CN110348656A - Dispatching method, device, system and computer readable storage medium - Google Patents
Dispatching method, device, system and computer readable storage medium Download PDFInfo
- Publication number
- CN110348656A CN110348656A CN201810304109.2A CN201810304109A CN110348656A CN 110348656 A CN110348656 A CN 110348656A CN 201810304109 A CN201810304109 A CN 201810304109A CN 110348656 A CN110348656 A CN 110348656A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- scheduler task
- storage space
- task
- status indicator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
The invention discloses a kind of dispatching method, device, system and computer readable storage mediums, are related to field of computer technology.Dispatching method therein includes: to receive tunnel scheduler task, and tunnel scheduler task includes target identification and tunnel scheduler task type identification;Searching database task list, it is determined whether there are same target mark, identical tunnel scheduler task type identification and tunnel scheduler task status indicators to dispatch successful task for untreated or tunnel;If it exists, tunnel scheduler task is abandoned.The present invention can eliminate be because of the unstability of intelligent scheduled production devices in system and artificial mobile target target repetitive schedule tunnel abnormal conditions, guarantee the normal consistency of target, enhance the robustness of tunnel scheduling process.
Description
Technical field
The present invention relates to field of computer technology, in particular to a kind of dispatching method, device, system and computer-readable deposit
Storage media.
Background technique
In existing unmanned storehouse shuttle garage, hopper needs first to recommend tunnel to intelligent scheduled production system request before entering shelf,
Hopper recommends storage space to intelligent scheduled production system request again after entering recommendation tunnel.Determine after recommending storage space, then by elevator and
Shuttle, which transports, reaches storage space.Fig. 1 shows the structural schematic diagram in unmanned storehouse shuttle garage.
Summary of the invention
Inventor since the equipment in intelligent product plan is with unstability, and in the presence of artificial movement the study found that expect
The case where case, hopper may repetitive requests tunnel, can only product plan can not judge same hopper two tunnels scheduling appoint
Business be it is duplicate, cause intelligent product plan to repeat to be that hopper recommends tunnel to occur abnormal, thus the excessive tunnel that increases
Tunnel scheduler task number, even results in hopper and blocks transmission line body.
The technical problem that the present invention solves be how to eliminate because intelligent scheduled production devices in system unstability and
Artificial mobile target and be target repetitive schedule tunnel abnormal conditions, guarantee the normal consistency of target, enhance tunnel scheduling
The robustness of process.
According to an aspect of an embodiment of the present invention, a kind of dispatching method is provided, comprising: tunnel scheduler task is received,
Tunnel scheduler task includes target identification and tunnel scheduler task type identification;Searching database task list, it is determined whether deposit
It is untreated or lane in same target mark, identical tunnel scheduler task type identification and tunnel scheduler task status indicator
Dispatch successful task in road;If it exists, tunnel scheduler task is abandoned.
In some embodiments, dispatching method further include: if it does not exist, increase tunnel scheduling in the scheduler task of tunnel
Task status mark, initialization tunnel scheduler task status indicator is untreated, and tunnel scheduler task is stored in database
In task list;It is that untreated tunnel scheduler task is handled to tunnel scheduler task status indicator in database task list;
In the case where tunnel is dispatched successfully, increase corresponding scheduling lanes mark in the tunnel scheduler task in database tasks table
Know, and tunnel scheduler task status indicator is dispatched successfully by untreated tunnel of being revised as;In the case where tunnel dispatches and fails,
Tunnel scheduler task status indicator is revised as tunnel scheduling failure by untreated.
In some embodiments, dispatching method further include: receive storage space scheduler task, storage space scheduler task includes target
Mark and storage space scheduler task type identification;Searching database task list, it is determined whether there are same target mark and tunnels
Scheduler task status indicator is that successful task is dispatched in tunnel;If it exists, increase storage space scheduler task in storage space scheduler task
Status indicator, initialization storage space scheduler task status indicator is untreated, and storage space scheduler task is stored in database tasks
In table;If it does not exist, storage space scheduler task is abandoned.
In some embodiments, storage space scheduler task also includes current tunnel mark;Dispatching method further include: utilize storage space
The tunnel scheduler task in target identification inquiry database tasks table in scheduler task, judges in corresponding tunnel scheduler task
Scheduling lanes mark identified whether with current tunnel it is identical, and by scheduler task state mark in tunnel in corresponding tunnel scheduler task
Knowledge is dispatched by tunnel is successfully revised as storage space scheduling completion;In different situations, the tunnel scheduler task of scheduling lanes is reduced
Number, and storage space scheduler task is handled;If handling successfully, storage space scheduler task status indicator is revised as storing up by untreated
Position is dispatched successfully, and increases the storage space scheduler task number of scheduling storage space place storage space layer;If processing failure, by storage space scheduler task
Status indicator is revised as storage space scheduling failure by untreated.
In some embodiments, dispatching method further include: under identical circumstances, at storage space scheduler task
Reason;If handling successfully, storage space scheduler task status indicator is dispatched successfully by the untreated storage space that is revised as, and reduce current tunnel
Tunnel scheduler task number, increase scheduling storage space where storage space layer storage space scheduler task number;If processing failure dispatches storage space
Task status mark is revised as storage space scheduling failure by untreated, and reduces the tunnel scheduler task number in current tunnel.
Other side according to an embodiment of the present invention provides a kind of dispatching device, comprising: tunnel scheduler task receives
Unit is configured as receiving tunnel scheduler task, and tunnel scheduler task includes target identification and tunnel scheduler task type mark
Know;First database task list retrieval unit, is configured as searching database task list, it is determined whether there are same target marks
Know, identical tunnel scheduler task type identification and tunnel scheduler task status indicator are that the scheduling of untreated or tunnel is successful
Task;Tunnel scheduler task processing unit exists if being configured as above-mentioned task, abandons tunnel scheduler task.
In some embodiments, it is not present if tunnel scheduler task processing unit is also configured to above-mentioned task, in tunnel
Increase scheduler task status indicator in tunnel in scheduler task, initialization tunnel scheduler task status indicator is untreated, and by lane
Road scheduler task is stored in database tasks table;It is untreated to tunnel scheduler task status indicator in database task list
Tunnel scheduler task is handled;In the case where tunnel is dispatched successfully, in the tunnel scheduler task in database tasks table
Increase corresponding scheduling lanes mark, and tunnel scheduler task status indicator is dispatched successfully by untreated tunnel of being revised as;?
In the case where the scheduling failure of tunnel, tunnel scheduler task status indicator is revised as tunnel scheduling failure by untreated.
In some embodiments, dispatching device further include: storage space scheduler task receiving unit is configured as receiving storage space
Scheduler task, storage space scheduler task include target identification and storage space scheduler task type identification;The inspection of second database tasks table
Cable elements are configured as searching database task list, it is determined whether there are same target mark and tunnel scheduler task state marks
Know is that successful task is dispatched in tunnel;Storage space scheduler task processing unit exists if being configured as above-mentioned task, dispatches in storage space
Increase storage space scheduler task status indicator in task, initialization storage space scheduler task status indicator is untreated, and by storage space tune
Degree task is stored in database tasks table;If it does not exist, storage space scheduler task is abandoned.
In some embodiments, storage space scheduler task also includes current tunnel mark;Storage space scheduler task processing unit is also
It is configured as: using the tunnel scheduler task in the target identification inquiry database tasks table in storage space scheduler task, judging phase
Scheduling lanes mark identifies whether identical with current tunnel in the tunnel scheduler task answered, and will be in corresponding tunnel scheduler task
Tunnel scheduler task status indicator is dispatched by tunnel is successfully revised as storage space scheduling completion;In different situations, scheduling is reduced
The tunnel scheduler task number in tunnel, and storage space scheduler task is handled;If handling successfully, by storage space scheduler task state mark
Knowledge is dispatched successfully by the untreated storage space that is revised as, and increases the storage space scheduler task number of scheduling storage space place storage space layer;If processing
Storage space scheduler task status indicator is revised as storage space scheduling failure by untreated by failure.
In some embodiments, storage space scheduler task processing unit is also configured under identical circumstances, to storage space tune
Degree task is handled;If handling successfully, storage space scheduler task status indicator is dispatched successfully by the untreated storage space that is revised as, and
The tunnel scheduler task number in current tunnel is reduced, the storage space scheduler task number of storage space layer where increasing scheduling storage space;If processing is lost
It loses, storage space scheduler task status indicator is revised as storage space scheduling failure by untreated, and reduce the tunnel scheduling in current tunnel
Number of tasks.
Another aspect according to an embodiment of the present invention provides a kind of scheduling system, including dispatching device above-mentioned;With
And tunnel scanner, it is configured as being scanned target, generates the tunnel scheduler task of target and be sent to dispatching device;Storage
Bit scan device is configured as being scanned target, generates the storage space scheduler task of target and is sent to dispatching device.
Another aspect according to an embodiment of the present invention provides a kind of dispatching device, wherein includes: memory;And
It is coupled to the processor of memory, processor is configured as executing dispatching party above-mentioned based on instruction stored in memory
Method.
Another aspect according to an embodiment of the present invention provides a kind of computer readable storage medium, wherein computer
Readable storage medium storing program for executing is stored with computer instruction, and instruction realizes dispatching method above-mentioned when being executed by processor.
The present invention, which can be eliminated, is target because of the unstability of intelligent scheduled production devices in system and artificial mobile target
The abnormal conditions in repetitive schedule tunnel guarantee the normal consistency of target, enhance the robustness of tunnel scheduling process.
By referring to the drawings to the detailed description of exemplary embodiment of the present invention, other feature of the invention and its
Advantage will become apparent.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art
To obtain other drawings based on these drawings.
Fig. 1 shows the structural schematic diagram in unmanned storehouse shuttle garage.
Fig. 2 shows the flow diagrams of the dispatching method of one embodiment of the invention.
Fig. 3 shows the flow diagram of the dispatching method of another embodiment of the present invention.
Fig. 4 shows the flow diagram of the dispatching method of another embodiment of the present invention.
Fig. 5 shows an application examples of dispatching method of the present invention.
Fig. 6 shows the structural schematic diagram of the dispatching device of one embodiment of the invention.
Fig. 7 shows the structural schematic diagram of the scheduling system of one embodiment of the invention.
Fig. 8 shows the structural schematic diagram of the dispatching device of another embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Below
Description only actually at least one exemplary embodiment be it is illustrative, never as to the present invention and its application or make
Any restrictions.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under all other embodiment obtained, shall fall within the protection scope of the present invention.
Fig. 2 is combined to introduce the dispatching method of one embodiment of the invention first.
Fig. 2 shows the flow diagrams of the dispatching method of one embodiment of the invention.As shown in Fig. 2, in the present embodiment
Dispatching method include step S202~step S206.
In step S202, tunnel scheduler task is received, tunnel scheduler task includes that target identification and tunnel scheduling are appointed
Service type mark.
In step S204, searching database task list, it is determined whether there are same target mark, the scheduling of identical tunnel to appoint
Service type mark and tunnel scheduler task status indicator are that successful task is dispatched in untreated or tunnel.
If it exists, then in step S206, tunnel scheduler task is abandoned.
If it does not exist, then in step S208, increase scheduler task status indicator in tunnel in the scheduler task of tunnel, initially
It is untreated for changing tunnel scheduler task status indicator, and tunnel scheduler task is stored in database tasks table.
It is that the scheduling of untreated tunnel is appointed to tunnel scheduler task status indicator in database task list in step S210
Business is handled.
Tunnel scheduler task in the case where tunnel is dispatched successfully, then in step S212, in database tasks table
It is middle to increase corresponding scheduling lanes mark, and tunnel scheduler task status indicator is dispatched successfully by untreated tunnel of being revised as.
In the case where tunnel dispatches and fails, then in step S214, by tunnel scheduler task status indicator by untreated
It is revised as tunnel scheduling failure.
Above-described embodiment can be eliminated is because of the unstability of intelligent scheduled production devices in system and artificial mobile target
The abnormal conditions in target repetitive schedule tunnel, guarantee the normal consistency of target, enhance the robustness of tunnel scheduling process.
Inventor also found, the processing logic of intelligent product plan is first to determine storage space behind determining tunnel.In logical operation
When determining storage space, if failing to recommend tunnel information out before grabbing, intelligent product plan will appear logical operation failure,
Hopper obstruction, to occur not requesting the abnormal conditions of tunnel direct request storage space.In order to solve this technical problem, below with reference to
Fig. 3 introduces the dispatching method of one embodiment of the invention.
Fig. 3 shows the flow diagram of the dispatching method of another embodiment of the present invention.As shown in figure 3, shown in Fig. 2
On the basis of embodiment, the dispatching method in the present embodiment further includes step S316~step S322.
In step S316, storage space scheduler task is received, storage space scheduler task includes that target identification and storage space scheduling are appointed
Service type mark.
In step S318, searching database task list, it is determined whether there are same target mark and tunnel scheduler tasks
Status indicator is that successful task is dispatched in tunnel.
If it exists, in step s 320, increase storage space scheduler task status indicator, initialization storage in storage space scheduler task
Position scheduler task status indicator is untreated, and storage space scheduler task is stored in database tasks table.
If it does not exist, in step S322, storage space scheduler task is abandoned.
Above-described embodiment, can by the way that tunnel scheduler task status indicator to be associated and screen with storage space scheduler task
Eliminating because of the unstability of intelligent scheduled production devices in system and artificial mobile target is that target does not request tunnel direct request
The abnormal conditions of storage space, guarantee the normal consistency of target, further enhance the robustness of storage space scheduling process.
At present then intelligence scheduled production goes processing related using recommendation tunnel and storage space task is first received using asynchronous woker
Task includes the step of recommending tunnel, storage space and increase out to reduce corresponding tunnel, layer task quantity.Handle tunnel scheduler task
When, recommended as long as having task, and increase the number of tasks recommended in tunnel out;When storage space is recommended in processing, need
It is first that the information for recommending tunnel before is got from task, it then carries out recommending storage space operation, and reduce a times in place tunnel
Business quantity, increases the task quantity of layer where recommending storage space out.Inventor in product plan it has furthermore been found that can only may deposit
The exception of storage space is requested when hopper does not enter specified tunnel, that is to say, that for intelligent scheduled production in logical operation, crawl is material
The tunnel that case actually enters carries out recommendation storage space, causes that mistake occurs when reducing tunnel scheduler task number, to generate tunnel tune
Spend the data exception of number of tasks.In order to solve this technical problem, the scheduling of another embodiment of the present invention is introduced below with reference to Fig. 4
Method.
Fig. 4 shows the flow diagram of the dispatching method of another embodiment of the present invention.As shown in figure 4, shown in Fig. 3
On the basis of embodiment, the dispatching method in the present embodiment further includes step S424~step S436.
In step S424, storage space scheduler task also includes current tunnel mark, utilizes the target in storage space scheduler task
Tunnel scheduler task in mark inquiry database tasks table judges that scheduling lanes identify and work as in corresponding tunnel scheduler task
Preceding tunnel identifies whether identical, and tunnel scheduler task status indicator in corresponding tunnel scheduler task is dispatched successfully by tunnel
Storage space scheduling is revised as to complete.
In different situations, then in step S426, the tunnel scheduler task number of scheduling lanes is reduced, and to storage space tune
Degree task is handled.
If handling successfully, in step S428, storage space scheduler task status indicator is revised as storage space tune by untreated
It spends successfully, and increases the storage space scheduler task number of scheduling storage space place storage space layer.
If processing failure, in step S430, storage space scheduler task status indicator is revised as storage space tune by untreated
Degree failure.
Under identical circumstances, then in step S432, storage space scheduler task is handled;
If handling successfully, in step S434, storage space scheduler task status indicator is revised as storage space tune by untreated
It spends successfully, and reduces the tunnel scheduler task number in current tunnel, the storage space scheduler task number of storage space layer where increasing scheduling storage space.
If processing failure, in step S436, storage space scheduler task status indicator is revised as storage space tune by untreated
Degree failure, and reduce the tunnel scheduler task number in current tunnel.
Above-described embodiment can be eliminated because target does not enter layer where tunnel caused by storage space, storage space are just requested in specified tunnel
Storage space scheduler task quantity misregistration and transmission line body block the problems such as, thus guarantee hopper normally executes storage grasp
Make, further enhances the robustness of storage space scheduling process.
An application examples of dispatching method of the present invention is introduced below with reference to Fig. 5.
(1) set up task type WIRTR and four kinds of state values to tunnel scheduler task: 0 is untreated, and 2 recommend tunnel complete
At 3 recommend storage space to complete, 9 abnormal recommendation failures;Task type is set up to storage space scheduler task: WIRLR and three kinds of state values: 0
Untreated, 2 recommend storage space to complete, 9 abnormal recommendation failures.
(2) when receiving tunnel scheduler task, according to hopper number, task type (WIRTR), task status (0,2) three
Condition carries out retrieval tasks table in database;If there is data, then this task is rejected;If it does not exist, then
It receives and saves, to solve the exception in repetitive requests tunnel.
(3) when handling tunnel scheduler task, the task that crawl task status is 0 is handled.If recommending successfully, to repair
Changing task status is 2, increases the tunnel scheduler task quantity of scheduling lanes, and issues and recommend tunnel out to requesting party;If
Recommend failure, modification task status is 9, and informs that requesting party fails.
(4) storage space scheduler task is received, scheduling lanes field is verified, if field is that empty explanation is not asked
Tunnel was asked, rejected and informs that requesting party fails;It so normally receives if there is tunnel number, is not requested to solve
The exception of tunnel direct request storage space.
(5) storage space scheduler task is handled, according to (2) three hopper number, task type (WIRTR), task status conditions,
Retrieval tasks table is carried out in database;Completed tunnel scheduler task is inquired, then taking out in the scheduler task of tunnel
Tunnel number in tunnel number and current storage space scheduler task compares.If two tunnels number are identical, logical operation progress is carried out
Storage space scheduling reduces tunnel task quantity, modification storage if scheduling storage space success, modification tunnel scheduler task state are 3
Position scheduler task state is 2, the storage space scheduler task quantity of layer where increasing storage space;If recommending storage space failure, modify
Tunnel scheduler task state is 3, reduces tunnel task quantity, modification storage space scheduler task state is 9, and issues requesting party.Such as
Two tunnels number of fruit are not identical, and modification tunnel scheduler task state is 3, reduce the tunnel scheduler task quantity of scheduling lanes, into
Row logical operation determines storage space, if storage space is dispatched successfully, modification storage space scheduler task state is 2, layer where increasing storage space
Storage space scheduler task quantity;If recommending storage space failure, modification storage space scheduler task state is 9, and issues requesting party, to solve
It has determined and has not entered the exception of specified tunnel request storage space.
The dispatching device of one embodiment of the invention is introduced below with reference to Fig. 6.
Fig. 6 shows the structural schematic diagram of the dispatching device of one embodiment of the invention.As shown in fig. 6, the present embodiment
Dispatching device 60 includes:
Tunnel scheduler task receiving unit 602 is configured as receiving tunnel scheduler task, and tunnel scheduler task includes target
Mark and tunnel scheduler task type identification;
First database task list retrieval unit 604, is configured as searching database task list, it is determined whether there are identical
Target identification, identical tunnel scheduler task type identification and tunnel scheduler task status indicator are that untreated or tunnel is dispatched
Successful task;
Tunnel scheduler task processing unit 606 exists if being configured as above-mentioned task, abandons tunnel scheduler task.
In some embodiments, it is not present if tunnel scheduler task processing unit 606 is also configured to above-mentioned task,
Increasing scheduler task status indicator in tunnel in the scheduler task of tunnel, initialization tunnel scheduler task status indicator is untreated, and
Tunnel scheduler task is stored in database tasks table;It is not locate to tunnel scheduler task status indicator in database task list
The tunnel scheduler task of reason is handled;In the case where tunnel is dispatched successfully, the tunnel scheduling in database tasks table is appointed
Increase corresponding scheduling lanes mark in business, and tunnel scheduler task status indicator is scheduled to by untreated tunnel of being revised as
Function;In the case where tunnel dispatches and fails, tunnel scheduler task status indicator is revised as tunnel scheduling failure by untreated.
In some embodiments, dispatching device 60 further include:
Storage space scheduler task receiving unit 608 is configured as receiving storage space scheduler task, and storage space scheduler task includes target
Mark and storage space scheduler task type identification;
Second database tasks table retrieval unit 610, is configured as searching database task list, it is determined whether there are identical
Target identification and tunnel scheduler task status indicator are that successful task is dispatched in tunnel;
Storage space scheduler task processing unit 612 exists if being configured as above-mentioned task, increases storage in storage space scheduler task
Position scheduler task status indicator, initialization storage space scheduler task status indicator is untreated, and storage space scheduler task is stored in
In database tasks table;If it does not exist, storage space scheduler task is abandoned.
In some embodiments, storage space scheduler task also includes current tunnel mark;Storage space scheduler task processing unit 612
It is also configured to utilize the tunnel scheduler task in the target identification inquiry database tasks table in storage space scheduler task, judgement
Scheduling lanes mark identifies whether identical with current tunnel in corresponding tunnel scheduler task, and by corresponding tunnel scheduler task
Middle tunnel scheduler task status indicator is dispatched by tunnel is successfully revised as storage space scheduling completion;In different situations, tune is reduced
The tunnel scheduler task number in tunnel is spent, and storage space scheduler task is handled;If handling successfully, by storage space scheduler task state
Mark is dispatched successfully by the untreated storage space that is revised as, and increases the storage space scheduler task number of scheduling storage space place storage space layer;If place
Storage space scheduler task status indicator is revised as storage space scheduling failure by untreated by reason failure.
In some embodiments, storage space scheduler task processing unit 612 is also configured under identical circumstances, to storage
Position scheduler task is handled;If handling successfully, storage space scheduler task status indicator is scheduled to by the untreated storage space that is revised as
Function, and the tunnel scheduler task number in current tunnel is reduced, the storage space scheduler task number of storage space layer where increasing scheduling storage space;If place
Storage space scheduler task status indicator is revised as storage space scheduling failure by untreated, and reduces the tunnel in current tunnel by reason failure
Scheduler task number.
The scheduling system of one embodiment of the invention is introduced below with reference to Fig. 7.
Fig. 7 shows the structural schematic diagram of the scheduling system of one embodiment of the invention.As shown in fig. 7, the present embodiment
Scheduling system 70 includes:
Dispatching device 60;And
Tunnel scanner 702 is configured as being scanned target, generates the tunnel scheduler task of target and is sent to tune
Spend device;
Storage space scanner 704 is configured as being scanned target, generates the storage space scheduler task of target and is sent to tune
Spend device.
Fig. 8 shows the structural schematic diagram of the dispatching device of another embodiment of the present invention.As shown in figure 8, the embodiment
Dispatching device 80 include: memory 810 and the processor 820 for being coupled to the memory 810, processor 820 is configured as
Based on the instruction being stored in memory 810, the dispatching method in any one aforementioned embodiment is executed.
Wherein, memory 810 is such as may include system storage, fixed non-volatile memory medium.System storage
Device is for example stored with operating system, application program, Boot loader (Boot Loader) and other programs etc..
A kind of dispatching device 80 can also include input/output interface 830, network interface 840, memory interface 850 etc..This
It can for example be connected by bus 860 between a little interfaces 830,840,850 and memory 810 and processor 820.Wherein, defeated
Enter output interface 830 and provides connecting interface for input-output equipment such as display, mouse, keyboard, touch screens.Network interface 840
Connecting interface is provided for various networked devices.The external storages such as memory interface 840 is SD card, USB flash disk provide connecting interface.
The invention also includes a kind of computer readable storage mediums, are stored thereon with computer instruction, and the instruction is processed
Device realizes the dispatching method in any one aforementioned embodiment when executing.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more,
The calculating implemented in non-transient storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) can be used
The form of machine program product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and
Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (13)
1. a kind of dispatching method, comprising:
Tunnel scheduler task is received, the tunnel scheduler task includes target identification and tunnel scheduler task type identification;
Searching database task list, it is determined whether there are same target mark, identical tunnel scheduler task type identification and lanes
Road scheduler task status indicator is that successful task is dispatched in untreated or tunnel;
If it exists, the tunnel scheduler task is abandoned.
2. dispatching method as described in claim 1, the dispatching method further include:
If it does not exist, increase scheduler task status indicator in tunnel in the tunnel scheduler task, initialize the tunnel scheduling
Task status is identified as untreated, and the tunnel scheduler task is stored in database tasks table;
It is that untreated tunnel scheduler task is handled to tunnel scheduler task status indicator in database task list;
In the case where tunnel is dispatched successfully, increase corresponding scheduling lanes in the tunnel scheduler task in database tasks table
Mark, and tunnel scheduler task status indicator is dispatched successfully by untreated tunnel of being revised as;
In the case where tunnel dispatches and fails, tunnel scheduler task status indicator is revised as tunnel scheduling failure by untreated.
3. dispatching method as described in claim 1, the dispatching method further include:
Storage space scheduler task is received, the storage space scheduler task includes target identification and storage space scheduler task type identification;
Searching database task list, it is determined whether there are same target mark and tunnel scheduler task status indicator is tunnel scheduling
Successful task;
If it exists, increase storage space scheduler task status indicator in the storage space scheduler task, initialize the storage space scheduling and appoint
Business status indicator is untreated, and the storage space scheduler task is stored in database tasks table;
If it does not exist, the storage space scheduler task is abandoned.
4. dispatching method as claimed in claim 3, wherein the storage space scheduler task also includes current tunnel mark;
The dispatching method further include:
Using the tunnel scheduler task in the target identification inquiry database tasks table in the storage space scheduler task, judgement is corresponding
Tunnel scheduler task in scheduling lanes mark identified whether with the current tunnel it is identical, and by corresponding tunnel scheduler task
Middle tunnel scheduler task status indicator is dispatched by tunnel is successfully revised as storage space scheduling completion;
In different situations, the tunnel scheduler task number of scheduling lanes is reduced, and the storage space scheduler task is handled;
If handling successfully, the storage space scheduler task status indicator is dispatched successfully by the untreated storage space that is revised as, and increase tune
The storage space scheduler task number of storage space layer where spending storage space;
If processing failure, the storage space scheduler task status indicator is revised as storage space scheduling failure by untreated.
5. dispatching method as claimed in claim 4, wherein the dispatching method further include:
Under identical circumstances, the storage space scheduler task is handled;
If handling successfully, the storage space scheduler task status indicator is dispatched successfully by the untreated storage space that is revised as, and reduce and work as
The tunnel scheduler task number in preceding tunnel, the storage space scheduler task number of storage space layer where increasing scheduling storage space;
If processing failure, the storage space scheduler task status indicator is revised as storage space scheduling failure by untreated, and reduce and work as
The tunnel scheduler task number in preceding tunnel.
6. a kind of dispatching device, comprising:
Tunnel scheduler task receiving unit is configured as receiving tunnel scheduler task, and the tunnel scheduler task includes target mark
Knowledge and tunnel scheduler task type identification;
First database task list retrieval unit, is configured as searching database task list, it is determined whether there are same target marks
Know, identical tunnel scheduler task type identification and tunnel scheduler task status indicator are that the scheduling of untreated or tunnel is successful
Task;
Tunnel scheduler task processing unit exists if being configured as above-mentioned task, abandons the tunnel scheduler task.
7. dispatching device as claimed in claim 6, the tunnel scheduler task processing unit is also configured to
If above-mentioned task is not present, increase scheduler task status indicator in tunnel in the tunnel scheduler task, described in initialization
Tunnel scheduler task status indicator is untreated, and the tunnel scheduler task is stored in database tasks table;
It is that untreated tunnel scheduler task is handled to tunnel scheduler task status indicator in database task list;
In the case where tunnel is dispatched successfully, increase corresponding scheduling lanes in the tunnel scheduler task in database tasks table
Mark, and tunnel scheduler task status indicator is dispatched successfully by untreated tunnel of being revised as;
In the case where tunnel dispatches and fails, tunnel scheduler task status indicator is revised as tunnel scheduling failure by untreated.
8. dispatching device as claimed in claim 6, the dispatching device further include:
Storage space scheduler task receiving unit is configured as receiving storage space scheduler task, and the storage space scheduler task includes target mark
Knowledge and storage space scheduler task type identification;
Second database tasks table retrieval unit, is configured as searching database task list, it is determined whether there are same target marks
Know and tunnel scheduler task status indicator is that successful task is dispatched in tunnel;
Storage space scheduler task processing unit exists if being configured as above-mentioned task, increases storage space in the storage space scheduler task
Scheduler task status indicator, it is untreated for initializing the storage space scheduler task status indicator, and by the storage space scheduler task
It is stored in database tasks table;If it does not exist, the storage space scheduler task is abandoned.
9. dispatching device as claimed in claim 8, wherein the storage space scheduler task also includes current tunnel mark;
The storage space scheduler task processing unit is also configured to
Using the tunnel scheduler task in the target identification inquiry database tasks table in the storage space scheduler task, judgement is corresponding
Tunnel scheduler task in scheduling lanes mark identified whether with the current tunnel it is identical, and by corresponding tunnel scheduler task
Middle tunnel scheduler task status indicator is dispatched by tunnel is successfully revised as storage space scheduling completion;
In different situations, the tunnel scheduler task number of scheduling lanes is reduced, and the storage space scheduler task is handled;
If handling successfully, the storage space scheduler task status indicator is dispatched successfully by the untreated storage space that is revised as, and increase tune
The storage space scheduler task number of storage space layer where spending storage space;
If processing failure, the storage space scheduler task status indicator is revised as storage space scheduling failure by untreated.
10. dispatching device as claimed in claim 9, wherein the storage space scheduler task processing unit is also configured to
Under identical circumstances, the storage space scheduler task is handled;
If handling successfully, the storage space scheduler task status indicator is dispatched successfully by the untreated storage space that is revised as, and reduce and work as
The tunnel scheduler task number in preceding tunnel, the storage space scheduler task number of storage space layer where increasing scheduling storage space;
If processing failure, the storage space scheduler task status indicator is revised as storage space scheduling failure by untreated, and reduce and work as
The tunnel scheduler task number in preceding tunnel.
11. a kind of scheduling system, including the dispatching device as described in any one of claim 6 to 10;And
Tunnel scanner is configured as being scanned the target, generates the tunnel scheduler task of the target and is sent to
The dispatching device;
Storage space scanner is configured as being scanned the target, generates the storage space scheduler task of the target and is sent to
The dispatching device.
12. a kind of dispatching device, wherein include:
Memory;And
It is coupled to the processor of the memory, the processor is configured to the instruction based on storage in the memory,
Execute the dispatching method as described in any one of claims 1 to 5.
13. a kind of computer readable storage medium, wherein the computer-readable recording medium storage has computer instruction, institute
State the dispatching method realized as described in any one of claims 1 to 5 when instruction is executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810304109.2A CN110348656B (en) | 2018-04-08 | 2018-04-08 | Scheduling method, device, system and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810304109.2A CN110348656B (en) | 2018-04-08 | 2018-04-08 | Scheduling method, device, system and computer readable storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110348656A true CN110348656A (en) | 2019-10-18 |
CN110348656B CN110348656B (en) | 2022-09-30 |
Family
ID=68172950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810304109.2A Active CN110348656B (en) | 2018-04-08 | 2018-04-08 | Scheduling method, device, system and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110348656B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102316156A (en) * | 2011-07-05 | 2012-01-11 | 万达信息股份有限公司 | Method for distributing and processing dynamically extensible task |
CN105469201A (en) * | 2015-07-20 | 2016-04-06 | 浙江工业大学 | Method for logistics dispensing center work task processing and scheduling |
CN106022689A (en) * | 2016-05-23 | 2016-10-12 | 广东工业大学 | Deadlock preventive warehouse-in and warehouse-out scheduling method of hollow glass pairing warehouse |
CN106144368A (en) * | 2016-07-27 | 2016-11-23 | 国网河北省电力公司电力科学研究院 | Storage allocation method for three-dimensional storehouse |
CN106611397A (en) * | 2015-10-26 | 2017-05-03 | 阿里巴巴集团控股有限公司 | Logistics data processing method and device |
CN107168789A (en) * | 2016-03-08 | 2017-09-15 | 阿里巴巴集团控股有限公司 | The serial scheduling method and device of multitask |
-
2018
- 2018-04-08 CN CN201810304109.2A patent/CN110348656B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102316156A (en) * | 2011-07-05 | 2012-01-11 | 万达信息股份有限公司 | Method for distributing and processing dynamically extensible task |
CN105469201A (en) * | 2015-07-20 | 2016-04-06 | 浙江工业大学 | Method for logistics dispensing center work task processing and scheduling |
CN106611397A (en) * | 2015-10-26 | 2017-05-03 | 阿里巴巴集团控股有限公司 | Logistics data processing method and device |
CN107168789A (en) * | 2016-03-08 | 2017-09-15 | 阿里巴巴集团控股有限公司 | The serial scheduling method and device of multitask |
CN106022689A (en) * | 2016-05-23 | 2016-10-12 | 广东工业大学 | Deadlock preventive warehouse-in and warehouse-out scheduling method of hollow glass pairing warehouse |
CN106144368A (en) * | 2016-07-27 | 2016-11-23 | 国网河北省电力公司电力科学研究院 | Storage allocation method for three-dimensional storehouse |
Non-Patent Citations (1)
Title |
---|
蒋固金: "Spring内置任务调度实现添加、取消、重置", 《百度》 * |
Also Published As
Publication number | Publication date |
---|---|
CN110348656B (en) | 2022-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108595157B (en) | Block chain data processing method, device, equipment and storage medium | |
TWI838596B (en) | Electronic apparatus for managing logistics information and control method thereof | |
JP6021120B2 (en) | Method for streaming data, computer system thereof, and program for computer system | |
CN100375036C (en) | Method and system for resource allocation in remembering grids | |
US9430285B2 (en) | Dividing and parallel processing record sets using a plurality of sub-tasks executing across different computers | |
CN105550225A (en) | Index construction method and query method and apparatus | |
CN110290166B (en) | Cross-cluster data interaction method, system and device and readable storage medium | |
CN103377101A (en) | Testing system and testing method | |
CN106201788A (en) | Copy restorative procedure and system for distributed storage cluster | |
US20180239323A1 (en) | Method for Operating an Engineering System for an Industrial Process Automation System, and Control Program | |
EP2390739A2 (en) | A method and apparatus for providing industrial plant information | |
US20170220624A1 (en) | Transaction processor | |
CN114443171A (en) | Configurable service platform and configurable service implementation method | |
CN102959499B (en) | Computer system, storage volume management method | |
KR101988482B1 (en) | Apparatus for processing data in tactical data link system | |
CN113407973A (en) | Software function authority management method, system, server and storage medium | |
CN115660540B (en) | Cargo tracking method, cargo tracking device, computer equipment and storage medium | |
CN102597957B (en) | System deployment determination system, system deployment determination method and program | |
CN110348656A (en) | Dispatching method, device, system and computer readable storage medium | |
CN117764253A (en) | Design execution device and design execution method | |
CN110457018A (en) | A kind of data management system and its management method based on Hadoop | |
KR102115734B1 (en) | Attack and anomaly detection device, attack and anomaly detection method, and attack and anomaly detection program | |
JP6928182B1 (en) | Stop cause identification support device, stop cause identification support program and method | |
US11016828B2 (en) | Task support system and method | |
CN114490338A (en) | Multithreading debugging method, device, equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200521 Address after: Room A1905, 19th floor, No. 2 Building, 18 Kechuang 11th Street, Beijing Daxing District, Beijing Applicant after: Beijing Jingdong Qianshi Technology Co.,Ltd. Address before: 300 457 days First Floor, Phase 2, No. 10, Fourth Avenue, Binhai New Area Economic and Technological Development Zone, Tianjin Applicant before: Tianjin Jingdong Shentuo Robot Technology Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |