CN110331674A - A kind of integral type anchor promoted for Hanging Basket - Google Patents

A kind of integral type anchor promoted for Hanging Basket Download PDF

Info

Publication number
CN110331674A
CN110331674A CN201910594209.8A CN201910594209A CN110331674A CN 110331674 A CN110331674 A CN 110331674A CN 201910594209 A CN201910594209 A CN 201910594209A CN 110331674 A CN110331674 A CN 110331674A
Authority
CN
China
Prior art keywords
integral type
fixture
power
lifter
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910594209.8A
Other languages
Chinese (zh)
Other versions
CN110331674B (en
Inventor
赖学海
荣劲松
马存骥
吴卫敏
黄国忠
刘达常
滕飞
陈鸣
陈日胜
魏学锋
胡祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC Fourth Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC Fourth Harbor Engineering Co Ltd
Priority to CN201910594209.8A priority Critical patent/CN110331674B/en
Publication of CN110331674A publication Critical patent/CN110331674A/en
Application granted granted Critical
Publication of CN110331674B publication Critical patent/CN110331674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of integral type anchors promoted for Hanging Basket, including being set to the power-lifter poured in beam section, by several raising cords of power-lifter driving lifting;The power-lifter is equipped with the first connection structure, and one end of the raising cord is affixed by first connection structure and the power-lifter, and the other end has poured beam section described in as free end and extended downwardly;The second connection structure its structure that the free end is equipped with for connecting with Hanging Basket is simple, easy to operate, is convenient for on-site construction operations, while production efficiency can be improved, accelerates construction progress, and guarantees construction safety.

Description

A kind of integral type anchor promoted for Hanging Basket
Technical field
The invention belongs to Hanging Baskets to promote hoisting technology field, and in particular to a kind of integral type anchoring dress promoted for Hanging Basket It sets.
Background technique
Hanging Basket is a kind of especially common carrying system of bridge construction, especially continuous rigid frame bridge and cable-stayed bridge, girder Construction mostly uses Hanging Basket cantilever to be linked to be whole beam in stretch-draw anchor and with pier shaft that is, by a pair of walking Hanging Basket It is moved in section, to carry out reinforcing bar binding, formwork erection, concreting, construction should be applied etc. in advance.And after completing one section of construction, hang Symmetrical each one segment of movement forward of basket, carries out lower a pair of of beam section construction, moves ahead in proper order, until cantilever beam section pours completion.
Steel strand wires are generally utilized at present, while Hanging Basket being promoted by the mode of jack and I-steel layered splicing and is installed Beam section is being poured, to realize the installment work of Hanging Basket.Such mounting means, needs to assemble at the construction field (site) and is largely assembled Work so that dismounting get up it is very cumbersome, inconvenient, it is not only time-consuming, but also be unfavorable for realizing the standardization of construction site, integration pipe Reason.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of integral type anchor promoted for Hanging Basket, knots Structure is simple, easy to operate, is convenient for on-site construction operations, while production efficiency can be improved, accelerates construction progress, and guarantees construction peace Entirely.
The invention adopts the following technical scheme:
A kind of integral type anchor promoted for Hanging Basket, including be set to poured power-lifter in beam section, by Several raising cords of the power-lifter driving lifting;
The power-lifter is equipped with the first connection structure, and one end of the raising cord passes through the first connection knot Structure and the power-lifter are affixed, and the other end has poured beam section described in as free end and extended downwardly;The free end Equipped with the second connection structure for being connect with Hanging Basket.
Further, first connection structure includes the first fixture on the power-lifter, and described the One fixture is equipped with several first through hole, and several raising cords are arranged in respectively in the first through hole, and pass through tool holder Piece and the first fixture anchor connection.
Further, second connection structure includes the second fixture, and second fixture is equipped with several second through-holes, Several raising cords are arranged in respectively in second through-hole, and pass through tool clamping piece and the second fixture anchor connection.
Further, second connection structure further includes the anticreep pressing plate below second fixture, described anti- De- pressing plate is detachably connected with the raising cord.
It further, further include support base, the power-lifter has poured beam section set on described by the support base On, the support base is equipped with the second through-hole passed through for the raising cord.
It further, further include the position limiting structure for limiting the raising cord adjustable height, the position limiting structure includes being set to Limit plate on the support base, the third fixture below the limit plate, the third fixture by tool clamping piece with The raising cord anchor connection;The limit plate, which is equipped with, to be limited to the limiting slot under it, the limit for the third fixture Position slot passes through for the cable wire.
Further, the support base includes top plate and several side plates below the top plate, is set on the top plate There is second through-hole;
The limit plate is set in the accommodation space being made of the side plate, and the limit plate is fixed in the side plate On;And the side plate that at least there is side is equipped with action pane.
Further, the side plate at least in the presence of 1 side is retractable setting.
Further, the support base is equipped with the lifting lug for being easy to implement lifting.
Further, it includes jack that the power-lifter, which includes power-lifter, first connection structure It is connected to the jacking cylinder of the jack, and drives the raising cord with the jacking cylinder synchronization lifting.
Compared with prior art, the invention has the benefit that
The present invention by the first connection structure and the second connection structure will be promoted the both ends of lock respectively with power-lifter It is connected with Hanging Basket, so that Hanging Basket is acted with power-lifter and gone up and down.The integral type anchor structure is simple, operation side Just, it is convenient for on-site construction operations, while improves production efficiency, accelerate construction progress, guarantees construction safety.
By the way that position limiting structure is arranged, the lifting action that can use power-lifter, which is realized, presss from both sides raising cord and first The anchor connection of plate/second clamping plate.
The both ends for promoting lock are connect with the first fixture/second fixture respectively using tool clamping piece, there is connection simply, behaviour Make the features such as facilitating, helps to realize construction site integration, standardized management.
Detailed description of the invention
Technology of the invention is described in further detail with reference to the accompanying drawings and detailed description:
Fig. 1 is the use state of the integral type anchor of the present invention promoted for Hanging Basket with reference to figure;
Fig. 2 is the front view of the integral type anchor of the present invention promoted for Hanging Basket;
Fig. 3 is the rearview of the integral type anchor of the present invention promoted for Hanging Basket.
Description of symbols:
1, beam section has been poured;2, power-lifter;21, jack;22, jacking cylinder;3, raising cord;4, the first connection knot Structure;41, the first fixture;5, the second connection structure;51, the second fixture;52, anticreep pressing plate;6, tool clamping piece;7 support bases;71, Top plate;72, side plate;73, third through-hole;74, action pane;75, lifting lug;8;Position limiting structure;81, limit plate;82, limiting slot; 83, third fixture;9, Hanging Basket.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
The invention discloses a kind of integral type anchors promoted for Hanging Basket, as shown in Figures 1 to 3,
Set on the power-lifter 2 poured in beam section 1, by several raising cords 3 of the driving lifting of power-lifter 2;
Power-lifter 3 is equipped with the first connection structure 4, and one end of raising cord 3 passes through the first connection structure 4 and power Hoisting mechanism 2 is affixed, and the other end passes through as free end and poured beam section 1 and extend downwardly;Free end is equipped with for connecting with Hanging Basket 9 The second connection structure 5.
Based on said structure design, the present invention will promote the both ends of lock by the first connection structure 4 and the second connection structure 5 It is connect respectively with power-lifter and Hanging Basket 9, so that Hanging Basket 9 is acted with power-lifter and gone up and down.Integral type anchoring Apparatus structure is simple, easy to operate, is convenient for on-site construction operations, while improving production efficiency, accelerates construction progress, and guarantees construction Safety.
As one embodiment, as shown in Figures 1 to 3, the first connection structure 4 includes first on power-lifter Fixture 41, the first fixture 41 are equipped with several first through hole, and several raising cords 3 are arranged in first through hole respectively, and pass through work Have intermediate plate 6 and 41 anchor connection of the first fixture.First connection structure 4 will promote the one end locked and be set to using tool clamping piece 6 The first fixture 41 connection on power-lifter, has the features such as connection is simple, easy to operate, helps to realize construction site Integration, standardized management.
Second connection structure 5 includes the second fixture 51, and the second fixture 51 is equipped with several second through-holes, several raising cords 3 It is arranged in the second through-hole respectively, and passes through 51 anchor connection of tool clamping piece 6 and the second fixture.The other end of raising cord 3 passes through After Hanging Basket 9, the second furniture is fixed on to the lower section of Hanging Basket 9 using tool clamping piece 6, to realize the company of raising cord 3 Yu Hanging Basket 9 It connects.
To further prevent Hanging Basket 9 to fall in lifting process, as shown in Figures 1 to 3, the second connection structure 5 further includes setting Anticreep pressing plate 52 in 51 lower section of the second fixture, anticreep pressing plate 52 are detachably connected with raising cord 3.
It in the above-described embodiments, as shown in Figures 1 to 3, further include support base 7, power-lifter 2 is set by support base 7 In having poured in beam section 1, support base 7 is equipped with the second through-hole passed through for raising cord 3.The setting of support base 7 is convenient for mentioning power Liter mechanism 2, which is firmly placed in, have been poured in beam section 1.
It in the above-described embodiments, as shown in Figures 1 to 3, further include being limited for limiting 3 adjustable height position limiting structure 8 of raising cord Bit architecture 8 includes the limit plate 81 on support base 7, the third fixture 83 set on 81 lower section of limit plate, and third fixture 83 is logical Cross tool clamping piece 6 and 3 anchor connection of raising cord;Limit plate 81 is equipped with the limiting slot that can be limited to third fixture 83 under it 82, limiting slot 82 passes through for cable wire.By the way that position limiting structure 8 is arranged, the lifting action that can use power-lifter 2 is realized By raising cord 3 and the anchor connection of first clamping plate/second clamping plate.
Specifically, as shown in Figures 1 to 3, support base 7 includes top plate 71 and several side plates 72 set on 71 lower section of top plate, top Plate 71 is equipped with third through-hole 73;
Limit plate 81 is set in the accommodation space being made of side plate 72, and limit plate 81 is fixed on side plate 72;And at least There are the side plates 72 of side to be equipped with action pane 74.
Side plate 72 at least in the presence of 1 side is retractable setting;Support base 7 is equipped with the lifting lug 75 for being easy to implement lifting.It should Top plate 71, side plate 72, lifting lug 75, the limit plate 81 of support base 7, which use, to be welded to connect, which meets associated specifications It is required that guarantee its stabilized structure.
In the above-described embodiments, power-lifter 2 includes jack 21, and the first connection structure 4 is connected to jack 21 Jacking cylinder 22, and drive raising cord 3 with 22 synchronization lifting of jacking cylinder.In one embodiment, jacking cylinder 22 Stroke 23cm.
Operating procedure of the present invention for Hanging Basket lifting is as follows:
Setting-out is measured beam section 1 will have been poured so as to location and installation hoist point position;And install four groups of Hanging Baskets 9 branch Support seat 7 and power-lifter 2, latus inframedium 72 with poured beam section 1 guarantee it is closely connected;Installation shifts to an earlier date blanking isometric and numbers Raising cord 3 is installed from top to bottom from beam section 1 has been poured to 9 bottom of Hanging Basket, after raising cord 3 is installed in place, urgent second connection structure 5 tool clamping piece 6, and anti-dropout pressing plate is installed;After preformed hole by Hanging Basket 9 itself, raising cord 3 is penetrated into third by number Fixture 83, then raising cord 3 is promoted into tooling by 3 channel of raising cord (the second through-hole) in Hanging Basket 9, the first connection structure 4 is installed, Clamping tool intermediate plate 6 installs anti-dropout pressing plate.
The tool clamping piece 6 on the first fixture 41 is compressed, 21 jacking cylinder 22 of jack is stretched out into 15cm, compresses third fixture Tool clamping piece 6 on 83, uniformly bounces back jacking cylinder 22, and retraction compresses the tool clamping piece on the first fixture 41 again after in place 6, jacking cylinder 22 is then stretched out into 15cm, then carry out next circulation.Specific lifting process divides following four step:
Step 1: the tool clamping piece 6 on the first fixture 41 is compressed.
Step 2: 21 oil inlet of jack, jacking cylinder 22 jack up 15cm, make 6 stress of tool clamping piece on the first fixture 41.
Step 3: compressing the tool clamping piece 6 on third fixture 83, then uniformly by the retraction of jacking cylinder 22 in place, make the 6 stress of tool clamping piece on three fixtures 83.
Step 4: compressing the tool clamping piece 6 on third fixture 83 again, recycles the above operation.Until by raising cord 3 and first Connection structure 4, the second connection structure 5, position limiting structure 8 anchor tightly, i.e., go up and down Hanging Basket 9 using the integral type anchor.
Other contents of the integral type anchor of the present invention promoted for Hanging Basket are referring to the prior art, herein not It repeats again.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, therefore Without departing from the technical solutions of the present invention, according to the technical essence of the invention it is to the above embodiments it is any modification, Equivalent variations and modification, all of which are still within the scope of the technical scheme of the invention.

Claims (10)

1. a kind of integral type anchor promoted for Hanging Basket, it is characterised in that: poured the power in beam section including being set to and mention Rise mechanism, by several raising cords of power-lifter driving lifting;
The power-lifter is equipped with the first connection structure, one end of the raising cord by first connection structure and The power-lifter is affixed, and the other end has poured beam section described in as free end and extended downwardly;The free end is equipped with The second connection structure for being connect with Hanging Basket.
2. integral type anchor according to claim 1, it is characterised in that: first connection structure includes being set to institute The first fixture on power-lifter is stated, first fixture is equipped with several first through hole, several raising cord difference It is arranged in the first through hole, and passes through tool clamping piece and the first fixture anchor connection.
3. integral type anchor according to claim 1, it is characterised in that: second connection structure includes the second folder Tool, second fixture are equipped with several second through-holes, and several raising cords are arranged in respectively in second through-hole, and are led to Cross tool clamping piece and the second fixture anchor connection.
4. integral type anchor according to claim 3, it is characterised in that: second connection structure further includes being set to Anticreep pressing plate below second fixture, the anticreep pressing plate are detachably connected with the raising cord.
5. integral type anchor according to any one of claims 1 to 4, it is characterised in that: it further include support base, institute It states power-lifter and has been poured in beam section by the support base set on described, the support base is equipped with to be worn for the raising cord The second through-hole crossed.
6. integral type anchor according to claim 5, it is characterised in that: further include limiting the raising cord lifting height The position limiting structure of degree, the position limiting structure include limit plate on the support base, the below the limit plate Three fixtures, the third fixture pass through tool clamping piece and the raising cord anchor connection;The limit plate is equipped with can will be described Third fixture is limited to the limiting slot under it, and the limiting slot passes through for the cable wire.
7. integral type anchor according to claim 6, it is characterised in that: the support base include top plate and be set to institute Several side plates below top plate are stated, the top plate is equipped with second through-hole;
The limit plate is set in the accommodation space being made of the side plate, and the limit plate is affixed on the side plate;And The side plate that at least there is side is equipped with action pane.
8. integral type anchor according to claim 7, it is characterised in that: the side plate at least in the presence of 1 side is can Folding setting.
9. integral type anchor according to claim 5, it is characterised in that: the support base is equipped with to be easy to implement and hang The lifting lug of dress.
10. integral type anchor according to any one of claims 1 to 4, it is characterised in that: the power elevator Structure includes jack, and first connection structure is connected to the jacking cylinder of the jack, and drives the raising cord with institute State jacking cylinder synchronization lifting.
CN201910594209.8A 2019-07-03 2019-07-03 Integrated anchoring device for lifting hanging basket Active CN110331674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910594209.8A CN110331674B (en) 2019-07-03 2019-07-03 Integrated anchoring device for lifting hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910594209.8A CN110331674B (en) 2019-07-03 2019-07-03 Integrated anchoring device for lifting hanging basket

Publications (2)

Publication Number Publication Date
CN110331674A true CN110331674A (en) 2019-10-15
CN110331674B CN110331674B (en) 2024-09-10

Family

ID=68144060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910594209.8A Active CN110331674B (en) 2019-07-03 2019-07-03 Integrated anchoring device for lifting hanging basket

Country Status (1)

Country Link
CN (1) CN110331674B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050091251A (en) * 2004-03-11 2005-09-15 엠에스아시아 주식회사 Construction method for bridge using a form traveller
CN202194072U (en) * 2011-07-25 2012-04-18 中铁四局集团第一工程有限公司 Cradle suspension type walking device
CN203065973U (en) * 2013-02-19 2013-07-17 中交二公局第三工程有限公司 Stretch-draw device for monofilament epoxy coating steel strands
CN104555287A (en) * 2013-10-22 2015-04-29 中国石油化工股份有限公司 Large stress surface elastic hanging device of motor-vibrating feeder
CN208055880U (en) * 2018-01-10 2018-11-06 中铁十二局集团第四工程有限公司 A kind of crane's major girder hoisting frame
CN210886965U (en) * 2019-07-03 2020-06-30 中交第四航务工程局有限公司 Integrated anchoring device for lifting hanging basket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050091251A (en) * 2004-03-11 2005-09-15 엠에스아시아 주식회사 Construction method for bridge using a form traveller
CN202194072U (en) * 2011-07-25 2012-04-18 中铁四局集团第一工程有限公司 Cradle suspension type walking device
CN203065973U (en) * 2013-02-19 2013-07-17 中交二公局第三工程有限公司 Stretch-draw device for monofilament epoxy coating steel strands
CN104555287A (en) * 2013-10-22 2015-04-29 中国石油化工股份有限公司 Large stress surface elastic hanging device of motor-vibrating feeder
CN208055880U (en) * 2018-01-10 2018-11-06 中铁十二局集团第四工程有限公司 A kind of crane's major girder hoisting frame
CN210886965U (en) * 2019-07-03 2020-06-30 中交第四航务工程局有限公司 Integrated anchoring device for lifting hanging basket

Also Published As

Publication number Publication date
CN110331674B (en) 2024-09-10

Similar Documents

Publication Publication Date Title
JP2001226913A (en) Device and method for erecting bridge
CN102926332B (en) Derrick arrangement of tools for replacing steel arch bridge suspender and replacing method thereof
CN105926443A (en) Construction method for continuous rigid frame side span by first girder installation and then closure
CN104631810A (en) High-altitude movable hanging basket system and construction method thereof
CN212670303U (en) Stay cable beam end mounting structure
CN112554076A (en) Continuous small-stroke hanging basket bottom basket lowering device and construction method
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN210886965U (en) Integrated anchoring device for lifting hanging basket
CN210134364U (en) Bridge construction device
CN110331674A (en) A kind of integral type anchor promoted for Hanging Basket
CN201714057U (en) Lifting mechanism for adhered electric lifting scaffold
JP2001049622A (en) Bridge erecting apparatus and bridge erecting method
CN113136961A (en) Lifting structure for large-span truss and lifting method thereof
CN111252683A (en) Bridge deck crane and application method thereof applied to bridge dismantling
CN108545629B (en) Utilize the construction method of tower crane lifting girder truss
CN203684708U (en) Hydraulic multipoint synchronous lifting device
CN209837061U (en) Device for quickly pressing underwater steel cofferdam of reinforced bridge
CN203269457U (en) Steel strand pre-tightening device
CN214656390U (en) Continuous small-stroke lowering device for bottom basket of hanging basket
CN211285604U (en) Manual tube drawing machine
CN211285309U (en) Traveling type hanging basket for bridge construction
CN103332637B (en) Steel strand pretightening device
JP2009286531A (en) Dismantling method of tower crane
CN111395194A (en) Tensioning device and method for suspender of tied-arch bridge
CN201891254U (en) Lifting scaffold without diagonal draw bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant