CN110319428A - A kind of vertical high pressure heater turn setting lifting engineering method - Google Patents

A kind of vertical high pressure heater turn setting lifting engineering method Download PDF

Info

Publication number
CN110319428A
CN110319428A CN201910427196.5A CN201910427196A CN110319428A CN 110319428 A CN110319428 A CN 110319428A CN 201910427196 A CN201910427196 A CN 201910427196A CN 110319428 A CN110319428 A CN 110319428A
Authority
CN
China
Prior art keywords
pressure heater
heater
temporary concrete
basis
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910427196.5A
Other languages
Chinese (zh)
Inventor
李�杰
刘贝贝
邵洪儒
邱树江
王宪福
王立新
郑文超
李建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Power Construction Third Engineering Co Ltd
Original Assignee
Shandong Power Construction Third Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Power Construction Third Engineering Co Ltd filed Critical Shandong Power Construction Third Engineering Co Ltd
Priority to CN201910427196.5A priority Critical patent/CN110319428A/en
Publication of CN110319428A publication Critical patent/CN110319428A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F19/00Hoisting, lifting, hauling or pushing, not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B3/00Other methods of steam generation; Steam boilers not provided for in other groups of this subclass
    • F22B3/08Other methods of steam generation; Steam boilers not provided for in other groups of this subclass at critical or supercritical pressure values

Abstract

The invention belongs to heaters to lift field, and in particular to a kind of standing heater turn setting lifting engineering method.According to high-pressure heater pedestal size and and spacing, pour on the ground temporary concrete basis;High-pressure heater is subjected to angle adjustment on turning rolls, it adjusts to two high-pressure heater pedestals and is located in same level, high-pressure heater level is sling, two high-pressure heater pedestals are placed on by temporary concrete basis and are fixed temporarily the platform for being used to be horizontally arranged high-pressure heater that support forms, correcting wedge is placed on the basis of temporary concrete in advance, it lifts by crane hanging scaffold at the top of heater and carries out hoisting and overturning, it turns over when standing upright as angle is gradually increased, correcting wedge gradually stress, high-pressure heater is completed to erect, and it is in place then to carry out vertical lifting again.It solves the problems, such as safely and efficiently to complete large-scale vertical heater in the limited situation in equipment factory building space and lifts in place, provide Technical Reference for the construction of same type units equipment hoisting from now on.

Description

A kind of vertical high pressure heater turn setting lifting engineering method
Technical field
The invention belongs to heater hoisting technology fields, and in particular to a kind of standing heater turn setting lifting engineering method.
Background technique
Extra-supercritical unit engineering in general includes more vertical high pressure heaters, is arranged side by side in Turbine Engine Foundation platform one Side.Vertical high pressure heater height is generally 12-15m, weight 180t-260t, has the characteristics that height is big, heavy;And And it is used to support the formal foundation elevation of high-pressure heater generally in 3m or so, how by vertical high pressure heater safety, steady Ground is lifted on the basis of formal, is the technical problem of this field.
In the prior art, power station high-pressure heater is all horizontal installation, and lifting mode is the bridge using steam turbine building setting Formula crane is directly lifted this method in place by bridge crane and is not suitable for vertical high pressure heater.Vertical high pressure heater needs Vertical lifting, it is also necessary to solve the problems such as tank body is turned over, erect, rotating.
Traditional Lao Xinge hydraulic lifting method needs in the sky to turn over tank body uprightly, during air turning is upright, The rate of load condensate of bridge crane is constant, needs to pay close attention to the stability of lifting process, if unbalance stress will cause instantaneously mistake It carries;And during high-pressure heater turns over upright in the sky, wirerope is to equipment appurtenance (such as instrument tube socket, pipe fitting Deng) and equipment paint exist damage risk, affect process quality control;And there is also costs for Singh's hydraulic lifting method Disadvantage high, the activity duration is long.
In addition, the maximum spacing of steam turbine building bridge crane main hook and operating layer platform generally only has 13m or so, Wu Faman Sufficient high-pressure heater vertical length lifting, that is to say, that high-pressure heater, which must lift by crane, moves to the other space in formal basis in place It turned over, erect again.However in the engineering method of the prior art, it not can be realized in the limited situation in equipment factory building space It safely and efficiently completes large-scale vertical heater and lifts problem in place.
Summary of the invention
In view of the above technical problems, the present invention provides a kind of vertical high pressure heater turn setting lifting engineering method, vertical height Pressing heater to turn over upright process is to carry out on the ground, is turned over when standing upright, and main stress point is temporary concrete basis, The rate of load condensate of bridge crane substantially reduces, and construction quality controllability is high compared with conventional construction method;And turn over upright mistake Journey carries out on the ground, the damage risk that wirerope paints equipment appurtenance and equipment when reducing air turning;It solves Large-scale vertical heater is safely and efficiently completed in the limited situation in equipment factory building space and lifts problem in place, while for from now on The construction of same type units equipment hoisting provides Technical Reference.
The present invention is achieved by the following technical solutions:
A kind of vertical high pressure heater turn setting lifting engineering method, the high-pressure heater include tank body, are set to tank body The top hanging scaffold at top, two high-pressure heater pedestals for being set to tank base opposite sides;The lifting engineering method includes:
According to high-pressure heater pedestal size and and spacing, pour on the ground temporary concrete basis;By high pressure plus Hot device carries out angle adjustment on turning rolls, adjusts to two high-pressure heater pedestals and is located in same level, by high pressure plus Hot device level is sling, and is then placed on by temporary concrete basis and is fixed temporarily support and forms two high-pressure heater pedestals For being horizontally arranged the platform of high-pressure heater, correcting wedge is placed in advance on the basis of temporary concrete, with interim coagulation Fulcrum of the earth foundation as high-pressure heater pedestal, lifting heater at the top of hanging scaffold carry out hoisting and overturning, turn over when standing upright with Angle is gradually increased, and gradually stress, stress point gradually transit to horizontal component from the wedge-like portion of correcting wedge to correcting wedge, high It presses heater to complete to erect, it is in place then to carry out vertical lifting again.
Further, the lifting engineering method specifically includes:
Temporary concrete foundation construction: the temporary concrete base as high-pressure heater pedestal fulcrum is poured on the ground The size of plinth, temporary concrete basis is determined according to the size and spacing of the high-pressure heater pedestal;
Correcting wedge production: using sleeper make correcting wedge, correcting wedge include have key groove wedge-like portion and Horizontal component;
Be fixed temporarily support installation: setting one is fixed temporarily branch at a certain distance near the temporary concrete basis Seat, the temporary concrete basis and the support that is fixed temporarily are combined into platform for being horizontally arranged high-pressure heater;
Roller carrier special installation and debugging: one group of special roller is placed in the other free area in temporary concrete basis Frame, Pass line adjustment is consistent, and the rotation that is powered is normal;
Crane Combine debugging: the bridge crane arranged in workshop is carried out according to shop instruction and vehicle is debugged, really Each component is protected to work well, and after vehicle crane movement synchronize, after the completion of debugging on crane main hook suspension strap suspension hook it is flat Spreader beam;
Heater is unloaded: vertical high pressure heater sling by level in transport vehicle disk, crosses Turbine Engine Foundation platform, It is placed on the roller carrier special;
The adjustment of heater angle: being rotated the tank body of vertical high pressure heater using turning rolls, until tank base Two high-pressure heater pedestals in same level, then high-pressure heater is sling and is placed on by the temporary concrete The basic and described platform for being used to be horizontally arranged high-pressure heater for being fixed temporarily support composition;
Heater, which turns over, to be erect: suspension centre being moved to the top hanging scaffold of top of the tank, main hook steps up and two high pressures Heater support, which is cooperated using temporary concrete basis as fulcrum, to be rotated, and high-pressure heater is slowly erect, gradually with setting angle Increase, gradually stress, stress point gradually transit to the correcting wedge on the basis of temporary concrete from the wedge-like portion of correcting wedge Horizontal component, entire high-pressure heater complete steady setting, at this time the horizontal part of two high-pressure heater pedestals and correcting wedge Tap touching;
Heater is vertically in place: continuing after lifting by crane high-pressure heater to appropriate height, installation high-pressure heater sliding end rolling Wheel, idler wheel continue to complete the vertical raising of high-pressure heater in place on the basis of being hung to formally after being installed.
Further, the temporary concrete basis includes being oppositely arranged and having mutually level 2 temporary concretes Support, 2 temporary concrete holder tops are respectively provided with a flat surface, and the distance between two flat surfaces are according to high-pressure heater The spacing of pedestal determines that the area of each flat surface is determined according to the size of high-pressure heater pedestal;Two height of opposite sides Pressure heater support is placed in two flat surfaces, and can carry out turn setting using two flat surfaces as fulcrum.
Further, burying for stationary wedge cushion block is arranged at the top of basic two flat surfaces of temporary concrete Part.
Further, described to be fixed temporarily used temporary support when support is transported using high-pressure heater;It will be described It is fixed temporarily support and base board junction carries out being broken fixation, prevent from being fixed temporarily support when placing high-pressure heater and incline Tiltedly;It is and described to be fixed temporarily support and the two sides of high-pressure heater center of gravity are arranged in the temporary concrete support, it is ensured that high Press the stabilization of heater.
Further, it turns over and is erect in step in the heater, high-pressure heater is turned over before erectting, check that high pressure adds Bolt has fastened completion at hot device support, and during preventing turn, bolt looseness, local pressure excess load cause bolt fracture.
Advantageous effects of the invention:
(1) compared with traditional Lao Xinge hydraulic lifting method, security risk controllability is high: engineering method provided by the invention is neutral It is to carry out on the ground that formula heater, which turns over upright process, is turned in the sky directly than traditional construction scheme Lao Xinge hydraulic lifting method It stands safer;And equipment is turned over when standing upright in engineering method provided by the invention, and main stress point is temporary concrete basis, bridge-type The rate of load condensate of crane substantially reduces, and equipment is turned over when standing upright in the sky in Lao Xinge hydraulic lifting method, bridge crane Rate of load condensate is constant, but also to pay close attention to the stability of lifting process, and unbalance stress is avoided to cause instantaneous overload.
(2) compared with traditional Lao Xinge hydraulic lifting method, construction quality controllability is high: setting in engineering method provided by the invention The standby upright process of turn is to carry out on the ground, and wirerope is to equipment appurtenance (instrument tube socket, pipe fitting when reducing air turning Deng) and equipment paint damage risk, it is ensured that process quality control.
(3) economic benefit significantly improves: it is more economical compared with Lao Xinge hydraulic lifting method, it can be saved compared with Lao Xinge hydraulic lifting method Nearly 40,000 yuan of cost.
(4) duration is obviously shortened: compared with Lao Xinge hydraulic lifting method, largely reducing difficulty of construction, reduces Activity duration, using engineering method provided by the invention construction complete 4 vertical high pressure heaters lift it is in place share 4 days, and it is sharp It is 10 days with the Lao Xinge hydraulic lifting method estimated construction time, shortens nearly 6 day duration, actively promoted the progress of engineering.
(5) engineering method construction provided by the invention is suitable for the large-scale vertical tank body equipment in the same type workshop confined space It turns over, erect, operation in place.
Detailed description of the invention
Fig. 1 is a kind of vertical high pressure heater turn setting lifting engineering method flow diagram in the embodiment of the present invention;
Fig. 2 is the structural schematic diagram on temporary concrete basis in the embodiment of the present invention;
Fig. 3 is mesohigh of embodiment of the present invention heater level displacement structure schematic diagram;
Fig. 4 is that heater is unloaded process schematic in the embodiment of the present invention;
Fig. 5, Fig. 6 are that heater turns over setting process schematic in the embodiment of the present invention;
Appended drawing reference: 1. high-pressure heaters;1-1. high-pressure heater pedestal;1-2. tank body;Hanging scaffold at the top of 1-3.;2. interim Basis;2-1. temporary concrete support;2-2. flat surface;3. being fixed temporarily support.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is explained in further detail.It should be appreciated that specific embodiment described herein is used only for explaining the present invention, and It is not used in the restriction present invention.
On the contrary, the present invention covers any substitution done on the essence and scope of the present invention being defined by the claims, repairs Change, equivalent method and scheme.Further, in order to make the public have a better understanding the present invention, below to of the invention thin It is detailed to describe some specific detail sections in section description.Part without these details for a person skilled in the art The present invention can also be understood completely in description.
The embodiment of the present invention provides a kind of vertical high pressure heater turn setting lifting engineering method, and the high-pressure heater includes Tank body, the top hanging scaffold for being set to top of the tank, two high-pressure heater pedestals for being set to tank base opposite sides;It is described Lifting engineering method include: according to high-pressure heater pedestal size and and spacing, pour on the ground temporary concrete basis;It will be high Pressure heater carries out angle adjustment on turning rolls, adjusts to two high-pressure heater pedestals and is located in same level, will be high Pressure heater level is sling, and is then placed on by temporary concrete basis and is fixed temporarily support two high-pressure heater pedestals What is formed is used to be horizontally arranged the platform of high-pressure heater, correcting wedge is placed in advance on the basis of temporary concrete, with interim Fulcrum of the concrete foundation as high-pressure heater pedestal, lifting heater top hanging scaffold carry out hoisting and overturning, turn over when standing upright As angle is gradually increased, gradually stress, stress point gradually transit to horizontal part from the wedge-like portion of correcting wedge to correcting wedge Point, high-pressure heater is completed to erect, and it is in place then to carry out vertical lifting again.
As shown in Figure 1, the lifting engineering method is specifically includes the following steps: temporary concrete foundation construction, correcting wedge system Make, be fixed temporarily support installation, roller carrier special installation and debugging, Crane Combine is debugged, heater is unloaded, heater angle tune Whole, heater turn is erect, heater is vertically in place;Specifically:
Temporary concrete foundation construction: the temporary concrete base as high-pressure heater pedestal fulcrum is poured on the ground The size of plinth, temporary concrete basis is determined according to the size and spacing of the high-pressure heater pedestal;As shown in Fig. 2, at this In embodiment, the temporary concrete basis includes being oppositely arranged and having mutually level 2 temporary concrete supports, and 2 Temporary concrete holder top is respectively provided with a flat surface, and the distance between two flat surfaces are according between high-pressure heater pedestal Away from determination, the area of each flat surface is determined according to the size of high-pressure heater pedestal;Two high-pressure heaters of opposite sides Pedestal is placed in two flat surfaces, and can carry out turn setting using two flat surfaces as fulcrum.
Preferably, the embedded part for stationary wedge cushion block is arranged at the top of basic two flat surfaces of temporary concrete. Also, the setting of correcting wedge and embedded part can make temporary concrete basis uniform stressed.Temporary concrete foundation construction place Be selected near formal basis, in order to high-pressure heater it is upright after, vertical raising be hung to it is formal on the basis of.
During temporary concrete foundation construction, strict control unwrapping wire precision is needed, it is ensured that base position and design position It sets and is consistent;Used concrete grade and steel bar arrangement mode are referring to high plus formal basic engineering construction.
Correcting wedge production: using sleeper make correcting wedge, correcting wedge include have key groove wedge-like portion and Horizontal component;Preferably, the wedge angle of wedge-shaped angle part according to high-pressure heater center of gravity and turns over fulcrum in same vertical line When base plane angle with horizontal plane depending on (more slightly larger than theoretical value to be advisable), muti-piece wedge shape sleeper binding it is integral, increase contact Area, front and back welding block are fixed.Preferably, correcting wedge can be using the top of basic two flat surfaces of temporary concrete The embedded part that portion arranges is fixed.Preferably, the waste and old sleeper production correcting wedge in scene can be selected.
It is fixed temporarily support installation: as shown in figure 3, setting one is faced at a certain distance near the temporary concrete basis When hold-down support, the temporary concrete basis and the support that is fixed temporarily are combined into for being horizontally arranged high-pressure heater Platform;Preferably, being fixed temporarily support can be using used temporary support when high-pressure heater transport;It is fixed temporarily support It carries out being broken fixation with base board junction, prevents from being fixed temporarily support run-off the straight when placing high-pressure heater;It is fixed temporarily The two sides of high-pressure heater center of gravity should be arranged in support and temporary concrete support, it is ensured that equipment is stablized.
Roller carrier special installation and debugging: one group of special roller is placed in the other free area in temporary concrete basis Frame, Pass line adjustment is consistent, and the rotation that is powered is normal;
Crane Combine debugging: the bridge crane arranged in workshop is carried out according to shop instruction and vehicle is debugged, really Each component is protected to work well, and after vehicle crane movement synchronize, after the completion of debugging on crane main hook suspension strap suspension hook it is flat Spreader beam;Preferably, bridge crane quantity is 2;Warm-up debugging should be carried out after suspension shoulder pole girder, check service braking system, Ensure normal;When checking two driving joint debuggings, main hook lifting velocity, the actuated small roadster speed of travel should keep synchronous, prevent hoisting process It is middle because caused by asynchronous two vehicle-mounted lotuses be unevenly distributed, equipment deflection the problems such as, form security risk.
Heater is unloaded: as shown in figure 4, vertical high pressure heater is sling by level in transport vehicle disk, crossing steamer Machine basic platform is placed on the roller carrier special;Preferably, it is driven a vehicle using two 145/32t and lifts the scheme of unloading, two It drives a vehicle and vehicle, two driving main hook spacing 8.88m, two driving main hooks passes through connection pulling plate, pin shaft and 500t connecting traverse respectively and connect For entirety.The wirerope of 500t suspension hook (self weight 15t) hanging 80 × 25m of a pair of Ф, hangs mode (8 strand) using pocket and is unloaded Vehicle.
The adjustment of heater angle: being rotated the tank body of vertical high pressure heater using turning rolls, until tank base Two high-pressure heater pedestals in same level, then high-pressure heater is sling and is placed on by the temporary concrete The basic and described platform for being used to be horizontally arranged high-pressure heater for being fixed temporarily support composition;Specifically, tank base Two high-pressure heater pedestals are respectively placed in two flat surfaces on the temporary concrete basis, and tank body is placed on described face When hold-down support on, entire high-pressure heater is in horizontal positioned.
Heater, which turns over, to be erect: as seen in figs. 5-6, suspension centre being moved to the top hanging scaffold of top of the tank, main hook steps up And two high-pressure heater pedestals, which are cooperated using temporary concrete basis as fulcrum, to be rotated, and high-pressure heater is slowly erect, with It erects angle to be gradually increased, the gradually stress of the correcting wedge on the basis of temporary concrete, wedge-shaped part of the stress point from correcting wedge Divide and gradually transit to horizontal component, entire high-pressure heater completes steady setting, at this time two high-pressure heater pedestals and wedge shape The horizontal component of cushion block contacts;Preferably, it turns over before erectting, should check that bolt has fastened completion at high-pressure heater support, prevent During only turning over, bolt looseness, local pressure excess load cause bolt fracture;When upright, high-pressure heater is supported on temporarily In concrete foundation, high-pressure heater pedestal is contacted with the horizontal component of correcting wedge, ensure that upright process steadily carries out.
Heater is vertically in place: continuing after lifting by crane high-pressure heater to appropriate height, installation high-pressure heater sliding end rolling Wheel, idler wheel continue to complete the vertical raising of high-pressure heater in place on the basis of being hung to formally after being installed.
In the present embodiment, when carrying out lifting high-pressure heater, lifting region periphery must set special messenger and guard, to prevent It damages people, basis and equipment etc..High plus surface is coped in hoisting process takes necessary protection, in order to avoid to equipment in hoisting process It causes to scratch and damage.
Application example: by application of construction method Yu Hua electricity provided by the invention Laizhou second phase 2 × 1000MW extra-supercritical unit work In journey high-pressure heater lifting project, the related work of 4 vertical high pressure heaters of #4 unit lifting is satisfactorily completed, is used " prefabricated foundation, ground have been removed " arrangement and method for construction will turn over setting process and carry out from aerial move on ground, and working procedure is reasonable, It is highly-safe, the turn, setting and lifting operation of standing heater are satisfactorily completed, electricity generating corporation, Ltd's second phase in the Laizhou Hua electricity It was verified that the engineering method is safe and reliable in 2 × 1000MW extra-supercritical unit vertical high pressure heater installation process, technology Feasible, installation quality is excellent.And great achievement is achieved in terms of security process control, processing quality, promotion.This Outside, this engineering method investment of hoisting machinery significantly less compared with Lao Xinge hydraulic lifting method reduces mechanical energy consumption and last row.
By application of construction method provided by the invention in the efficient ultra-supercritical coal-fired units engineering of 2 × 1000MW of the Hengshan Mountain Yu Neng, Shaanxi High-pressure heater lifting, satisfactorily completes the related work of #2 unit vertical high pressure heater lifting, by high-pressure heater equipment Setting process is turned over to carry out from aerial move on ground, working procedure is reasonable, and it is highly-safe, satisfactorily complete standing heater Turn, setting and lifting operation, in the efficient ultra-supercritical coal-fired units engineering high-pressure heater of 2 × 1000MW of the Hengshan Mountain Yu Neng, Shaanxi It was verified that the engineering method is safe and reliable in installation process, technology is feasible, and installation quality is excellent.
The economic benefit of engineering method provided by the invention: compared with 39115 yuan of Lao Xinge hydraulic lifting method save the cost, effect is very Significantly, meanwhile, reduce the use time of bridge crane in workshop, improve production efficiency, pushed the progress of engineering.
The social benefit of engineering method provided by the invention: engineering method provided by the invention is using tradition machinery, utilization New-type technique not only reduces operating cost, and the safety of construction, stationarity have also obtained larger promotion, for same type from now on Unit equipment lifting construction provides Technical Reference.
The energy conservation and environmental protection benefit of engineering method provided by the invention: engineering method provided by the invention is significantly compared with Lao Xinge hydraulic lifting method The activity duration is shortened, and is assisted without other hoisting machineries, the loss of crane electric energy and fuel oil is thereby reduced.
The safety benefit of engineering method provided by the invention: engineering method mesohigh heater provided by the invention, which turns over setting movement, is It carries out, is turned over compared with setting in the sky with Lao Xinge hydraulic lifting method on the ground, it is potential huge to eliminate aerial work institute Big security risk, so that operational security gets a promotion.

Claims (6)

1. a kind of vertical high pressure heater, which turns over, erects lifting engineering method, the high-pressure heater includes tank body, is set to tank body top The top hanging scaffold in portion, two high-pressure heater pedestals for being set to tank base opposite sides;It is characterized in that, the slinger Method includes:
According to high-pressure heater pedestal size and and spacing, pour on the ground temporary concrete basis;By high-pressure heater Angle adjustment is carried out on turning rolls, is adjusted to two high-pressure heater pedestals and is located in same level, by high-pressure heater Level is sling, and is then placed on by temporary concrete basis and is fixed temporarily the use that support forms two high-pressure heater pedestals In on the platform of horizontal positioned high-pressure heater, correcting wedge is placed on the basis of temporary concrete, in advance with temporary concrete base Fulcrum of the plinth as high-pressure heater pedestal, lifting heater top hanging scaffold carry out hoisting and overturning, turn over when standing upright with angle It is gradually increased, gradually stress, stress point gradually transit to horizontal component from the wedge-like portion of correcting wedge to correcting wedge, and high pressure adds Hot device is completed to erect, and it is in place then to carry out vertical lifting again.
2. a kind of vertical high pressure heater, which turns over, according to claim 1 erects lifting engineering method, which is characterized in that the lifting Engineering method specifically includes:
Temporary concrete foundation construction: the temporary concrete basis as high-pressure heater pedestal fulcrum is poured on the ground, is faced When concrete foundation size according to the size and spacing of the high-pressure heater pedestal determine;
Correcting wedge production: correcting wedge is made using sleeper, correcting wedge includes the wedge-like portion and level with key groove Part;
Be fixed temporarily support installation: setting one is fixed temporarily support at a certain distance near the temporary concrete basis, institute It states temporary concrete basis and the support that is fixed temporarily is combined into platform for being horizontally arranged high-pressure heater;
Roller carrier special installation and debugging: one group of roller carrier special is placed in the other free area in temporary concrete basis, is marked Height adjustment is consistent, and the rotation that is powered is normal;
Crane Combine debugging: the bridge crane arranged in workshop being carried out and vehicle is debugged, it is ensured that each component works well, and After vehicle crane movement synchronize, after the completion of debugging on crane main hook suspension strap suspension hook shoulder pole girder;
Heater is unloaded: vertical high pressure heater being sling by level in transport vehicle disk, crosses Turbine Engine Foundation platform, is placed On the roller carrier special;
The adjustment of heater angle: being rotated the tank body of vertical high pressure heater using turning rolls, until the two of tank base Then high-pressure heater is sling and is placed on by the temporary concrete basis in same level by a high-pressure heater pedestal With the platform for being used to be horizontally arranged high-pressure heater for being fixed temporarily support composition;
Heater, which turns over, to be erect: suspension centre being moved to the top hanging scaffold of top of the tank, main hook steps up and two hyperbaric heatings Device pedestal, which is cooperated using temporary concrete basis as fulcrum, to be rotated, and high-pressure heater is slowly erect, and is gradually increased with angle is erect, Gradually stress, stress point gradually transit to horizontal part from the wedge-like portion of correcting wedge to correcting wedge on the basis of temporary concrete Point, entire high-pressure heater completes steady setting, and the horizontal component of two high-pressure heater pedestals and correcting wedge contacts at this time;
Heater is vertically in place: continuing after lifting by crane high-pressure heater to appropriate height, installs high-pressure heater sliding end idler wheel, rolling Wheel continues to complete the vertical raising of high-pressure heater in place on the basis of being hung to formally after being installed.
3. a kind of vertical high pressure heater, which turns over, according to claim 2 erects lifting engineering method, which is characterized in that described interim Concrete foundation includes being oppositely arranged and having mutually level 2 temporary concrete supports, 2 temporary concrete holder tops It is respectively provided with a flat surface, the distance between two flat surfaces are determined according to the spacing of high-pressure heater pedestal, each flat surface Area according to the size of high-pressure heater pedestal determine;Two high-pressure heater pedestals of opposite sides are placed in two platforms On face, and turn setting can be carried out using two flat surfaces as fulcrum.
4. a kind of vertical high pressure heater, which turns over, according to claim 3 erects lifting engineering method, which is characterized in that mixed temporarily The embedded part for stationary wedge cushion block is arranged at the top of solidifying two flat surfaces of earth foundation.
5. a kind of vertical high pressure heater, which turns over, according to claim 2 erects lifting engineering method, which is characterized in that described interim Hold-down support used temporary support when being transported using high-pressure heater;Support and base board junction are fixed temporarily by described It carries out being broken fixation, prevents from being fixed temporarily support run-off the straight when placing high-pressure heater;And it is described be fixed temporarily support and The two sides of high-pressure heater center of gravity are arranged in the temporary concrete support, it is ensured that the stabilization of high-pressure heater.
6. a kind of vertical high pressure heater, which turns over, according to claim 2 erects lifting engineering method, which is characterized in that add described Hot device, which turns over, to be erect in step, high-pressure heater is turned over before erectting, and checks that bolt has fastened completion at high-pressure heater support, During preventing turn, bolt looseness, local pressure excess load cause bolt fracture.
CN201910427196.5A 2019-05-22 2019-05-22 A kind of vertical high pressure heater turn setting lifting engineering method Pending CN110319428A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910427196.5A CN110319428A (en) 2019-05-22 2019-05-22 A kind of vertical high pressure heater turn setting lifting engineering method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910427196.5A CN110319428A (en) 2019-05-22 2019-05-22 A kind of vertical high pressure heater turn setting lifting engineering method

Publications (1)

Publication Number Publication Date
CN110319428A true CN110319428A (en) 2019-10-11

Family

ID=68113272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910427196.5A Pending CN110319428A (en) 2019-05-22 2019-05-22 A kind of vertical high pressure heater turn setting lifting engineering method

Country Status (1)

Country Link
CN (1) CN110319428A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111532980A (en) * 2020-04-03 2020-08-14 中国能源建设集团安徽电力建设第一工程有限公司 Vertical high-pressure heater hoisting method
CN111960333A (en) * 2020-07-27 2020-11-20 南京欧弈物流设备制造有限公司 Clamp for mounting on-site lifting frame column piece and using method thereof
WO2021196465A1 (en) * 2020-03-30 2021-10-07 中国电建集团山东电力建设第一工程有限公司 Hoisting system for overweight horizontal high-pressure heater and hoisting method
CN113864641A (en) * 2021-09-02 2021-12-31 海洋石油工程(青岛)有限公司 Installation process for turning over after horizontal in-side installation of vertical tank equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BG98800U (en) * 1994-05-28 1995-11-30 Ivanov Stand for the repair of housings of high pressure heaters in thermoelectric and nuclear plants
CN106315384A (en) * 2016-10-25 2017-01-11 苏州天沃科技股份有限公司 Turnover supporting tool of high-pressure heater tube system
CN106365027A (en) * 2016-10-25 2017-02-01 苏州天沃科技股份有限公司 Hoisting and overturning tool of high-pressure heater pipe system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BG98800U (en) * 1994-05-28 1995-11-30 Ivanov Stand for the repair of housings of high pressure heaters in thermoelectric and nuclear plants
BG128Y1 (en) * 1994-05-28 1997-05-30 Ivanov Stand for the repair of housings
CN106315384A (en) * 2016-10-25 2017-01-11 苏州天沃科技股份有限公司 Turnover supporting tool of high-pressure heater tube system
CN106365027A (en) * 2016-10-25 2017-02-01 苏州天沃科技股份有限公司 Hoisting and overturning tool of high-pressure heater pipe system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
任苹: "田湾核电站1#机组B列高压加热器的拆除与安装探析", 《机电信息》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021196465A1 (en) * 2020-03-30 2021-10-07 中国电建集团山东电力建设第一工程有限公司 Hoisting system for overweight horizontal high-pressure heater and hoisting method
CN111532980A (en) * 2020-04-03 2020-08-14 中国能源建设集团安徽电力建设第一工程有限公司 Vertical high-pressure heater hoisting method
CN111532980B (en) * 2020-04-03 2021-12-10 中国能源建设集团安徽电力建设第一工程有限公司 Vertical high-pressure heater hoisting method
CN111960333A (en) * 2020-07-27 2020-11-20 南京欧弈物流设备制造有限公司 Clamp for mounting on-site lifting frame column piece and using method thereof
CN113864641A (en) * 2021-09-02 2021-12-31 海洋石油工程(青岛)有限公司 Installation process for turning over after horizontal in-side installation of vertical tank equipment

Similar Documents

Publication Publication Date Title
CN110319428A (en) A kind of vertical high pressure heater turn setting lifting engineering method
CN101880006B (en) Roll-on device and method for large fixed type rotary crane
CN102561191A (en) Integral lifting system and construction method for arch bridge ribs
CN106892054B (en) A kind of vehicle passenger ferry host equipment hanging method
CN103437563B (en) A kind of mounting method for large steel-strctrue building steel frame
CN201411321Y (en) Clear-water prefabricated slab turning-over frame
CN205077878U (en) Unit type curtain plate hoisting device
CN105019664A (en) High-altitude slipping installation method for compartment-type electric room
CN206751187U (en) It is a kind of can be from the boom hoisting of four direction adjustment angle
CN206590793U (en) Connect arm assembly and the movable arm tower crane comprising the device in the air
CN103574158A (en) Super-large diameter pressure steel tube inclined shaft three-hanging-point installation method
CN206052577U (en) A kind of bridge local deviation correcting device
CN202482772U (en) Collapse-proof stop block mounting system for railway bridge
CN207293976U (en) A kind of cantilever crane set up for bridge subsection transport
CN207312994U (en) Power station major diameter surge shaft steel lining cantilevered annular track boom hoisting
CN204825655U (en) Arc case roof beam lifts by crane focus off -centre and installation leveling system that takes one's place
CN205114897U (en) That climbs formula braced system in tower built -in is put has bad luck device certainly
CN206290072U (en) A kind of Convenient-safe electric pole erecting device
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method
CN203213090U (en) Transferring and hoisting device for ship reception chamber of ship lift
CN205011283U (en) Hoist and mount apparatus of large -scale rolling -mill housing
CN204530506U (en) End bay closing device
CN104386586B (en) The land installation method of water conservancy project prefabricated components
CN209853542U (en) Lifting appliance for lifting pipe gallery
CN208201816U (en) Diversion system of hydropower station penstock and the trailer system of telescopic joint auxiliary installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011