CN110319428A - A kind of vertical high pressure heater turn setting lifting engineering method - Google Patents
A kind of vertical high pressure heater turn setting lifting engineering method Download PDFInfo
- Publication number
- CN110319428A CN110319428A CN201910427196.5A CN201910427196A CN110319428A CN 110319428 A CN110319428 A CN 110319428A CN 201910427196 A CN201910427196 A CN 201910427196A CN 110319428 A CN110319428 A CN 110319428A
- Authority
- CN
- China
- Prior art keywords
- pressure heater
- heater
- temporary concrete
- basis
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F19/00—Hoisting, lifting, hauling or pushing, not otherwise provided for
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B3/00—Other methods of steam generation; Steam boilers not provided for in other groups of this subclass
- F22B3/08—Other methods of steam generation; Steam boilers not provided for in other groups of this subclass at critical or supercritical pressure values
Abstract
The invention belongs to heaters to lift field, and in particular to a kind of standing heater turn setting lifting engineering method.According to high-pressure heater pedestal size and and spacing, pour on the ground temporary concrete basis;High-pressure heater is subjected to angle adjustment on turning rolls, it adjusts to two high-pressure heater pedestals and is located in same level, high-pressure heater level is sling, two high-pressure heater pedestals are placed on by temporary concrete basis and are fixed temporarily the platform for being used to be horizontally arranged high-pressure heater that support forms, correcting wedge is placed on the basis of temporary concrete in advance, it lifts by crane hanging scaffold at the top of heater and carries out hoisting and overturning, it turns over when standing upright as angle is gradually increased, correcting wedge gradually stress, high-pressure heater is completed to erect, and it is in place then to carry out vertical lifting again.It solves the problems, such as safely and efficiently to complete large-scale vertical heater in the limited situation in equipment factory building space and lifts in place, provide Technical Reference for the construction of same type units equipment hoisting from now on.
Description
Technical field
The invention belongs to heater hoisting technology fields, and in particular to a kind of standing heater turn setting lifting engineering method.
Background technique
Extra-supercritical unit engineering in general includes more vertical high pressure heaters, is arranged side by side in Turbine Engine Foundation platform one
Side.Vertical high pressure heater height is generally 12-15m, weight 180t-260t, has the characteristics that height is big, heavy;And
And it is used to support the formal foundation elevation of high-pressure heater generally in 3m or so, how by vertical high pressure heater safety, steady
Ground is lifted on the basis of formal, is the technical problem of this field.
In the prior art, power station high-pressure heater is all horizontal installation, and lifting mode is the bridge using steam turbine building setting
Formula crane is directly lifted this method in place by bridge crane and is not suitable for vertical high pressure heater.Vertical high pressure heater needs
Vertical lifting, it is also necessary to solve the problems such as tank body is turned over, erect, rotating.
Traditional Lao Xinge hydraulic lifting method needs in the sky to turn over tank body uprightly, during air turning is upright,
The rate of load condensate of bridge crane is constant, needs to pay close attention to the stability of lifting process, if unbalance stress will cause instantaneously mistake
It carries;And during high-pressure heater turns over upright in the sky, wirerope is to equipment appurtenance (such as instrument tube socket, pipe fitting
Deng) and equipment paint exist damage risk, affect process quality control;And there is also costs for Singh's hydraulic lifting method
Disadvantage high, the activity duration is long.
In addition, the maximum spacing of steam turbine building bridge crane main hook and operating layer platform generally only has 13m or so, Wu Faman
Sufficient high-pressure heater vertical length lifting, that is to say, that high-pressure heater, which must lift by crane, moves to the other space in formal basis in place
It turned over, erect again.However in the engineering method of the prior art, it not can be realized in the limited situation in equipment factory building space
It safely and efficiently completes large-scale vertical heater and lifts problem in place.
Summary of the invention
In view of the above technical problems, the present invention provides a kind of vertical high pressure heater turn setting lifting engineering method, vertical height
Pressing heater to turn over upright process is to carry out on the ground, is turned over when standing upright, and main stress point is temporary concrete basis,
The rate of load condensate of bridge crane substantially reduces, and construction quality controllability is high compared with conventional construction method;And turn over upright mistake
Journey carries out on the ground, the damage risk that wirerope paints equipment appurtenance and equipment when reducing air turning;It solves
Large-scale vertical heater is safely and efficiently completed in the limited situation in equipment factory building space and lifts problem in place, while for from now on
The construction of same type units equipment hoisting provides Technical Reference.
The present invention is achieved by the following technical solutions:
A kind of vertical high pressure heater turn setting lifting engineering method, the high-pressure heater include tank body, are set to tank body
The top hanging scaffold at top, two high-pressure heater pedestals for being set to tank base opposite sides;The lifting engineering method includes:
According to high-pressure heater pedestal size and and spacing, pour on the ground temporary concrete basis;By high pressure plus
Hot device carries out angle adjustment on turning rolls, adjusts to two high-pressure heater pedestals and is located in same level, by high pressure plus
Hot device level is sling, and is then placed on by temporary concrete basis and is fixed temporarily support and forms two high-pressure heater pedestals
For being horizontally arranged the platform of high-pressure heater, correcting wedge is placed in advance on the basis of temporary concrete, with interim coagulation
Fulcrum of the earth foundation as high-pressure heater pedestal, lifting heater at the top of hanging scaffold carry out hoisting and overturning, turn over when standing upright with
Angle is gradually increased, and gradually stress, stress point gradually transit to horizontal component from the wedge-like portion of correcting wedge to correcting wedge, high
It presses heater to complete to erect, it is in place then to carry out vertical lifting again.
Further, the lifting engineering method specifically includes:
Temporary concrete foundation construction: the temporary concrete base as high-pressure heater pedestal fulcrum is poured on the ground
The size of plinth, temporary concrete basis is determined according to the size and spacing of the high-pressure heater pedestal;
Correcting wedge production: using sleeper make correcting wedge, correcting wedge include have key groove wedge-like portion and
Horizontal component;
Be fixed temporarily support installation: setting one is fixed temporarily branch at a certain distance near the temporary concrete basis
Seat, the temporary concrete basis and the support that is fixed temporarily are combined into platform for being horizontally arranged high-pressure heater;
Roller carrier special installation and debugging: one group of special roller is placed in the other free area in temporary concrete basis
Frame, Pass line adjustment is consistent, and the rotation that is powered is normal;
Crane Combine debugging: the bridge crane arranged in workshop is carried out according to shop instruction and vehicle is debugged, really
Each component is protected to work well, and after vehicle crane movement synchronize, after the completion of debugging on crane main hook suspension strap suspension hook it is flat
Spreader beam;
Heater is unloaded: vertical high pressure heater sling by level in transport vehicle disk, crosses Turbine Engine Foundation platform,
It is placed on the roller carrier special;
The adjustment of heater angle: being rotated the tank body of vertical high pressure heater using turning rolls, until tank base
Two high-pressure heater pedestals in same level, then high-pressure heater is sling and is placed on by the temporary concrete
The basic and described platform for being used to be horizontally arranged high-pressure heater for being fixed temporarily support composition;
Heater, which turns over, to be erect: suspension centre being moved to the top hanging scaffold of top of the tank, main hook steps up and two high pressures
Heater support, which is cooperated using temporary concrete basis as fulcrum, to be rotated, and high-pressure heater is slowly erect, gradually with setting angle
Increase, gradually stress, stress point gradually transit to the correcting wedge on the basis of temporary concrete from the wedge-like portion of correcting wedge
Horizontal component, entire high-pressure heater complete steady setting, at this time the horizontal part of two high-pressure heater pedestals and correcting wedge
Tap touching;
Heater is vertically in place: continuing after lifting by crane high-pressure heater to appropriate height, installation high-pressure heater sliding end rolling
Wheel, idler wheel continue to complete the vertical raising of high-pressure heater in place on the basis of being hung to formally after being installed.
Further, the temporary concrete basis includes being oppositely arranged and having mutually level 2 temporary concretes
Support, 2 temporary concrete holder tops are respectively provided with a flat surface, and the distance between two flat surfaces are according to high-pressure heater
The spacing of pedestal determines that the area of each flat surface is determined according to the size of high-pressure heater pedestal;Two height of opposite sides
Pressure heater support is placed in two flat surfaces, and can carry out turn setting using two flat surfaces as fulcrum.
Further, burying for stationary wedge cushion block is arranged at the top of basic two flat surfaces of temporary concrete
Part.
Further, described to be fixed temporarily used temporary support when support is transported using high-pressure heater;It will be described
It is fixed temporarily support and base board junction carries out being broken fixation, prevent from being fixed temporarily support when placing high-pressure heater and incline
Tiltedly;It is and described to be fixed temporarily support and the two sides of high-pressure heater center of gravity are arranged in the temporary concrete support, it is ensured that high
Press the stabilization of heater.
Further, it turns over and is erect in step in the heater, high-pressure heater is turned over before erectting, check that high pressure adds
Bolt has fastened completion at hot device support, and during preventing turn, bolt looseness, local pressure excess load cause bolt fracture.
Advantageous effects of the invention:
(1) compared with traditional Lao Xinge hydraulic lifting method, security risk controllability is high: engineering method provided by the invention is neutral
It is to carry out on the ground that formula heater, which turns over upright process, is turned in the sky directly than traditional construction scheme Lao Xinge hydraulic lifting method
It stands safer;And equipment is turned over when standing upright in engineering method provided by the invention, and main stress point is temporary concrete basis, bridge-type
The rate of load condensate of crane substantially reduces, and equipment is turned over when standing upright in the sky in Lao Xinge hydraulic lifting method, bridge crane
Rate of load condensate is constant, but also to pay close attention to the stability of lifting process, and unbalance stress is avoided to cause instantaneous overload.
(2) compared with traditional Lao Xinge hydraulic lifting method, construction quality controllability is high: setting in engineering method provided by the invention
The standby upright process of turn is to carry out on the ground, and wirerope is to equipment appurtenance (instrument tube socket, pipe fitting when reducing air turning
Deng) and equipment paint damage risk, it is ensured that process quality control.
(3) economic benefit significantly improves: it is more economical compared with Lao Xinge hydraulic lifting method, it can be saved compared with Lao Xinge hydraulic lifting method
Nearly 40,000 yuan of cost.
(4) duration is obviously shortened: compared with Lao Xinge hydraulic lifting method, largely reducing difficulty of construction, reduces
Activity duration, using engineering method provided by the invention construction complete 4 vertical high pressure heaters lift it is in place share 4 days, and it is sharp
It is 10 days with the Lao Xinge hydraulic lifting method estimated construction time, shortens nearly 6 day duration, actively promoted the progress of engineering.
(5) engineering method construction provided by the invention is suitable for the large-scale vertical tank body equipment in the same type workshop confined space
It turns over, erect, operation in place.
Detailed description of the invention
Fig. 1 is a kind of vertical high pressure heater turn setting lifting engineering method flow diagram in the embodiment of the present invention;
Fig. 2 is the structural schematic diagram on temporary concrete basis in the embodiment of the present invention;
Fig. 3 is mesohigh of embodiment of the present invention heater level displacement structure schematic diagram;
Fig. 4 is that heater is unloaded process schematic in the embodiment of the present invention;
Fig. 5, Fig. 6 are that heater turns over setting process schematic in the embodiment of the present invention;
Appended drawing reference: 1. high-pressure heaters;1-1. high-pressure heater pedestal;1-2. tank body;Hanging scaffold at the top of 1-3.;2. interim
Basis;2-1. temporary concrete support;2-2. flat surface;3. being fixed temporarily support.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is explained in further detail.It should be appreciated that specific embodiment described herein is used only for explaining the present invention, and
It is not used in the restriction present invention.
On the contrary, the present invention covers any substitution done on the essence and scope of the present invention being defined by the claims, repairs
Change, equivalent method and scheme.Further, in order to make the public have a better understanding the present invention, below to of the invention thin
It is detailed to describe some specific detail sections in section description.Part without these details for a person skilled in the art
The present invention can also be understood completely in description.
The embodiment of the present invention provides a kind of vertical high pressure heater turn setting lifting engineering method, and the high-pressure heater includes
Tank body, the top hanging scaffold for being set to top of the tank, two high-pressure heater pedestals for being set to tank base opposite sides;It is described
Lifting engineering method include: according to high-pressure heater pedestal size and and spacing, pour on the ground temporary concrete basis;It will be high
Pressure heater carries out angle adjustment on turning rolls, adjusts to two high-pressure heater pedestals and is located in same level, will be high
Pressure heater level is sling, and is then placed on by temporary concrete basis and is fixed temporarily support two high-pressure heater pedestals
What is formed is used to be horizontally arranged the platform of high-pressure heater, correcting wedge is placed in advance on the basis of temporary concrete, with interim
Fulcrum of the concrete foundation as high-pressure heater pedestal, lifting heater top hanging scaffold carry out hoisting and overturning, turn over when standing upright
As angle is gradually increased, gradually stress, stress point gradually transit to horizontal part from the wedge-like portion of correcting wedge to correcting wedge
Point, high-pressure heater is completed to erect, and it is in place then to carry out vertical lifting again.
As shown in Figure 1, the lifting engineering method is specifically includes the following steps: temporary concrete foundation construction, correcting wedge system
Make, be fixed temporarily support installation, roller carrier special installation and debugging, Crane Combine is debugged, heater is unloaded, heater angle tune
Whole, heater turn is erect, heater is vertically in place;Specifically:
Temporary concrete foundation construction: the temporary concrete base as high-pressure heater pedestal fulcrum is poured on the ground
The size of plinth, temporary concrete basis is determined according to the size and spacing of the high-pressure heater pedestal;As shown in Fig. 2, at this
In embodiment, the temporary concrete basis includes being oppositely arranged and having mutually level 2 temporary concrete supports, and 2
Temporary concrete holder top is respectively provided with a flat surface, and the distance between two flat surfaces are according between high-pressure heater pedestal
Away from determination, the area of each flat surface is determined according to the size of high-pressure heater pedestal;Two high-pressure heaters of opposite sides
Pedestal is placed in two flat surfaces, and can carry out turn setting using two flat surfaces as fulcrum.
Preferably, the embedded part for stationary wedge cushion block is arranged at the top of basic two flat surfaces of temporary concrete.
Also, the setting of correcting wedge and embedded part can make temporary concrete basis uniform stressed.Temporary concrete foundation construction place
Be selected near formal basis, in order to high-pressure heater it is upright after, vertical raising be hung to it is formal on the basis of.
During temporary concrete foundation construction, strict control unwrapping wire precision is needed, it is ensured that base position and design position
It sets and is consistent;Used concrete grade and steel bar arrangement mode are referring to high plus formal basic engineering construction.
Correcting wedge production: using sleeper make correcting wedge, correcting wedge include have key groove wedge-like portion and
Horizontal component;Preferably, the wedge angle of wedge-shaped angle part according to high-pressure heater center of gravity and turns over fulcrum in same vertical line
When base plane angle with horizontal plane depending on (more slightly larger than theoretical value to be advisable), muti-piece wedge shape sleeper binding it is integral, increase contact
Area, front and back welding block are fixed.Preferably, correcting wedge can be using the top of basic two flat surfaces of temporary concrete
The embedded part that portion arranges is fixed.Preferably, the waste and old sleeper production correcting wedge in scene can be selected.
It is fixed temporarily support installation: as shown in figure 3, setting one is faced at a certain distance near the temporary concrete basis
When hold-down support, the temporary concrete basis and the support that is fixed temporarily are combined into for being horizontally arranged high-pressure heater
Platform;Preferably, being fixed temporarily support can be using used temporary support when high-pressure heater transport;It is fixed temporarily support
It carries out being broken fixation with base board junction, prevents from being fixed temporarily support run-off the straight when placing high-pressure heater;It is fixed temporarily
The two sides of high-pressure heater center of gravity should be arranged in support and temporary concrete support, it is ensured that equipment is stablized.
Roller carrier special installation and debugging: one group of special roller is placed in the other free area in temporary concrete basis
Frame, Pass line adjustment is consistent, and the rotation that is powered is normal;
Crane Combine debugging: the bridge crane arranged in workshop is carried out according to shop instruction and vehicle is debugged, really
Each component is protected to work well, and after vehicle crane movement synchronize, after the completion of debugging on crane main hook suspension strap suspension hook it is flat
Spreader beam;Preferably, bridge crane quantity is 2;Warm-up debugging should be carried out after suspension shoulder pole girder, check service braking system,
Ensure normal;When checking two driving joint debuggings, main hook lifting velocity, the actuated small roadster speed of travel should keep synchronous, prevent hoisting process
It is middle because caused by asynchronous two vehicle-mounted lotuses be unevenly distributed, equipment deflection the problems such as, form security risk.
Heater is unloaded: as shown in figure 4, vertical high pressure heater is sling by level in transport vehicle disk, crossing steamer
Machine basic platform is placed on the roller carrier special;Preferably, it is driven a vehicle using two 145/32t and lifts the scheme of unloading, two
It drives a vehicle and vehicle, two driving main hook spacing 8.88m, two driving main hooks passes through connection pulling plate, pin shaft and 500t connecting traverse respectively and connect
For entirety.The wirerope of 500t suspension hook (self weight 15t) hanging 80 × 25m of a pair of Ф, hangs mode (8 strand) using pocket and is unloaded
Vehicle.
The adjustment of heater angle: being rotated the tank body of vertical high pressure heater using turning rolls, until tank base
Two high-pressure heater pedestals in same level, then high-pressure heater is sling and is placed on by the temporary concrete
The basic and described platform for being used to be horizontally arranged high-pressure heater for being fixed temporarily support composition;Specifically, tank base
Two high-pressure heater pedestals are respectively placed in two flat surfaces on the temporary concrete basis, and tank body is placed on described face
When hold-down support on, entire high-pressure heater is in horizontal positioned.
Heater, which turns over, to be erect: as seen in figs. 5-6, suspension centre being moved to the top hanging scaffold of top of the tank, main hook steps up
And two high-pressure heater pedestals, which are cooperated using temporary concrete basis as fulcrum, to be rotated, and high-pressure heater is slowly erect, with
It erects angle to be gradually increased, the gradually stress of the correcting wedge on the basis of temporary concrete, wedge-shaped part of the stress point from correcting wedge
Divide and gradually transit to horizontal component, entire high-pressure heater completes steady setting, at this time two high-pressure heater pedestals and wedge shape
The horizontal component of cushion block contacts;Preferably, it turns over before erectting, should check that bolt has fastened completion at high-pressure heater support, prevent
During only turning over, bolt looseness, local pressure excess load cause bolt fracture;When upright, high-pressure heater is supported on temporarily
In concrete foundation, high-pressure heater pedestal is contacted with the horizontal component of correcting wedge, ensure that upright process steadily carries out.
Heater is vertically in place: continuing after lifting by crane high-pressure heater to appropriate height, installation high-pressure heater sliding end rolling
Wheel, idler wheel continue to complete the vertical raising of high-pressure heater in place on the basis of being hung to formally after being installed.
In the present embodiment, when carrying out lifting high-pressure heater, lifting region periphery must set special messenger and guard, to prevent
It damages people, basis and equipment etc..High plus surface is coped in hoisting process takes necessary protection, in order to avoid to equipment in hoisting process
It causes to scratch and damage.
Application example: by application of construction method Yu Hua electricity provided by the invention Laizhou second phase 2 × 1000MW extra-supercritical unit work
In journey high-pressure heater lifting project, the related work of 4 vertical high pressure heaters of #4 unit lifting is satisfactorily completed, is used
" prefabricated foundation, ground have been removed " arrangement and method for construction will turn over setting process and carry out from aerial move on ground, and working procedure is reasonable,
It is highly-safe, the turn, setting and lifting operation of standing heater are satisfactorily completed, electricity generating corporation, Ltd's second phase in the Laizhou Hua electricity
It was verified that the engineering method is safe and reliable in 2 × 1000MW extra-supercritical unit vertical high pressure heater installation process, technology
Feasible, installation quality is excellent.And great achievement is achieved in terms of security process control, processing quality, promotion.This
Outside, this engineering method investment of hoisting machinery significantly less compared with Lao Xinge hydraulic lifting method reduces mechanical energy consumption and last row.
By application of construction method provided by the invention in the efficient ultra-supercritical coal-fired units engineering of 2 × 1000MW of the Hengshan Mountain Yu Neng, Shaanxi
High-pressure heater lifting, satisfactorily completes the related work of #2 unit vertical high pressure heater lifting, by high-pressure heater equipment
Setting process is turned over to carry out from aerial move on ground, working procedure is reasonable, and it is highly-safe, satisfactorily complete standing heater
Turn, setting and lifting operation, in the efficient ultra-supercritical coal-fired units engineering high-pressure heater of 2 × 1000MW of the Hengshan Mountain Yu Neng, Shaanxi
It was verified that the engineering method is safe and reliable in installation process, technology is feasible, and installation quality is excellent.
The economic benefit of engineering method provided by the invention: compared with 39115 yuan of Lao Xinge hydraulic lifting method save the cost, effect is very
Significantly, meanwhile, reduce the use time of bridge crane in workshop, improve production efficiency, pushed the progress of engineering.
The social benefit of engineering method provided by the invention: engineering method provided by the invention is using tradition machinery, utilization
New-type technique not only reduces operating cost, and the safety of construction, stationarity have also obtained larger promotion, for same type from now on
Unit equipment lifting construction provides Technical Reference.
The energy conservation and environmental protection benefit of engineering method provided by the invention: engineering method provided by the invention is significantly compared with Lao Xinge hydraulic lifting method
The activity duration is shortened, and is assisted without other hoisting machineries, the loss of crane electric energy and fuel oil is thereby reduced.
The safety benefit of engineering method provided by the invention: engineering method mesohigh heater provided by the invention, which turns over setting movement, is
It carries out, is turned over compared with setting in the sky with Lao Xinge hydraulic lifting method on the ground, it is potential huge to eliminate aerial work institute
Big security risk, so that operational security gets a promotion.
Claims (6)
1. a kind of vertical high pressure heater, which turns over, erects lifting engineering method, the high-pressure heater includes tank body, is set to tank body top
The top hanging scaffold in portion, two high-pressure heater pedestals for being set to tank base opposite sides;It is characterized in that, the slinger
Method includes:
According to high-pressure heater pedestal size and and spacing, pour on the ground temporary concrete basis;By high-pressure heater
Angle adjustment is carried out on turning rolls, is adjusted to two high-pressure heater pedestals and is located in same level, by high-pressure heater
Level is sling, and is then placed on by temporary concrete basis and is fixed temporarily the use that support forms two high-pressure heater pedestals
In on the platform of horizontal positioned high-pressure heater, correcting wedge is placed on the basis of temporary concrete, in advance with temporary concrete base
Fulcrum of the plinth as high-pressure heater pedestal, lifting heater top hanging scaffold carry out hoisting and overturning, turn over when standing upright with angle
It is gradually increased, gradually stress, stress point gradually transit to horizontal component from the wedge-like portion of correcting wedge to correcting wedge, and high pressure adds
Hot device is completed to erect, and it is in place then to carry out vertical lifting again.
2. a kind of vertical high pressure heater, which turns over, according to claim 1 erects lifting engineering method, which is characterized in that the lifting
Engineering method specifically includes:
Temporary concrete foundation construction: the temporary concrete basis as high-pressure heater pedestal fulcrum is poured on the ground, is faced
When concrete foundation size according to the size and spacing of the high-pressure heater pedestal determine;
Correcting wedge production: correcting wedge is made using sleeper, correcting wedge includes the wedge-like portion and level with key groove
Part;
Be fixed temporarily support installation: setting one is fixed temporarily support at a certain distance near the temporary concrete basis, institute
It states temporary concrete basis and the support that is fixed temporarily is combined into platform for being horizontally arranged high-pressure heater;
Roller carrier special installation and debugging: one group of roller carrier special is placed in the other free area in temporary concrete basis, is marked
Height adjustment is consistent, and the rotation that is powered is normal;
Crane Combine debugging: the bridge crane arranged in workshop being carried out and vehicle is debugged, it is ensured that each component works well, and
After vehicle crane movement synchronize, after the completion of debugging on crane main hook suspension strap suspension hook shoulder pole girder;
Heater is unloaded: vertical high pressure heater being sling by level in transport vehicle disk, crosses Turbine Engine Foundation platform, is placed
On the roller carrier special;
The adjustment of heater angle: being rotated the tank body of vertical high pressure heater using turning rolls, until the two of tank base
Then high-pressure heater is sling and is placed on by the temporary concrete basis in same level by a high-pressure heater pedestal
With the platform for being used to be horizontally arranged high-pressure heater for being fixed temporarily support composition;
Heater, which turns over, to be erect: suspension centre being moved to the top hanging scaffold of top of the tank, main hook steps up and two hyperbaric heatings
Device pedestal, which is cooperated using temporary concrete basis as fulcrum, to be rotated, and high-pressure heater is slowly erect, and is gradually increased with angle is erect,
Gradually stress, stress point gradually transit to horizontal part from the wedge-like portion of correcting wedge to correcting wedge on the basis of temporary concrete
Point, entire high-pressure heater completes steady setting, and the horizontal component of two high-pressure heater pedestals and correcting wedge contacts at this time;
Heater is vertically in place: continuing after lifting by crane high-pressure heater to appropriate height, installs high-pressure heater sliding end idler wheel, rolling
Wheel continues to complete the vertical raising of high-pressure heater in place on the basis of being hung to formally after being installed.
3. a kind of vertical high pressure heater, which turns over, according to claim 2 erects lifting engineering method, which is characterized in that described interim
Concrete foundation includes being oppositely arranged and having mutually level 2 temporary concrete supports, 2 temporary concrete holder tops
It is respectively provided with a flat surface, the distance between two flat surfaces are determined according to the spacing of high-pressure heater pedestal, each flat surface
Area according to the size of high-pressure heater pedestal determine;Two high-pressure heater pedestals of opposite sides are placed in two platforms
On face, and turn setting can be carried out using two flat surfaces as fulcrum.
4. a kind of vertical high pressure heater, which turns over, according to claim 3 erects lifting engineering method, which is characterized in that mixed temporarily
The embedded part for stationary wedge cushion block is arranged at the top of solidifying two flat surfaces of earth foundation.
5. a kind of vertical high pressure heater, which turns over, according to claim 2 erects lifting engineering method, which is characterized in that described interim
Hold-down support used temporary support when being transported using high-pressure heater;Support and base board junction are fixed temporarily by described
It carries out being broken fixation, prevents from being fixed temporarily support run-off the straight when placing high-pressure heater;And it is described be fixed temporarily support and
The two sides of high-pressure heater center of gravity are arranged in the temporary concrete support, it is ensured that the stabilization of high-pressure heater.
6. a kind of vertical high pressure heater, which turns over, according to claim 2 erects lifting engineering method, which is characterized in that add described
Hot device, which turns over, to be erect in step, high-pressure heater is turned over before erectting, and checks that bolt has fastened completion at high-pressure heater support,
During preventing turn, bolt looseness, local pressure excess load cause bolt fracture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910427196.5A CN110319428A (en) | 2019-05-22 | 2019-05-22 | A kind of vertical high pressure heater turn setting lifting engineering method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910427196.5A CN110319428A (en) | 2019-05-22 | 2019-05-22 | A kind of vertical high pressure heater turn setting lifting engineering method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110319428A true CN110319428A (en) | 2019-10-11 |
Family
ID=68113272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910427196.5A Pending CN110319428A (en) | 2019-05-22 | 2019-05-22 | A kind of vertical high pressure heater turn setting lifting engineering method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110319428A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111532980A (en) * | 2020-04-03 | 2020-08-14 | 中国能源建设集团安徽电力建设第一工程有限公司 | Vertical high-pressure heater hoisting method |
CN111960333A (en) * | 2020-07-27 | 2020-11-20 | 南京欧弈物流设备制造有限公司 | Clamp for mounting on-site lifting frame column piece and using method thereof |
WO2021196465A1 (en) * | 2020-03-30 | 2021-10-07 | 中国电建集团山东电力建设第一工程有限公司 | Hoisting system for overweight horizontal high-pressure heater and hoisting method |
CN113864641A (en) * | 2021-09-02 | 2021-12-31 | 海洋石油工程(青岛)有限公司 | Installation process for turning over after horizontal in-side installation of vertical tank equipment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BG98800U (en) * | 1994-05-28 | 1995-11-30 | Ivanov | Stand for the repair of housings of high pressure heaters in thermoelectric and nuclear plants |
CN106315384A (en) * | 2016-10-25 | 2017-01-11 | 苏州天沃科技股份有限公司 | Turnover supporting tool of high-pressure heater tube system |
CN106365027A (en) * | 2016-10-25 | 2017-02-01 | 苏州天沃科技股份有限公司 | Hoisting and overturning tool of high-pressure heater pipe system |
-
2019
- 2019-05-22 CN CN201910427196.5A patent/CN110319428A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BG98800U (en) * | 1994-05-28 | 1995-11-30 | Ivanov | Stand for the repair of housings of high pressure heaters in thermoelectric and nuclear plants |
BG128Y1 (en) * | 1994-05-28 | 1997-05-30 | Ivanov | Stand for the repair of housings |
CN106315384A (en) * | 2016-10-25 | 2017-01-11 | 苏州天沃科技股份有限公司 | Turnover supporting tool of high-pressure heater tube system |
CN106365027A (en) * | 2016-10-25 | 2017-02-01 | 苏州天沃科技股份有限公司 | Hoisting and overturning tool of high-pressure heater pipe system |
Non-Patent Citations (1)
Title |
---|
任苹: "田湾核电站1#机组B列高压加热器的拆除与安装探析", 《机电信息》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021196465A1 (en) * | 2020-03-30 | 2021-10-07 | 中国电建集团山东电力建设第一工程有限公司 | Hoisting system for overweight horizontal high-pressure heater and hoisting method |
CN111532980A (en) * | 2020-04-03 | 2020-08-14 | 中国能源建设集团安徽电力建设第一工程有限公司 | Vertical high-pressure heater hoisting method |
CN111532980B (en) * | 2020-04-03 | 2021-12-10 | 中国能源建设集团安徽电力建设第一工程有限公司 | Vertical high-pressure heater hoisting method |
CN111960333A (en) * | 2020-07-27 | 2020-11-20 | 南京欧弈物流设备制造有限公司 | Clamp for mounting on-site lifting frame column piece and using method thereof |
CN113864641A (en) * | 2021-09-02 | 2021-12-31 | 海洋石油工程(青岛)有限公司 | Installation process for turning over after horizontal in-side installation of vertical tank equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110319428A (en) | A kind of vertical high pressure heater turn setting lifting engineering method | |
CN101880006B (en) | Roll-on device and method for large fixed type rotary crane | |
CN102561191A (en) | Integral lifting system and construction method for arch bridge ribs | |
CN106892054B (en) | A kind of vehicle passenger ferry host equipment hanging method | |
CN103437563B (en) | A kind of mounting method for large steel-strctrue building steel frame | |
CN201411321Y (en) | Clear-water prefabricated slab turning-over frame | |
CN205077878U (en) | Unit type curtain plate hoisting device | |
CN105019664A (en) | High-altitude slipping installation method for compartment-type electric room | |
CN206751187U (en) | It is a kind of can be from the boom hoisting of four direction adjustment angle | |
CN206590793U (en) | Connect arm assembly and the movable arm tower crane comprising the device in the air | |
CN103574158A (en) | Super-large diameter pressure steel tube inclined shaft three-hanging-point installation method | |
CN206052577U (en) | A kind of bridge local deviation correcting device | |
CN202482772U (en) | Collapse-proof stop block mounting system for railway bridge | |
CN207293976U (en) | A kind of cantilever crane set up for bridge subsection transport | |
CN207312994U (en) | Power station major diameter surge shaft steel lining cantilevered annular track boom hoisting | |
CN204825655U (en) | Arc case roof beam lifts by crane focus off -centre and installation leveling system that takes one's place | |
CN205114897U (en) | That climbs formula braced system in tower built -in is put has bad luck device certainly | |
CN206290072U (en) | A kind of Convenient-safe electric pole erecting device | |
CN105317031B (en) | A kind of ship lift main equipment room bridge main beam hanging method | |
CN203213090U (en) | Transferring and hoisting device for ship reception chamber of ship lift | |
CN205011283U (en) | Hoist and mount apparatus of large -scale rolling -mill housing | |
CN204530506U (en) | End bay closing device | |
CN104386586B (en) | The land installation method of water conservancy project prefabricated components | |
CN209853542U (en) | Lifting appliance for lifting pipe gallery | |
CN208201816U (en) | Diversion system of hydropower station penstock and the trailer system of telescopic joint auxiliary installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191011 |