CN110331993A - A kind of filling and injecting slurry method of integrating tunnel lining quality defect blank repairing - Google Patents

A kind of filling and injecting slurry method of integrating tunnel lining quality defect blank repairing Download PDF

Info

Publication number
CN110331993A
CN110331993A CN201910778648.4A CN201910778648A CN110331993A CN 110331993 A CN110331993 A CN 110331993A CN 201910778648 A CN201910778648 A CN 201910778648A CN 110331993 A CN110331993 A CN 110331993A
Authority
CN
China
Prior art keywords
cavity
slurry
concrete
pipe
skylight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910778648.4A
Other languages
Chinese (zh)
Other versions
CN110331993B (en
Inventor
龚伦
王立川
樊永杰
阳军生
仇文革
武朝光
张致心
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
China Railway 18th Bureau Group Co Ltd
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201910778648.4A priority Critical patent/CN110331993B/en
Publication of CN110331993A publication Critical patent/CN110331993A/en
Application granted granted Critical
Publication of CN110331993B publication Critical patent/CN110331993B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Abstract

The invention discloses a kind of filling and injecting slurry methods of integrating tunnel lining quality defect blank repairing, belong to tunnel repairing field;Successively cuts standard thickness the following steps are included: being less than to tunnel vault lining thickness and carry out the regulation that puts in a skylight in the presence of the disease compared with macroscopic-void behind, prepare several row slurry pipes and equidistantly bores row's slurry outlet in top surface along row slurry pipe longitudinal direction, non-closed sealing protection is carried out to injected hole, then it is close to just branch along the surrounding of skylight cavity or waterproof level lays row slurry pipe, in the radially arranged more Grouting Pipes of the edge of skylight, slurry pipe is let out in highest point setting in cavity, after being layered gunite concrete and final set in cavity, through Grouting Pipe slip casting until after letting out slurry pipe full packages pulp, stop slip casting;And protective layer is sprayed in concrete surface, the present invention has many advantages, such as that design is reasonable, of simple structure and low cost, operates conveniently, construction safety is reliable.

Description

A kind of filling and injecting slurry method of integrating tunnel lining quality defect blank repairing
Technical field
The present invention relates to tunnels to repair field, and in particular to a kind of repairing of integrating tunnel lining quality defect blank Filling and injecting slurry method.
Background technique
Since there are corrosivity for underground water, so that tunnel lining concrete deteriorates, especially in percolating water development area It is in bulk shape that corrosion is relatively deep;When corrosive medium is mainly calcium sulfate in tunnel environment, concrete is corroded with crystallinity Effect, underground water is contacted with lining cutting leads to loose concrete, and intensity gradually reduces, and percolating water develops paragraph, sulfate lining in water It builds surface gradually to deposit, deterioration is caused gradually to aggravate.The formation of lining cutting back cavity is mainly by three reasons:
(1): the constructing tunnel time is more early, construction relatively fall behind, construction period Blasting Control is not tight, after backbreaking not into Row in time, effectively backfills;
(2): tunnel surrounding condition is poor, and mainly based on argillaceous siltstoue, silty, it is close to be influenced occurrence by gauffer Level, the easy softening and shedding of country rock after excavation form cavity;
(3): after landslide, water burst (mud) occur for construction period, a large amount of timber being taken to be supported measure.
When larger less than 15cm, lining cutting back cavity floor projection scale there are lining thickness, it need to be less than using cutting The lining cutting (i.e. blank) of 20cm, then repaired by way of spray-fiber concrete or form concrete, because of coagulation It is not closely connected when soil shrinks or applies, it often results in mending concrete and there is gap or smaller cavity behind, cannot reach ideal Tunnel stress, in order to improve tunnel-liner stress, so need to make tunnel reach ideal stress using filling and injecting slurry State.
Summary of the invention
In view of the deficiencies of the prior art, the present invention proposes a kind of repairings of integrating tunnel lining quality defect blank Filling and injecting slurry method, specific technical solution are as follows:
A kind of filling and injecting slurry method of integrating tunnel lining quality defect blank repairing, successively the following steps are included:
(S1): tunnel Arch lining thickness being less than and cuts standard thickness and is opened behind in the presence of the disease compared with macroscopic-void Skylight regulation;
(S2): prepare several rows slurry pipe and equidistantly bore row's slurry outlet in top surface along row slurry pipe is longitudinal, to injected hole into Then row non-closed sealing protection lays row slurry pipe along skylight cavity surrounding, need will to go the top surface for starching pipe tight in the procedures of establishment Paste waterproof layer arrangement;
(S3): being connected in the radially arranged more Grouting Pipes of the edge of skylight, and by three-way connection with row slurry pipe;
(S4): slurry pipe is let out in the highest point setting in cavity, and the spacing on the top and waterproof layer of letting out slurry pipe is not more than 1cm, The bottom end for letting out slurry pipe is arranged outside tunnel-liner;
(S5): after being layered gunite concrete and concrete initial set into cavity, by Grouting Pipe slip casting until wait let out slurry After pipe full packages pulp, stop slip casting;
(S6): before the concrete final set of injection, clearing up spray concrete surface with medium hard steel brush, keep concrete and former lining cutting neat It is flat, and protective layer is sprayed in concrete surface.
The present invention will first be abolished in tunnel less than the lining cutting for cutting standard thickness and back cavity, be subsequent grouting operation Operating space is provided, staff, which is expert to starch to open up injected hole on pipe and carry out non-closed sealing to injected hole, to be protected, and is avoided Residue in row slurry pipe the procedures of establishment in cavity will not block injected hole, while slurry can break through non-closed sealing and to cavity It is filled.When starching pipe full packages pulp simultaneously to be arranged on letting out in cavity, show behind gap or small in cavity regulation range Empty full-filling is full, can stop slip casting, the final back cavity slip casting for realizing lining concrete in tunnel.
Preferably, no less than 3 layers of gunite concrete should be divided at cavity in step (S5);And it need to be sprayed in the last layer Slip casting in cavity is completed before penetrating concrete.
The present invention is not closely connected when avoiding generating concrete shrinkage or applying by carrying out multi-layer concrete injection to cavity And it causes mending concrete behind and still there is a situation where smaller cavity, while by being completed before the last layer gunite concrete Slip casting in cavity and so that slip casting is reached ideal effect, so that tunnel is in ideal stress.
Preferably, being both needed to be laid with silent steel mesh after every layer of gunite concrete.
The present invention improves the structural strength of concrete at cavity by being laid with silent steel mesh after gunite concrete, It avoids because of the reinforcing bar selvage circle reinforcing bar exposure that is open.
Preferably, the regular shape of the skylight and side of skylight is using circular construction joint as boundary in step (S1), remaining Skylight boundary lining concrete thickness is not less than 20cm.
The present invention is operated by using the skylight of regular shape convenient for operator, while skylight boundary lining concrete Thickness is not less than 20cm, it is ensured that the overall stability and safety of structure after the regulation that puts in a skylight, and improve its stress.
Preferably, it is vertical the implantation of sky side should to be faced in skylight when the thickness of protection tier of skylight boundary is more than 15cm The circumferential reinforcement for being 18cm to 22cm to spacing, when thickness of protection tier is more than 20cm using drilling implantation, as reinforcing bar guarantor Covering thickness is less than 20cm and then welds implantation using with raw steel tendon protective layer.
The present invention improves to put in a skylight and renovates the effective connection and entirety of structure by being implanted into circumferential reinforcement in skylight Stability, while different implantations is taken according to the different-thickness of cover to reinforcement, perfect implantation effect while, mention High bearing capacity.
Preferably, step (S1) if in empty inner waterproofing plate tighten and not closely connected preliminary bracing, need to cut along longitudinal direction Repairing splash guard makes its closely connected preliminary bracing afterwards.
The present invention repairs splash guard after blank, and preliminary bracing is avoided to seep after slip casting mending course It leaks and tunnel is adversely affected.
Preferably, the material that protective layer uses in step (S6) is high osmosis, the epoxy resin of high-durability, and In addition to close to the side of construction joint of tunnel, remaining marginal spray epoxy resin range exceeds pneumatically placed concrete boundary 40cm extremely 60cm。
The present invention passes through sprayed on material as high osmosis, the protective layer of the epoxy resin of high-durability, and except close to tunnel Outside the side of road construction joint, remaining marginal spray epoxy resin range exceeds pneumatically placed concrete boundary a distance, it is ensured that spray is mixed Solidifying soil surface will not occur scaling-off and adversely affect to tunnel operation.
Preferably, needing to take protection to contact net, railway roadbed and rail in step (S5) into cavity when pneumatically placed concrete Measure.
The present invention is by taking safeguard procedures to contact net, railway roadbed and rail, generation when avoiding the pneumatically placed concrete in cavity Residue fall into contact net, railway roadbed and rail etc., influence tunnel operation.
Preferably, the diameter that row slurry pipe and Grouting Pipe use is φ 25 to φ 30, the material used is PVC, and phase The spacing of adjacent injected hole is 18cm to 22cm.
Preferably, vault preliminary bracing behind in regulation range need to be verified in step (S1) before cavity blemish regulation Closely knit situation.
The present invention renovates the closely knit situation of vault preliminary bracing behind in range by verifying before cavity blemish is renovated, and makes Staff, which can have the overall condition of preliminary bracing and tunnel, adequately to be understood, and is arranged convenient for supplementing necessary regulation It applies.
The invention has the following advantages:
The present invention will first be abolished in tunnel less than the lining cutting for cutting standard thickness and back cavity, be subsequent grouting operation Operating space is provided, staff, which is expert to starch to open up injected hole on pipe and carry out non-closed sealing to injected hole, to be protected, and is avoided Residue in row slurry pipe the procedures of establishment in cavity will not block injected hole, while slurry can break through non-closed sealing and to cavity It is filled.When starching pipe full packages pulp simultaneously to be arranged on letting out in cavity, show behind gap or small in cavity regulation range Empty full-filling is full, can stop slip casting, and the final back cavity slip casting for realizing lining concrete in tunnel makes tunnel reach reason The stress thought.The present invention have design it is reasonable, of simple structure and low cost, operate conveniently, that construction safety is reliable etc. is excellent Point can promote the use of cavity processing construction field or the cavity processing of mountain tunnel structure outside on the outside of urban subway tunnel structure Construction field.
Detailed description of the invention
Fig. 1 is the sectional schematic diagram in tunnel in the present invention;
Fig. 2 is structural schematic diagram empty in the present invention;
Fig. 3 is the structural schematic diagram of row slurry pipe and Grouting Pipe cooperation in the present invention.
In figure: the cavity 1-;2- lining cutting;3- skylight;4- row slurry pipe;5- slurry outlet;6- Grouting Pipe;7- lets out slurry pipe;8- protection Layer;The silent steel mesh of 9-;10- splash guard;11- preliminary bracing
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
Embodiment 1
Referring to Fig. 1 to Fig. 3, a kind of filling of 2 mass defect blank of integrating tunnel lining cutting repairing provided by the invention Slip casting method, successively the following steps are included:
(S1): verifying the closely knit situation of 11 behind of vault preliminary bracing in regulation range before empty 1 defect regulation, make work Adequately understanding can be had to the overall condition of preliminary bracing 11 and tunnel by making personnel, be arranged convenient for supplementing necessary regulation It applies.If empty 1 inner waterproofing plate 10 is tightened and not closely connected preliminary bracing 11, repairing splash guard 10 after cutting along longitudinal direction is needed to keep its close Preliminary bracing 11 is pasted, the present invention repairs splash guard 10 after blank, and preliminary bracing 11 is avoided to repair in slip casting Leakage occurs after journey and tunnel is adversely affected.
Then it is abolished in tunnel less than the lining cutting 2 for cutting standard thickness 20cm and back cavity 1, i.e. " Kaitian Window " provides operating space for subsequent grouting operation.The regular shape of the skylight 3 and side of skylight 3 is with circular construction joint Boundary, remaining 3 boundary lining cutting of skylight, 2 concrete thickness are not less than 20cm.The present invention is convenient for by using the skylight 3 of regular shape Operator's operation, while 3 boundary lining cutting of skylight, 2 concrete thickness makes to put in a skylight the whole of structure after 3 regulations not less than 20cm Body stability and safety, and improve its stress;
(S2): preparing two sets of row slurry 4 systems of pipe and equidistantly bore row's slurry outlet 5, row slurry pipe along the longitudinal top surface of row slurry pipe 4 4 diameters used is φ 30, and the material used is pvc pipe, and the spacing of adjacent injected hole is 20cm.It is expert at and starches the arrangement of pipe 4 It is preceding that non-closed sealing protection is carried out to injected hole, it is longitudinal by 5 seal of slurry outlet along row slurry pipe 4 with sealing compound, it avoids being expert at and starches pipe 4 Residue during laying and pneumatically placed concrete in cavity 1 will not block injected hole, while slurries can break through non-closed sealing simultaneously Cavity 1 is filled.Then the surrounding along 3 cavity 1 of skylight lays row slurry pipe 4, needs to go in the procedures of establishment to starch pipe 4 It is close to waterproof layer arrangement in top surface;
(S3): starching 4 phase of pipe in radially arranged two Grouting Pipes 6 of the edge of skylight 3, and by three-way connection and row Even;The diameter that Grouting Pipe 6 uses is φ 30 and the material that uses is pvc pipe.In the present invention staff by Grouting Pipe 6 to Row slurry pipe 4 conveys slurry, and sprays from injected hole and tamp to cavity 1;
(S4): slurry pipe 7 is let out in the highest point setting in cavity 1, and the spacing on the top and waterproof layer of letting out slurry pipe 7 is not more than 1cm, the bottom end for letting out slurry pipe 7 are arranged outside tunnel-liner 2, to be arranged on when letting out slurry 7 full packages pulp of pipe, sky is shown in cavity 1 Behind gap or small empty 1 full-filling are full in chamber regulation range, can stop slip casting, understand in cavity 1 convenient for staff Slip casting state.It avoids generating the situation that slip casting is insufficient or slip casting is excessive;
(S5): after being layered gunite concrete and concrete initial set into cavity 1, by 6 slip casting of Grouting Pipe until wait let out After starching 7 full packages pulp of pipe, stop slip casting.No less than 3 layers of gunite concrete should be divided at cavity 1;And it need to be sprayed in the last layer Slip casting in cavity is completed before penetrating concrete.The present invention avoids generating concrete receipts by carrying out multi-layer concrete injection to cavity 1 Not closely connected when contracting or applying and cause mending concrete still to there is for smaller empty 1 the case where behind, while by last Slip casting in cavity is completed before one layer of gunite concrete and slip casting is made to reach ideal effect, and tunnel is made to be in ideal stress.
It is both needed to be laid with silent steel mesh 9 after every layer of gunite concrete, improves the structural strength of concrete at cavity 1, keep away Exempt from that there is a situation where collapse, deform.Into cavity 1 when pneumatically placed concrete, need to take protection to arrange contact net, railway roadbed and rail It applies, avoids the residue generated when the pneumatically placed concrete in cavity 1 from falling into contact net, railway roadbed and rail etc., influence tunnel operation;
(S6): before the concrete final set of injection, repairing receipts face being carried out to the concrete in 3 range of skylight, makes concrete It is flushed with former lining cutting 2, and sprays protective layer 8 in concrete surface.The material that protective layer 8 uses is high osmosis, high-durability Epoxy resin, and except close to construction joint of tunnel side in addition to, remaining marginal spray epoxy resin range exceeds spray coagulation Native boundary 50cm.The present invention passes through sprayed on material as high osmosis, the protective layer 8 of the epoxy resin of high-durability, and removes and lean on Outside the side of nearly construction joint of tunnel, remaining marginal spray epoxy resin range exceeds pneumatically placed concrete boundary a distance, it is ensured that Pneumatically placed concrete surface will not occur slag-off phenomenon and adversely affect to tunnel operation.
The present invention will first be abolished in tunnel less than the lining cutting 2 for cutting standard thickness and back cavity 1, be grasped for subsequent slip casting Make offer operating space, staff, which is expert to starch to open up injected hole on pipe 4 and carry out non-closed sealing to injected hole, to be protected, and is avoided The residue starched in 4 the procedures of establishment of pipe in cavity 1 of being expert at will not block injected hole, while slurry can break through non-closed sealing and right Cavity 1 is filled.It is empty behind in cavity regulation range to be arranged on when letting out slurry 7 full packages pulp of pipe, showing in cavity 1 simultaneously Gap or small empty 1 full-filling are full, can stop slip casting, final 1 slip casting of back cavity for realizing lining concrete in tunnel 2.
Embodiment 2
With further reference to Fig. 2 to Fig. 3, the filling of 2 mass defect blank of the integrating tunnel lining cutting repairing of the present embodiment Slip casting method is substantially the same manner as Example 1, and difference is, when the thickness of protection tier of 3 boundary of skylight is more than in step (S1) When 15cm, the circumferential reinforcement that sky side implantation longitudinal pitch is 20cm should be faced in skylight 3, when thickness of protection tier is more than 20cm It is then implanted into using with the welding of raw steel tendon protective layer using drilling implantation, when thickness of protection tier is less than 20cm.The present invention passes through It is being implanted into circumferential reinforcement in skylight 3, is improving the stability of skylight 3 during the work time, while according to cover to reinforcement Different-thickness takes different implantations, and perfect implantation effect while improves work efficiency.
The present invention will first be abolished in tunnel less than the lining cutting 2 for cutting standard thickness and back cavity 1, be grasped for subsequent slip casting Make offer operating space, staff, which is expert to starch to open up injected hole on pipe 4 and carry out non-closed sealing to injected hole, to be protected, and is avoided The residue starched in 4 the procedures of establishment of pipe in cavity 1 of being expert at will not block injected hole, while slurry can break through non-closed sealing and right Cavity 1 is filled.It is empty behind in cavity regulation range to be arranged on when letting out slurry 7 full packages pulp of pipe, showing in cavity 1 simultaneously Gap or small empty 1 full-filling are full, can stop slip casting, and final 1 slip casting of back cavity for realizing lining concrete in tunnel 2 makes Tunnel reaches ideal stress.The present invention is reasonable, of simple structure and low cost with design, operates conveniently, construction safety The advantages that reliable, can promote the use of cavity 1 on the outside of urban subway tunnel structure and handle outside construction field or mountain tunnel structure Side cavity 1 handles construction field.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that including the article of a series of elements or equipment not only includes those elements, but also including not having There is the other element being expressly recited, or further includes for this article or the intrinsic element of equipment.Do not limiting more In the case where system, the element that is limited by sentence " including ... ", it is not excluded that also deposited in the article or equipment for including element In other identical element.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of filling and injecting slurry method of integrating tunnel lining quality defect blank repairing, which is characterized in that successively include with Lower step:
(S1): tunnel Arch lining thickness being less than and cuts standard thickness and puts in a skylight behind in the presence of the disease compared with macroscopic-void Regulation;
(S2): preparing several row slurry pipes and equidistantly bore row's slurry outlet in top surface along row slurry pipe longitudinal direction, injected hole is carried out non- Then closure sealing protection lays row slurry pipe along skylight cavity surrounding, need will to go the top surface of slurry pipe to be close in the procedures of establishment anti- Water layer arrangement;
(S3): being connected in the radially arranged more Grouting Pipes of the edge of skylight, and by three-way connection with row slurry pipe;
(S4): slurry pipe is let out in the highest point setting in cavity, is let out the top of slurry pipe and the spacing of waterproof layer no more than 1cm, is let out slurry The bottom end of pipe is arranged outside tunnel-liner;
(S5): by Grouting Pipe slip casting until full wait let out slurry pipe after being layered gunite concrete and concrete initial set into cavity After pipe pulp, stop slip casting;
(S6): before the concrete final set of injection, spray concrete surface is cleared up with medium hard steel brush, flushes concrete with former lining cutting, and Protective layer is sprayed in concrete surface.
2. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 1, feature It is, no less than 3 layers of gunite concrete should be divided at cavity in the step (S5);And it need to be in the last layer gunite concrete Preceding completion cavity internal pore slip casting.
3. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 2, feature It is, is both needed to be laid with silent steel mesh after every layer of gunite concrete.
4. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 1, feature It is, the regular shape of the skylight and side of skylight is using circular construction joint as boundary, remaining skylight boundary in the step (S1) Locate lining concrete thickness and is not less than 20cm.
5. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 4, feature It is, when the thickness of protection tier of skylight boundary is more than 15cm, should face sky side implantation longitudinal pitch in skylight is 18cm To the circumferential reinforcement of 22cm, it is implanted into when thickness of protection tier is more than 20cm using drilling, when thickness of protection tier is less than 20cm then welds implantation using with raw steel tendon protective layer.
6. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 1, feature Be, the step (S1) if in empty inner waterproofing plate tighten and not closely connected preliminary bracing, need to repair after cutting along longitudinal direction anti- Water plate makes its closely connected preliminary bracing.
7. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 1, feature It is, the material that protective layer uses in the step (S6) removes for high osmosis, the epoxy resin of high-durability close to tunnel Outside the side of road construction joint, remaining marginal spray epoxy resin range exceeds pneumatically placed concrete boundary 40cm to 60cm.
8. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 1, feature It is, when pneumatically placed concrete, needs to take safeguard procedures to contact net, railway roadbed and rail into cavity in the step (S5).
9. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 1, feature It is, the diameter that the row slurry pipe is used with Grouting Pipe is φ 25 to φ 30, and the material used is PVC, and adjacent injected hole Spacing be 18cm to 22cm.
10. the filling and injecting slurry method of integrating tunnel lining quality defect blank repairing according to claim 1, feature It is, in the step (S1) before cavity blemish regulation, the closely knit situation of vault preliminary bracing behind in regulation range need to be verified.
CN201910778648.4A 2019-08-22 2019-08-22 Filling and grouting method combined with 'skylight opening' repair of tunnel lining quality defects Active CN110331993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910778648.4A CN110331993B (en) 2019-08-22 2019-08-22 Filling and grouting method combined with 'skylight opening' repair of tunnel lining quality defects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910778648.4A CN110331993B (en) 2019-08-22 2019-08-22 Filling and grouting method combined with 'skylight opening' repair of tunnel lining quality defects

Publications (2)

Publication Number Publication Date
CN110331993A true CN110331993A (en) 2019-10-15
CN110331993B CN110331993B (en) 2021-02-26

Family

ID=68150113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910778648.4A Active CN110331993B (en) 2019-08-22 2019-08-22 Filling and grouting method combined with 'skylight opening' repair of tunnel lining quality defects

Country Status (1)

Country Link
CN (1) CN110331993B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110966021A (en) * 2019-12-20 2020-04-07 西南交通大学 A renovate structure that is used for operation tunnel to strut large-scale cavity behind one's back
CN111206941A (en) * 2020-01-15 2020-05-29 中铁十六局集团有限公司 Tunnel lining thickness deficiency processing method
CN111561329A (en) * 2020-05-11 2020-08-21 中铁十八局集团有限公司 Method for repairing water permeable cavern below inverted arch of railway tunnel in water reservoir explosion roof
CN111706361A (en) * 2020-06-04 2020-09-25 中铁大桥勘测设计院集团有限公司 Steel frame back filling equipment in tunnel and construction method thereof
CN113323694A (en) * 2021-06-29 2021-08-31 重庆科技学院 Tunnel lining cavity negative pressure grouting process
CN113669083A (en) * 2021-10-08 2021-11-19 中铁第一勘察设计院集团有限公司 Tunnel repairing structure based on load conversion and cap type and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895585A (en) * 2015-04-30 2015-09-09 中铁二十一局集团第四工程有限公司 Construction method of reserved grouting pipe of tunnel vault
CN105178980A (en) * 2015-09-07 2015-12-23 中南大学 Skylight-forming lining structure repair method for tunnels
CN106285722A (en) * 2016-08-30 2017-01-04 中铁十局集团第四工程有限公司 A kind of device preventing tunnel double-lining vault to come to nothing and construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895585A (en) * 2015-04-30 2015-09-09 中铁二十一局集团第四工程有限公司 Construction method of reserved grouting pipe of tunnel vault
CN105178980A (en) * 2015-09-07 2015-12-23 中南大学 Skylight-forming lining structure repair method for tunnels
CN106285722A (en) * 2016-08-30 2017-01-04 中铁十局集团第四工程有限公司 A kind of device preventing tunnel double-lining vault to come to nothing and construction method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110966021A (en) * 2019-12-20 2020-04-07 西南交通大学 A renovate structure that is used for operation tunnel to strut large-scale cavity behind one's back
CN110966021B (en) * 2019-12-20 2022-03-01 西南交通大学 A renovate structure that is used for operation tunnel to strut large-scale cavity behind one's back
CN111206941A (en) * 2020-01-15 2020-05-29 中铁十六局集团有限公司 Tunnel lining thickness deficiency processing method
CN111561329A (en) * 2020-05-11 2020-08-21 中铁十八局集团有限公司 Method for repairing water permeable cavern below inverted arch of railway tunnel in water reservoir explosion roof
CN111561329B (en) * 2020-05-11 2022-03-15 中铁十八局集团有限公司 Method for repairing water permeable cavern below inverted arch of railway tunnel in water reservoir explosion roof
CN111706361A (en) * 2020-06-04 2020-09-25 中铁大桥勘测设计院集团有限公司 Steel frame back filling equipment in tunnel and construction method thereof
CN113323694A (en) * 2021-06-29 2021-08-31 重庆科技学院 Tunnel lining cavity negative pressure grouting process
CN113323694B (en) * 2021-06-29 2024-02-20 重庆科技学院 Negative pressure grouting process for tunnel lining cavity
CN113669083A (en) * 2021-10-08 2021-11-19 中铁第一勘察设计院集团有限公司 Tunnel repairing structure based on load conversion and cap type and construction method thereof
CN113669083B (en) * 2021-10-08 2023-10-10 中铁第一勘察设计院集团有限公司 Tunnel repairing structure based on load conversion and cap type and construction method thereof

Also Published As

Publication number Publication date
CN110331993B (en) 2021-02-26

Similar Documents

Publication Publication Date Title
CN110331993A (en) A kind of filling and injecting slurry method of integrating tunnel lining quality defect blank repairing
CN105178980B (en) Put in a skylight liner structure restorative procedure for a kind of tunnel
CN106761810A (en) A kind of large-deformation tunnel in soft rock supporting structure system and its construction method
CN110005442A (en) Under wear existing building Urban Underground mining sectbn surrounding rock consolidation technique
CN104675408B (en) High hydraulic pressure extra long distance large cross-section tunnel liquid nitrogen freezing system and shield shield tail brush quick change method
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN107587557A (en) Outdoor water engineering construction method
CN106050266A (en) Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel
CN111287759B (en) Shallow-buried close-connection underground excavation tunnel construction method
CN103244128A (en) Method for constructing large-section karst tunnels through double sidewall pilot tunnel and reservation core soil methods
CN113833480A (en) Shield initial tunneling and arrival construction method
CN112901207B (en) Treatment method for collapse in tunnel during arch change of secondary lining in sulfate corrosion section of operation tunnel
CN104895581A (en) Tunnel lining rapid repair structure based on carbon fiber woven mesh and repair method thereof
CN106894428A (en) A kind of multi layer waterproof method for blocking of mass raft foundation dewatering well
CN206143827U (en) Underground works crack repairing structure
CN110080789A (en) A kind of shield sky, which pushes away, spells section of jurisdiction construction
CN106869151A (en) A kind of bridge construction method of deep foundation ditch
CN104060590B (en) The reinforcement leakage preventing structure of a kind of pressure diversion tunnel and construction method thereof
CN107574834A (en) A kind of old basic transformation reinforcement means of power machine
CN201943086U (en) Underground building wall body
CN204358338U (en) The repair structure of PCCP pipe
CN112482415B (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition
CN207211188U (en) Outer wall of underground structure HCMW engineering methods overlap wall
CN110159307A (en) A kind of tunnel multilayer grouting process
CN108547625A (en) TBM cutterhead method for dismounting in a kind of tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Gong Lun

Inventor after: Wu Chaoguang

Inventor after: Zhang Zhixin

Inventor after: Liao Qibin

Inventor after: Wei Min

Inventor after: Wang Lichuan

Inventor after: Fan Yongjie

Inventor after: Lin Mengjun

Inventor after: Qiu Wenge

Inventor after: Yang Junsheng

Inventor after: Wang Chuanhu

Inventor before: Gong Lun

Inventor before: Wang Lichuan

Inventor before: Fan Yongjie

Inventor before: Yang Junsheng

Inventor before: Qiu Wenge

Inventor before: Wu Chaoguang

Inventor before: Zhang Zhixin

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240415

Address after: 610031 north section of two ring road, Sichuan, Chengdu

Patentee after: SOUTHWEST JIAOTONG University

Country or region after: China

Patentee after: CHINA RAILWAY 18 BUREAU GROUP Co.,Ltd.

Address before: 610031 No. two, section 111, ring road, Chengdu, Sichuan, China

Patentee before: SOUTHWEST JIAOTONG University

Country or region before: China