CN110318793A - Soft rock large deformation section tunnel inverted arch handles the construction method of long anchor pole - Google Patents

Soft rock large deformation section tunnel inverted arch handles the construction method of long anchor pole Download PDF

Info

Publication number
CN110318793A
CN110318793A CN201910630192.7A CN201910630192A CN110318793A CN 110318793 A CN110318793 A CN 110318793A CN 201910630192 A CN201910630192 A CN 201910630192A CN 110318793 A CN110318793 A CN 110318793A
Authority
CN
China
Prior art keywords
construction
anchor pole
inverted arch
tunnel
long anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910630192.7A
Other languages
Chinese (zh)
Inventor
李五红
邸建玄
赵月生
刘晓亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201910630192.7A priority Critical patent/CN110318793A/en
Publication of CN110318793A publication Critical patent/CN110318793A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides the construction method that a kind of soft rock large deformation section tunnel inverted arch handles long anchor pole, the construction method is the following steps are included: S1) inverted arch position in tunnel is longitudinal according to the multiple construction rings of the first pitch mark along tunnel, and according to the first multiple construction points of circumferential direction pitch mark on each construction ring;S2) long anchor pole is performed in the construction point of each construction ring in the tunnel;S3) mixed serum is injected into long anchor pole;S4 after) slip casting in long anchor pole is completed and continues first time period, anchor plate and nut are installed in the exposed junction of each long anchor pole.Construction method provided by the invention by performing long anchor pole to the inverted arch portion of tunnel deformation segment as requested, and the soil body by reinforcing country rock around deformation section inverted arch portion to long bolt grouting, the soil body of country rock around tunnel deformation segment inverted arch portion can be stablized, it is ensured that the country rock soil body no longer deforms around inverted arch portion after the completion of the construction of subsequent tunnel deformation section inverted arch portion.

Description

Soft rock large deformation section tunnel inverted arch handles the construction method of long anchor pole
Technical field
The present invention relates to technical field of tunnel construction, and in particular, to a kind of processing of soft rock large deformation section tunnel inverted arch is used The construction method of long anchor pole.
Background technique
Your it is located at railway Zhenxiong into complete segmental construction in the tunnel Gao Po, overall length 7939m, one-tunnel two-tracks, route longitudinal slope Single side goes up a slope, maximum buried depth about 445m, the tunnel Gao Po soft rock large deformation Disease Processing segment length 457.4m, and when constructing tunnel need to lead to Cross tomography at 3, at 1 to tiltedly, large size joint band at anticline and 2 at 2, also to pass through P in the middle part of tunnel2L high methane coal measure strata, tunnel It is influenced and the influence of the unfavorable factors such as construction, multiple electrodes after road construction by complicated landform, is occurred after the completion of constructing tunnel Supporting Structure deformation causes inverted arch fill surface in tunnel phenomena such as drum swells in appearance in crack and fill surface longitudinally occur, on The generation of phenomenon is stated mainly since the Supporting Structure deformation in tunnel inverted arch portion causes, inverted arch portion supporting construction is deformed in tunnel Mainly due to around tunnel inverted arch portion the country rock soil body deform so that oppress inverted arch portion supporting construction so that the supporting of inverted arch portion Structure deforms, and therefore, to solve tunnel inverted arch portion Supporting Structure deformation and need soil to country rock around tunnel inverted arch position Body is reinforced, it is ensured that country rock inside soil body is stablized around inverted arch, and the country rock soil body around inverted arch is avoided to deform and destroy Inverted arch supporting construction, while preventing the country rock soil body after the completion of subsequent inverted arch supporting from deforming again, therefore, need a kind of construction Method removes the soil body reinforced around inverted arch position.
Summary of the invention
The purpose of the present invention is for the country rock inside soil body in the Tunnel in solution soft rock strata because of tunnel perimeter Large deformation occurs for structural instability, causes inverted arch Supporting Structure deformation that inverted arch fill surface is caused longitudinally to occur in crack and fill surface Before the problems such as drum swells in appearance, a kind of processing of soft rock large deformation section tunnel inverted arch is provided with the construction method of long anchor pole to tunnel The soil body around road inverted arch is reinforced, and the danger that surrounding soil deforms again after the completion of inverted arch supporting is prevented, after avoiding The supporting construction of continuous inverted arch is destroyed again.
To achieve the goals above, the embodiment of the present invention provides a kind of soft rock large deformation section tunnel inverted arch and handles long anchor pole Construction method, the construction method is the following steps are included: S1) inverted arch position in tunnel is between tunnel is longitudinal according to first Away from the multiple construction rings of label, and according to the first multiple construction points of circumferential pitch mark on each construction ring;S2) in the tunnel Each construction ring construction point on perform long anchor pole;S3) mixed serum is injected into the long anchor pole;S4) in the long anchor After the slip casting of bar is completed and continues first time period, anchor plate and nut are installed in the exposed junction of each long anchor pole.
Specifically, first spacing is between 1.2m-1.5m, and the described first circumferential spacing is between 1.2m-1.5m.
Specifically, it is located at different horizontal planes per the construction point on two adjacent construction rings.
Specifically, the long anchor pole includes: two connector sleeves and three hollow bolt bodies with the first given length.
Specifically, first given length is 4.2m.
Specifically, the hollow bolt body is made of seamless steel pipe.
Specifically, step S2) in perform long anchor pole in the construction point of each construction ring in the tunnel, comprising: every The bolthole with the first given depth is drilled out in one construction point;Assemble the long anchor pole, and the long anchor that assembling will be completed Bar is placed in the bolthole.
Specifically, first given depth is 12m.
Specifically, the mixed serum is cement grout.
Soft rock large deformation section provided by the invention tunnel inverted arch handles the construction method of long anchor pole, and tunnel is in soft rock geology Completed inverted arch supporting in environment, the country rock around tunnel occur large deformation due to cause inverted arch Supporting Structure deformation to draw Hair inverted arch fill surface longitudinally occur occurring in crack and fill surface on drum protuberance the problems such as, when solving the above problems, need pair The soil body around inverted arch portion is reinforced, it is ensured that inverted arch portion surrounding soil is stablized, and construction method provided by the invention can be to tunnel The soil body around the inverted arch portion of road deformation section is reinforced, the ability after the reinforcing for completing tunnel deformation segment inverted arch portion surrounding soil Ensure that the soil stabilization of the country rock around inverted arch portion after the completion of subsequent inverted arch supporting will not deform again, avoids inverted arch branch Protection structure is deformed again by destroying, solve inverted arch fill surface longitudinally occur occurring in crack and fill surface on drum protuberance The problems such as generation again;In the soil body reinforced around deformation section inverted arch, first at tunnel inverted arch position along the longitudinal direction in tunnel According to the multiple construction rings of the first pitch mark, the longitudinal pitch of long anchor pole is determined, then according to first on each construction ring The given circumferential direction multiple construction points of pitch mark determine the horizontal spacing between long anchor pole, and the construction point marked is determined most The construction location of long anchor pole eventually, performs long anchor pole in each construction point, by long bolt grouting with Strengthening Tunnel deformation section The soil body of country rock around inverted arch installs anchor plate and spiral shell in the exposed junction of long anchor pole after slip casting is completed to continue first time period It is female.
Construction method provided by the invention is passed through by performing long anchor pole as requested to the inverted arch portion of tunnel deformation segment The depth of the soil body of country rock is deeper around the inverted arch portion that long bolt grouting can be reinforced, and can preferably stable tunnel deformation segment face upward The soil body of country rock around arch, it is ensured that subsequent tunnel deformation section inverted arch portion country rock soil body around inverted arch portion after the completion of supporting construction It no longer deforms, subsequent inverted arch supporting is avoided to be destroyed again and inverted arch fill surface is caused crack and fill surface longitudinally occur Appearance again in upper appearance the problems such as drum protuberance.
Other features and advantages of the present invention will the following detailed description will be given in the detailed implementation section.
Detailed description of the invention
The drawings are intended to provide a further understanding of the invention, and constitutes part of specification, with following tool Body embodiment is used to explain the present invention together, but is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the construction method that the soft rock large deformation section tunnel inverted arch that embodiment of the present invention provides handles long anchor pole Flow chart.
Specific embodiment
Below in conjunction with attached drawing, detailed description of the preferred embodiments.It should be understood that this place is retouched The specific embodiment stated is merely to illustrate and explain the present invention, and is not intended to restrict the invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
In the present invention, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, top, bottom " is usually needle For direction shown in the drawings either for it is vertical, on vertical or gravity direction for each component mutual alignment relation Word is described.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Embodiment of the present invention provides the construction method that a kind of soft rock large deformation section tunnel inverted arch handles long anchor pole, Fig. 1 The flow chart that the construction method of long anchor pole is handled for soft rock large deformation section tunnel inverted arch, as shown in Figure 1, the construction method packet Including following steps: S1) inverted arch position in tunnel is longitudinal according to the multiple construction rings of the first pitch mark along tunnel, and each According to the first multiple construction points of circumferential pitch mark on construction ring;S2 it) is applied in the construction point of each construction ring in the tunnel Do long anchor pole;S3) mixed serum is injected into the long anchor pole;S4) when the slip casting of the long anchor pole is completed and continues first Between after section, install anchor plate and nut in the exposed junction of each long anchor pole.
Soft rock large deformation section provided by the invention tunnel inverted arch handles the construction method of long anchor pole, sends out using in tunnel The inverted arch position for the shape that changes marks multiple construction rings, then marks construction point on each construction ring, passes through the first of setting What spacing and the first circumferential spacing determined the i.e. each anchor pole of construction point performs position, in each construction after determining construction point Perform long anchor pole on point, backward long anchor pole injection mixed serum, the mixed serum of injection penetrates into around deformation section inverted arch portion In the soil body of country rock, reinforced together with the long anchor pole being embedded into the country rock soil body around deformation section inverted arch portion after mixed serum solidification The soil body in country rock installs anchor plate and nut in the exposed junction of each long anchor pole after slip casting is completed to continue first time period, Construction method provided by the invention can reinforce inverted arch portion before the inverted arch portion progress supporting to tunnel deformation segment by long anchor pole The soil body around position, and reinforcement depth is deeper, it is ensured that subsequent tunnel deformation section inverted arch portion's supporting is more stable, avoids subsequent inverted arch Supporting is destroyed again, solves inverted arch fill surface and the problems such as drum swells in appearance in crack and fill surface longitudinally occurs.
For the soil body for enabling long anchor pole to reinforce around inverted arch portion and the use of long anchor pole is saved, it is specifically, described First spacing is between 1.2m-1.5m, and the described first circumferential spacing is between 1.2m-1.5m.By the first spacing and the first circumferential spacing Be arranged after it between 1.2m.-1.5m, can guarantee to perform a root long anchor pole in construction point injected by long anchor pole it is mixed The range of scatter of slurries is closed in default range, both will not over range cause to waste, too small influence pair will not be spread The consolidation effect of the soil body.
When setting performs, specifically, it is located at different horizontal planes per the construction points on two adjacent construction rings.It will Construction point setting on two adjacent construction rings is in different level, conducive to the uniform soil for reinforcing country rock around inverted arch portion Body, for example, can may insure in this way in certain regional scope can all there is length by multiple construction points according to quincuncial arrangement The soil body of country rock around bolt anchorage inverted arch portion avoids soil stabilization caused by long anchor pole is concentrated and concentrates.
In one embodiment, for the soil body more preferably reinforced around deformation section inverted arch portion, specifically, the long anchor pole packet It includes: two connector sleeves and three hollow bolt bodies with the first given length.When in use according to hollow bolt body, connection The sequence of set, hollow bolt body, connector sleeve and hollow bolt body, which successively assembles, forms the long anchor pole with certain length, In, hollow bolt body is selectedSteel pipe be made, it is preferable that the hollow bolt body is made of seamless steel pipe, specifically Ground selects Q345 seamless steel pipe to make hollow bolt body, it is preferable that first given length is 4.2m, i.e., each middle spare anchor Body of rod length is 4.2m, ease of assembly at different length anchor pole, by the test in identical geological environment, after reference test Perform efficiency, loss and cost consideration, select D42/R32L120 type, the reinforced connection interplanting of long 120mm, wall thickness 5mm For long anchor pole connector sleeve, it is threadedly coupled between hollow bolt body and connector sleeve, the long rock-bolt length being assembled into is about 12.6m, this Using the soil body of country rock around the longer long bolt anchorage inverted arch portion of length, reinforcing area is deeper, wider for invention, is conducive to stable become The soil body of country rock around shape section inverted arch portion.
In one embodiment, select safe industry TY400 Down-hole rolling rig as length when performing long anchor pole in each construction point Construction equipment used when anchor pole, specifically, step S2) in perform long anchor in the construction point of each construction ring in the tunnel Bar, comprising: drill out the bolthole with the first given depth in each construction point;The long anchor pole is assembled, and will be complete It is placed in the bolthole at the long anchor pole of assembling.When construction, first is first drilled out in construction point using TY400 Down-hole rolling rig The bolthole of given depth, it is preferable that first given depth is 12m, and after drilling out bolthole, assembling is placed in into bolthole Good long anchor pole is placed in after long anchor pole and injects mixed serum by long anchor pole, and specifically, the mixed serum is cement grout, For example, cement single slurry, cement single slurry ratio of mud 0.8:1, slip casting is made using P42.5 ordinary cement in the cement grout of injection Whole pore pressure force control is in 1.5~2Mpa, in order to ensure mixed serum can reinforce the soil body of country rock around deformation section inverted arch portion, to Grouting amount in each long anchor pole controls more than design flow, just can ensure that grouting amount abundance, guarantees to deformation section inverted arch portion week The reinforcing of the country rock soil body.
Soft rock large deformation section provided by the invention tunnel inverted arch handles the construction method of long anchor pole, and tunnel is in soft rock geology Completed inverted arch supporting in environment, the country rock around tunnel occur large deformation due to cause inverted arch Supporting Structure deformation to draw Hair inverted arch fill surface longitudinally occur occurring in crack and fill surface on drum protuberance the problems such as, when solving the above problems, need pair The soil body around inverted arch portion is reinforced, it is ensured that inverted arch portion surrounding soil is stablized, and construction method provided by the invention can be to tunnel The soil body around the inverted arch portion of road deformation section is reinforced, the ability after the reinforcing for completing tunnel deformation segment inverted arch portion surrounding soil Ensure that the soil stabilization of the country rock around inverted arch portion after the completion of subsequent inverted arch supporting will not deform again, avoids inverted arch branch Protection structure is deformed again by destroying, solve inverted arch fill surface longitudinally occur occurring in crack and fill surface on drum protuberance The problems such as generation again;In the soil body reinforced around deformation section inverted arch, first at tunnel inverted arch position along the longitudinal direction in tunnel According to the multiple construction rings of the first pitch mark, the longitudinal pitch of long anchor pole is determined, then according to first on each construction ring The given circumferential direction multiple construction points of pitch mark determine the horizontal spacing between long anchor pole, and the construction point marked is determined most The construction location of long anchor pole eventually, performs long anchor pole in each construction point, by long bolt grouting with Strengthening Tunnel deformation section The soil body of country rock around inverted arch installs anchor plate and spiral shell in the exposed junction of long anchor pole after slip casting is completed to continue first time period It is female.
Construction method provided by the invention is passed through by performing long anchor pole as requested to the inverted arch portion of tunnel deformation segment The depth of the soil body of country rock is deeper around the inverted arch portion that long bolt grouting can be reinforced, and can preferably stable change tunnel-type section face upward The soil body of country rock around arch, it is ensured that subsequent tunnel deformation section inverted arch portion country rock soil body around inverted arch portion after the completion of supporting construction It no longer deforms, subsequent inverted arch supporting is avoided to be destroyed again and inverted arch fill surface is caused crack and fill surface longitudinally occur Appearance again in upper appearance the problems such as drum protuberance.
It is described the prefered embodiments of the present invention in detail above in conjunction with attached drawing, still, the present invention is not limited to above-mentioned realities The detail in mode is applied, within the scope of the technical concept of the present invention, a variety of letters can be carried out to technical solution of the present invention Monotropic type, these simple variants all belong to the scope of protection of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case where shield, can be combined in any appropriate way, in order to avoid unnecessary repetition, the present invention to it is various can No further explanation will be given for the combination of energy.
In addition, various embodiments of the present invention can be combined randomly, as long as it is without prejudice to originally The thought of invention, it should also be regarded as the disclosure of the present invention.

Claims (9)

1. the construction method that a kind of soft rock large deformation section tunnel inverted arch handles long anchor pole, which is characterized in that the construction method The following steps are included:
S1) the inverted arch position in tunnel is longitudinal according to the multiple construction rings of the first pitch mark along tunnel, and in each construction ring On according to the first circumferential multiple construction points of pitch mark;
S2) long anchor pole is performed in the construction point of each construction ring in the tunnel;
S3) mixed serum is injected into the long anchor pole;
S4 it) after the slip casting of the long anchor pole is completed and continues first time period, is installed in the exposed junction of each long anchor pole Anchor plate and nut.
2. construction method according to claim 1, which is characterized in that first spacing is between 1.2m-1.5m, and described One circumferential spacing is between 1.2m-1.5m.
3. construction method according to claim 1, which is characterized in that be located at per the construction point on two adjacent construction rings Different horizontal planes.
4. construction method according to claim 1, which is characterized in that the long anchor pole includes: two connector sleeves and three Hollow bolt body with the first given length.
5. construction method according to claim 4, which is characterized in that first given length is 4.2m.
6. construction method according to claim 4, which is characterized in that the hollow bolt body is made of seamless steel pipe.
7. construction method according to claim 1, which is characterized in that step S2) in the tunnel each construction ring Construction point on perform long anchor pole, comprising:
The bolthole with the first given depth is drilled out in each construction point;
The long anchor pole is assembled, and the long anchor pole for completing assembling is placed in the bolthole.
8. construction method according to claim 7, which is characterized in that first given depth is 12m.
9. construction method according to claim 1, which is characterized in that the mixed serum is cement grout.
CN201910630192.7A 2019-07-12 2019-07-12 Soft rock large deformation section tunnel inverted arch handles the construction method of long anchor pole Pending CN110318793A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910630192.7A CN110318793A (en) 2019-07-12 2019-07-12 Soft rock large deformation section tunnel inverted arch handles the construction method of long anchor pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910630192.7A CN110318793A (en) 2019-07-12 2019-07-12 Soft rock large deformation section tunnel inverted arch handles the construction method of long anchor pole

Publications (1)

Publication Number Publication Date
CN110318793A true CN110318793A (en) 2019-10-11

Family

ID=68123225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910630192.7A Pending CN110318793A (en) 2019-07-12 2019-07-12 Soft rock large deformation section tunnel inverted arch handles the construction method of long anchor pole

Country Status (1)

Country Link
CN (1) CN110318793A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203756203U (en) * 2014-06-11 2014-08-06 泰安振声科技工程有限公司 Self-drilling type full-thread bolt grouting anchor rod
CN104847374A (en) * 2015-04-24 2015-08-19 长安大学 Soft rock large-deformation tunnel supporting system and construction method thereof
US20150308269A1 (en) * 2013-05-16 2015-10-29 MatLok, Inc. Mine roof bolt system
CN105937396A (en) * 2016-05-27 2016-09-14 中铁隧道集团有限公司 Support method for ridge section extreme-high geostress soft rock tunnel construction deformation control
CN106593483A (en) * 2016-12-14 2017-04-26 中铁十局集团第四工程有限公司 Construction method for weak surrounding rock tunnel inverted arch long anchor rod
CN208310824U (en) * 2018-05-17 2019-01-01 中交第一公路勘察设计研究院有限公司 It is a kind of to increase the resistance long anchor structure of Extensible type suitable for the multistage of large deformation tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150308269A1 (en) * 2013-05-16 2015-10-29 MatLok, Inc. Mine roof bolt system
CN203756203U (en) * 2014-06-11 2014-08-06 泰安振声科技工程有限公司 Self-drilling type full-thread bolt grouting anchor rod
CN104847374A (en) * 2015-04-24 2015-08-19 长安大学 Soft rock large-deformation tunnel supporting system and construction method thereof
CN105937396A (en) * 2016-05-27 2016-09-14 中铁隧道集团有限公司 Support method for ridge section extreme-high geostress soft rock tunnel construction deformation control
CN106593483A (en) * 2016-12-14 2017-04-26 中铁十局集团第四工程有限公司 Construction method for weak surrounding rock tunnel inverted arch long anchor rod
CN208310824U (en) * 2018-05-17 2019-01-01 中交第一公路勘察设计研究院有限公司 It is a kind of to increase the resistance long anchor structure of Extensible type suitable for the multistage of large deformation tunnel

Similar Documents

Publication Publication Date Title
CN203756203U (en) Self-drilling type full-thread bolt grouting anchor rod
CN110017144B (en) Loess tunnel three-step construction method considering substrate reinforcement treatment
CN105696602A (en) Composite pile-anchor supporting method and structure for deepening excavation
CN106917627B (en) The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN106194204A (en) A kind of drift cobble tunnel advanced support structure and method for protecting support
CN107060774A (en) A kind of anti-tunnel portal wall damage device and construction method
CN108775252A (en) The supporting construction and method for protecting support in Deep Soft Rock tunnel
CN104963696B (en) The construction method of tunnel bottom arching
CN105350988B (en) Tunnel Base reinforcement means
CN107288138B (en) The control structure and construction method of the rock side slope containing weak intercalated layer
CN109653749A (en) A kind of loose slide rock rubble soil section tunnel excavation construction method of high altitude localities shallow embedding
CN103321234B (en) Constructing method of load-bearing structure built on high slope or geological complex area
CN108385715A (en) A kind of assembled stake arch combination retaining wall and its construction method
CN105156114A (en) Enlarging repair and reinforcement method of roadways at crossing
CN205225280U (en) A combined supporting structure that is used for steel -pipe pile bar planting tunnel composite lining of soft base
CN204343306U (en) Tunnel, landslide integration Reinforcement device
CN109139046A (en) Segmenting slip casting self-drilling type barrel vault advanced support method
CN205689216U (en) A kind of reinforced combined retaining structure of pipe-plate lining
CN108397202B (en) Freeze the leading excavation method of base tunnel in multi-step under advance support
CN208328666U (en) A kind of Extended chemotherapy seat-plate type bridge abutment structure with anchor pole
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN109538236A (en) A kind of tunnel structure and tunnel construction method
CN103410529B (en) A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method
CN106640117A (en) Underground cavern top arc structure, underground cavern and construction method of underground cavern
CN110318793A (en) Soft rock large deformation section tunnel inverted arch handles the construction method of long anchor pole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011

RJ01 Rejection of invention patent application after publication