CN110319533A - New blower and air duct switching method with multiple duct switching construction - Google Patents

New blower and air duct switching method with multiple duct switching construction Download PDF

Info

Publication number
CN110319533A
CN110319533A CN201910776836.3A CN201910776836A CN110319533A CN 110319533 A CN110319533 A CN 110319533A CN 201910776836 A CN201910776836 A CN 201910776836A CN 110319533 A CN110319533 A CN 110319533A
Authority
CN
China
Prior art keywords
air
outlet
equipment
indoor
port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910776836.3A
Other languages
Chinese (zh)
Inventor
龙韬
吴广胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Childhood Air Technology Co Ltd
Original Assignee
Hunan Childhood Air Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Childhood Air Technology Co Ltd filed Critical Hunan Childhood Air Technology Co Ltd
Priority to CN201910776836.3A priority Critical patent/CN110319533A/en
Publication of CN110319533A publication Critical patent/CN110319533A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V33/00Structural combinations of lighting devices with other articles, not otherwise provided for
    • F21V33/0088Ventilating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/08Air-flow control members, e.g. louvres, grilles, flaps or guide plates
    • F24F13/082Grilles, registers or guards
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/20Casings or covers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0003Exclusively-fluid systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/04Ventilation with ducting systems, e.g. by double walls; with natural circulation
    • F24F7/06Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit
    • F24F7/08Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit with separate ducts for supplied and exhausted air with provisions for reversal of the input and output systems

Abstract

The invention discloses a kind of new blowers with multiple duct switching construction, including shell, equipment air inlet air port, equipment outlet air air port, indoor air inlet and indoor air outlet are provided on the shell, the circulation air path with circulating fan is provided in the shell simultaneously, aforementioned four air port is connected with the circulation air path, and enters the wind in the equipment and be provided with air-valve in air port, the indoor air outlet and the indoor air outlet;And the air inlet of a tee tube is then connected on equipment outlet air air port, and two air outlets of the tee tube pass through the piping connection interior space and the exterior space respectively, and the switching construction for switching between two air outlets is additionally provided on the tee tube, and fresh air therein, air draft, heating function are driven by a blower by the switching of air-valve or switching device based on the air duct switching method of the new blower, equipment cost and complexity are greatly reduced, the occupancy of installation space is reduced.

Description

New blower and air duct switching method with multiple duct switching construction
Technical field
The present invention relates to house fresh air system fields, and in particular to a kind of new blower and wind with multiple duct switching construction Channel switching method.
Background technique
Outdoor fresh air can be introduced into interior and by the equipment of foul indoor air outlet as a kind of by new blower, can The pernicious gases contents such as indoor carbon dioxide concentration, formaldehyde, fragrant benzene are effectively reduced, increase oxygen content, prevent air conditioner disease.Together When, in new blower it is general can also built in air filter, pass through air filter and filter bacterium in fresh air, particulate matter (PM2.5) and other harmful substances, guarantee introduce the cleanliness of indoor fresh air.
In the prior art, house new clothes or the new blower of repacking, function is often more single, can only solve toward interior It send, the function of air draft, when installation, in the most furred ceiling for being mounted on toilet or kitchen, it is also necessary to independent aperture peace Air piping is reinstalled, installation cost is higher.And toilet or kitchen generally also also will be installed illumination, super bath or Hitachi simultaneously, Thus needing to install two distinct devices, one side complex procedures, it is time-consuming and laborious, increase installation and follow-up maintenance cost, And another aspect occupied space is more, the case where being easy to appear installation space mutual extrusion.Also have on the market and increases on super bath The technical solution of fresh air function mainly realizes corresponding air inlet and air-exhausting function by the scheme of blower commutation.However, this The fresh air function of a kind of equipment can not achieve full room fresh air just for local space, and can not achieve and give, return air uninterruptedly follow Ring uses limitation with biggish.
Summary of the invention
The invention discloses a kind of new blower and air duct switching method with multiple duct switching construction, the new blower is to pass through Air blowing function, ventilatory, the free switching between heating function are realized in the switching of multiple duct, to solve above-mentioned technical background The defects of.
Technical problem solved by the invention is realized using following technical scheme:
New blower with multiple duct switching construction, including shell are provided with equipment air inlet air port and equipment outlet air on the shell Air port, equipment air inlet air port is by outside piping connection room or fresh air region, in addition, on the housing also towards room It is provided with indoor air inlet and indoor air outlet in interior one side, while being provided with circulation air path in the shell, it is described Circulating fan is provided on circulation air path, and be set on the shell equipment air inlet air port, equipment outlet air air port, it is indoor into Air port and indoor air outlet are connected with the circulation air path, and the equipment enter the wind air port, the indoor air outlet with And the air-valve that open and close is carried out for controlling corresponding air port is provided in the indoor air outlet;And equipment outlet air air port position It sets and is also connected with a tee tube, the outlet air air port is connected with the air inlet of the tee tube, and two of the tee tube Air outlet passes through the piping connection interior space and the exterior space respectively, and is additionally provided on the tee tube at two The switching construction switched between air outlet.
As a further improvement, the equipment air inlet air port and the indoor air inlet are set in the air channel structure The air intake of circulating fan, and equipment outlet air air port and the indoor air outlet are set to the circulation in the air channel structure Blower outlet air end.
As a further improvement, the air-valve being arranged in the equipment air inlet air port and the indoor air outlet passes through stepping electricity Machine is controlled, air-valve receive be controlled in after trigger signal standard-sized sheet, it is complete close between switch over.
Come pair as a further improvement, being provided with louver structure or the grid plate face with shaft in the indoor air outlet The air-valve being set in indoor air outlet is replaced, and is operated manually the unlatching and envelope that carry out indoor air outlet to facilitate It closes.
As a further improvement, the switching construction being arranged on the tee tube is air-valve or water conservancy diversion baffle, and the wind Valve or the water conservancy diversion baffle carry out unidirectional handover between two air outlets of the tee tube, i.e. the connection interior space and room Two air outlets of the external space can only keep one of air outlet to open under the control of the air-valve or the water conservancy diversion baffle It opens.
As a further improvement, the air duct preferably uses L shape air duct.
As a further improvement, it is provided with an air cleaning member on air duct on the inside of equipment outlet air air port, and The air cleaning member is preferably the combination of physical filtering unit and active purification device.
As a further improvement, being provided with electric heating unit on the inside of the indoor air outlet, and the electric heating unit Preferably ceramic PTC heater, the electric heating unit is synchronous with air-valve corresponding in indoor air outlet to be opened, i.e., when air-valve is opened When indoor air outlet, which opens together.
As a further improvement, setting filter element may be selected in the inside of the indoor air outlet, and the filter element is The combination of electrostatic precipitation strainer or strainer and non-woven fabrics.
As a further improvement, the shell recycles indoors is additionally provided with lighting unit on the face of air port side, it is described Lighting unit is preferably LED light, one kind of energy-saving lamp or combination.
The embodiment of the present invention also discloses a kind of switching construction based on the new blower with multiple duct switching construction Air duct switching method, this method include that at least three kinds of multiple ducts switch switching state:
New wind state: control indoor air inlet, indoor air outlet position air-valve by indoor air inlet, indoor air outlet close, The air-valve for controlling equipment air inlet tuyere position opens equipment air inlet air port, controls the switching construction in equipment outlet air air port for threeway The pipeline that pipe outlet side connects the interior space is opened, and the pipeline for connecting the exterior space is closed, when above-mentioned movement is fully completed, Complete the switching of new wind state;
Ventilatory state: the air-valve of control indoor air inlet position opens indoor air inlet, the wind of air outlet position in control room Valve closes indoor air outlet, and the air-valve of control equipment air inlet tuyere position closes equipment air inlet air port, controls equipment outlet air The switching construction in air port opens the pipeline of the tee tube outlet side connection exterior space, and the pipeline for connecting the interior space is closed It closes, when above-mentioned movement is fully completed, completes the switching of ventilatory state;
Indoor half cycle state: control indoor air inlet, indoor air outlet position air-valve by indoor air inlet, indoor air outlet It opens, the air-valve of control equipment air inlet tuyere position closes equipment air inlet air port, when above-mentioned movement is fully completed, completes indoor The state of half cycle.
Wherein, indoor circulation state is mainly used for improving the cycling rate of room air;It simultaneously also can be by going out indoors Air heating apparatus is arranged to achieve the purpose that heating region space carries out heating in tuyere position;Outlet air indoors can also be passed through Mouth position setting filter element or treatment facilities come to the air cleaning in regional space.
Advantages of the present invention and beneficial effect are:
The defect that the multifunctional new wind eedle has a single function existing new blower improves, by fresh air system and heating plant The improvement for being integrated, and being designed by the structure to new blower, so that the ventilation of new blower, heating share a wind Machine can effectively solve new blower in traditional fresh air system and have a single function, and heating, ventilation need the defect of newly added equipment, drop significantly The low material cost of equipment and the complexity of installation.
The present invention integrates fresh air, air draft, heating, illumination functions, and integrated level is high, and the three of the setting of cooperating equipment outlet air air port Siphunculus is installed, and additional separately installed pipeline is not needed, it is only necessary to installation can be realized using original new pipeline of fans, can have Effect reduces installation cost.
Detailed description of the invention
Fig. 1 is the cross-section front view of presently preferred embodiments of the present invention.
Fig. 2 is the side schematic view of presently preferred embodiments of the present invention.
Wherein: 1, equipment enters the wind air port;1-1 equipment enters the wind air port commutation air-valve;2, shell;3, equipment outlet air air port;3- 1, ventilation air port;3-2, equipment outlet air air port commutation air-valve;3-3, fresh air air outlet;4, air-purifying module;5, electric heater; 6, blower;7, indoor air inlet;7-1, louver structure;8, commutate air-valve in air duct;9, indoor air outlet.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Conjunction is specifically illustrating, and the present invention is further explained.
It, in the present embodiment, should referring to the preferred embodiment of a kind of new blower with multiple duct switching construction of Fig. 1, Fig. 2 New blower passes through the furred ceiling position that shell 2 is fixed on bathing room for being mounted in bathroom.The shell 2 is rectangular housing, Equipment including being set to housing sidewall enters the wind air port 1 and equipment outlet air air port 3, and equipment air inlet air port 1 passes through pipe on the outside Outside the junction chamber of road, and the inside in equipment air inlet air port 1 is provided with equipment air inlet air port commutation air-valve 1-1, equipment enters the wind air port Commutation air-valve 1-1 is controlled by stepper motor, and can be switched between b, c two states of Fig. 1, so that equipment is entered the wind Air port 1 switches between standard-sized sheet or full off state.
And structure is then connected through a screw thread in 3 position of equipment outlet air air port and is connected with a Y tube as threeway, the Y shape Other two air outlet of pipe is respectively the air port 3-1 and fresh air air outlet 3-3 that takes a breath, ventilation air port 3-1 and fresh air air outlet Respectively by the piping connection exterior space and the interior space on the outside of 3-3, and in the ventilation air port 3-1 and fresh air of the Y tube The outlet air that an equipment outlet air air port commutation air-valve 3-2 comes as switching construction to Y tube is additionally provided between air outlet 3-3 to lead to Road switches over.Equipment outlet air air port commutation air-valve 3-2 is driven by stepper motor, and can only keep ventilation air port 3- A unlatching in 1 and fresh air air outlet 3-3, i.e. equipment outlet air air port commutation air-valve 3-2 can only correspond to a, b two in Fig. 1 A position carries out state switching.And an air cleaning member 4 is provided on the air duct of the inside in equipment outlet air air port 3, it should Air cleaning member 4 is the combination of physical filtering unit and active purification device, wherein physical filtering unit is strainer, quiet One of electrofiltration net, active carbon filter plate perhaps combine and active purification device is that PHI air purifier or RGF air are net Change device.
