CN110341880B - Rubber groove bracket positioning method for large ship stern springboard - Google Patents

Rubber groove bracket positioning method for large ship stern springboard Download PDF

Info

Publication number
CN110341880B
CN110341880B CN201910602017.7A CN201910602017A CN110341880B CN 110341880 B CN110341880 B CN 110341880B CN 201910602017 A CN201910602017 A CN 201910602017A CN 110341880 B CN110341880 B CN 110341880B
Authority
CN
China
Prior art keywords
stern
rubber
springboard
bracket
rubber groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910602017.7A
Other languages
Chinese (zh)
Other versions
CN110341880A (en
Inventor
计敏
马鸿顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201910602017.7A priority Critical patent/CN110341880B/en
Publication of CN110341880A publication Critical patent/CN110341880A/en
Application granted granted Critical
Publication of CN110341880B publication Critical patent/CN110341880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)

Abstract

The invention relates to a method for positioning a stern ramp rubber groove bracket of a stern ramp of a large ship, which comprises the following steps: step 1, preassembling a stern door and a stern springboard to an installation position; step 2, marking a positioning datum line of the rubber trough bracket of the stern springboard by using a positioning model of the rubber trough bracket of the stern springboard; step 3, installing a stern springboard rubber slot bracket along a positioning datum line of the stern springboard rubber slot bracket; step 4, installing a stern springboard rubber groove on a stern springboard rubber groove bracket; and 5, installing rubber in the rubber groove of the stern springboard. The rubber groove bracket positioning method for the large ship stern springboard is used for quickly and accurately positioning the rubber groove bracket, so that the installation period of a stern channel system is shortened and the construction quality is ensured; meanwhile, the method is simple and easy to operate and does not generate extra use cost; in addition, the method is suitable for the same ship type, has strong universality and is easy to popularize and apply.

Description

Rubber groove bracket positioning method for large ship stern springboard
Technical Field
The invention relates to the technical field of ship construction, in particular to a method for positioning a stern ramp rubber groove bracket of a stern ramp of a large ship.
Background
The stern passage system of large ship consists of stern door and stern springboard, is used for the large hovercraft to enter and exit from the dock cabin, and is the key of the whole passage system. The stern springboard is fixed at the dock cabin deck through a hinge, the stern door is hung upside down on the stern sealing plate through the hinge, and when the stern door and the stern springboard are closed together, the stern door and the stern springboard are locked into a whole through the hydraulic bolt and pressed on the rubber positioned on the door frame, so that the stern part of the ship is closed, the outer side of the ship body and the dock cabin are effectively separated, and the watertight bulkhead is played. The stern door and the stern ramp are complex in design, so that the installation is very complicated, the invention patent with the application number of 200810041802.1 discloses an installation method of a stern door transmission system of a large ship, the installation of the stern door transmission system can be referred to the patent, and the installation of a stern ramp rubber groove bracket at the bottom of the stern ramp is more important.
Rubber grooves are arranged around the stern sealing plate door frame along the contour of the stern sealing plate door frame, and rubber is arranged in the rubber grooves. The rubber groove at the bottom of the stern springboard can not be directly arranged on the doorframe of the stern springboard due to the reason that the bottom of the springboard is provided with the hinge, and the rubber groove needs to be extended outwards by means of a bracket of the stern springboard rubber groove. Because the structural dimensions of the stern transom and the stern transom of each ship have certain errors, and the transverse width of the stern transom door frame is about 20 meters, certain deformation exists in the span range, and the factors can cause the gap between the stern transom and the stern transom door frame at the rubber groove to be inconsistent, so that the compression amount of rubber in the sealing groove is inconsistent, the tightness of a stern channel is influenced, and the phenomenon of water leakage caused by untight sealing in the future use process is easily caused.
Disclosure of Invention
In order to solve the technical problem, the invention provides a method for positioning a rubber trough bracket of a stern ramp of a large ship, which is realized by the following technical scheme;
a method for positioning a stern ramp rubber groove bracket of a stern ramp of a large ship comprises the following steps:
step 1, preassembling a stern door and a stern springboard to an installation position;
step 2, marking a positioning datum line of the rubber trough bracket of the stern springboard by using a positioning model of the rubber trough bracket of the stern springboard;
step 3, installing a stern springboard rubber slot bracket along a positioning datum line of the stern springboard rubber slot bracket;
step 4, installing a stern springboard rubber groove on a stern springboard rubber groove bracket;
and 5, installing rubber in the rubber groove of the stern springboard.
Further, in step 1, the stern door and the stern ramp are temporarily fixed according to the up-down, left-right positions of the stern door and the stern ramp relative to the frame of the stern seal plate and the compression amount of the rubber.
Furthermore, the positioning model of the stern springboard rubber groove bracket is a plate with the same cross section size and shape as the cross section of the stern springboard rubber groove bracket, and the stern springboard rubber groove bracket is temporarily replaced by the positioning model of the stern springboard rubber groove bracket, so that the position of the scribed positioning reference line of the stern springboard rubber groove bracket can be ensured to be more accurate.
Further, in the step 2, the stern ramp rubber groove bracket model is vertically attached to a stern seal plate bottom door frame and a stern ramp at the same time, lines are drawn along the lower end of the attachment of the stern ramp rubber groove bracket model and the stern seal plate bottom door frame, lines are drawn along the stern seal plate bottom door frame at intervals of 0.5-1m in the transverse direction, and then the drawn lines are sequentially connected through straight lines to obtain a stern ramp rubber groove bracket positioning datum line.
Further, in step 3, the transom is opened, and the transom rubber groove bracket is installed along the positioning datum line of the transom rubber groove bracket.
Further, before the rubber is installed in the rubber groove of the stern ramp, the rubber groove of the stern ramp and the bracket of the rubber groove of the stern ramp are polished and coated, and then the rubber is installed in the rubber groove of the stern ramp.
The invention has the beneficial effects that:
1. the method can ensure the installation size of the rubber groove bracket of the stern ramp, improve the installation precision of the stern door and the stern ramp, avoid the influence on the sealing performance of a dock cabin due to the installation deviation of the rubber groove bracket of the stern ramp, and shorten the installation period of a channel system while ensuring the installation quality of a ship channel system from the source.
2. The method can also quickly position the installation position of the rubber groove, and is convenient for field construction, thereby reducing the labor intensity of workers, improving the operation efficiency, further shortening the installation period of the channel system, and creating favorable conditions for shortening the ship construction period.
3. The requirement on the labor skill of workers is not high, the labor intensity of the workers can be reduced, and the effect of knowing and releasing the production force is achieved.
Drawings
FIG. 1 is a side view of the stern door and stern ramp in a closed state.
Fig. 2 is a schematic diagram of arrangement of rubber on a frame of a stern transom plate.
FIG. 3 is a cross-sectional view of the rubber trough bracket of the stern ramp.
FIG. 4 is a schematic view of the positioning of the bracket of the rubber trough of the stern ramp.
FIG. 5 is a three-dimensional schematic view of a positioning model of a stern springboard rubber trough bracket.
In the figure, 1, a stern door; 2. a stern ramp; 3. a stern seal plate; 4. an eraser; 5. a stern springboard rubber slot positioning bracket model; 6. a stern ramp rubber trough bracket; 7. a stern springboard rubber groove; 11. a stern door hinge eye plate; 21. a stern ramp hinge eye plate; 31. a stern closing plate hinge eye plate; 8. the stern springboard rubber groove bracket positions the datum line.
Detailed Description
The invention is further described below with reference to specific embodiments:
a method for positioning a stern springboard rubber groove bracket of a stern springboard of a large ship comprises the following steps:
the first step is as follows: according to the up-down and left-right positions of the stern door 1 and the stern ramp 2 relative to the door frame of the stern sealing plate 3 and the compression amount of the rubber 4, the stern door 1 and the stern ramp 2 are hoisted to a preassembly position, the stern door 1 and the stern ramp 2 are firmly fixed by using a chain block, a limiting plate and the like, the stern sealing plate hinge eye plate 31 is positioned according to the positions of the stern door hinge eye plate 11 on the stern door 1 and the stern ramp hinge eye plate 21 on the stern ramp 2 respectively, as shown in the figure 1, the stern sealing plate hinge eye plate 31 is welded after the stern door 1 and the stern ramp 2 are hoisted, then the stern door 1 and the stern ramp 2 are hoisted, and the stern door hinge eye plate 11 and the stern ramp hinge eye plate 21 are respectively connected with the stern sealing plate hinge eye plate 31 on the stern sealing plate through hinge pins.
The second step is that: the method comprises the steps of simultaneously vertically attaching a stern springboard rubber groove positioning bracket model 5 to a bottom door frame of a stern sealing plate 3 and a stern springboard 2, marking a line along the lower end of the attachment part of the stern springboard rubber groove positioning bracket model 5 and the bottom door frame of the stern sealing plate 3 by using a marking needle, marking the line at intervals of 1m along the transverse direction of the bottom door frame of the stern sealing plate 3, wherein the marking interval is shorter, the precision is higher, and finally, the marked sections are sequentially connected by using straight lines to obtain a stern springboard rubber groove bracket positioning datum line.
The third step: the stern ramp 2 is opened by a winch, and then the stern ramp rubber groove bracket 6 is installed and welded on the door frame of the stern closing plate 3 along the positioning datum line of the stern ramp rubber groove bracket scribed in the second step.
The fourth step: and (3) installing the stern ramp rubber groove 7 on the stern ramp rubber groove bracket 6 fixedly installed in the third step, and polishing and painting the stern ramp rubber groove 7 and the stern ramp rubber groove bracket 6.
The fifth step: the rubber 4 is installed into the stern ramp rubber groove 7.
The present invention is further explained and not limited by the embodiments, and those skilled in the art can make various modifications as necessary after reading the present specification, but all the embodiments are protected by the patent law within the scope of the claims.

Claims (3)

1. A method for positioning a stern ramp rubber groove bracket of a stern ramp of a large ship is characterized by comprising the following steps:
step 1, preassembling a stern door and a stern ramp to an installation position, and temporarily fixing the stern door and the stern ramp according to the upper, lower, left and right positions of the stern door and the stern ramp relative to a stern sealing plate door frame and the compression amount of rubber;
step 2, drawing a stern springboard rubber slot bracket positioning datum line by using a stern springboard rubber slot bracket positioning model, vertically attaching the stern springboard rubber slot bracket positioning model to a bottom door frame of a stern sealing plate and the stern springboard at the same time, drawing a line along the lower end of the attachment part of the stern springboard rubber slot bracket positioning model and the bottom door frame of the stern sealing plate, drawing a line along the bottom door frame of the stern sealing plate at intervals of 0.5-1m in the transverse direction, and then sequentially connecting the drawn lines by straight lines to obtain the stern springboard rubber slot bracket positioning datum line;
step 3, opening the stern springboard, and installing the stern springboard rubber groove bracket along the scribed stern springboard rubber groove bracket positioning datum line;
step 4, installing a stern springboard rubber groove on a stern springboard rubber groove bracket;
and 5, installing rubber in the rubber groove of the stern springboard.
2. The method as claimed in claim 1, wherein the cross section of the positioning model is the same as the cross section of the rubber trough bracket.
3. The method as claimed in claim 1, wherein the rubber is polished and coated before being installed in the rubber groove, and then the rubber is installed in the rubber groove.
CN201910602017.7A 2019-07-05 2019-07-05 Rubber groove bracket positioning method for large ship stern springboard Active CN110341880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910602017.7A CN110341880B (en) 2019-07-05 2019-07-05 Rubber groove bracket positioning method for large ship stern springboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910602017.7A CN110341880B (en) 2019-07-05 2019-07-05 Rubber groove bracket positioning method for large ship stern springboard

Publications (2)

Publication Number Publication Date
CN110341880A CN110341880A (en) 2019-10-18
CN110341880B true CN110341880B (en) 2021-01-19

Family

ID=68177515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910602017.7A Active CN110341880B (en) 2019-07-05 2019-07-05 Rubber groove bracket positioning method for large ship stern springboard

Country Status (1)

Country Link
CN (1) CN110341880B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202414106U (en) * 2011-12-19 2012-09-05 舟山大神洲造船有限公司 Non-hydraulic opening structure for hydraulic type side-rolling hatch cover of ten-thousand-ton ship
KR20130049928A (en) * 2011-11-07 2013-05-15 스타코 주식회사 Auto-seal packing equipment of door for vessel
CN103847925A (en) * 2014-03-26 2014-06-11 浙江海洋学院 Mounting technique for rubber channel and rubber strip of ship stern door
CN105438404A (en) * 2015-10-27 2016-03-30 沪东中华造船(集团)有限公司 Mounting method for large stern ramp
CN205273800U (en) * 2015-10-24 2016-06-01 张家港市锦丰润尔发五金塑料厂 Boats and ships sealing door

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130049928A (en) * 2011-11-07 2013-05-15 스타코 주식회사 Auto-seal packing equipment of door for vessel
CN202414106U (en) * 2011-12-19 2012-09-05 舟山大神洲造船有限公司 Non-hydraulic opening structure for hydraulic type side-rolling hatch cover of ten-thousand-ton ship
CN103847925A (en) * 2014-03-26 2014-06-11 浙江海洋学院 Mounting technique for rubber channel and rubber strip of ship stern door
CN205273800U (en) * 2015-10-24 2016-06-01 张家港市锦丰润尔发五金塑料厂 Boats and ships sealing door
CN105438404A (en) * 2015-10-27 2016-03-30 沪东中华造船(集团)有限公司 Mounting method for large stern ramp

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
4900PCTC活动坡道制作与安装工艺;林以坚;《科技与创新》;20171001;第126-128页 *
浅谈5000PCTC滚装船RO-RO装置尾门制作安装;李明忠;《船舶》;20111215;第22卷(第6期);第67-70页 *
货滚船大型艉门的装焊精度控制;商成刚等;《金属加工》;20180901;第35-37页 *

Also Published As

Publication number Publication date
CN110341880A (en) 2019-10-18

Similar Documents

Publication Publication Date Title
CN110341878B (en) Mounting method of stern sealing plate hinge
CN108928432B (en) A kind of installation method in ultra large crude carrier energy-conservation conduit segmentation stage
CN104071300B (en) The installation method that anchor station anchor lip ground is integral prefabricated
CN110877684B (en) Positioning and mounting method for ship side door
CN102490864B (en) Underwater folding method for half ships
CN108202846B (en) Positioning method for secondary docking of ship
CN102975817A (en) Integral installation technology method of folding hatch cover and hatch coaming
CN107235117B (en) A kind of fabrication and installation method of anchor recess
CN110466689B (en) Method for controlling mounting precision of stern door hinge
CN113184131B (en) High-precision positioning and mounting method for ship stern springboard
CN101857067B (en) Special support tooling for installing translational hatch cover of bulk carrier and installation method thereof
CN110877677A (en) Integrated flat ground manufacturing method for translation type hatch cover system of large-scale ocean bulk cargo ship
CN110341880B (en) Rubber groove bracket positioning method for large ship stern springboard
CN105416523A (en) Double-plate bilge keel and mounting method thereof
CN110758673A (en) Ship side door segmented preassembling method
CN111268056A (en) Method for installing guide cover of large ore carrier
CN203094369U (en) Folded structure of cargo hold C section general assembly
CN115716521A (en) Method for carrying out strength test of ballast tank of LNG ship in dry dock state
CN114715352A (en) Method for manufacturing bow door of ship
CN103174895A (en) Cutter suction dredger over-water floating pipe hydraulic fast connector
CN202703846U (en) Fixation compound plate
CN209836956U (en) Water seal structure of tail water cooler overhaul gate
CN209410299U (en) Hoistable platform is used in a kind of maintenance of hull
CN105346686A (en) Installation method of large watertight door
CN208376998U (en) Body section closes up auxiliary device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant