CN110322144A - A kind of construction-engineering project management system - Google Patents

A kind of construction-engineering project management system Download PDF

Info

Publication number
CN110322144A
CN110322144A CN201910586500.0A CN201910586500A CN110322144A CN 110322144 A CN110322144 A CN 110322144A CN 201910586500 A CN201910586500 A CN 201910586500A CN 110322144 A CN110322144 A CN 110322144A
Authority
CN
China
Prior art keywords
module
platform
supervisor
construction
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910586500.0A
Other languages
Chinese (zh)
Inventor
王明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Kaifeiko Information System Co Ltd
Original Assignee
Nanjing Kaifeiko Information System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Kaifeiko Information System Co Ltd filed Critical Nanjing Kaifeiko Information System Co Ltd
Priority to CN201910586500.0A priority Critical patent/CN110322144A/en
Publication of CN110322144A publication Critical patent/CN110322144A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/018Certifying business or products
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Abstract

The invention discloses a kind of construction-engineering project management systems, present system composition includes: supervisor's platform, government department's terminal, designing unit's module, unit in charge of construction's module, safety supervision module, quality surveillance module, acceptance of work module, and process flow includes: project design, engineering project examination & approval, Construction of Engineering Projects, engineering project examination.The present invention is realized by four step process flows to the management of engineering project and the informationization of project data, system is by the relevant all data input systems of engineering project, it carries out information-based, and data format is unified, each system unit all preserves information data, supervisor's platform supervises the work of other modules, and government department's terminal monitor is responsible for platform, and then supervise whole system, realize monitoring of the government to engineering project, it is high to provide a kind of data-handling efficiency, it is convenient to manage data, advanced IT application, data sharing, entirety is workflow management, convenient for the construction-engineering project management system of Governmental monitoring.

Description

A kind of construction-engineering project management system
Technical field
The present invention relates to engineering management field more particularly to construction-engineering project management systems.
Background technique
Traffic transport industry is one of important departments engaged in material production and pillar industry of Chinese national economy, and Trunk highway Highway is then the important infrastructure of economy and society development, and with the fast development of economic society, various regions are to Trunk highway public affairs The construction demand of road traffic is further urgent.With Trunk highway Highway Project enlargement, complication increasingly, engineering construction work Skill and technical difficulty are also continuously improved, and to the quality safety management in building site, more stringent requirements are proposed.
With the development and application of information-based the relevant technologies, the advantages that convenient, fast, efficient, flexible, Yi Tuozhan gradually Protrusion shows, and people also gradually appreciate information-based effect and importance, therefore the whole nation generally advocates and pushes informationization Engineering construction data are carried out information-based " wisdom building site " and also proposed therewith, and obtained certain journey in some areas by development The application of degree: Jinan-Qingdao high-speed rail north glue Xinhe River grand bridge engineering, Nanchang subway, Guizhou Jia Yan water-control project etc..
Traffic transport industry to informationization also have certain application: Shenzhen outer ring high speed project, using Video Supervision Technique, Wireless network transmission technology, Integrated Management Platform, multi-platform integrated office mode, component at suitable road and bridge construction intelligence Intelligentization management system realizes the dynamic pipe comprehensive to construction site personnel, equipment, goods and materials, quality, safety, cost etc. The drawbacks of managing and monitoring, avoid behavior adjustment management to greatest extent, improves the timeliness and authenticity of data acquisition;Xu Ming high speed connects cloud Port section construction project develops whole intelligent managing and control system, real using the sensing technology of Internet of Things framework and the transmission technology of 3G When acquire asphalt pavement construction overall process data information, the system by asphalt mixture mixing, transport, pave, roll overall process, In real time, continuously monitor, change the mode of traditional subsequent detection, sampling Detection, asphalt pavement construction matter can be effectively controlled Amount improves working efficiency;Nantong Jiu Xugang second-line shiplock introduces the theory of " internet+", in quality management, safety management, people Member honours an agreement, the links such as testing inspection introduce information technology, relies on that " Project quality management system, people, machine safety management system mix Solidifying soil blending station intelligent monitor system, testing inspection data managing and control system, accomplish whole process information system management.
Certain application has been obtained in engineering construction although information-based, facilitate to a certain extent engineering project into Row, but it is generally only limited to application of certain information technology in building site, and the quality safety management work in building site is gone back mostly at present Using traditional management mode, obstructed, feedback that there are information transmitting channels not in time phenomena such as.Although individual Trunk highways are public Road has carried out the exploration and practice of informatization work for site operation control, the acquisition of testing inspection data etc., but For now, the information work of construction site not yet forms system, and information based data lacks unified format and standard, makes Not high at information-based achievement service efficiency, generally existing " information island " phenomenon cannot achieve subsequent " big data " analysis.Cause This, how transition information working method, improve the service efficiency of data information, provide management handgrip for site construction, realize Building site management " wisdom ", it has also become urgently consider the problems of.
Summary of the invention
Present invention aim to address the acquisition of project data present in engineering construction difficulty, data-handling efficiency is low, counts The problem of inconvenient according to management, information-based low, not formed system management, provide a kind of data-handling efficiency is high, management data are convenient, Advanced IT application, data sharing, entirety are workflow management, the construction-engineering project management system convenient for Governmental monitoring.
The technical solution adopted in the present invention: a kind of construction-engineering project management system, system composition include: that supervisor is flat Platform, government department's terminal, designing unit's module, unit in charge of construction's module, safety supervision module, quality surveillance module, the acceptance of work Module, supervisor's platform are used by engineering general supervision department, are the higher management of project management system, with government department's end End, designing unit's module, unit in charge of construction's module, safety supervision module, quality surveillance module, acceptance of work module, the supervisor Platform carries out pipe to designing unit's module, unit in charge of construction's module, safety supervision module, quality surveillance module, acceptance of work module Reason and supervision, and then grasp control engineering progress, distribute task for each executive arm and audit performance, the supervisor is flat Platform sends engineering examination & approval application to government department's terminal and receives the supervision of government department's terminal;Government department's terminal is political affairs The terminal that the department of mansion management engineering uses is connected with supervisor's platform, and government department's terminal exercises supervision to supervisor's platform And the engineering examination & approval application that supervisor's platform is sent is examined, while being monitored to engineering project;Designing unit's module is to set The module that meter unit uses is connected with supervisor's platform, and the engineering project that designing unit's module receives supervisor's platform transmission is wanted Summation basic document, and project design after the completion is transmitted to supervisor's platform;Unit in charge of construction's module is work order Module used in position is connected with supervisor's platform, and unit in charge of construction's module, which receives, to be responsible for construction task that platform transmits and want It asks, and typing preservation is carried out to construction speed, feeds back to supervisor's platform;The safety supervision module is the use of safety supervision unit Module, with supervisor platform be connected and receive supervisor platform transmission task, the safety supervision module is to construction site Safety supervision situation carries out typing preservation and feeds back to supervisor's platform;The quality surveillance module is what quality surveillance unit used Module is connected with supervisor's platform and receives the task that supervisor's platform transmission comes, matter of the quality surveillance module to construction site Amount supervision situation carries out typing preservation and feeds back to supervisor's platform;The acceptance of work module is the mould that acceptance of work unit uses Block is connected with supervisor's platform and receives the task that supervisor's platform transmission comes, and the acceptance of work module is checked and accepted projects and tied Fruit carries out typing preservation and feeds back to supervisor's platform.
A kind of process flow of construction-engineering project management system of the present invention includes: that project design, engineering project are examined Batch, Construction of Engineering Projects, engineering project check and accept, this four steps process flow, first authorities are by the requirement of engineering project and base This data gives designing unit, is designed by designing unit and gives design after the completion to authorities, authorities are again Project design submission departments of government is examined, after examination & approval pass through, Project design is transferred to unit in charge of construction by authorities It constructs, while unit in charge of construction constructs, safety supervision unit carries out the safety supervision of construction site, while quality surveillance list Position carries out construction quality supervision, after the completion of construction, carries out the project acceptance inspection by acceptance of work unit, all in four step process flows File, material, table, examination & approval notice, the equal typing this system of every data and uniform format, are converted to information data and are included in and be System database.
The project design, the requirement of engineering project and basic document typing are responsible for platform by authorities, and are passed through Supervisor's platform is organized into unified format and is sent to designing unit's module after saving, and designing unit is received by designing unit's module It saves and checks the material that transmits of supervisor's platform, and Project design is carried out according to material, after the completion, designing unit is by Project design Typing designing unit module, and format is arranged by designing unit's module and is transmitted to supervisor's platform after saving, authorities are logical It crosses supervisor's platform and receives preservation and inspection item design, if passing, project design is completed, do not pass through if examining, Then authorities will examine problem and opinion typing supervisor's platform, and arrange format by supervisor's platform and be transmitted to after saving and set Count single-bit module, designing unit is received by designing unit's module to keep and checks examination problem and opinion, designing unit according to Examination problem and opinion modify Project design, and transfer to authorities to examine modified Project design, so until examining Pass through.
Project design and engineering are examined application material by supervisor's platform and submitted by the engineering project examination & approval, authorities Government department's terminal, departments of examination and approval, government are received by government department's terminal and save and check material, if examination & approval pass through, engineering Project examination is completed, if examination & approval do not pass through, by suggestions made after examination and there are problem typing government department terminals, and passes through portion, government Door terminal arranges format and is transmitted to supervisor's platform after saving, and supervisor's platform receives and saves suggestions made after examination and there are after problem, Designing unit's module is transmitted it to again and is saved, and is transferred to designing unit to carry out Project design modification, is submitted project after modification again Design to government department's terminal is examined, so until examination & approval pass through.
Project design and corresponding task are transmitted to by the Construction of Engineering Projects, authorities by supervisor's platform Unit in charge of construction's module, safety supervision module, quality surveillance module simultaneously save, unit in charge of construction according to Project design and task into Row construction, and by construction speed typing unit in charge of construction module, format is arranged by construction speed of unit in charge of construction's module to typing And supervisor's platform is transmitted to after saving, supervisor's platform carries out reception preservation, examines for authorities;Safety supervision department is to construction Process carries out safety supervision, reports safety supervision to typing safety supervision module, and arrange format simultaneously by safety supervision module Supervisor's platform is transmitted to after preservation, supervisor's platform carries out reception preservation, examines for authorities;Quality surveillance unit is to construction matter Amount exercises supervision, by quality surveillance report typing quality surveillance module, and by quality surveillance module arrange format and save after It is transmitted to supervisor's platform, supervisor's platform carries out reception preservation, examines for authorities.
The engineering project is checked and accepted, and authorities are tested Project design and examination multiplexed transport to engineering by supervisor's platform Module is received, acceptance of work unit receives and saves Project design and examination task by acceptance of work module, according to Project design It carries out an acceptance inspection with examination task, if acceptance(check), writes acceptance report, by acceptance report typing acceptance of work module, and lead to It crosses acceptance of work module to arrange format and be transmitted to supervisor's platform after saving, supervisor's platform carries out reception preservation, for authorities It examines, if examination is unqualified, it is required that corresponding unit is rectified and improved, is checked and accepted again after rectification.
Beneficial effects of the present invention: (1) All Files, material, table of engineering project, examination & approval notice, every data are equal By corresponding component input system, it is responsible in platform and preserves all information datas of engineering project, preserved in other modules The information data respectively needed is convenient for data query, information-based high, avoids data silo, realizes data sharing;(2) this is System carries out form collator to all information, data, makes its uniform format, improves data-handling efficiency, facilitates data pipe Reason;(3) there are respective module or terminal in each department, therefore respective data can be carried out information-based be passed to by all departments System, is convenient for gathering project data, and Information System is complete;(4) authorities by supervisor platform to designing unit's module, apply Work single-bit module, safety supervision module, quality surveillance module, acceptance of work module are managed and supervise, and then manage and supervise The work of each executable unit is superintended and directed, realizes that engineering entirety is full-range management;(5) government department's terminal and supervisor's platform phase Even, and supervisor's platform is supervised, and is responsible for other modules of platform management, therefore government department can pass through government department's terminal and supervisor Platform is monitored engineering project, convenient for the monitoring of government.
Detailed description of the invention
Fig. 1 is organigram of the invention.
Fig. 2 is process flow schematic diagram of the invention.
Fig. 3 is project design flow chart of the invention.
Fig. 4 is engineering project approval process figure of the invention.
Fig. 5 is Construction of Engineering Projects flow chart of the invention.
Fig. 6 is engineering project acceptance process figure of the invention.
Specific embodiment:
The present invention is described in detail with specific example with reference to the accompanying drawing.
Present invention composition includes: supervisor's platform 1, government department's terminal 2, designing unit's module 3, unit in charge of construction's module 4, peace Full supervision module 5, quality surveillance module 6, acceptance of work module 7, supervisor's platform 1 are used by engineering general supervision department, are The higher management of project management system, with government department terminal 2, designing unit's module 3, unit in charge of construction's module 4, safety supervision mould Block 5, quality surveillance module 6, acceptance of work module 7, supervisor's platform 1 is to designing unit's module 3, unit in charge of construction's module 4, peace Full supervision module 5, quality surveillance module 6, acceptance of work module 7 are managed and supervise, and then grasp control engineering progress, are Other each executive arm's distribution tasks simultaneously audit performance, and supervisor's platform 1 sends engineering to government department's terminal 2 and examines Criticize the supervision for applying for and receiving government department's terminal 2;Government department's terminal 2 is the end that the department of governability engineering uses End is connected with supervisor's platform 1, and 2 pairs of supervisor's platforms 1 of government department's terminal exercise supervision and examine what supervisor's platform 1 was sent Engineering examination & approval application, while engineering project is monitored;Designing unit's module 3 is the module that designing unit uses, with It is responsible for platform 1 to be connected, the engineering project that designing unit's module 3 receives supervisor's transmission of platform 1 requires and basic document, and will Project design after the completion is transmitted to supervisor's platform 1;Unit in charge of construction's module 4 is module used in unit in charge of construction, Be connected with supervisor's platform 1, unit in charge of construction's module 4, which receives, is responsible for construction task and requirement that platform 1 transmits, and to construct into Degree carries out typing preservation, feeds back to supervisor's platform 1;The safety supervision module 5 is the module that safety supervision unit uses, with master Pipe platform 1 is connected and receives the task that supervisor's transmission of platform 1 comes, safety supervision of the safety supervision module 5 to construction site Situation carries out typing preservation and feeds back to supervisor's platform 1;The quality surveillance module 6 is the module that quality surveillance unit uses, It is connected with supervisor's platform 1 and receives the task that supervisor's transmission of platform 1 comes, quality of the quality surveillance module 6 to construction site Supervision situation carries out typing preservation and feeds back to supervisor's platform 1;The acceptance of work module 7 is the mould that acceptance of work unit uses Block is connected with supervisor's platform 1 and receives the task that supervisor's transmission of platform 1 comes, and the acceptance of work module 6 checks and accepts projects As a result it carries out typing preservation and feeds back to supervisor's platform 1.
A kind of process flow of construction-engineering project management system of the present invention includes: that project design 8, engineering project are examined Batches 9, Construction of Engineering Projects 10, engineering project check and accept 11, this four steps process flow, first authorities are by the requirement of engineering project Designing unit is given with basic document, be designed by designing unit and gives design after the completion to authorities, supervisor portion Door again examines Project design submission departments of government, and after examination & approval pass through, Project design is transferred to construct by authorities Unit is constructed, and while unit in charge of construction constructs, safety supervision unit carries out the safety supervision of construction site, while quality is supervised It superintends and directs unit and carries out construction quality supervision, after the completion of construction, the project acceptance inspection is carried out by acceptance of work unit, in four step process flows All Files, material, table, examination & approval notice, the equal typing this system of every data, are converted to information data and are included in this system data Library.
The process of the project design 8 are as follows: first transmit project material 801 from authorities to designing unit, then According to project material, designing unit carries out Project design and Project design is sent to authorities 802, and authorities receive item After mesh design, authorities' inspection item design 803, if passing, project design completes 805, if examining obstructed It crosses, is then retransmited by designing unit's modification Project design to authorities' check 804.
The process of the engineering project examination & approval 9 are as follows: project examination application 901 first is submitted from authorities to government department, Then government department carries out examination & approval 902 to engineering project, if examination & approval pass through, engineering project examination & approval complete 904, if examination & approval are obstructed It crosses, then submits examination & approval 903 after modifying again.
The process of the Construction of Engineering Projects 10 are as follows: first supervised from authorities to unit in charge of construction, safety supervision unit, quality Unit publication Project design and corresponding task 1001 are superintended and directed, then unit in charge of construction carries out engineering construction 1002, and constructs Unit reports construction speed 1005 to authorities;Safety supervision unit carries out construction safety supervision 1003 simultaneously, and safe It supervises unit and reports safety supervision situation 1006 to authorities;Quality surveillance unit carries out construction quality supervision 1004 simultaneously, And quality surveillance unit reports quality surveillance situation 1007 to authorities.Last Construction of Engineering Projects completes 1008.
The process that the engineering project checks and accepts 11 is that authorities issue Project design to acceptance of work unit and examination is appointed Business 1101, then acceptance of work unit carries out an acceptance inspection 1102 to engineering project, does not pass through if checking and accepting, and carries out after construction rectification again 1103 are checked and accepted, is passed through if checking and accepting, acceptance of work unit writes acceptance report and is committed to authorities 1104, last engineering item Mesh, which is checked and accepted, completes 1105.
A kind of live specific implementation step of construction-engineering project management system of the present invention is as follows:
Step 1, project design 8: the requirement of engineering project and basic document typing are responsible for platform 1 by authorities, And it is sent to designing unit's module 3 after supervisor's platform 1 is organized into unified format and saves, designing unit passes through designing unit's mould Block 3 receives the material for saving and checking that supervisor's platform 1 transmits, and carries out Project design according to material, and after the completion, designing unit will Project design typing designing unit module 3, and format is arranged by designing unit's module 3 and is transmitted to supervisor's platform 1 after saving, Authorities are received by supervisor's platform 1 and save simultaneously inspection item design, if passing, project design is completed, if Examination does not pass through, then authorities will examine problem and opinion typing supervisor's platform 1, and arrange format simultaneously by supervisor's platform 1 Designing unit's module 3 is transmitted to after preservation, designing unit is received by designing unit's module 3 to keep and check examination problem and meaning See, Project design is modified according to the problem of examination and opinion by designing unit, and transfers to authorities to examine modified Project design It looks into, so until passing;
Step 2, engineering project examination & approval 9: Project design and engineering examination & approval are applied for material by supervisor's platform 1 by authorities Material submits government department's terminal 2, and departments of examination and approval, government are received by government department's terminal 2 and save and check material, if examination & approval are logical It crosses, then engineering project examination & approval are completed, if examination & approval do not pass through, by suggestions made after examination and there are problem typing government department terminals 2, and It is transmitted to supervisor's platform 1 after arranging format and preservation by government department's terminal 2, supervisor's platform 1 receives and saves suggestions made after examination It with there are after problem, then transmits it to designing unit's module 3 and saves, transfer to designing unit to carry out Project design modification, repair Project design to government department's terminal 2 is submitted to be examined after changing again, so until examination & approval pass through;
Step 3, Construction of Engineering Projects 10: authorities are by being responsible for platform 1 for Project design and corresponding task Be transmitted to unit in charge of construction's module 4, safety supervision module 5, quality surveillance module 6 and save, unit in charge of construction according to Project design and Task is constructed, and the construction by construction speed typing unit in charge of construction module 4, by unit in charge of construction's module 4 to typing Progress arranges format and is transmitted to supervisor's platform 1 after saving, and supervisor's platform 1 carries out reception preservation, examines for authorities;Safety Superintendent office carries out safety supervision to work progress, reports safety supervision to typing safety supervision module 5, and pass through safety supervision Module 5 arranges format and is transmitted to supervisor's platform 1 after saving, and supervisor's platform 1 carries out reception preservation, examines for authorities;Matter Amount supervision unit exercises supervision to construction quality, reports quality surveillance to typing quality surveillance module 6, and pass through quality surveillance mould Block 6 arranges format and is transmitted to supervisor's platform 1 after saving, and supervisor's platform 1 carries out reception preservation, examines for authorities;
Step 4, engineering project check and accept 11: authorities are by being responsible for platform 1 for Project design and checking and accepting multiplexed transport extremely Acceptance of work module 7, acceptance of work unit receive and save Project design and examination task by acceptance of work module 7, according to Project design and examination task carry out an acceptance inspection, if acceptance(check), write acceptance report, by acceptance report typing acceptance of work mould Block 7, and format is arranged by acceptance of work module 7 and is transmitted to supervisor's platform 1 after saving, supervisor's platform 1 carries out reception preservation, It examines for authorities, if examination is unqualified, it is required that corresponding unit is rectified and improved, is checked and accepted again after rectification.

Claims (7)

1. a kind of construction-engineering project management system, it is characterised in that: include: supervisor's platform, government department's terminal, designing unit Module, unit in charge of construction's module, safety supervision module, quality surveillance module, acceptance of work module, supervisor's platform are total by engineering Administrative department uses, and is the higher management of project management system, with government department terminal, designing unit's module, unit in charge of construction's mould Block, safety supervision module, quality surveillance module, acceptance of work module, supervisor's platform send engineering to government department's terminal Examination & approval are applied and receive the supervision of government department's terminal;Designing unit's module is the module that designing unit uses, with supervisor Platform is connected;Unit in charge of construction's module is module used in unit in charge of construction, is connected with supervisor's platform;The safety supervision mould Block is the module that safety supervision unit uses;The quality surveillance module is the module that quality surveillance unit uses, flat with supervisor Platform is connected;The acceptance of work module is the module that acceptance of work unit uses, and is connected with supervisor's platform.
2. a kind of construction-engineering project management system according to claim 1, it is characterised in that: government department's terminal For the terminal that the department of governability engineering uses, it is connected with supervisor's platform, engineering project is monitored.
3. a kind of construction-engineering project management system according to claim 1, it is characterised in that: process flow includes: work Journey Project design, engineering project examination & approval, Construction of Engineering Projects, engineering project are checked and accepted, All Files in this four steps process flow, Material, table, examination & approval notice, the equal typing this system of every data and uniform format, are converted to information data and are included in this system number According to library.
4. a kind of construction-engineering project management system according to claim 1 or 3, it is characterised in that: the engineering project The requirement of engineering project and basic document typing are responsible for platform by design, authorities, and are responsible for platform and are organized into unified lattice Designing unit's module is sent to after formula and preservation, designing unit is received by designing unit's module saves and check supervisor's platform biography Come material, and according to material carry out Project design, after the completion, designing unit by Project design typing designing unit module, and It is transmitted to supervisor's platform after arranging format and preservation by designing unit's module, authorities are received by supervisor's platform and saved simultaneously Inspection item design, if passing, project design is completed, and is not passed through if examining, authorities will examine problem It is responsible for platform with opinion typing, and format is arranged by supervisor's platform and is transmitted to designing unit's module, designing unit after saving It is received by designing unit's module and keeps and check examination problem and opinion, designing unit is according to the problem of examination and opinion modification item Mesh design, and transfer to authorities to examine modified Project design, so until passing.
5. a kind of construction-engineering project management system according to claim 1 or 3, it is characterised in that: the engineering project Project design and engineering are examined application material by supervisor's platform and submit government department's terminal by examination & approval, authorities, and government examines The department of criticizing is received by government department's terminal and saves and check material, if examination & approval pass through, engineering project, which is examined, to be completed, if examination & approval Do not pass through, then by suggestions made after examination and there are problem typing government department terminals, and format is arranged by government department's terminal and is protected It is transmitted to supervisor's platform after depositing, supervisor's platform receives and saves suggestions made after examination and there are after problem, then to transmit it to design single Position module simultaneously saves, and transfers to designing unit to carry out Project design modification, submits Project design to government department's terminal again after modification It is examined, so until examination & approval pass through.
6. a kind of construction-engineering project management system according to claim 1 or 3, it is characterised in that: the engineering project Construction, Project design and corresponding task are transmitted to unit in charge of construction's module by supervisor's platform by authorities, safety is supervised It superintends and directs module, quality surveillance module and saves, unit in charge of construction constructs according to Project design and task, and by construction speed It is flat to be transmitted to supervisor by unit in charge of construction's module to the construction speed arrangement format of typing and after saving for typing unit in charge of construction module Platform, supervisor's platform carry out reception preservation, examine for authorities;Safety supervision department carries out safety supervision to work progress, will Safety supervision reports typing safety supervision module, and flat by being transmitted to supervisor after safety supervision module arrangement format and preservation Platform, supervisor's platform carry out reception preservation, examine for authorities;Quality surveillance unit exercises supervision to construction quality, by quality Supervision report typing quality surveillance module, and format is arranged by quality surveillance module and is transmitted to supervisor's platform after saving, it is main Pipe platform carries out reception preservation, examines for authorities.
7. a kind of construction-engineering project management system according to claim 1 or 3, it is characterised in that: the engineering project It checks and accepts, authorities by Project design and check and accept multiplexed transport to acceptance of work module, acceptance of work unit by supervisor's platform Project design and examination task are received and saved by acceptance of work module, is carried out an acceptance inspection according to Project design and examination task, If acceptance report is write in acceptance(check), lattice are arranged by acceptance report typing acceptance of work module, and by acceptance of work module Supervisor's platform is transmitted to after formula and preservation, supervisor's platform carries out reception preservation, examines for authorities, if examination is unqualified, It is required that corresponding unit is rectified and improved, checked and accepted again after rectification.
CN201910586500.0A 2019-07-01 2019-07-01 A kind of construction-engineering project management system Pending CN110322144A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910586500.0A CN110322144A (en) 2019-07-01 2019-07-01 A kind of construction-engineering project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910586500.0A CN110322144A (en) 2019-07-01 2019-07-01 A kind of construction-engineering project management system

Publications (1)

Publication Number Publication Date
CN110322144A true CN110322144A (en) 2019-10-11

Family

ID=68122323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910586500.0A Pending CN110322144A (en) 2019-07-01 2019-07-01 A kind of construction-engineering project management system

Country Status (1)

Country Link
CN (1) CN110322144A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110880096A (en) * 2019-11-20 2020-03-13 广西越知网络股份有限公司 Multi-party cooperative office system for constructional engineering
CN110910092A (en) * 2019-11-21 2020-03-24 四川高路交通信息工程有限公司 Highway construction information management platform
CN112232761A (en) * 2020-09-27 2021-01-15 广西绿能电力勘察设计有限公司 Infrastructure application system and method
CN112308468A (en) * 2020-11-26 2021-02-02 上海济邦投资咨询有限公司 Government payment capability analysis system based on big data
CN112686569A (en) * 2021-01-11 2021-04-20 武汉建工集团股份有限公司 Job site divides unit management system of grading based on wisdom building site management platform

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110880096A (en) * 2019-11-20 2020-03-13 广西越知网络股份有限公司 Multi-party cooperative office system for constructional engineering
CN110880096B (en) * 2019-11-20 2023-10-31 广西越知网络股份有限公司 Multi-party collaborative office system for building engineering
CN110910092A (en) * 2019-11-21 2020-03-24 四川高路交通信息工程有限公司 Highway construction information management platform
CN112232761A (en) * 2020-09-27 2021-01-15 广西绿能电力勘察设计有限公司 Infrastructure application system and method
CN112232761B (en) * 2020-09-27 2023-11-14 广西绿能电力勘察设计有限公司 Infrastructure application system and method
CN112308468A (en) * 2020-11-26 2021-02-02 上海济邦投资咨询有限公司 Government payment capability analysis system based on big data
CN112686569A (en) * 2021-01-11 2021-04-20 武汉建工集团股份有限公司 Job site divides unit management system of grading based on wisdom building site management platform

Similar Documents

Publication Publication Date Title
CN110322144A (en) A kind of construction-engineering project management system
CN109658067A (en) A kind of power engineering project control platform and system
CN109302487A (en) Highway project quality administration information system based on cloud platform
CN102801805A (en) Field data acquisition system and method based on mobile internet technology
CN110147417A (en) Expressway works construction supervision unified platform
CN110910092A (en) Highway construction information management platform
CN102736567A (en) Method and system for centralized test control
Huovila et al. Smart city performance measurement system
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN107153951A (en) The method of one-stop confirmation of land right
CN112327781A (en) Asphalt mixing station production quality remote monitoring management system based on internet of things technology
CN105150383A (en) Dynamic monitoring system of production process of cement concrete mixing station
CN202285139U (en) Dynamic quality monitoring system for ready-mixed commercial concrete
CN110430449A (en) A kind of TV big data processing method and system based on electronic program guides
CN112905710A (en) Traffic product selective inspection system based on block chain and operation method thereof
CN115865720B (en) Construction acceptance management method and system based on block chain cross-chain network
CN110414854B (en) Enterprise employee file management evaluation system based on block chain
CN107563671A (en) A kind of enterprise's test and appraisal planning service system based on internet
CN116739496A (en) Intelligent management system for coal mine production
CN107612744B (en) Intelligent transportation equipment operation and maintenance system based on mobile platform
CN202677481U (en) Intelligent routine inspection system for instruments
CN201725205U (en) Integrated mix proportion monitoring device
CN109272431A (en) A kind of system being standardized teaching using computer
CN114429299A (en) Engineering quality safety management method
Neri Big data in the digital oilfield requires data transfer standards to perform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191011

WD01 Invention patent application deemed withdrawn after publication