Shell 2 is towards being provided with indoor air inlet 7 and indoor air outlet 9 in indoor one side, on indoor air inlet 7 It is provided with louver structure 7-1, louver structure 7-1 is fixed on indoor air inlet 7 by shaft, is stirred by manual or motor Louver structure 7-1 can carry out indoor air inlet 7 to open/shutoff operation;And the opening size of indoor air outlet 9 be it is indoor into The half of 7 size of air port, inside form an air duct commutation air-valve 8, and air duct commutation air-valve 8 is controlled by stepper motor System, and can be switched between e, f two states of Fig. 2, to control the switch of indoor air outlet 9.And air outlet 9 indoors Then there is lighting unit installation space in leftward space, illumination functions are realized with mounted LED lamp.
In addition, the new blower due to the present embodiment is mounted in bathroom, for the effect for obtaining hot-air heating system for bathing, indoors The inside of air outlet 9 is additionally provided with an electric heater 5, which is ceramic PTC heater, the electric heater 5 and room Interior air outlet 9 corresponding air duct commutation air-valve 8 is synchronous to be opened, i.e., when air duct, commutation air-valve 8 opens indoor air outlet, which adds Hot device 5 is opened together.In another embodiment, new blower can be used for kitchen and use as Hitachi, it is contemplated that kitchen self-temperature It is higher, thus the inside of air outlet 9 eliminates the use of electric heater 5 indoors.In another embodiment, new blower is installed on Laboratory, while eliminating the use of electric heater 5 on the inside of air outlet 9 indoors, the inside of air outlet 9 is provided with indoors The combination of electrostatic precipitation strainer and non-woven fabrics carried out the partial impurities in the air entered the room as filter element Filter.
The circulation air path with circulating fan is then provided in shell 2, which is L shape air duct, in the L shape air duct Angular position is provided with blower 6 as circulating fan, and equipment air inlet air port 1 and indoor air inlet 7 are set in air channel structure The air intake of blower 6, and equipment outlet air air port 3 and indoor air outlet 9 are set to the outlet air end of blower 6 in air channel structure.
There is three kinds of fresh air, ventilation and super bath operating modes when the present embodiment is in use, three kinds of operating modes are not by Same wind path switches to realize, and single blower is all made of under three kinds of operating modes, i.e., blower 6 carries out wind energy driving, wherein The working condition of each operating mode is expressed as follows:
New wind state: it is closed using louver structure 7-1 is closed to control indoor air inlet 7, while setting equipment air inlet air port 1 Standby air inlet air port commutation air-valve 1-1 is opened and (is located at the position d), and air duct commutation air-valve 8 is opened into air draft state and (is located at the position e, i.e., Closed to heating side), the air-valve 3-2 that commutates of the equipment outlet air air port in equipment outlet air air port 3 is opened to the fresh air side air outlet 3-3 (being located at the position b), the air port 3-1 that takes a breath at this time are in close state.Power is provided by blower 6, is passed through by equipment air inlet air port 1 Pipeline is introduced new air into from outdoor be filtered by air-purifying module 4 after, via fresh air air outlet 3-3 send out.
And clean fresh air is sent into interior by fresh air air outlet 3-3 cooperation pipeline, meanwhile, by fresh air air outlet 3-3 is connected with branch line, different branch lines can also be connected the demand spaces such as bathing room, horizontal and study.
When using ventilatory of the multifunctional novel blower of the present embodiment, the louver structure 7-1 of indoor air inlet 7, which is in, to be opened State is opened, the equipment air inlet air port commutation air-valve 1-1 in equipment air inlet air port 1 is in close state the air duct commutation (in the position c) Air-valve 8 is opened into air draft state (being located at the position e, i.e., close to heating side), and the equipment outlet air air port in equipment outlet air air port 3 is changed It opens to air-valve 3-2 to the ventilation side air port 3-1 and (is in the position a, fresh air air outlet 3-3 is in close state).It is provided by blower 6 Power, interior enters by indoor circulation air inlet 7 is again expelled to room air by being connected to the pipeline of ventilation air port 3-1 It is outdoor.
When the use heating function of the multifunctional novel blower of the present embodiment, at the louver structure 7-1 of control indoor air inlet 7 In open state, and the equipment air inlet air port commutation air-valve 1-1 in equipment air inlet air port 1 is in close state (in the position c), wind Road commutation air-valve 8 is opened into heating state (being located at the position f, i.e., open to heating side), provides power, indoor process by blower 6 Indoor circulation air inlet 7 is sent directly into interior into after again heating room air by electric heater 5 again, plays indoor heating Effect.At this point, i.e. can be at the position a can also be in b to the equipment outlet air air port commutation air-valve 3-2 in equipment outlet air air port 3 It sets, carries out bathing indoor air circulation for assisting, prevent bath indoor oxygen content too low and anoxic be in the presence of.
Based on above-mentioned working condition, defect that the multifunctional new wind eedle of the present embodiment has a single function existing new blower into Row improves, between realizing that equipment different function is realized in the switching of circulation line access by the selectivity switching of three groups of air-valves Switching.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (10)

1. the new blower with multiple duct switching construction, including shell, which is characterized in that be provided with equipment air inlet air port on the shell And equipment outlet air air port, the equipment air inlet air port is by outside piping connection room or fresh air region, in addition, in the shell On also towards being provided with indoor air inlet and indoor air outlet in indoor one side, while being provided with and following in the shell Equipment the air inlet air port, equipment outlet air that ring air duct is provided with circulating fan on the circulation air path, and is set on the shell Air port, indoor air inlet and indoor air outlet are connected with the circulation air path, and enter the wind air port, the room in the equipment The air-valve that open and close is carried out for controlling corresponding air port is provided on interior air outlet and the indoor air outlet;And the equipment Outlet air tuyere position is also connected with a tee tube, and equipment outlet air air port connects the air inlet of tee tube, and the threeway Two air outlets of pipe pass through the piping connection interior space and the exterior space respectively, and are additionally provided with use on the tee tube In the switching construction switched between two air outlets.
2. the new blower according to claim 1 with multiple duct switching construction, which is characterized in that the equipment enters the wind air port The air intake of the circulating fan in the air channel structure is set to the indoor air inlet;And equipment outlet air air port and institute State the circulating fan outlet air end that indoor air outlet is set in the air channel structure.
3. the new blower according to claim 1 with multiple duct switching construction, which is characterized in that in the indoor air outlet Louver structure or the grid plate face with shaft are provided with to be replaced to the air-valve being set in indoor air outlet.
4. the new blower according to claim 1 with multiple duct switching construction, which is characterized in that be arranged on the tee tube Switching construction be air-valve perhaps two outlet air of water conservancy diversion baffle and the air-valve or the water conservancy diversion baffle in the tee tube Unidirectional handover is carried out between mouthful.
5. the new blower according to claim 1 with multiple duct switching construction, which is characterized in that the air duct is L shape wind Road, and the angular position in L shape air duct is provided with a guiding flow guiding structure.
6. the new blower according to claim 1 with multiple duct switching construction, which is characterized in that equipment outlet air air port Air cleaning member is provided on the air duct of inside.
7. the new blower according to claim 1 with multiple duct switching construction, which is characterized in that the indoor air outlet Inside is provided with electric heating unit.
8. the new blower according to claim 7 with multiple duct switching construction, which is characterized in that the electric heating unit is Ceramic PTC heater.
9. the new blower according to claim 1 with multiple duct switching construction, which is characterized in that the shell follows indoors Lighting unit is additionally provided on the face of ring air outlet side.
10. a kind of air duct switching method, which is characterized in that this method is based on claim 1 with the new of multiple duct switching construction The switching construction of blower, this method include that at least three kinds of multiple ducts switch switching state:
New wind state: control indoor air inlet, indoor air outlet position air-valve by indoor air inlet, indoor air outlet close, The air-valve for controlling equipment air inlet tuyere position opens equipment air inlet air port, controls the switching construction in equipment outlet air air port for threeway The pipeline that pipe outlet side connects the interior space is opened, and the pipeline for connecting the exterior space is closed, when above-mentioned movement is fully completed, Complete the switching of new wind state;
Ventilatory state: the air-valve of control indoor air inlet position opens indoor air inlet, the wind of air outlet position in control room Valve closes indoor air outlet, and the air-valve of control equipment air inlet tuyere position closes equipment air inlet air port, controls equipment outlet air The switching construction in air port opens the pipeline of the tee tube outlet side connection exterior space, and the pipeline for connecting the interior space is closed It closes, when above-mentioned movement is fully completed, completes the switching of ventilatory state;
Indoor half cycle state: control indoor air inlet, indoor air outlet position air-valve by indoor air inlet, indoor air outlet It opens, the air-valve of control equipment air inlet tuyere position closes equipment air inlet air port, when above-mentioned movement is fully completed, completes indoor The state of half cycle.
CN201910776836.3A 2019-08-22 2019-08-22 New blower and air duct switching method with multiple duct switching construction Pending CN110319533A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910776836.3A CN110319533A (en) 2019-08-22 2019-08-22 New blower and air duct switching method with multiple duct switching construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910776836.3A CN110319533A (en) 2019-08-22 2019-08-22 New blower and air duct switching method with multiple duct switching construction

Publications (1)

Publication Number Publication Date
CN110319533A true CN110319533A (en) 2019-10-11

Family

ID=68126364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910776836.3A Pending CN110319533A (en) 2019-08-22 2019-08-22 New blower and air duct switching method with multiple duct switching construction

Country Status (1)

Country Link
CN (1) CN110319533A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112050291A (en) * 2020-08-10 2020-12-08 珠海格力电器股份有限公司 Air port switching control method and device and area control system
CN113154755A (en) * 2021-04-23 2021-07-23 青岛海尔电冰箱有限公司 Refrigerator with a door
CN113418263A (en) * 2021-05-11 2021-09-21 东莞市万科建筑技术研究有限公司 Kitchen automatic air supplement equipment based on house fresh air system and house fresh air system
CN113865058A (en) * 2021-09-29 2021-12-31 佛山市顺德区美的电子科技有限公司 Control method, air conditioner fresh air equipment and storage medium
CN114414266A (en) * 2022-01-28 2022-04-29 重庆长安汽车股份有限公司 Air volume reversing device for air conditioning system comprehensive performance test bed
WO2022111032A1 (en) * 2020-11-26 2022-06-02 广东美的制冷设备有限公司 Air handling module, air conditioner indoor unit, and air conditioner
CN114659204A (en) * 2022-03-18 2022-06-24 张�杰 Energy-conserving ventilation unit of green building

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090004688U (en) * 2007-11-13 2009-05-18 한일전기그룹 주식회사 Heating and ventilation
CN103090502A (en) * 2011-10-28 2013-05-08 美克司株式会社 Air supply device
CN205119342U (en) * 2015-10-23 2016-03-30 何支峻 Hoist and filter device of taking a breath with bathroom heating in full room in bathroom new trend
CN206556192U (en) * 2017-03-22 2017-10-13 奥普家居股份有限公司 A kind of new blower fan with heating function
CN207230864U (en) * 2017-09-06 2018-04-13 姚哲凡 A kind of fresh air purifying bathroom heating device
CN207247465U (en) * 2017-09-11 2018-04-17 惠州市杰德电器有限公司 A kind of two fans ventilation and heating installation
CN207501364U (en) * 2017-08-25 2018-06-15 惠州市杰德电器有限公司 It is a kind of to be vented lighting device to the heating of indoor supplemental oxygen
CN207555713U (en) * 2017-11-17 2018-06-29 浙江奥华电气有限公司 The multifunctional heater of ventilation can be aerated
CN207649020U (en) * 2017-12-15 2018-07-24 佛山市海顿灯饰电器有限公司 Intelligent fresh air system
CN208075319U (en) * 2018-01-13 2018-11-09 叶志荣 A kind of bathroom Multi Role Aircraft
CN208139380U (en) * 2018-04-19 2018-11-23 佛山市顺德区意艾蒲电器有限公司 A kind of linkage structure of exhaust smoke system for kitchen and bidirectional flow fresh air system
CN208652835U (en) * 2018-07-29 2019-03-26 先欣(上海)智能科技有限公司 A kind of internal and external circulation type fresh air purifier

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090004688U (en) * 2007-11-13 2009-05-18 한일전기그룹 주식회사 Heating and ventilation
CN103090502A (en) * 2011-10-28 2013-05-08 美克司株式会社 Air supply device
CN205119342U (en) * 2015-10-23 2016-03-30 何支峻 Hoist and filter device of taking a breath with bathroom heating in full room in bathroom new trend
CN206556192U (en) * 2017-03-22 2017-10-13 奥普家居股份有限公司 A kind of new blower fan with heating function
CN207501364U (en) * 2017-08-25 2018-06-15 惠州市杰德电器有限公司 It is a kind of to be vented lighting device to the heating of indoor supplemental oxygen
CN207230864U (en) * 2017-09-06 2018-04-13 姚哲凡 A kind of fresh air purifying bathroom heating device
CN207247465U (en) * 2017-09-11 2018-04-17 惠州市杰德电器有限公司 A kind of two fans ventilation and heating installation
CN207555713U (en) * 2017-11-17 2018-06-29 浙江奥华电气有限公司 The multifunctional heater of ventilation can be aerated
CN207649020U (en) * 2017-12-15 2018-07-24 佛山市海顿灯饰电器有限公司 Intelligent fresh air system
CN208075319U (en) * 2018-01-13 2018-11-09 叶志荣 A kind of bathroom Multi Role Aircraft
CN208139380U (en) * 2018-04-19 2018-11-23 佛山市顺德区意艾蒲电器有限公司 A kind of linkage structure of exhaust smoke system for kitchen and bidirectional flow fresh air system
CN208652835U (en) * 2018-07-29 2019-03-26 先欣(上海)智能科技有限公司 A kind of internal and external circulation type fresh air purifier

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112050291A (en) * 2020-08-10 2020-12-08 珠海格力电器股份有限公司 Air port switching control method and device and area control system
CN112050291B (en) * 2020-08-10 2021-08-24 珠海格力电器股份有限公司 Air port switching control method and device and area control system
WO2022111032A1 (en) * 2020-11-26 2022-06-02 广东美的制冷设备有限公司 Air handling module, air conditioner indoor unit, and air conditioner
CN113154755A (en) * 2021-04-23 2021-07-23 青岛海尔电冰箱有限公司 Refrigerator with a door
CN113418263A (en) * 2021-05-11 2021-09-21 东莞市万科建筑技术研究有限公司 Kitchen automatic air supplement equipment based on house fresh air system and house fresh air system
CN113865058A (en) * 2021-09-29 2021-12-31 佛山市顺德区美的电子科技有限公司 Control method, air conditioner fresh air equipment and storage medium
CN113865058B (en) * 2021-09-29 2023-12-22 佛山市顺德区美的电子科技有限公司 Control method, air conditioner fresh air equipment and storage medium
CN114414266A (en) * 2022-01-28 2022-04-29 重庆长安汽车股份有限公司 Air volume reversing device for air conditioning system comprehensive performance test bed
CN114414266B (en) * 2022-01-28 2023-07-07 重庆长安汽车股份有限公司 Air quantity reversing device for comprehensive performance test bed of air conditioning system
CN114659204A (en) * 2022-03-18 2022-06-24 张�杰 Energy-conserving ventilation unit of green building
CN114659204B (en) * 2022-03-18 2023-08-15 山东滨州城建集团有限公司 Energy-saving ventilation device for green building

Similar Documents

Publication Publication Date Title
CN110319533A (en) New blower and air duct switching method with multiple duct switching construction
CN206626740U (en) New blower fan and fresh air heating system
CN202254096U (en) Fresh air machine capable of automatically removing dust
CN101021347A (en) Total heat exchanger with dust detecting and dust eliminating modules
CN204285721U (en) A kind of VMC
CN108302685B (en) Air circulation system having internal air circulation, discharge and suction functions
CN107525152A (en) It is a kind of to handle fresh air and the window air purifier group and its processing method of return air simultaneously
CN206191746U (en) Medical air purification system of weak torrent
CN109028425A (en) Two fans formula intelligent fresh air system
CN206430312U (en) Fresh air purifier and air cleaning unit
CN205137723U (en) Comfortable new trend purification all -in -one
CN208846590U (en) A kind of Medical air purifying device
CN203024324U (en) Ventilating device
KR101904041B1 (en) Heat Exchange Air Circulation Apparatus with Air Supply and Cleaning of Kitchen
CN204240525U (en) Single channel accumulation of energy aeration device and indoor air cleaner
CN202938466U (en) Multifunctional air conditioner terminal provided with heat recovery device
CN210740544U (en) Wall-mounted five-constant air conditioning purifier
CN202927971U (en) A multifunctional air conditioning terminal provided with an efficient filter screen disposed in a fresh air inlet device
JP3235004U (en) Multi-function outside air blower
CN206191766U (en) Air treatment device
CN205641348U (en) New trend ware with air purification function
CN205717732U (en) A kind of fresh air dehumidifying system
CN209197005U (en) A kind of wind pipe type fresh air conditioner all-in-one machine
CN110360702A (en) A kind of multifunctional novel blower
CN101000167A (en) Ventilation air interchange system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011