse, Y-factor method Y or class can be used It estimates its yield respectively than analytic approach and illustrates emission direction.
2.2 operation phase Major environment impacts and control measure
Operation phase environment influences mainly to include sewage, exhaust gas, noise and solid waste pollution etc..
(1) sewage: mainly including the draining of the medical technologies medical department such as chemical examination, consulting room, operation and dirt wash between drain, disease in hospital People and attending family such as are flushed the toilet, wash one's hands and face at the draining, sanitation and hygiene draining, the life office sewage and food that medical care and administrative personnel generate Hall waste water etc.;Notice that the actual conditions in conjunction with hospital make an explanation to the property, disposal options and whereabouts of several special waters, i.e., Chemically examine waste water, dept. of radiology's waste water, clinical laboratory's waste water, department of stomatology waste water etc..If project sewage can smoothly connect via city planting ductwork Enter sewage treatment plant, then project waste water should meet GB18466-2005 " medical institutions' water pollution by self-built sewage treatment facility Object discharge standard " preparation standards in table 2;If project sewage is directly discharged into surface water body via pipe network or irrigation canals and ditches, project is useless Water should meet the discharge in GB18466-2005 " Discharge standard of water pollutants for medical organization " table 2 by self-built sewage treatment facility Standard.According to different Effluent criterias, with reference to " Hospital Sewage Treatment engineering legislation " (HJ2029-2013) and " hospital is dirty Water treatment technology guide " (ring send out [2003] No. 197) etc. takes corresponding sewage treatment scheme, while being also noted that integration project Pipe network facilities are to its further refinement in sewage discharge property (dirty to shunt still dirty interflow) and institute.
(2) exhaust gas: mainly from boiler waste gas, dining room oil smoke, vehicle exhaust, Sewage Disposal stench and diesel-driven generator Exhaust gas, peculiar smell of boiling medicine (if having decoction room) etc. that (if having spare) operation generates.To these pollution sources to carry out quantitative analysis and Prediction (peculiar smell of wherein boiling medicine is due to complicated component and lacks source strength calculation basis, and environmental impact assessment only needs qualitative analysis), and propose Corresponding pollution prevention measure.
(3) noise: mainly from dining room blower, pump house, boiler room, central air-conditioning water cooler, cooling tower, get off The equipment such as library blower and medical treatment crowd noises.It should targetedly propose that Noise Prevention and Treatment is arranged by construction project content in evaluation It applies, not only to consider influence of the hospital noise to periphery sensitive spot, it is also contemplated that the noise shadow that building etc. of being hospitalized in institute may be subject to It rings.
(4) solid waste: mainly including house refuse, clinical waste, Sewage Disposal sludge, dining room waste oil, useless work Property charcoal (if for that can be related to if sewage treatment facility deodorization) etc., analogue analysis method can be used or statistic law estimates its yield, It determines processing scheme, specifies emission direction, pay attention to implementing dangerous waste treatment protocol.
What 3 pairs of Hospital Project environmental impact assessments examined pays close attention to content
3.1 waste water
The sewage of project lesion and non-lesion, the sewage of infected area and non-infectious lesion, if dual treatment, dirty shunting; The design scale of Sewage Disposal, treatment process, processing unit, treatment effeciency, disinfection way and sewage treatment scheme reach Whether comprehensive mark feasibility analysis;Whether property, Drainage feature, discharging modes and the whereabouts of Special Category waste water are apparent;Sewage Discharge final whereabouts whether accuracy of judgement, whether effluent-disposal standard in strict accordance with " Discharge standard of water pollutants for medical organization " (GB18466-2005) it executes;Whether sewage on-Line Monitor Device is arranged according to relevant specification of country.If being otherwise noted that receiving doctor What sewage treatment plant's adapter tube standard of institute's waste discharge had a particular/special requirement should list its adapter tube standard.
Between 3.2 dangerous wastes are temporary
Hospital's intermediate item should be understood that the feelings such as set-up site, scale, disinfection situation, the transhipment frequency, antiseepage arrangement between dangerous waste is temporary Condition, dedicated dirt transport channel, which should be noted that, is away as far as possible key personnel accumulation regions, effectively prevent letting out during dirt transports Pollution caused by dew, diffusion, avoids pollution intersecting for article and clean article, realizes clean dirty shunt.
3.3 infectious disease regions
In conjunction with the prevention and control feature in infectious disease region, pay attention to waste water, sludge, medical waste treatment that infectious disease region generates require and Air cleaning requirement.
3.4 environmental risk
Hospital's environmental risk that may be present is generally concentrated in public auxiliary engineering, such as non-normal emission, the oxygen of Sewage Disposal Leakage and fire incident occur for gas station or oxygen generating station, the use of disinfectant, natural gas leaking, oil depot occur accident and (be generally used for Diesel-driven generator or boiler are spare, when a small amount of storage generally between fuel tank or oil storage), clinical waste collects, disposition, transhipment it is complete Process.
Influence of 3.5 external environments to project
External environment influence factor mainly has: having the urban operating mechanism of obvious exhaust gas or influence of noise pollution, such as sewage treatment plant, rubbish Rubbish transfer station, refuse landfill, large pumping station etc., traffic noise, vibration, electromagnetic pollution, industrial pollution etc., in evaluation procedure Related pollution sources should be sufficiently investigated, its pollution effect degree of quantitative analysis is clear whether to meet related standard criterion requirement.
3.6 radiation pollution
Hospital should specially entrust the environmental impact assessment mechanism of organizations nuclear technology environmental impact assessment with establishment Application of Nuclear Technology project qualification The shadow that the Applications of Nuclear Technology such as file, radiology devices that this document is related to hospital and nuclear medicine application may cause environment It rings and carries out prediction and assessment, and propose to prevent and mitigate countermeasure and measure that poor environment influences, while proposing related spoke Penetrate environmental management requirement.Hospital's intermediate item environmental impact assessment no longer does detailed assessment explanation to this part, can sketch principle environmental protection and want Seek or quote the conclusion of radiation class environmental impact assessment.
3.7 reorganization and expansion and the hospital that relocates
From the point of view of certain the city's Hospital Project classification examined in recent years according to the author, hospital's reorganization and expansion or resettlement situation are more universal, right Also to pay special attention to following several respects content: in transitional period (this in addition to the above in the emphasis of this intermediate item environmental impact assessment concern In the signified transitional period, when meaning that between hospital tears open, changes the date but proposed part is not yet built up) Sewage Disposal, clinical waste Equal construction between temporary, using problem, i.e. outlet, clinical waste absolutely cannot be effectively treated there can be no sewage and nowhere stack Or situations such as arbitrarily abandoning;Whether meet reorganization and expansion requirement in the presence of the propping works of the relationship of support;Construction period is to former in hospital There are the exhaust gas of Sensitive Buildings, such as ward, consulting room, operating room etc., influence of noise pollution to have specially section analysis;For item of relocating Mesh should carry out healthy prevention work conscientiously, especially pass to existing building if construction unit needs to deliver existing medical building After dye isolated area need to carry out pasteurised completely processing, hygiene department or related authorities can be transferred to redistribute use.
3.8 other
At present many Civilian Hospitals, private infirmary often lease real estate only building for commercial use or business annex certain is several layers of Can come into operation, to pay special attention to the following for the environmental impact assessment of this intermediate item: the property in clearly lease room (should have correlation File support, such as property ownership certificate), there are it is clearly contradicted when should be used as the conditionality factor of project site selection;The business being leased for is used With the presence or absence of commercial sex restrictive condition (such as health station, hospital cannot be introduced etc.) in project environmental impact assessment where room, and whether In the presence of the space of setting hospital's indispensability Pollution treatment installation;If the sewage treatment facility of hospital is set to except lease room Space (such as on the vacant lot beside building for commercial use or under vacant lot or in public lawn, etc.), environmental impact assessment must specify the space Allocation of landownership and land use right or jurisdiction, if being not belonging to the side of being leased for, hospital should obtain the agreement of relevant unit or department.
2. calculating each environmental impact factor evaluation index according to the evaluation index parameter of different environmental impact factors Weight;Specifically, to each environmental impact factor established standards value, evaluation index parameter when constructing technology evaluation index system For the correction value of standard value, the upper limit for obtaining permissible value is standard value+correction value, and the lower limit for obtaining permissible value is that standard value-is repaired Positive value, then the weight for calculating evaluation index is the ratio of measured value and standard value, and when measured value is greater than the upper limit of permissible value Or less than permissible value lower limit when, weight is denoted as 0.
3. constructing the evaluation index gradation factor of each environmental impact factor;Specifically, evaluation index gradation factor is divided into I Grade, II grade, III grade, and belonging to each environmental impact factor coefficient in I grade is 1.0, each environment belonged in II grade influences Factor coefficient is 0.5, and each environmental impact factor coefficient belonged in III grade is 0.2.
Wherein, belong to I grade of environmental impact factor include: construction fugitive dust, construction waste water, construction noise, construction period it is solid Between solid waste during body waste, sewage, exhaust gas, noise, operation, dangerous waste are temporary, infectious disease region;Belong to II grade of environment shadow The factor of sound includes: the influence to project of environmental risk, external environment, radiation pollution;The environmental impact factor for belonging to III grade includes work Journey overview, project analysis, environmental impact prediction and evaluation, pollution prevention measure, clean manufacturing.
4. weight and gradation factor based on each environmental impact factor obtain the influence point of each environmental impact factor Number obtains influencing total score according to the influence score of each environmental impact factor, to judge hospital's human subject environmental impact factor It assesses whether to pass through.
When calculating influence total score, deviation factor is set, deviation factor first calculates the ratio of measured value and standard value when calculating, And obtain the difference between the ratio and 1 of measured value and standard value, judged by the ratio that difference accounts for correction value: 0-20% belongs to A Class, 20-50% belong to B class, and 50-100% belongs to C class, then deviation factor are as follows: A class environmental impact factor quantity accounts for total environment influence It is 1 when factor number 100%;A class environmental impact factor quantity accounts for 90% or more total environment influence factor number and C class is 5% or less When be 0.95;A class environmental impact factor quantity accounts for 75% or more total environment influence factor number and when C class is 10% or less is 0.9; A class environmental impact factor quantity accounts for 60% or more total environment influence factor number and when C class is 15% or less is 0.85;A class environment Influence factor quantity accounts for 40% or more total environment influence factor number and when C class is 25% or less is 0.75;The deviation of remaining situation Coefficient is 0.7.
Finally, remember standard value P, correction value Pi, measured value M, weight N, gradation factor I, environmental impact factor number Z, partially Poor coefficient Q, total score F is influenced, then influences total score F=[(N1+N2+N3+ ...) * I1+(N4+N5+N6+…)*I2+(N7+N8+N9+…)* I3] * Q, wherein when calculating each weight N, N=M/P, and work as M>P+Pi, or, when M<P-Pi, the weight of this environmental impact factor N is denoted as 0, obtains after influencing total score F, the ratio influenced between total score F and environmental impact factor number Z is calculated, when ratio is greater than 0.7 and belongs to the environmental impact factor of I grade and II grade gradation factor there is no be determined as qualification when weight is 0.
It should be noted that since project profile includes following sub-project: project basic condition, project overall planning feelings Condition, project construction content, general layout, the relationship of quasi- construction project and external environment and original land used situation, public work and Environment-friendly engineering;Environmental impact prediction and evaluation include following sub-project: the influence of environmental impact prediction, external environment to projects awaiting construction And the cross-impact analysis between inside.It therefore, should to the weight calculation of project profile and environmental impact prediction and evaluation First to comprising sub-project constructing technology evaluation index system, and the evaluation index parameter of each sub-project is determined, according to different The evaluation index parameter of sub-project calculates the weight of each sub-project, and each sub-project weight is averaged that engineering can be obtained is general The weight of condition and environmental impact prediction and evaluation.
To every when the sub-project constructing technology evaluation index system for including with evaluation to project profile and environmental impact prediction One environmental impact factor established standards value, evaluation index parameter are the correction value of standard value, obtain the upper limit of permissible value as mark Quasi- value+correction value, obtain permissible value lower limit be standard value-correction value, then calculate evaluation index weight be measured value with The ratio of standard value, and when measured value is greater than the upper limit of permissible value or when less than the lower limit of permissible value, weight is denoted as 0.

Claims (10)

1. hospital's class environmental impact factor appraisal procedure, which is characterized in that the described method includes:
It determines the environmental impact factor for participating in assessment, constructing technology evaluation index system, and determines commenting for each environmental impact factor Estimate index corrected parameter;
The weight of each environmental impact factor evaluation index is calculated according to the evaluation index parameter of different environmental impact factors;
Construct the evaluation index gradation factor of each environmental impact factor;
Weight and gradation factor based on each environmental impact factor obtain the influence score of each environmental impact factor, according to The influence score of each environmental impact factor obtains influencing total score, to judge that hospital's human subject environmental impact factor assesses whether Pass through;
Wherein, the environmental impact factor for participating in assessment includes: project profile, project analysis, environmental impact prediction and evaluation, pollution Control measure, clean manufacturing, construction fugitive dust, construction waste water, construction noise, construction period solid waste, sewage, exhaust gas, noise, Between solid waste during operation, dangerous waste are temporary, the influence to project of infectious disease region, environmental risk, external environment, radiation pollution;
Evaluation index gradation factor is divided into I grade, II grade, III grade, and belonging to each environmental impact factor coefficient in I grade is 1.0, The each environmental impact factor coefficient belonged in II grade is 0.5, and each environmental impact factor coefficient belonged in III grade is 0.2.
2. hospital's class environmental impact factor appraisal procedure according to claim 1, it is characterised in that: constructing technology assessment refers to To each environmental impact factor established standards value when mark system, evaluation index parameter is the correction value of standard value, is allowed The upper limit of value is standard value+correction value, and the lower limit for obtaining permissible value is standard value-correction value, then calculates the power of evaluation index Weight is the ratio of measured value and standard value, and when measured value is greater than the upper limit of permissible value or when less than the lower limit of permissible value, weight It is denoted as 0.
3. hospital's class environmental impact factor appraisal procedure according to claim 2, it is characterised in that: belong to I grade of environment Influence factor includes: construction fugitive dust, construction waste water, construction noise, construction period solid waste, sewage, exhaust gas, noise, operation Between period solid waste, dangerous waste are temporary, infectious disease region.
4. hospital's class environmental impact factor appraisal procedure according to claim 2, it is characterised in that: belong to II grade of environment Influence factor includes: the influence to project of environmental risk, external environment, radiation pollution.
5. hospital's class environmental impact factor appraisal procedure according to claim 2, it is characterised in that: belong to III grade of environment Influence factor includes project profile, project analysis, environmental impact prediction and evaluation, pollution prevention measure, clean manufacturing.
6. hospital's class environmental impact factor appraisal procedure according to claim 1, which is characterized in that the project profile packet Include following sub-project: project basic condition, project overall planning situation, project construction content, general layout, quasi- construction project With the relationship and original land used situation, public work and environment-friendly engineering of external environment;The environmental impact prediction and evaluation include such as Lower sub-project: the cross-impact analysis between the influence and inside of environmental impact prediction, external environment to projects awaiting construction.
7. hospital's class environmental impact factor appraisal procedure according to claim 6, it is characterised in that: to project profile and ring Border influences the sub-project constructing technology evaluation index system that prediction includes with evaluation, and determines the evaluation index ginseng of each sub-project Number, the weight of each sub-project is calculated according to the evaluation index parameter of different sub-projects, each sub-project weight is averaged The weight of project profile and environmental impact prediction and evaluation can be obtained.
8. hospital's class environmental impact factor appraisal procedure according to claim 7, it is characterised in that: to project profile and ring Border, which influences to set each environmental impact factor when the sub-project constructing technology evaluation index system that prediction includes with evaluation, marks Quasi- value, evaluation index parameter are the correction value of standard value, and the upper limit for obtaining permissible value is standard value+correction value, obtain permissible value Lower limit be standard value-correction value, then the weight for calculating evaluation index is the ratio of measured value and standard value, and works as measured value When the upper limit greater than permissible value or the lower limit less than permissible value, weight is denoted as 0.
9. hospital's class environmental impact factor appraisal procedure according to claim 2, it is characterised in that: calculating influences total score When, deviation factor is set, the deviation factor first calculates the ratio of measured value and standard value when calculating, and obtains measured value and mark Difference between the ratio and 1 of quasi- value, judged by the ratio that difference accounts for correction value: 0-20% belongs to A class, and 20-50% belongs to B Class, 50-100% belong to C class, then deviation factor are as follows: when A class environmental impact factor quantity accounts for total environment influence factor number 100% It is 1;A class environmental impact factor quantity accounts for 90% or more total environment influence factor number and when C class is 5% or less is 0.95;A class ring Border influence factor quantity accounts for 75% or more total environment influence factor number and when C class is 10% or less is 0.9;A class environment influence because Prime number amount accounts for 60% or more total environment influence factor number and when C class is 15% or less is 0.85;A class environmental impact factor quantity accounts for 40% or more total environment influence factor number and when C class is 25% or less is 0.75;The deviation factor of remaining situation is 0.7.
10. hospital's class environmental impact factor appraisal procedure according to claim 9, it is characterised in that: standard value P, amendment Value Pi, measured value M, weight N, gradation factor I, environmental impact factor number Z, deviation factor Q, total score F is influenced, then influences total score F=[(N1+N2+N3+ ...) * I1+(N4+N5+N6+…)*I2+(N7+N8+N9+…)*I3] * Q, wherein when calculating each weight N, work as M > P+Pi is obtained after influencing total score F or, the weight N of this environmental impact factor is denoted as 0 when M < P-Pi, calculate influence total score F with Ratio between environmental impact factor number Z, when ratio be greater than 0.7 and belong to I grade and II grade gradation factor environment influence because There is no be determined as qualification when weight is 0 for element.
CN201910628977.0A 2019-07-12 2019-07-12 Hospital environmental impact factor assessment method Active CN110348738B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910628977.0A CN110348738B (en) 2019-07-12 2019-07-12 Hospital environmental impact factor assessment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910628977.0A CN110348738B (en) 2019-07-12 2019-07-12 Hospital environmental impact factor assessment method

Publications (2)

Publication Number Publication Date
CN110348738A true CN110348738A (en) 2019-10-18
CN110348738B CN110348738B (en) 2024-01-12

Family

ID=68175950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910628977.0A Active CN110348738B (en) 2019-07-12 2019-07-12 Hospital environmental impact factor assessment method

Country Status (1)

Country Link
CN (1) CN110348738B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113155770A (en) * 2021-04-30 2021-07-23 中国人民解放军91977部队 Photoelectric environment grading system and method
CN113511152A (en) * 2021-09-15 2021-10-19 李斯特技术中心(上海)有限公司 Vehicle sanitation evaluation method and device, vehicle and electronic equipment
CN114338754A (en) * 2022-03-10 2022-04-12 广州海洁尔医疗设备有限公司 Operating room environment monitoring processing method and system
CN115657627A (en) * 2022-10-31 2023-01-31 安徽三马信息科技有限公司 Energy efficiency diagnosis system and method for factory public and auxiliary equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2012111648A (en) * 2012-03-26 2013-10-10 Юрий Алексеевич Игнатьев METHOD FOR QUANTITATIVE ASSESSMENT OF THE LEVEL OF INTEGRAL ENVIRONMENTAL SAFETY OF OBJECTS OF CONSUMPTION, LIFE USE AND Habitat
JP2015194934A (en) * 2014-03-31 2015-11-05 東芝環境ソリューション株式会社 Environmental risk evaluation system, environmental risk evaluation method, and environmental risk evaluation program
CN105809578A (en) * 2016-05-30 2016-07-27 北京师范大学 Regional water environment risk evaluating and region dividing method
CN106055865A (en) * 2016-05-16 2016-10-26 中电建路桥集团有限公司 Method and system for evaluating influences of tunnel construction on water environment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2012111648A (en) * 2012-03-26 2013-10-10 Юрий Алексеевич Игнатьев METHOD FOR QUANTITATIVE ASSESSMENT OF THE LEVEL OF INTEGRAL ENVIRONMENTAL SAFETY OF OBJECTS OF CONSUMPTION, LIFE USE AND Habitat
JP2015194934A (en) * 2014-03-31 2015-11-05 東芝環境ソリューション株式会社 Environmental risk evaluation system, environmental risk evaluation method, and environmental risk evaluation program
CN106055865A (en) * 2016-05-16 2016-10-26 中电建路桥集团有限公司 Method and system for evaluating influences of tunnel construction on water environment
CN105809578A (en) * 2016-05-30 2016-07-27 北京师范大学 Regional water environment risk evaluating and region dividing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄木林: "基于指标体系法的高速公路工程环境影响分析评估研究", 《公路》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113155770A (en) * 2021-04-30 2021-07-23 中国人民解放军91977部队 Photoelectric environment grading system and method
CN113511152A (en) * 2021-09-15 2021-10-19 李斯特技术中心(上海)有限公司 Vehicle sanitation evaluation method and device, vehicle and electronic equipment
CN113511152B (en) * 2021-09-15 2022-02-11 李斯特技术中心(上海)有限公司 Vehicle sanitation evaluation method and device, vehicle and electronic equipment
CN114338754A (en) * 2022-03-10 2022-04-12 广州海洁尔医疗设备有限公司 Operating room environment monitoring processing method and system
CN115657627A (en) * 2022-10-31 2023-01-31 安徽三马信息科技有限公司 Energy efficiency diagnosis system and method for factory public and auxiliary equipment

Also Published As

Publication number Publication date
CN110348738B (en) 2024-01-12

Similar Documents

Publication Publication Date Title
CN110348738A (en) hospital environment influence factor evaluation method
Shen et al. A computer-based scoring method for measuring the environmental performance of construction activities
Gangolells et al. Assessing concerns of interested parties when predicting the significance of environmental impacts related to the construction process of residential buildings
Karaca et al. Indicator rating methodology for Rapid Sustainability Assessment Method (RSAM) for existing residential buildings using opinions of residents
Manderso Overview of existing wastewater management system in case of Debre Markos Town, Ethiopia
Wong et al. Water seepage in multi‐storey buildings
Liu Types of Environmental Pollution Caused by Real Estate Construction Projects and their Control Measures.
Leblanc et al. Challenges and opportunities for improving household sanitation in the Ger areas of Ulaanbaatar
Waidyasekara Sustainable use of water in construction projects: the case of Sri Lanka
Subtil et al. Conceptual approach for the modernization of sanitation systems in peri-urban slums. Exploring the interdependence of land occupation, water supply, storm water drainage, sanitation and solid waste management services in Maputo, Mozambique
Suttibak et al. Enhancing solid waste management capacity of local government authorities: review of current status in Thailand
Musonda Development of an excreta pathway for Kanyama peri-urban area of Lusaka using the shit flow diagram (SFD) tool.
COUNTY Environmental Impact Assessment
Ghosh et al. Does benefits of mixed land uses match up to people’s expectations from their living environments
Gambrill et al. Challenges and Opportunities for Improving Household Sanitation in the Ger Areas of Ulaanbaatar
Gathungu Environmental Impact Assessment Study Report for the Proposed two Blocks Residential Units Development on Plot Lr No: 10119/4-Next to Garden City Mall
Omar Environmental impact assessment: proposed development of 10 Storey building development with basement in M. Nadhee, Male'
Musthafa Environmental impact assessment: proposed 8 storey building development with basement in Ma. Gongali, Male'
Hussain Comparative Analysis of Green Building Rating Systems for Sustainability Assessment of a Residential Building
CHIROMO ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY FOR THE PROPOSED STUDENT RESIDENCE AND CONVENIENCE RETAIL ON LR. NO. 209/346/50 AT THE JUNCTION OF SCIENCE CRESCENT ROAD AND RIVERSIDE DRIVE OFF
Musthafa Environmental impact assessment: proposed 10 storey building construction in M. Yookafi, Male’
Manik Environmental impact assessment: proposed development of 13 storey apartment building in M. Marconi, Male’
Zuhair Environmental and social management plan for the upgrading of Island Waste and Resource Management Centre in B. Eydhafushi
STREET et al. VOLUME I: FINAL EIA STUDY REPORT
Tanks et al. Initial Environmental Examination

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant