CN110320015A - A kind of list H gas circuit pneumatic element fatigue life testboard - Google Patents

A kind of list H gas circuit pneumatic element fatigue life testboard Download PDF

Info

Publication number
CN110320015A
CN110320015A CN201910561381.3A CN201910561381A CN110320015A CN 110320015 A CN110320015 A CN 110320015A CN 201910561381 A CN201910561381 A CN 201910561381A CN 110320015 A CN110320015 A CN 110320015A
Authority
CN
China
Prior art keywords
valve
pneumatic element
measured
list
fatigue life
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910561381.3A
Other languages
Chinese (zh)
Other versions
CN110320015B (en
Inventor
宋媛媛
赵雅荣
许明中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Fast Gear Co Ltd
Original Assignee
Shaanxi Fast Gear Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Fast Gear Co Ltd filed Critical Shaanxi Fast Gear Co Ltd
Priority to CN201910561381.3A priority Critical patent/CN110320015B/en
Publication of CN110320015A publication Critical patent/CN110320015A/en
Application granted granted Critical
Publication of CN110320015B publication Critical patent/CN110320015B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • G01M13/003Machine valves

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The present invention provides a kind of list H gas circuit pneumatic element fatigue life testboard, solve the problems, such as that long conventional transmissions pneumatic element fatigue life test period, low efficiency and serious occupy test resource.The testboard meets the installation and arrangement that tester completes each pneumatic element and execution operating mechanism of at least a set of list H air-channel system in the smallest spatial dimension using the solid space structure being laid out before and after upper lower leaf and upper layer, referring to ergonomics;When use, it only needs for each element under test to be installed in place, height reduction air circuit connection, fatigue life test individually is carried out to each pneumatic element, working efficiency is promoted, the movement and state of each pneumatic element are monitored in real time, movement and response of each pneumatic element during fatigue life test are analyzed, effectively judge the phenomenon of the failure that pneumatic element occurs during the test, understands the performance of each pneumatic element and service life in list H gas circuit.

Description

A kind of list H gas circuit pneumatic element fatigue life testboard
Technical field
The present invention relates to a kind of speed changer pneumatic element testboards, and in particular to a kind of list H gas circuit pneumatic element tired longevity Order testboard.
Background technique
Traditional speed changer pneumatic element, can only be total in speed changer for simulation actual condition when carrying out fatigue life test Carrying test, this mode test period length, low efficiency are carried out on, and serious occupy tests resource, so that design improvement is tested It is slower to demonstrate,prove work propulsion.
With the more fining that research and development of products requires test result, the test of speed changer pneumatic element product is tested It is qualified or not that card has been not limited solely to evaluate its function, service life, but studies air-channel system subcomponent and subcomponent combination Afterwards to the influence of whole system, the failure phenomenon and fail early period that each pneumatic element accidentally occurs during the test are studied Failure performance, and then performance of each pneumatic element in whole life cycle is studied, basic technology data are accumulated, thus more Deepen into improvement speed changer working condition, for product improvement, system improving, FCL design support is provided.
Therefore, designing a kind of list H gas circuit pneumatic element fatigue life testboard is necessary.
Summary of the invention
It is an object of the invention to solve conventional transmissions pneumatic element fatigue life test period long, low efficiency and tight The shortcoming of test resource is occupied again, and provides a kind of list H gas circuit pneumatic element fatigue life testboard.
To achieve the above object, technical solution provided by the present invention is:
A kind of list H gas circuit pneumatic element fatigue life testboard, is characterized in that, can be completed at the same time the road N list H gas circuit The fatigue life of upper pneumatic element tests, and N is positive integer, can carry out N wheel test simultaneously, substantially increase testing efficiency;
The testboard includes testboard bay and analogue unit;
The testboard bay includes testing stand and supporting table setting up and down;
The testing stand includes the console and test box that front and back is arranged;
The console includes console pedestal and the N group pneumatic element bracket that console pedestal is arranged in;
The front side of the test box is installation panel, and rear side is chamber door, which has accommodating inner cavity, can be by each air pressure Sensor stand and the cabling of various gas circuits, circuit are fixed wherein, and rear side chamber door is utilized to hide test auxiliary herein, make The appearance of entire testboard is more beautiful, succinctly;N number of air cleaner bracket is provided in test box;
N number of pre-selection valve support is provided on the installation panel from left to right;It is respectively provided with below each pre-selection valve support There is execution cylinder mounting hole, the side of each pre-selection valve support is provided with preselector valve shifting block switching driving assembly;
The analogue unit includes driving cylinder, lateral gear lever, pressure regulator valve, solenoid valve, N number of shifting block, N number of to be measured pneumatic Element, N number of preselector valve to be measured, N number of execution cylinder to be measured, N number of air cleaner to be measured;Wherein, the pneumatic element packet to be measured Include gas path control valve to be measured and list H valve to be measured;Alternatively, the pneumatic element to be measured includes pile-up valve to be measured;
The driving cylinder and lateral gear lever are arranged on console pedestal, and N number of shifting block is arranged on lateral gear lever; It drives cylinder to drive lateral gear lever rotation, and then drives N number of shifting block rotation, make gas path control valve to be measured or pile-up valve to be measured Mandril be in compressive state or free state, the motion profile of transverse direction gear lever when simulating actual condition;
The pressure regulator valve and solenoid valve are arranged in the test box;
The pneumatic element to be measured, air cleaner to be measured are separately mounted to pneumatic element bracket and air cleaner bracket On;Above-mentioned pile-up valve refers to while having a kind of valve of single H valve and gas path control valve function, can be applied to existing list H gas circuit and sets In meter;If desired the service life and performance of single H valve or gas path control valve are tested, then just needed when using testboard by Single H valve and gas path control valve are installed in place simultaneously, form complete list H gas circuit;If desired to the service life of pile-up valve and performance into Pile-up valve, then need to only be installed in place by row test;It is voluntarily adjusted according to testing requirement;
The preselector valve to be measured is vertically installed in pre-selection valve support, can make preselector valve to be measured using vertical mounting means Measurement condition and actual condition be consistent, reduce test error;The shifting block switching driving assembly is used for pre-selection to be measured The shifting block of valve carries out high and low shift switching;Execution cylinder to be measured is mounted in execution cylinder mounting hole, and its telescopic rod extends perpendicularly out The installation panel of test box, i.e. cylinder body are hidden in test box, and execution cylinder guarantees installation strength using entire test box, collection At spend it is high, easy for installation, eliminate execution cylinder bracket, moulding is more succinct.
Compressed air enters driving cylinder after pressure regulator valve and solenoid valve, through low-grade tracheae or high-grade tracheae, this is should The gas circuit principle of cylinder is driven on testboard;
In every road list H gas circuit, compressed air respectively enters preselector valve to be measured and gas circuit control to be measured through air cleaner to be measured In valve processed, and then entered in list H valve to be measured by the gas outlet of gas path control valve to be measured, eventually by high-grade tracheae or low grade Tracheae enters execution cylinder;Alternatively, in every road list H gas circuit, compressed air through air cleaner, respectively enter preselector valve to be measured and In pile-up valve to be measured, finally the high and low shift hole through pile-up valve to be measured enters execution cylinder;This is former for the gas circuit of pneumatic element to be measured Reason.
Entire air circuit connection part is consistent with the air circuit connection in actual condition, really restores gas circuit, promotes test knot The precision of structure.
Further, the driving cylinder drives lateral gear lever rotation by gear-shifting rocker arm;The one of the gear-shifting rocker arm End is connected by universal joint with the telescopic rod of the driving cylinder, and the other end is connected with one end of the lateral gear lever;
The driving cylinder is mounted on console pedestal by air cylinder base, and the air cylinder base is on console pedestal Position it is adjustable;
The transverse direction gear lever is mounted on console pedestal by the fulcrum bearing cooperated with its both ends, and lateral gear lever The upper position close to fulcrum bearing is provided with latch, prevents lateral gear lever from moving axially;It is provided in the fulcrum bearing Anti-wearing liner can prolong the service life, and position of the fulcrum bearing on console pedestal is adjustable.
Further, the pneumatic element bracket includes first support and/or second support;First support for install with The gas path control valve to be measured or pile-up valve to be measured that the shifting block matches, second support is for installing list H valve to be measured.
Further, the pre-selection valve support and preselector valve shifting block driving assembly can above and below the position in installation panel It adjusts, suitable position can be adjusted to when testing different model preselector valve, be applicable in relatively broad;N number of execution gas The high settings such as cylinder mounting hole, because execution cylinder movement when dynamics it is larger, execution cylinder movement when, etc. high settings can make entirely to pacify Panel uniform force, proof strength are filled, and waits high settings from the appearance also more beautiful;
The pre-selection valve support includes riser and transverse slat, and riser is mounted on installation panel by fastener, transverse slat On offer arc-shaped through-hole compatible with all sockets in preselector valve bottom to be measured, to preselector valve carry out air circuit connection when, just It is installed in tester, improves working efficiency.
Further, N number of shifting block is set on lateral gear lever by positioning pin fixation;On the console pedestal Be additionally provided with the limit plate for limiting all shifting block rotational angles, installation site of the limit plate on console pedestal and It is adjustable to limit direction;For example, the mounting means limit shifting block of limit plate is rotated in 0 °~-12 ° directions at present, if will limit Plate is still installed here after rotating 180 °, then can limit shifting block is rotated in 0 °~12 ° directions;It is conducive to extend and dials in this way The service life of head, can replace it from lower convex platform to convex with the position that gas path control valve or pile-up valve mandril cooperate Platform reduces and reuses same position, reduces abrasion;Meanwhile the setting of limit plate, it is also beneficial to extend the use of driving cylinder Service life makes that cylinder stroke and movement is driven not to be influenced by shifting block rotational angle.
Further, the console pedestal is rectangle, offers multiple rack mounting apertures, multiple rack mounting apertures thereon The two sides of uniformly distributed transverse direction gear lever, N number of first support separation lateral gear lever two sides, can adjust between multiple rack mounting apertures Section is set, and can change the pressure of gas path control valve to be measured or pile-up valve mandril to be measured by adjusting the installation site of first support Contracting length.
Further, in the supporting table there are accommodating space, glove trolley or stream can be placed in the accommodating space Meter trolley makes full use of testboard space, effectively save test resource;There are four limits for setting on supporting table level table The console pedestal of bolt, rectangle is installed on the level table of supporting table by four caging bolts.
Further, it is respectively provided on each panel of the supporting table, between testing stand and supporting table and in test box There is silencing and damping cotton, farthest reduces vibration and noise caused by rack is shifted gears due to cylinder during the test;
Multiple tracheae via holes are offered on the installation panel of the test box, for the connection of each gas circuit and circuit and solid It is fixed, reduce the intersection of each pipeline, route;The side plate and top plate of the test box are hollow design, are conducive to solenoid valve Exhaust, meanwhile, the tracheae through-hole passed through convenient for external gas source pipeline is also provided on side plate.
Further, the pressure regulator valve and solenoid valve pass through corresponding bracket and are mounted in test box, and installation is reliable;It should Baroceptor bracket is additionally provided in test box.
Further, which can be completed at the same time the fatigue life test of pneumatic element in three road list H gas circuits, can be right Same type product carries out three drive test examinations simultaneously, and the examination of three drive tests passes through, then product meets enterprise's fining standard requirement, if having It is any not pass through all the way, then it needs further to test, and find out failure cause, optimizing product design.
Further, it is provided with baroceptor on the pipeline in every list H gas circuit all the way between connected pneumatic element, it can be real When monitor the air pressure of each pneumatic element.
Further, displacement sensor is had on the driving cylinder, can monitor displacement.
The beneficial effects of the present invention are:
1. testboard of the present invention is using the solid space structure being laid out before and after upper lower leaf and upper layer, referring to human engineering Meet tester and complete each pneumatic element of at least a set of list H air-channel system in the smallest spatial dimension and execute operation The installation and arrangement of mechanism;Using the testboard in the present invention, it is only necessary to be installed in place each element under test, not only height is gone back Former air circuit connection also individually can carry out fatigue life test by the pneumatic element to single H gas circuit, to every while promoting working efficiency The movement of a pneumatic element and state are monitored in real time, and movement of each pneumatic element during fatigue life test is analyzed And response, effectively judge the phenomenon of the failure that pneumatic element occurs during the test, more in depth understands in list H gas circuit The performance of each pneumatic element and service life complete function intensified air-channel system, increased quality, performance raising etc. and require, preferably suitable Answer all kinds of production transmissions.
2. the present invention will drive cylinder to connect with lateral gear lever using gear-shifting rocker arm, i.e., commutated using gear-shifting rocker arm Movement drives the shifting block rotation on lateral gear lever, more closing to reality operating condition, and simulation validity is high, eliminates error, makes to test Structure is more true and reliable.
3. driving cylinder, lateral gear lever, pre-selection valve support, preselector valve shifting block driving assembly and first in the present invention Frame, second support position can be adjusted, be applicable to single H gas circuit pneumatic element of various models, applicability is relatively wide, function It can be powerful.
4. can be used for placing glove trolley or stream there are accommodating space (i.e. below table top) in supporting table of the invention Meter trolley or other articles closely related with test, take conveniently, make full use of testboard space, effectively save examination Certification of registered capital source.
5. the design of test box of the present invention, for the beautiful, succinct particularly important of entire testboard appearance;Due to testboard The testing experiment of multichannel list H air-channel system can be achieved at the same time, therefore, pipeline used in gas circuit and circuit and route are more, such as If all exposing to the open air on the outside, it is not easy to testing crew and carries out installation and debugging, therefore can be gone on smoothly not influencing testing experiment Under the premise of, part pipeline and route or even component are stashed using test box.
6. being provided on each panel of supporting table, between testing stand and supporting table and in test box in the present invention Silencing and damping cotton can farthest reduce vibration and noise caused by rack is shifted gears due to cylinder during the test, make to try Test steady progress.
7. the top plate of test box and side plate use hollow design in the present invention, be conducive to the solenoid valve being located in test box row Gas;And be chamber door on rear side of test box, it is overhauled convenient for testing crew installation and maintenance.
8. console bottom plate is not limited to be installed on the level table of supporting table in the present invention, it is also movable to other positions It sets and carries out shift test.
9. the present invention can be completed at the same time the fatigue life test of pneumatic element in three road list H gas circuits, can be to same model Product simultaneously carry out three drive test examinations, three drive tests examination pass through, then product meet enterprise fining standard requirement, if having it is any all the way Do not pass through, then need further to test, and find out failure cause, optimizes product convenient for research staff.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of testboard of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the right view of Fig. 1;
Fig. 4 is the top view of Fig. 1;
Fig. 5 is the rearview of testboard of the present invention;
Fig. 6 is that testboard of the present invention removes the structural schematic diagram after console;
Fig. 7 is the top view of console (when installing gas path control valve to be measured) in testboard of the present invention;
Fig. 8 is the structural schematic diagram of console in Fig. 7;
Fig. 9 is the schematic diagram of gas circuit of testing element of the present invention;
Figure 10 is the schematic diagram of gas circuit of present invention driving cylinder;
Figure 11 is pneumatic element flow detection schematic diagram;
Figure 12 is pneumatic element leakage rate detection principle diagram;
Drawing reference numeral is as follows:
01- testing stand;02- supporting table;1- test box;2- console;3- flowmeter trolley;The installation of 4- execution cylinder Hole;5- preselects valve support;6- preselector valve to be measured;7- shifting block switches driving assembly;8- console pedestal;9- first support;10- is waited for Survey gas path control valve or pile-up valve to be measured;11- list H valve to be measured;12- second support;13- fulcrum bearing;14- transverse direction gear lever; 15- shifting block;16- positioning pin;17- limit plate;18- latch;19- rack mounting apertures;20- drives cylinder;21- universal joint; 22- air cylinder base;23- gear-shifting rocker arm;24- tracheae via hole;25- execution cylinder to be measured;27- installs panel;28- chamber door;The top 29- Plate;30- side plate;31- tracheae through-hole;32- pressure regulator valve;33- solenoid valve;34- air cleaner to be measured;35- baroceptor; 36- switch valve;37- has the mass flowmenter of baroceptor;38- measured piece.
Specific embodiment
The contents of the present invention are described in further detail below in conjunction with the drawings and specific embodiments:
Only for convenience, in the following description, specific direction term has been used, has been with corresponding attached drawing For reference, it can not be considered limitation of the present invention, when the definition direction of drawing changes, what these words indicated Direction should be construed as corresponding different directions.
As shown in Fig. 1-Figure 12, a kind of list H gas circuit pneumatic element fatigue life testboard can be completed at the same time three road list H gas The fatigue life of road pneumatic element tests, and can also need to arrange appropriate number of list H gas circuit according to test, but need to adjust accordingly Whole testboard size and bearing strength.The testboard includes testboard bay and analogue unit.
Testboard bay includes testing stand 01 and supporting table 02 setting up and down.Analogue unit includes driving cylinder, laterally changes It is bar, pressure regulator valve, solenoid valve, N number of shifting block, N number of pneumatic element to be measured, N number of preselector valve to be measured, N number of execution cylinder to be measured, N number of Air cleaner to be measured;Wherein, pneumatic element to be measured includes gas path control valve to be measured and list H valve to be measured;Alternatively, pneumatic member to be measured Part includes pile-up valve to be measured.
There are accommodating spaces in supporting table 02, can place flowmeter trolley 3, which can be used for realizing The detection of each pneumatic element delivery outlet through-current capacity and the detection of pneumatic element leakage rate, flowmeter trolley 3 include four layers (three every Gear is separated), from top to bottom respectively first layer, the second layer, third layer and the 4th layer;Wherein, first layer is workbench, On be also placed with flowmeter display screen;The second layer is used to place the flowmeter bodies of test pneumatic element through-current capacity;Third layer and 4th layer for placing the mobile work case of different range test leakage rates.There are four limits for setting on 02 level table of supporting table Position bolt.
Testing stand 01 includes the console 2 and test box 1 of front and back setting.
Console 2 includes rectangle console pedestal 8;Rectangle console pedestal 8 can be both installed at four caging bolts, It can be moved to other positions.Driving cylinder 20 is mounted on console pedestal 8 by air cylinder base 22, and the air cylinder base 22 is being controlled Position on platform pedestal 8 processed is adjustable, which includes the pedestal of padded driving cylinder 20 and be used on pedestal The fixing piece of fixed driving 20 tail end of cylinder;Lateral gear lever 14 is mounted on console by the fulcrum bearing 13 cooperated with its both ends On pedestal 8, and the position of fulcrum bearing is provided with latch 18 on lateral gear lever 14, prevents lateral gear lever 14 from axis occurs To movement;It is provided with anti-wearing liner in fulcrum bearing 13, can be prolonged the service life, and position of the fulcrum bearing on console pedestal 8 It is adjustable;The driving cylinder 20 drives lateral gear lever 14 to rotate by gear-shifting rocker arm 23;One end of gear-shifting rocker arm 23 passes through universal Connector 21 is connected with the telescopic rod of driving cylinder 20, and the other end is connected with one end of the lateral gear lever 14.Console pedestal 8 On also set up that there are three 9, three second supports 12 of first support and multiple for installing first support 9 and second support 12 (second support also mountable other vacant positions in console bottom plate can play fixed list H valve to be measured to frame mounting hole 19 Effect is not distinctly claimed its position);Multiple 19 proper alignments of rack mounting apertures, 14 two sides of lateral gear lever of living apart, Three first supports 9 can carry out rational deployment between multiple rack mounting apertures 19, position be adjusted, by three gas path control valves to be measured And three list H valves 11 to be measured are separately mounted in first support 9 and second support 12;Certainly, if test product is integrated Valve, then only needing for three pile-up valves to be measured to be mounted in first support 9;There are three shifting blocks for setting on lateral gear lever 14 15, three shifting blocks 15 are matched with gas path control valve to be measured or pile-up valve to be measured 10 respectively;Three shifting blocks pass through positioning pin 16 Fixation is set on lateral gear lever 14;The limit for limiting all shifting block rotational angles is additionally provided on console pedestal 8 Plate 17, the installation site of the limit plate 17 on console pedestal 8 and limit direction are adjustable.Driving cylinder 20, which drives, laterally to be changed The rotation of bar 14 (commutates), and then drives three shifting block rotations, makes the top of gas path control valve to be measured or pile-up valve to be measured 10 Bar is in compressive state or free state, the motion profile of transverse direction gear lever 14 when simulating actual condition.For real-time monitoring position It moves, drives and be provided with displacement sensor on cylinder 20.
The front side of test box 1 is installation panel 27, and rear side is chamber door 28, and top plate 29 and side plate 30 are all made of hollow design; And test box 1 has accommodating inner cavity, by the installation of corresponding bracket, there are three air cleaners 34 to be measured to supply three tunnels respectively for inside Single H gas circuit use, a pressure regulator valve 32 and a solenoid valve 33 (solenoid valve 33 is two five-way electromagnetic valves), while can also incite somebody to action Baroceptor bracket and the cabling of various gas circuits, circuit are fixed wherein, using rear side chamber door 28 that test auxiliary herein is hidden Hiding, keeps the appearance of entire testboard more beautiful, succinctly.
It is uniformly arranged from left to right on installation panel 27 there are three valve support 5 is preselected, three about 5 valve supports of pre-selection are adjustable (being fixed by being adjusted with the strip-shaped hole cooperation being provided on installation panel 27);The lower section of each pre-selection valve support 5 is provided with Execution cylinder mounting hole 4, the side of each pre-selection valve support 5 are provided with adjustable preselector valve shifting block switching driving assembly up and down 7;Three preselector valves 6 to be measured are vertically installed in pre-selection valve support 5, the test of preselector valve can be made using vertical mounting means Operating condition and actual condition are consistent, and really restore use state.Wherein, pre-selection valve support 5 includes riser and transverse slat, riser It is mounted on installation panel 27, is offered on transverse slat compatible with the preselector valve all sockets in 6 bottom to be measured by fastener Arc-shaped through-hole is installed when carrying out air circuit connection to preselector valve convenient for tester, and working efficiency is improved.Shifting block switching Driving assembly 7 is used to carry out 6 shifting block of preselector valve to be measured high and low shift switching, and cylinder can be used in shifting block switching driving assembly 7, when Other prior arts so can also be used.Three installations of execution cylinder 25 to be measured are separately mounted in three execution cylinder mounting holes 4, And its telescopic rod extends perpendicularly out the installation panel 27 of test box 1, i.e. cylinder body is hidden in test box 1, and execution cylinder is using entirely 1 proof strength of test box, eliminates execution cylinder bracket, and integrated level is high, easy for installation, plastic simplicity, three execution cylinders peaces Fill the high settings such as hole 4, uniform force, proof strength.Multiple tracheae via holes 24 are also opened up on installation panel 27, are used for each gas circuit With the connection and fixation of circuit, the intersection of each pipeline, route is reduced;It offers on side plate 30 and passes through convenient for connection gas source pipeline Tracheae through-hole 31.
In order to farthest reduce vibration and noise caused by rack is shifted gears due to cylinder during the test, supporting table Silencing and damping cotton, supporting table are provided on 02 each panel, between testing stand 01 and supporting table 02 and in test box 1 02 bottom is also equipped with gasket.
Compressed air enters driving cylinder 20 after pressure regulator valve 32 and solenoid valve 33, through low-grade tracheae or high-grade tracheae, This is the gas circuit principle that cylinder 20 is driven on the testboard, referring to Figure 10;
In every road list H gas circuit, compressed air respectively enters preselector valve 6 to be measured and gas to be measured through air cleaner 34 to be measured In the control valve of road, and then entered in list H valve 11 to be measured by the gas outlet of gas path control valve to be measured, eventually by high-grade tracheae or Person's low grade tracheae enters execution cylinder;Alternatively, compressed air respectively enters to be measured through air cleaner 34 in every road list H gas circuit In preselector valve 6 and pile-up valve to be measured, finally the high and low shift hole through pile-up valve to be measured enters execution cylinder;In order to which real-time monitoring is each The air pressure change of pneumatic element is often provided with baroceptor 35 on the pipeline in list H gas circuit between connected pneumatic element all the way, This is the gas circuit principle of pneumatic element to be measured, referring to Fig. 9.
By taking gas path control valve and list H valve as an example, single H gas circuit actual act operating condition is as follows:
Odd-side high gear turns low gear: for main tank in gear, gas path control valve mandril is in compressive state, and switching preselector valve is to low Gear is set, and list H valve control terminal has air pressure at this time, and list H valve is pushed to complete conversion of the high gear to low gear, and speed changer realizes that low gear is pre- Choosing.Since gas path control valve mandril compresses, i.e., gas path control valve venthole is in off state, and list H valve air inlet at this time has no gas Pressure input.When main tank hangs neutral gear, gas path control valve mandril returns to free position, and the long ventilation of gas path control valve, compression are empty at this time Gas switches through gas path control valve, list H valve to the low gear position of auxiliary box cylinder (i.e. execution cylinder), auxiliary transmission to low gear.Solution The shift synchronizer of odd-side caused by basic transmission of having determined is preselected in gear beats tooth problem.
Odd-side low gear turns high gear: for main tank in gear, gas path control valve mandril is in compressive state, and switching preselector valve is supreme Gear is set, and list H valve control terminal is without air pressure at this time, and list H valve completes conversion of the low gear to high gear under the action of control terminal spring force, Speed changer realizes high gear pre-selection.Since gas path control valve mandril compresses, i.e., gas path control valve venthole is in off state, this When list H valve air inlet have no air pressure input.When main tank hangs neutral gear, gas path control valve mandril returns to free position, at this time gas circuit control The long ventilation of valve processed, compressed air is through gas path control valve, list H valve to the high gear position of auxiliary box cylinder (i.e. execution cylinder), secondary speed change Device switches to high gear.Solve the problems, such as that basic transmission preselects caused odd-side shift synchronizer in gear and beats tooth.
Equally, by taking gas path control valve and list H valve as an example, the course of work of single H gas circuit pneumatic element fatigue life testboard It is as follows:
Gas circuit is from low gear to high gear switching action
Cut-off: the compressed air after pressure stabilizing after 34 pressure regulation of air cleaner, into gas path control valve and preselector valve into Port;Switching two five-way electromagnetic valves 33 makes that cylinder 20 is driven to switch to low gear by high gear, drives transverse direction by gear-shifting rocker arm 23 Shifting block on gear lever 14 is rotated, and rotational angle is limited by limit plate 17;Shifting block compression gas circuit control valve top at this time Bar is in compressive state, and gas path control valve venthole is in off state, and single H valve is without air inlet.
Pre-selection: shifting block switching driving assembly 7 stirs preselector valve shifting block to be measured and switches to high gear by low gear, list H valve control at this time End processed is without air pressure, and list H valve completes conversion of the low gear to high gear under the action of control terminal spring force, since single H valve is without air inlet, this When be list H valve core shift in place realize preselect.
Shift gears in place: two five-way electromagnetic valves 33 of switching make that cylinder 20 is driven to switch to high gear by low gear, are shaken by shift Arm 23 drives the shifting block on lateral gear lever 14 to be rotated, and rotational angle is limited by limit plate 17;Shifting block compresses at this time Gas path control valve mandril is in free state, and compressed air leads to the high gear position of execution cylinder through gas path control valve, list H valve, Complete gear shifting action of the low gear to high gear.
Gas circuit is from high gear to low gear switching action
Cut-off: the compressed air after pressure stabilizing after 342 pressure regulation of air cleaner, into gas path control valve and preselector valve into Port;Switching two five-way electromagnetic valves 33 makes that cylinder 20 is driven to switch to low gear by high gear, drives transverse direction by gear-shifting rocker arm 23 Shifting block on gear lever 14 is rotated, and rotational angle is limited by limit plate 17;Shifting block compression gas circuit control valve top at this time Bar is in compressive state, and gas path control valve venthole is in off state, and single H valve is without air inlet.
Pre-selection: shifting block switching driving assembly 7 stirs preselector valve shifting block high gear to be measured and switches to low gear, and list H valve controls at this time There is air pressure at end, and list H valve is pushed to complete conversion of the high gear to low gear, is at this time the shift of list H valve core since single H valve is without air inlet Pre-selection is realized in place.
Shift gears in place: two five-way electromagnetic valves 33 of switching make that cylinder 20 is driven to switch to high gear by low gear, are shaken by shift Arm 23 drives the shifting block on lateral gear lever 14 to be rotated, and rotational angle is limited by limit plate 17;Shifting block compresses at this time Gas path control valve mandril is in free state, and compressed air leads to the low gear position of execution cylinder through gas path control valve, list H valve, Complete gear shifting action of the high gear to low gear.
In addition to the test of above-mentioned fatigue life, also to the through-current capacity of pneumatic element and let out using flowmeter trolley 3 Leakage quantity is tested:
1. pneumatic element through-current capacity is tested
This test belongs to the content of pneumatic element performance detection, and test schematic will need measured piece 38 (i.e. referring to Figure 11 The pneumatic element of test) it keeps opening gas source in test gas circuit on a certain state incoming stream meter trolley 3, adjusting pressure regulation Valve 32 can measure under certain air pressure the maximum stream flow of 38 access gas circuit of measured piece at this time;Other states for switching measured piece 38 can Test the maximum stream flow of the other access gas circuits of measured piece 38.Data of this result as examination sample flow ability.
2. pneumatic element leakage test
Measured piece 38 (pneumatic element tested) is kept a certain state before test and incited somebody to action by test schematic referring to Figure 12 Gas outlet under this state blocks, and before test gas circuit ventilation, closes the second air circuit breaker valve 36 and third air circuit breaker valve 36, The first air circuit breaker valve 36 is opened, is supplied to 38 air inlet of measured piece, pressure regulator valve 32 is adjusted, by gas circuit air pressure adjustment to testing gas Pressure.Second gas circuit flowmeter and third gas circuit flowmeter are respectively the flowmeter of wide range and small-range, first open the second gas circuit Switch valve 36 closes the first air circuit breaker valve 36, and it is the quilt that the numerical value is read after numerical stability on the second gas circuit flowmeter Survey leakage rate result of 38 test mode of part under this measuring air pressure;If the leakage numerical quantity shown at this time is too small, openable Three air circuit breaker valves 36 close the second air circuit breaker valve 36, read the numerical value i.e. after numerical stability on third gas circuit flowmeter For leakage rate result of 38 test modes of the measured piece under this measuring air pressure.(guarantee other portions of air circuit connection before test The equal No leakage in position).Switching measured piece 38 other states repeat above step test the leakage rate under other states as a result, this Test result is the important evidence for detecting pneumatic element sealing performance and whether meeting the requirements.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art can readily occur in various equivalent modifications or replace in technical scope disclosed by the invention It changes, these modifications or substitutions should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of list H gas circuit pneumatic element fatigue life testboard, it is characterised in that: can be completed at the same time in the list H gas circuit of the road N pneumatic The fatigue life of element tests, and N is positive integer;
The testboard includes testboard bay and analogue unit;
The testboard bay includes testing stand setting up and down (01) and supporting table (02);
The testing stand (01) includes the console (2) and test box (1) that front and back is arranged;
The console (2) includes console pedestal (8) and the N group pneumatic element bracket that console pedestal is arranged in;
The front side of the test box (1) is installation panel (27), and rear side is chamber door (28), is provided with N number of air filter in test box Clear device bracket;
N number of pre-selection valve support (5) is provided on the installation panel (27) from left to right;The lower section of each pre-selection valve support (5) It is provided with execution cylinder mounting hole (4), the side of each pre-selection valve support (5) is provided with preselector valve shifting block switching driving group Part (7);
The analogue unit includes driving cylinder (20), lateral gear lever (14), pressure regulator valve (32), solenoid valve (33), N number of shifting block (15), N number of pneumatic element to be measured, N number of preselector valve (6) to be measured, N number of execution cylinder (25) to be measured, N number of air cleaner to be measured (34);Wherein, the pneumatic element to be measured includes gas path control valve to be measured and list H valve (11) to be measured;Alternatively, described to be measured pneumatic Element includes pile-up valve to be measured;
The driving cylinder (20) and lateral gear lever (14) are arranged on console pedestal (8), and N number of shifting block (15) is arranged in cross To on gear lever (14);It drives cylinder (20) that lateral gear lever (14) is driven to rotate, and then drives N number of shifting block (15) rotation;
The pressure regulator valve (32) and solenoid valve (33) setting are in the test box (1);
The pneumatic element to be measured, air cleaner to be measured (34) are separately mounted to pneumatic element bracket and air cleaner bracket On;
The preselector valve to be measured (6) is vertically installed in pre-selection valve support (5), shifting block switching driving assembly (7) for pair The shifting block of preselector valve (6) to be measured carries out high and low shift switching;Execution cylinder (25) to be measured is mounted in execution cylinder mounting hole, and its Telescopic rod extends perpendicularly out the installation panel (27) of test box (1).
2. list H gas circuit pneumatic element fatigue life testboard according to claim 1, it is characterised in that: the driving gas Cylinder (20) drives lateral gear lever (14) to rotate by gear-shifting rocker arm (23);One end of the gear-shifting rocker arm (23) passes through Universal connector Head (21) is connected with the telescopic rod of driving cylinder (20), and the other end is connected with one end of the lateral gear lever (14);
The driving cylinder (20) is mounted on console pedestal (8) by air cylinder base (22), and the air cylinder base (22) exists Position on console pedestal (8) is adjustable;
The transverse direction gear lever (14) is mounted on console pedestal (8) by the fulcrum bearing (13) cooperated with its both ends, and horizontal Position on gear lever (14) close to fulcrum bearing is provided with latch (18);Wear-resisting lining is provided in the fulcrum bearing (13) Set, and position of the fulcrum bearing on console pedestal (8) is adjustable.
3. list H gas circuit pneumatic element fatigue life testboard according to claim 1 or 2, it is characterised in that: described pneumatic Element bracket includes first support (9) and/or second support (12);First support (9) is for installing and the shifting block (15) phase The gas path control valve to be measured or pile-up valve to be measured (10) of cooperation, second support (12) is for installing list H valve (11) to be measured.
4. list H gas circuit pneumatic element fatigue life testboard according to claim 3, it is characterised in that: the preselector valve Bracket (5) and preselector valve shifting block driving assembly are adjustable above and below the position in installation panel (27), and N number of execution cylinder is installed The high settings such as hole (4);
The pre-selection valve support (5) includes riser and transverse slat, and riser is mounted in installation panel (27) by fastener, horizontal Arc-shaped through-hole compatible with preselector valve to be measured (6) all sockets in bottom is offered on plate.
5. list H gas circuit pneumatic element fatigue life testboard according to claim 4, it is characterised in that: N number of shifting block (15) it is set on lateral gear lever (14) by positioning pin (16) fixation;It is additionally provided with and is used on the console pedestal (8) Limit the limit plate (17) of all shifting blocks (15) rotational angle, installation position of the limit plate (17) on console pedestal (8) It sets and to limit direction adjustable.
6. list H gas circuit pneumatic element fatigue life testboard according to claim 5, it is characterised in that: the console Pedestal (8) is rectangle, is offered thereon multiple rack mounting apertures (19), the uniformly distributed lateral gear lever of multiple rack mounting apertures (19) (14) two sides, described N number of lateral gear lever (14) two sides of first support (9) separation, can be between multiple rack mounting apertures (19) Adjusting position.
7. list H gas circuit pneumatic element fatigue life testboard according to claim 6, it is characterised in that: the supporting table (02) there are accommodating space in, there are four caging bolts, the console pedestal (8) of rectangle to pass through four for setting on level table Caging bolt is installed on the level table of supporting table (02).
8. list H gas circuit pneumatic element fatigue life testboard according to claim 7, it is characterised in that: the supporting table (02) on each panel, between testing stand (01) and supporting table (02) and test box (1) in be provided with silencing and damping Cotton;
Multiple tracheae via holes (24) are offered on the installation panel (27) of the test box (1);The side plate of the test box (1) (30) and top plate (29) is hollow design, and tracheae through-hole (31) are offered on side plate (30).
9. list H gas circuit pneumatic element fatigue life testboard according to claim 8, it is characterised in that: the pressure regulator valve (32) and solenoid valve (33) is mounted in test box (1) by corresponding bracket;Air pressure transmission is additionally provided in the test box (1) Sensor bracket.
10. list H gas circuit pneumatic element fatigue life testboard according to claim 1, it is characterised in that: the testboard can It is completed at the same time the fatigue life test of pneumatic element in three road list H gas circuits.
CN201910561381.3A 2019-06-26 2019-06-26 Single H gas circuit pneumatic element fatigue life testboard Active CN110320015B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910561381.3A CN110320015B (en) 2019-06-26 2019-06-26 Single H gas circuit pneumatic element fatigue life testboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910561381.3A CN110320015B (en) 2019-06-26 2019-06-26 Single H gas circuit pneumatic element fatigue life testboard

Publications (2)

Publication Number Publication Date
CN110320015A true CN110320015A (en) 2019-10-11
CN110320015B CN110320015B (en) 2021-04-13

Family

ID=68120304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910561381.3A Active CN110320015B (en) 2019-06-26 2019-06-26 Single H gas circuit pneumatic element fatigue life testboard

Country Status (1)

Country Link
CN (1) CN110320015B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070088361A (en) * 2006-02-24 2007-08-29 (재)한국기기유화시험연구원 Leak rate and life cycles test system of pneumatic angle valve for vacuum
KR20090025394A (en) * 2007-09-06 2009-03-11 연용현 Device and method for detecting broken edge of glass substrate
CN102749190A (en) * 2012-06-22 2012-10-24 浙江春晖智能控制股份有限公司 Testing method of flow characteristic curve of electronic gas-liquid ratio regulating valve for oil and gas recovery
CN103076797A (en) * 2012-12-25 2013-05-01 西安航天远征流体控制股份有限公司 Service life testing platform of control element of heavy-duty car gearbox operating system
CN203672607U (en) * 2013-12-27 2014-06-25 西安航天远征流体控制股份有限公司 Combined service life test system for pneumatic elements of heavy automobile gearbox
CN103913303A (en) * 2012-12-31 2014-07-09 西安航天远征流体控制股份有限公司 Pneumatic element combined life test system for automobile chassis
CN207050969U (en) * 2017-07-24 2018-02-27 宁波方太厨具有限公司 The electric-control system of valve body life-test rack
CN107783480A (en) * 2016-08-25 2018-03-09 张桂春 A kind of aircraft pneumatic element integrated test system
CN107917798A (en) * 2017-11-08 2018-04-17 燕山大学 The test system and test method of pneumatic proportional pressure valve
KR101928843B1 (en) * 2017-08-10 2018-12-13 이상일 Solenoid valve test apparatus for automotive automatic transmission

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070088361A (en) * 2006-02-24 2007-08-29 (재)한국기기유화시험연구원 Leak rate and life cycles test system of pneumatic angle valve for vacuum
KR20090025394A (en) * 2007-09-06 2009-03-11 연용현 Device and method for detecting broken edge of glass substrate
CN102749190A (en) * 2012-06-22 2012-10-24 浙江春晖智能控制股份有限公司 Testing method of flow characteristic curve of electronic gas-liquid ratio regulating valve for oil and gas recovery
CN103076797A (en) * 2012-12-25 2013-05-01 西安航天远征流体控制股份有限公司 Service life testing platform of control element of heavy-duty car gearbox operating system
CN103913303A (en) * 2012-12-31 2014-07-09 西安航天远征流体控制股份有限公司 Pneumatic element combined life test system for automobile chassis
CN203672607U (en) * 2013-12-27 2014-06-25 西安航天远征流体控制股份有限公司 Combined service life test system for pneumatic elements of heavy automobile gearbox
CN107783480A (en) * 2016-08-25 2018-03-09 张桂春 A kind of aircraft pneumatic element integrated test system
CN207050969U (en) * 2017-07-24 2018-02-27 宁波方太厨具有限公司 The electric-control system of valve body life-test rack
KR101928843B1 (en) * 2017-08-10 2018-12-13 이상일 Solenoid valve test apparatus for automotive automatic transmission
CN107917798A (en) * 2017-11-08 2018-04-17 燕山大学 The test system and test method of pneumatic proportional pressure valve

Also Published As

Publication number Publication date
CN110320015B (en) 2021-04-13

Similar Documents

Publication Publication Date Title
CN101391376B (en) Single-drive device for controlling the rotation and lift of worktable
CN102607844B (en) Vertical experiment table for precise performance test of small-tooth-difference planetary reducer
CN209325331U (en) A kind of measurement and control instrument Multi-angle regulating device
CN104697788A (en) Durability test device for automobile gear shifter
CN107167049B (en) A kind of crankshaft grinding processing on-position measure device
CN105043762A (en) Fatigue testing machine for gear shift fork
CN108007682A (en) A kind of durability test device for master on-off lock for motorcycle
CN208476443U (en) A kind of speed reducer efficiency test machine
CN101799360A (en) Valve element service life tester of single-handle double-control water nozzle
CN114719725A (en) Floor deformation test fixture that wets
CN110320015A (en) A kind of list H gas circuit pneumatic element fatigue life testboard
CN110044588A (en) A kind of line traffic control selector high/low temperature durability test equipment
CN101539492B (en) Intelligent testing method of lifter and testing device
CN107782572A (en) Machine is tested in a kind of automobile seat height adjuster endurance quality detection
CN101713708B (en) Development performance testing device of hydraulic breaking hammer main body
CN110307966A (en) A kind of auto pedal assembly detection device
CN204422208U (en) Automotive gear shifter device for testing endurance
CN201257594Y (en) Device for single drive controlling worktable rotary and up-down
CN106124149A (en) A kind of contrast test device detecting vehicle transmission shaft vibration and simulation fact
CN201697780U (en) Service life testing machine for single-handle dual-control water nozzle valve core
CN210719645U (en) Automobile part fatigue life test bench
CN203572673U (en) Multifunctional load simulation test bench
CN200941084Y (en) Simulating slide cap fatigue tester
CN113447288B (en) Durability detection system for national physique health test equipment
CN204964180U (en) Shifting fork fatigue testing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant