- CN110331993A CN110331993A CN201910778648.4A CN201910778648A CN110331993A CN 110331993 A CN110331993 A CN 110331993A CN 201910778648 A CN201910778648 A CN 201910778648A CN 110331993 A CN110331993 A CN 110331993A
- Authority
- CN
- China
- Prior art keywords
- cavity
- slurry
- concrete
- pipe
- skylight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007547 defect Effects 0.000 title claims abstract description 19
- 238000007613 slurry method Methods 0.000 title claims abstract description 16
- 239000004567 concrete Substances 0.000 claims abstract description 66
- 239000002002 slurry Substances 0.000 claims abstract description 54
- 238000007569 slipcasting Methods 0.000 claims abstract description 33
- 238000010276 construction Methods 0.000 claims abstract description 18
- 238000007789 sealing Methods 0.000 claims abstract description 14
- 239000011378 shotcrete Substances 0.000 claims abstract description 14
- 239000011241 protective layer Substances 0.000 claims abstract description 12
- 201000010099 disease Diseases 0.000 claims abstract description 3
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 claims abstract description 3
- 239000011800 void material Substances 0.000 claims abstract description 3
- 238000005520 cutting process Methods 0.000 claims description 25
- 239000010410 layer Substances 0.000 claims description 20
- 238000000034 method Methods 0.000 claims description 12
- 238000002513 implantation Methods 0.000 claims description 11
- 239000007921 spray Substances 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000003822 epoxy resin Substances 0.000 claims description 10
- 229920000647 polyepoxide Polymers 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 8
- 230000002787 reinforcement Effects 0.000 claims description 7
- 238000002347 injection Methods 0.000 claims description 5
- 239000007924 injection Substances 0.000 claims description 5
- 230000008439 repair process Effects 0.000 claims description 5
- 238000005553 drilling Methods 0.000 claims description 3
- 210000002435 tendon Anatomy 0.000 claims description 3
- 238000004078 waterproofing Methods 0.000 claims description 3
- 239000011148 porous material Substances 0.000 claims 1
- 238000013461 design Methods 0.000 abstract description 3
- 229920002472 Starch Polymers 0.000 description 7
- 235000019698 starch Nutrition 0.000 description 7
- 230000000694 effects Effects 0.000 description 5
- 239000008107 starch Substances 0.000 description 5
- 238000009955 starching Methods 0.000 description 5
- 230000002411 adverse Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- OSGAYBCDTDRGGQ-UHFFFAOYSA-L calcium sulfate Chemical compound [Ca+2].[O-]S([O-])(=O)=O OSGAYBCDTDRGGQ-UHFFFAOYSA-L 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000001502 supplementing effect Effects 0.000 description 2
- QAOWNCQODCNURD-UHFFFAOYSA-L Sulfate Chemical compound [O-]S([O-])(=O)=O QAOWNCQODCNURD-UHFFFAOYSA-L 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910778648.4A CN110331993B (en) | 2019-08-22 | 2019-08-22 | Filling and grouting method combined with 'skylight opening' repair of tunnel lining quality defects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910778648.4A CN110331993B (en) | 2019-08-22 | 2019-08-22 | Filling and grouting method combined with 'skylight opening' repair of tunnel lining quality defects |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110331993A true CN110331993A (en) | 2019-10-15 |
CN110331993B CN110331993B (en) | 2021-02-26 |
Family
ID=68150113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910778648.4A Active CN110331993B (en) | 2019-08-22 | 2019-08-22 | Filling and grouting method combined with 'skylight opening' repair of tunnel lining quality defects |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110331993B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110966021A (en) * | 2019-12-20 | 2020-04-07 | 西南交通大学 | A renovate structure that is used for operation tunnel to strut large-scale cavity behind one's back |
CN111206941A (en) * | 2020-01-15 | 2020-05-29 | 中铁十六局集团有限公司 | Tunnel lining thickness deficiency processing method |
CN111561329A (en) * | 2020-05-11 | 2020-08-21 | 中铁十八局集团有限公司 | Method for repairing water permeable cavern below inverted arch of railway tunnel in water reservoir explosion roof |
CN111706361A (en) * | 2020-06-04 | 2020-09-25 | 中铁大桥勘测设计院集团有限公司 | Steel frame back filling equipment in tunnel and construction method thereof |
CN113323694A (en) * | 2021-06-29 | 2021-08-31 | 重庆科技学院 | Tunnel lining cavity negative pressure grouting process |
CN113669083A (en) * | 2021-10-08 | 2021-11-19 | 中铁第一勘察设计院集团有限公司 | Tunnel repairing structure based on load conversion and cap type and construction method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895585A (en) * | 2015-04-30 | 2015-09-09 | 中铁二十一局集团第四工程有限公司 | Construction method of reserved grouting pipe of tunnel vault |
CN105178980A (en) * | 2015-09-07 | 2015-12-23 | 中南大学 | Skylight-forming lining structure repair method for tunnels |
CN106285722A (en) * | 2016-08-30 | 2017-01-04 | 中铁十局集团第四工程有限公司 | A kind of device preventing tunnel double-lining vault to come to nothing and construction method thereof |
-
2019
- 2019-08-22 CN CN201910778648.4A patent/CN110331993B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895585A (en) * | 2015-04-30 | 2015-09-09 | 中铁二十一局集团第四工程有限公司 | Construction method of reserved grouting pipe of tunnel vault |
CN105178980A (en) * | 2015-09-07 | 2015-12-23 | 中南大学 | Skylight-forming lining structure repair method for tunnels |
CN106285722A (en) * | 2016-08-30 | 2017-01-04 | 中铁十局集团第四工程有限公司 | A kind of device preventing tunnel double-lining vault to come to nothing and construction method thereof |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110966021A (en) * | 2019-12-20 | 2020-04-07 | 西南交通大学 | A renovate structure that is used for operation tunnel to strut large-scale cavity behind one's back |
CN110966021B (en) * | 2019-12-20 | 2022-03-01 | 西南交通大学 | A renovate structure that is used for operation tunnel to strut large-scale cavity behind one's back |
CN111206941A (en) * | 2020-01-15 | 2020-05-29 | 中铁十六局集团有限公司 | Tunnel lining thickness deficiency processing method |
CN111561329A (en) * | 2020-05-11 | 2020-08-21 | 中铁十八局集团有限公司 | Method for repairing water permeable cavern below inverted arch of railway tunnel in water reservoir explosion roof |
CN111561329B (en) * | 2020-05-11 | 2022-03-15 | 中铁十八局集团有限公司 | Method for repairing water permeable cavern below inverted arch of railway tunnel in water reservoir explosion roof |
CN111706361A (en) * | 2020-06-04 | 2020-09-25 | 中铁大桥勘测设计院集团有限公司 | Steel frame back filling equipment in tunnel and construction method thereof |
CN113323694A (en) * | 2021-06-29 | 2021-08-31 | 重庆科技学院 | Tunnel lining cavity negative pressure grouting process |
CN113323694B (en) * | 2021-06-29 | 2024-02-20 | 重庆科技学院 | Negative pressure grouting process for tunnel lining cavity |
CN113669083A (en) * | 2021-10-08 | 2021-11-19 | 中铁第一勘察设计院集团有限公司 | Tunnel repairing structure based on load conversion and cap type and construction method thereof |
CN113669083B (en) * | 2021-10-08 | 2023-10-10 | 中铁第一勘察设计院集团有限公司 | Tunnel repairing structure based on load conversion and cap type and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110331993B (en) | 2021-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110331993A (en) | A kind of filling and injecting slurry method of integrating tunnel lining quality defect blank repairing | |
CN105178980B (en) | Put in a skylight liner structure restorative procedure for a kind of tunnel | |
CN106761810A (en) | A kind of large-deformation tunnel in soft rock supporting structure system and its construction method | |
CN110005442A (en) | Under wear existing building Urban Underground mining sectbn surrounding rock consolidation technique | |
CN104675408B (en) | High hydraulic pressure extra long distance large cross-section tunnel liquid nitrogen freezing system and shield shield tail brush quick change method | |
CN106321121A (en) | Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works | |
CN107587557A (en) | Outdoor water engineering construction method | |
CN106050266A (en) | Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel | |
CN111287759B (en) | Shallow-buried close-connection underground excavation tunnel construction method | |
CN103244128A (en) | Method for constructing large-section karst tunnels through double sidewall pilot tunnel and reservation core soil methods | |
CN113833480A (en) | Shield initial tunneling and arrival construction method | |
CN112901207B (en) | Treatment method for collapse in tunnel during arch change of secondary lining in sulfate corrosion section of operation tunnel | |
CN104895581A (en) | Tunnel lining rapid repair structure based on carbon fiber woven mesh and repair method thereof | |
CN106894428A (en) | A kind of multi layer waterproof method for blocking of mass raft foundation dewatering well | |
CN206143827U (en) | Underground works crack repairing structure | |
CN110080789A (en) | A kind of shield sky, which pushes away, spells section of jurisdiction construction | |
CN106869151A (en) | A kind of bridge construction method of deep foundation ditch | |
CN104060590B (en) | The reinforcement leakage preventing structure of a kind of pressure diversion tunnel and construction method thereof | |
CN107574834A (en) | A kind of old basic transformation reinforcement means of power machine | |
CN201943086U (en) | Underground building wall body | |
CN204358338U (en) | The repair structure of PCCP pipe | |
CN112482415B (en) | Consolidation grouting method for underground cavern under high external water pressure and flowing water condition | |
CN207211188U (en) | Outer wall of underground structure HCMW engineering methods overlap wall | |
CN110159307A (en) | A kind of tunnel multilayer grouting process | |
CN108547625A (en) | TBM cutterhead method for dismounting in a kind of tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Gong Lun Inventor after: Wu Chaoguang Inventor after: Zhang Zhixin Inventor after: Liao Qibin Inventor after: Wei Min Inventor after: Wang Lichuan Inventor after: Fan Yongjie Inventor after: Lin Mengjun Inventor after: Qiu Wenge Inventor after: Yang Junsheng Inventor after: Wang Chuanhu Inventor before: Gong Lun Inventor before: Wang Lichuan Inventor before: Fan Yongjie Inventor before: Yang Junsheng Inventor before: Qiu Wenge Inventor before: Wu Chaoguang Inventor before: Zhang Zhixin |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240415 Address after: 610031 north section of two ring road, Sichuan, Chengdu Patentee after: SOUTHWEST JIAOTONG University Country or region after: China Patentee after: CHINA RAILWAY 18 BUREAU GROUP Co.,Ltd. Address before: 610031 No. two, section 111, ring road, Chengdu, Sichuan, China Patentee before: SOUTHWEST JIAOTONG University Country or region before: China |