CN110333458A - Electric automobile power battery component testing equipment and its control method - Google Patents

Electric automobile power battery component testing equipment and its control method Download PDF

Info

Publication number
CN110333458A
CN110333458A CN201810294973.9A CN201810294973A CN110333458A CN 110333458 A CN110333458 A CN 110333458A CN 201810294973 A CN201810294973 A CN 201810294973A CN 110333458 A CN110333458 A CN 110333458A
Authority
CN
China
Prior art keywords
test
power battery
measured
battery assembly
motorized roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810294973.9A
Other languages
Chinese (zh)
Inventor
汪滨
项诚
潘玉松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yika New Energy Automobile Co Ltd
Original Assignee
Zhejiang Yika New Energy Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yika New Energy Automobile Co Ltd filed Critical Zhejiang Yika New Energy Automobile Co Ltd
Priority to CN201810294973.9A priority Critical patent/CN110333458A/en
Publication of CN110333458A publication Critical patent/CN110333458A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/385Arrangements for measuring battery or accumulator variables
    • G01R31/3865Arrangements for measuring battery or accumulator variables related to manufacture, e.g. testing after manufacture

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Secondary Cells (AREA)

Abstract

The present invention relates to a kind of electric automobile power battery component testing equipment and its control methods.Test equipment includes rack-mounted test platform, test platform is equipped with multiple spaced motorized rollers and forms test section, two of them motorized roller is located at entrance and the exit of test section, entrance is equipped with first position inductor, the second position inductor that test position is reached for detecting power battery assembly is additionally provided in test section, test platform on the right side of test section is equipped with passage cylinder, test connector towards test section is installed, the test harness being connected on test connector is connected with battery test system in passage cylinder.Control method are as follows: drive power battery assembly to be measured to move ahead by motorized roller, position of the power battery assembly to be measured in test section is detected by position sensor, the plug of test connector is completed by passage cylinder.The present invention was not only time saving and energy saving, but also improved safety, greatly improved working efficiency.

Description

Electric automobile power battery component testing equipment and its control method
Technical field
The present invention relates to a kind of electrokinetic cell equipment more particularly to a kind of electric automobile power battery module testing to set Standby and its control method.
Background technique
Along with worldwide energy shortages and environmental requirement, the electric car of environmental protection and energy saving has become automobile industry Developing direction, the power source of electric car is exactly the power battery assembly formed after being connected in series and parallel by multisection lithium battery.It is dynamic Power battery component after the assembly is completed, needs to test its relevant parameter, performance using battery test system, to ensure that it goes out Factory's quality.Currently, the insertion and extraction of the connector of battery test system and power battery assembly docking are all by people when test Work manual operation is completed, and there are security risks, and power battery assembly volume is larger, heavier-weight, at present complete manually hand Dynamic operation moves test position to or moves away from test position, very time-consuming and laborious, influences working efficiency.
Summary of the invention
It needs manual hand manipulation to realize present invention mainly solves the test of original pair of power battery assembly to move and patch The plug of part, it is not only time-consuming and laborious, but also there is technical issues that;A kind of electric automobile power battery module testing is provided Equipment and its control method, by equipment control be automatically performed power battery assembly move and the plug of connector, both saved Shi Shengli, and safety is improved, greatly improve working efficiency.
Above-mentioned technical problem of the invention is mainly to be addressed by following technical proposals: electric car of the invention Power battery assembly test equipment including rack, is set on the rack test platform and covers on the cover on test platform, test Platform is equipped with multiple spaced motorized rollers, forms test section, and two of them motorized roller is located at test platform Entrance and exit, have the test connector of an activity installation on test platform, test connector is located at test section Right side, the test platform on the right side of test section are equipped with passage cylinder, passage cylinder and test connector and are connected, and are connected to test and connect Test harness on plug-in unit is connected with battery test system, and the entrance of test platform is equipped with first position inductor, and test is flat The second position inductor that test position is reached for detecting power battery assembly is additionally provided on platform.Motorized roller is in motor Be rotated by, drive power battery assembly to be measured to enter test section from the entrance of test platform, when power battery to be measured When component reaches test position, motorized roller stops operating, and passage cylinder acts at this time, pushes test connector to power to be measured Battery component, and plug test connector with the connector in power battery assembly to be measured, the electricity being connected with test harness Pond test macro can start to test power battery assembly to be measured.It is completed, passage cylinder counteragent pulls out Connector is tested out, and motorized roller rotation drives the power battery assembly being completed to leave survey from the exit of test platform Try area.Next power battery assembly to be measured enters back into test section and is tested.Motorized roller both plays driving power electric to be measured The effect of pond component Forward, and play the role of reducing frictional force, so that battery is moved ahead more smooth.The present invention is controlled certainly by equipment It is dynamic complete power battery assembly move and the plug of connector, be not necessarily to manual hand manipulation, it is not only time saving and energy saving, but also improve safety Property, greatly improve working efficiency.
Preferably, the test platform is equipped with the first stop cylinder and the second stop cylinder, the first stop cylinder Between the motorized roller and motorized roller adjacent thereto of entrance, the second stop cylinder is located at the motorized roller in exit Between motorized roller adjacent thereto.First stop cylinder is used to that subsequent power battery assembly to be measured to be stopped to enter test section, Second stop cylinder limits the power battery assembly to be measured for entering test section in test position.When first position inductor detects When to power battery assembly to be measured completely into test section, then the first stop cylinder acts, and rises from upwards, and blocking comes subsequent Other power battery assemblys to be measured go successively to test section;When the second position, inductor detects power battery assembly to be measured, Showing that power battery assembly to be measured arrived test position, then motorized roller stops operating, while the second stop cylinder acts, to Upper emersion stops power battery assembly to be measured and moves ahead, limited in test position.So that test connector will not shift, Ensure the connector tested in connector and power battery assembly to be measured and can correctly align, reliable grafting.
Preferably, the test platform of the test section is equipped with the guide pad being symmetrical set, guide pad difference Positioned at the left and right side of test platform entrance, the opposite face of two guide pads is a guiding surface, and guide pad is located at described Motorized roller top.Guide pad plays guiding role to the power battery assembly to be measured for be ready entering test section, it is ensured that Surveying power battery assembly will not shift, and can enter in test section along the tandem direction of test section.
Preferably, the left side of the test section, right side are respectively provided with row's directive wheel, directive wheel is located at described electronic The top of roller.The setting of directive wheel, both plays position-limiting action, it is ensured that the preceding line direction of power battery assembly to be measured, and play The effect for reducing frictional force makes battery move ahead more smooth.
Preferably, it is connected with tank chain on the test connector, the test harness being connected on test connector It is threaded through in tank chain.With the plug of test connector, test harness needs to stretch or shrink repeatedly, is easily damaged or breaks It splits.Tank chain plays a protective role to p-wire beam, and the stress of plug is undertaken by tank chain, and test harness is made to be hardly damaged or break It splits, improves reliability.
Preferably, the test platform is equipped with code reader, the setting position of code reader and power battery pack to be measured Bar code setting position on part is corresponding.By code reader, the model, parameter and requirement of power battery assembly to be measured can be read The information such as the performance reached.When power battery assembly to be measured reach test position when, code reader just with power battery pack to be measured Bar code setting position on part is corresponding, and the relevant parameter letter that power battery assembly to be measured should reach is obtained after code reader barcode scanning The actual parameter information for the power battery assembly to be measured that breath and battery test system obtain after tested is compared, to judge Whether power battery assembly to be measured is qualified out.
The control method of electric automobile power battery component testing equipment of the invention are as follows: the motorized roller is in motor Be rotated by, drive power battery assembly to be measured to enter test section from the entrance of the test platform, when described When second position inductor detects power battery assembly to be measured, show that power battery assembly to be measured arrived test position, then Motorized roller stops operating, and passage cylinder movement, pushes the test connector to power battery pack to be measured at this time Part, and make to test connector and be plugged with the connector in power battery assembly to be measured, the battery test system starts pair Power battery assembly to be measured is tested;It is completed, passage cylinder counteragent, extracts test connector, motorized roller turns It is dynamic, drive the power battery assembly being completed to leave test section from the exit of test platform.The present invention is controlled by equipment Be automatically performed power battery assembly move and the plug of connector, be not necessarily to manual hand manipulation, it is not only time saving and energy saving, but improve peace Quan Xing greatly improves working efficiency.
Preferably, the test platform is equipped with the first stop cylinder and the second stop cylinder, the first stop cylinder Between the motorized roller and motorized roller adjacent thereto of entrance, the second stop cylinder is located at the motorized roller in exit Between motorized roller adjacent thereto;The control method include: when the first position inductor detect it is to be measured When power battery assembly is completely into test section, then first stop cylinder movement rises from upwards, and blocking comes subsequent Other power battery assemblys to be measured go successively to test section, when power battery assembly to be measured reaches test position, the electricity Dynamic roller stops operating, while the second stop cylinder movement, rises from upwards, stops power battery assembly to be measured, will It is limited in test position.Test position positioning is correct, reliable, and power battery assembly to be measured is successively tested one by one.
Preferably, the test platform is equipped with code reader, the setting position of code reader and power battery pack to be measured Bar code setting position on part is corresponding;The control method include: when power battery assembly to be measured reach test position when, The code reader is just corresponding with the bar code setting position in power battery assembly to be measured, obtains after code reader barcode scanning to be measured The power electric to be measured that the relevant parameter information and the battery test system that power battery assembly should reach obtain after tested The actual parameter information of pond component is compared, to judge whether power battery assembly to be measured is qualified.
The beneficial effects of the present invention are: driving power battery assembly to be measured to move ahead by motorized roller, by position sensor Position of the power battery assembly to be measured in test section is detected, is realized by stop cylinder to power battery assembly to be measured one by one It is successively tested, and the power battery assembly to be measured in test section is properly positioned at test position, pass through passage cylinder Complete the plug of test connector.The present invention is automatically performed moving and test and patching for power battery assembly by a series of control The plug of part, it is not only time saving and energy saving, but also safety is improved, greatly improve working efficiency.
Detailed description of the invention
Fig. 1 is a kind of schematic perspective view of the invention.
Fig. 2 is that the present invention opens a kind of overlooking structure diagram after the cover.
Fig. 3 is a kind of schematic perspective view of test platform part of the present invention.
1. rack in figure, 2. test platforms, 3. covers, 4. roller mounting plates, 5. motorized rollers, 6. entrances, 7. outlets Place, 8. guide pads, 9. directive wheels, 10. first position inductors, 11. second position inductors, 12. first stop cylinders, 13. Second stop cylinder, 14. test connectors, 15. passage cylinders, 16. tank chains, 17. code readers.
Specific embodiment
Below with reference to the embodiments and with reference to the accompanying drawing the technical solutions of the present invention will be further described.
Embodiment: the electric automobile power battery component testing equipment of the present embodiment, as shown in Figure 1, including rack 1, peace It fills test platform 2 on the rack and covers on the cover 3 on test platform, bottom of the frame is equipped with multiple height-adjustable liters Descending branch support foot.Two roller mounting plates 4 are installed on test platform, as shown in Figure 2 and Figure 3, are installed between two roller mounting plates There are seven to be arranged in a row and parallel to each other, spaced motorized roller 5, formation test section, two of them motorized roller are distinguished Entrance 6 and exit 7 positioned at test section.The upper surface of two roller mounting plates are respectively equipped with a guide pad 8 and a row leads To wheel 9.Between the first motorized roller and the second motorized roller, two guide pads are symmetrical set guide pad, and two are led It is a guiding surface to the opposite face of block.Directive wheel two are one group, remove the first, second motorized roller, remaining is adjacent electronic Respectively there is one group of directive wheel between roller.The entrance of test section is equipped with first position inductor 10, also installs on test platform Have a second position inductor 11, second position inductor between the five, the 6th motorized rollers and with the 6th electronic rolling Cylinder is adjacent.It is also equipped with the first stop cylinder 12 and the second stop cylinder 13 on test platform, the first stop cylinder is located at first, Between second motorized roller, the second stop cylinder is between the six, the 7th motorized rollers.There is an activity on the right side of test section The test connector 14 of installation, on the test platform on the right side of test section installation there are two passage cylinder 15, two passage cylinders Piston is connected with left side, the right side of test connector respectively, tests on connector and is connected with tank chain 16, is connected to test and patches Test harness on part is threaded through in tank chain, and test harness is connected with battery test system.Test connector is located at test section Rear portion, in the present embodiment, test connector between the five, the 6th motorized rollers.One is equipped on the left of test section Code reader 17, in the present embodiment, code reader is between the five, the 6th motorized rollers, and the installation site phase of test connector It is corresponding.
The control method of above-mentioned electric automobile power battery component testing equipment are as follows: power battery assembly to be measured is by conveyer belt It is transported to this equipment, motorized roller rotates under the drive of the motor, drives entrance of the power battery assembly to be measured from test section Into test section, when first position, inductor detects power battery assembly to be measured completely into test section, then first stops Cylinder movement rises from upwards, and blocking comes subsequent other power battery assemblys to be measured and goes successively to test section, works as the second position When inductor detects power battery assembly to be measured, show that power battery assembly to be measured arrived test position, then motorized roller It stops operating, while the second stop cylinder acts, rises from upwards, stop power battery assembly to be measured and move ahead, limited Test position;At this point, code reader is just corresponding with the bar code setting position in power battery assembly to be measured, after code reader barcode scanning The relevant parameter information that power battery assembly to be measured should reach is obtained, while passage cylinder acts, test connector is pushed to Power battery assembly to be measured, and plug test connector with the connector in power battery assembly to be measured, grafting finishes, electricity Pond test macro starts to test power battery assembly to be measured;By the reality of the power battery assembly to be measured obtained by test Border parameter information and the relevant parameter information that should reach of power battery assembly to be measured obtained by barcode scanning are compared, thus Judge whether power battery assembly to be measured is qualified.It is completed, passage cylinder counteragent, extracts and test connector, first, The decline of second stop cylinder retracts, and motorized roller rotation drives the power battery assembly that is completed from the outlet of test platform Test section is left at place, and the power battery assembly to be measured for coming entrance enters test section, successively to power battery to be measured one by one Component completes performance test.
The present invention is automatically performed the plug for moving and testing connector of power battery assembly by a series of controls, both saves Shi Shengli, and safety is improved, greatly improve working efficiency.Equipment can carry out incessantly power electric in 24 hours when operating normally The test job of pond component.

Claims (9)

1. a kind of electric automobile power battery component testing equipment, it is characterised in that including rack, be set on the rack to test and put down Platform is equipped with multiple spaced motorized rollers with the cover on test platform, test platform is covered on, and forms test section, wherein Two motorized rollers are located at entrance and the exit of test platform, have the test of an activity installation to connect on test platform Plug-in unit, test connector are located at the right side of test section, and the test platform on the right side of test section is equipped with passage cylinder, passage cylinder with It tests connector to be connected, the test harness being connected on test connector is connected with battery test system, the import of test platform Place is equipped with first position inductor, be additionally provided on test platform one reach test position for detecting power battery assembly the Two position sensors.
2. electric automobile power battery component testing equipment according to claim 1, it is characterised in that the test is flat Platform is equipped with the first stop cylinder and the second stop cylinder, and the first stop cylinder is located at the motorized roller of entrance and adjacent thereto Motorized roller between, the second stop cylinder is located between the motorized roller and motorized roller adjacent thereto in exit.
3. electric automobile power battery component testing equipment according to claim 1, it is characterised in that the test section Test platform be equipped with the guide pad that is symmetrical set, guide pad is located at the left side and the right side of test platform entrance Side, the opposite face of two guide pads are a guiding surfaces, and guide pad is located at the top of the motorized roller.
4. electric automobile power battery component testing equipment according to claim 1 or 2 or 3, it is characterised in that described Left side, the right side of test section are respectively provided with row's directive wheel, and directive wheel is located at the top of the motorized roller.
5. electric automobile power battery component testing equipment according to claim 1 or 2 or 3, it is characterised in that described It is connected with tank chain on test connector, the test harness being connected on test connector is threaded through in tank chain.
6. electric automobile power battery component testing equipment according to claim 1 or 2 or 3, it is characterised in that described Test platform is equipped with code reader, and the bar code setting position on the setting position of code reader and power battery assembly to be measured is opposite It answers.
7. a kind of control method of electric automobile power battery component testing equipment according to claim 1, feature exist It is rotated under the drive of the motor in the motorized roller, drives power battery assembly to be measured from the import of the test platform Place enters test section and shows power battery to be measured when the second position inductor detects power battery assembly to be measured Component arrived test position, then motorized roller stops operating, and passage cylinder movement, the test is patched at this time Part pushes power battery assembly to be measured to, and plugs test connector with the connector in power battery assembly to be measured, described Battery test system start to test power battery assembly to be measured;It is completed, passage cylinder counteragent, extracts and survey It tries plug-in unit, motorized roller rotation drives the power battery assembly being completed to leave test section from the exit of test platform.
8. the control method of electric automobile power battery component testing equipment according to claim 7, it is characterised in that institute The test platform stated is equipped with the first stop cylinder and the second stop cylinder, and the first stop cylinder is located at the motorized roller of entrance Between motorized roller adjacent thereto, the second stop cylinder is located at the motorized roller and motorized roller adjacent thereto in exit Between;The control method include: when the first position inductor detect power battery assembly to be measured completely into When test section, then first stop cylinder movement rises from upwards, and blocking comes subsequent other power battery assemblys to be measured Test section is gone successively to, when power battery assembly to be measured reaches test position, the motorized roller stops operating, while institute The the second stop cylinder movement stated, rises from upwards, stops power battery assembly to be measured, limited in test position.
9. the control method of electric automobile power battery component testing equipment according to claim 7 or 8, it is characterised in that The test platform is equipped with code reader, and position is arranged in the bar code on the setting position of code reader and power battery assembly to be measured It is corresponding;The control method include: when power battery assembly to be measured reach test position when, the code reader just and Bar code setting position in power battery assembly to be measured is corresponding, and power battery assembly to be measured is obtained after code reader barcode scanning to be reached The actual parameter for the power battery assembly to be measured that the relevant parameter information and the battery test system arrived obtains after tested is believed Breath is compared, to judge whether power battery assembly to be measured is qualified.
CN201810294973.9A 2018-03-30 2018-03-30 Electric automobile power battery component testing equipment and its control method Pending CN110333458A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810294973.9A CN110333458A (en) 2018-03-30 2018-03-30 Electric automobile power battery component testing equipment and its control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810294973.9A CN110333458A (en) 2018-03-30 2018-03-30 Electric automobile power battery component testing equipment and its control method

Publications (1)

Publication Number Publication Date
CN110333458A true CN110333458A (en) 2019-10-15

Family

ID=68139471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810294973.9A Pending CN110333458A (en) 2018-03-30 2018-03-30 Electric automobile power battery component testing equipment and its control method

Country Status (1)

Country Link
CN (1) CN110333458A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5549443A (en) * 1994-01-06 1996-08-27 Hammerslag; Julius G. Battery charging and transfer system
CN103230883A (en) * 2013-03-20 2013-08-07 浙江杭可科技有限公司 Automatic grading control apparatus of power lithium battery
CN104880674A (en) * 2015-05-14 2015-09-02 苏州大源自动化科技股份有限公司 Battery on-line detector
CN205629150U (en) * 2016-05-05 2016-10-12 江苏金铁人自动化科技有限公司 Carry socket to press automation equipment of riveting and detecting
CN106935877A (en) * 2017-04-28 2017-07-07 浙江杭可科技股份有限公司 Soft package lithium battery cold-hot pressure fixture is melted into automatic assembly line
CN106986164A (en) * 2016-12-30 2017-07-28 浙江时空能源技术有限公司 Semi-automatic turnover machine and its control method
CN206373224U (en) * 2016-12-31 2017-08-04 万丰镁瑞丁新材料科技有限公司 A kind of stamping line of automotive upholstery
CN107064821A (en) * 2017-06-29 2017-08-18 浙江杭可科技股份有限公司 The automatic OCV test equipments of column lithium ion battery
CN208044036U (en) * 2018-03-30 2018-11-02 浙江伊卡新能源汽车有限公司 A kind of electric automobile power battery component testing equipment

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5549443A (en) * 1994-01-06 1996-08-27 Hammerslag; Julius G. Battery charging and transfer system
CN103230883A (en) * 2013-03-20 2013-08-07 浙江杭可科技有限公司 Automatic grading control apparatus of power lithium battery
CN104880674A (en) * 2015-05-14 2015-09-02 苏州大源自动化科技股份有限公司 Battery on-line detector
CN205629150U (en) * 2016-05-05 2016-10-12 江苏金铁人自动化科技有限公司 Carry socket to press automation equipment of riveting and detecting
CN106986164A (en) * 2016-12-30 2017-07-28 浙江时空能源技术有限公司 Semi-automatic turnover machine and its control method
CN206373224U (en) * 2016-12-31 2017-08-04 万丰镁瑞丁新材料科技有限公司 A kind of stamping line of automotive upholstery
CN106935877A (en) * 2017-04-28 2017-07-07 浙江杭可科技股份有限公司 Soft package lithium battery cold-hot pressure fixture is melted into automatic assembly line
CN107064821A (en) * 2017-06-29 2017-08-18 浙江杭可科技股份有限公司 The automatic OCV test equipments of column lithium ion battery
CN208044036U (en) * 2018-03-30 2018-11-02 浙江伊卡新能源汽车有限公司 A kind of electric automobile power battery component testing equipment

Similar Documents

Publication Publication Date Title
CN208044036U (en) A kind of electric automobile power battery component testing equipment
CN101941149B (en) Caterpillar track four-axis automatic screwing machine
CN204515082U (en) Mainboard testing apparatus
KR970070381A (en) Car parking lot
KR20170030014A (en) An assembly line for testing motor driving
CN104535301B (en) A kind of image data acquiring equipment
CN110333458A (en) Electric automobile power battery component testing equipment and its control method
CN219978424U (en) Online detection equipment for data line connector
CN110377011A (en) A kind of Auto-Test System and method of electric machine controller
CN218470946U (en) Quick detection device of lithium cell electric core group polarity
CN103741598A (en) Upper chord inspection vehicle
CN111307363A (en) Tire pressure detection device and use method thereof
CH706305A2 (en) Arrangement and method for testing of a solar module.
CN108266035A (en) A kind of control system of composite type stereo garage
CN216622541U (en) Automatic safety gauge detection equipment
CN115870617A (en) Laser welding production line and method
CN211344574U (en) Detection device for detecting solar cell panel
CN204422713U (en) A kind of equipment of image data acquiring equipment runs board
CN205291842U (en) SMT stokehold casting die machine
CN105634407A (en) Battery piece power-up device
CN206278646U (en) Keyboard circuit dispatches from the factory full inspection station
CN103758034A (en) First quarter checking vehicle
CN220305387U (en) Automatic butt joint device of galvanic pile test bench
CN114354480B (en) New energy automobile battery package bottom is cut and is rubbed test device
KR20230168336A (en) LED floor signal light Inspection System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191015