CN110318342A - A kind of precast segment bent cap free cantilever erection constructing device - Google Patents

A kind of precast segment bent cap free cantilever erection constructing device Download PDF

Info

Publication number
CN110318342A
CN110318342A CN201910627578.2A CN201910627578A CN110318342A CN 110318342 A CN110318342 A CN 110318342A CN 201910627578 A CN201910627578 A CN 201910627578A CN 110318342 A CN110318342 A CN 110318342A
Authority
CN
China
Prior art keywords
cantilever
top surface
segment
anchor
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910627578.2A
Other languages
Chinese (zh)
Other versions
CN110318342B (en
Inventor
黄永春
陈立生
万星
崔晨
徐波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Municipal Engineering Group Co Ltd filed Critical Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority to CN201910627578.2A priority Critical patent/CN110318342B/en
Publication of CN110318342A publication Critical patent/CN110318342A/en
Application granted granted Critical
Publication of CN110318342B publication Critical patent/CN110318342B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of precast segment bent cap free cantilever erection constructing devices, including principal piece and cantilever segment, it is characterized in that the constructing device includes top surface anchor, side anchor and steel construction hanger, the top surface anchor includes several top surface deformed bars in direction across bridge setting of two anchor blocks of anchor block and connection;The side anchor includes the side deformed bar in direction across bridge setting of the same side end of two fastener inserts of pre-buried anchoring assembly and connection;The steel construction hanger includes two hanger main bodys of two hanger main bodys and connection in the connector and pin rod assembly along bridge to setting.The invention has the advantages that passing through anchoring piece pre-buried in prefabricated bent cap, and the equipment such as steel construction hanger are installed on cantilever segment, guiding function can be played in place to the lifting of cantilever segment, and top surface anchor and side anchor can anchor cantilever segment and principal piece interim drawknot together, play good intermal force.

Description

A kind of precast segment bent cap free cantilever erection constructing device
Technical field
The present invention relates to bridge concrete Coping Construction technical fields, and in particular to a kind of precast segment bent cap free cantilever erection Constructing device.
Background technique
Bridge concrete Coping Construction generally uses support cast-in-place method or integral prefabricated lifting construction method to realize at present.It is mixed Coagulating earth mulch beam can significantly be shortened the construction period using prefabricated construction, reduce the construction road occupying time, and have quality height, security risk low With the advantages such as environmental protection, thus at home and abroad in Urban Bridge using in the ascendant.
Common great cantilever bent cap form in urban viaduct more than six-lane, the beam length and Liang Chong of this bent cap are usually very Greatly, the integral prefabricated crane capacity for being often limited by urban road transport restricted driving requirement and lifting appliance, and make integral prefabricated lifting Construction method can not be implemented, and segment free cantilever erection construction method can solve this problem.
Segment free cantilever erection construction method has a large amount of successful applications in bridge superstructure, and wherein segmental joints can be adopted It is glued with Conventional epoxy and is stitched, sets concrete shear key on joint face.However segmental construction method is applied man-hour requirement and is built bridge using large-scale Machine, including erection crane system and the segment anchoring temporarily system etc. for lifting by crane segment, cost is very high, and equipment dismounting is multiple Miscellaneous, turnover rate is very low, and the construction process time is long, is unfavorable for quickly spreading out and quickly finishing up for construction surface.
Summary of the invention
According to the deficiencies of the prior art described above, It is an object of the present invention to provide a kind of precast segment bent cap cantilevers to spell Constructing device is filled, which includes top surface anchor, side anchor and steel construction hanger, outstanding using being fixed on Steel construction hanger in arm section, which guides cantilever segment, keeps it horizontal in place, and top surface anchor and side anchor can incite somebody to action The active force that the self weight of cantilever segment generates is effectively transferred to principal piece, to realize the anchoring temporarily to cantilever segment, accelerates splicing Efficiency.
The object of the invention realization is completed by following technical scheme:
A kind of precast segment bent cap free cantilever erection constructing device, the prefabricated bent cap includes principal piece and cantilever segment, it is characterised in that The constructing device includes top surface anchor, side anchor and steel construction hanger, in which:
The top surface anchor includes the anchoring for respectively corresponding the top surface of the top surface for being set to the principal piece and the cantilever segment Several top surface deformed bars in direction across bridge setting of two anchor blocks of block and connection;
The side anchor include respectively correspond be set in the principal piece and the cantilever segment in along bridge to setting The side prestressing force in direction across bridge setting of the same side end of two pre-buried anchoring assemblies of pre-buried anchoring assembly and connection Reinforcing bar;
The steel construction hanger includes the two hanger main bodys and connection for being set to two side rising woods of the cantilever segment Two hanger main bodys in the connector and pin rod assembly along bridge to setting.
The pre-buried anchoring assembly includes from several in the anchoring embedded steel tube formed along bridge to the embedded steel tube of setting Group is equipped with anchoring reinforcing bar in the embedded steel tube, and the both ends revealed section of anchoring reinforcing bar is mounted with anchoring ear Plate.
The quantity of the embedded steel tube is two, and two embedded steel tubes are in setting up and down and are located at same vertical plane It is interior.
The front support end of the hanger main body stretches out in the Mosaic face of the cantilever segment and is supported in the top surface of the principal piece, The rear support end of the hanger main body is supported in the top surface of the cantilever segment.
The lower part of the hanger main body offers earhole, is provided in the cantilever segment in the pre-buried steel along bridge to setting Pipe, the central axes of the embedded steel tube pass through the hole heart of the earhole, and the pin rod assembly includes being threaded through the embedded steel tube The both ends installation of interior anchoring reinforcing bar and the hollow pins stick being set in outside the anchoring reinforcing bar, the anchoring reinforcing bar is solid Surely there is backing plate.
The top surface correspondence that the front support of the hanger main body rectifies the principal piece of lower section is embedded with front support pressure-bearing steel plate, The top surface correspondence that the rear support of the hanger main body rectifies the cantilever segment of lower section is embedded with rear support pressure-bearing steel plate.
The front support end of the hanger main body is equipped with vertically arranged unidirectional top-fastening rod, and the unidirectional top-fastening rod includes interior Threaded steel pipe and the external screw thread rod iron to match with the inner thread steel pipe.
Epoxy glue is coated on the Mosaic face of the principal piece and the cantilever segment
Shear connector is arranged at intervals on the Mosaic face of the principal piece and the cantilever segment.
The invention has the advantages that by anchoring piece pre-buried in prefabricated bent cap, and steel construction hanger is installed on cantilever segment Etc. equipment, guiding function can be played in place to the lifting of cantilever segment, and top surface anchor and side anchor can will hang Arm section and principal piece interim drawknot anchor together, play good intermal force.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of constructing device in the present invention;
Fig. 2 is the schematic diagram of A-A section in Fig. 1;
Fig. 3 is the structural schematic diagram of steel construction hanger in the present invention;
Fig. 4 is the structural schematic diagram of top surface anchor and side anchor in the present invention;
Fig. 5 is the hoisting process schematic diagram for splicing side cantilever segment in the present invention using steel construction hanger;
Fig. 6 is the work progress schematic diagram that top surface anchor and side anchor are installed in the present invention;
Fig. 7 is the hoisting process schematic diagram of other side cantilever segment in the present invention;
Fig. 8 is to do the schematic diagram that two sides cantilever segment and principal piece splicing are completed in invention.
Specific embodiment
Feature of the invention and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, with Convenient for the understanding of technical staff of the same trade:
Such as Fig. 1-8, label 1-22 is respectively as follows: pier stud 1, principal piece 2, cantilever segment 3, hanger main body 4, pin rod assembly 5, anchor block in figure 6, top surface deformed bar 7, Mosaic face 8, anchoring otic placode 9, side deformed bar 10, principal piece suspension centre 11, cantilever segment suspension centre 12, Sell stick embedded steel tube 13, pin stick reinforcing bar 14, hollow pins stick 15, side anchoring embedded steel tube 16, anchoring reinforcing bar 17, anchor Admittedly using embedded steel tube component 18, unidirectional top-fastening rod 19, connector 20, front support pressure-bearing steel plate 21, rear support pressure-bearing steel plate 22.
Embodiment: as shown in figures 1-8, the present embodiment is specifically related to a kind of precast segment bent cap free cantilever erection constructing device, The constructing device includes top surface anchor, side anchor and steel construction hanger, utilizes the steel being fixed on cantilever segment Structure hanger, which guides cantilever segment 3, keeps it horizontal in place, and top surface anchor and side anchor can be by cantilever segments 3 The active force that self weight generates is effectively transferred to principal piece 2, to realize the anchoring temporarily to cantilever segment 3, accelerates splicing efficiency.
As shown in Figs 1-4, precast segment bent cap involved in the present embodiment includes a principal piece 2 and two symmetrical cantilever segments 3 compositions, principal piece 2 lift the top for being set to pier stud 1;It is constructed according to the lifting of principal piece 2,2 top surface of principal piece is provided with principal piece suspension centre 11, principal piece suspension centre 11 is located in the gravity vertical of principal piece 2;And 3 top surface of cantilever segment is then provided with cantilever segment suspension centre 12, cantilever segment suspension centre 12 are located on the gravity resultant force line of cantilever segment 3;It is arranged at intervals with shear connector on the Mosaic face of principal piece 2 and cantilever segment 3, for transmitting The gravity that cantilever segment 3 is subject to, while epoxy glue is additionally provided on Mosaic face, for being bonded principal piece 2 and cantilever segment 3, it is ensured that principal piece 2 The transmitting of close contact and power between cantilever segment 3.
As shown in Figs 1-4, the constructing device in the present embodiment includes top surface anchor, side anchor and steel knot Structure hanger;Wherein, top surface anchor includes the anchor block 6 for being correspondingly arranged at 3 top surface of 2 top surface of principal piece and cantilever segment, i.e. principal piece 2 With an anchor block 6 is respectively set on cantilever segment 3, and the line of two anchor blocks 6 and the direction across bridge of precast segment bent cap are in the same direction, anchoring Block 6 is specially concrete anchor block, and prefabricated anchor block 6, anchor block 6 are set simultaneously in the prefabrication process of principal piece 2 and cantilever segment 3 Seated position and specific size size are then selected and are designed according to the self weight of cantilever segment 3 and partial pressing's principle.Two Several anchor holes being located in same horizontal line are offered on a anchor block 6, between two anchor blocks 6 in corresponding anchor hole Anchoring has the top surface deformed bar 7 being arranged in direction across bridge, and the quantity and length of top surface deformed bar 7 are according to cantilever segment 3 Self weight be determined, the top surface deformed bar 7 in the present embodiment be designed as 4 diameters be 40mm, the finish rolling that length is 6m Screw-thread steel.Principal piece 2 and cantilever segment 3 can be carried out drawknot and fixed by top surface anchor, keep the part gravity of cantilever segment 3 solid through top surface Determine device and be transferred to principal piece 2, realizes being tentatively fixed temporarily to cantilever segment 3.
As shown in Figs 1-4, side anchor include respectively correspond be arranged in principal piece 2 and cantilever segment 3 in along bridge to It answers in advance the side in direction across bridge setting of the same side end for the two pre-buried anchoring assemblies of pre-buried anchoring assembly and connection being arranged Power reinforcing bar 10.Specifically, several anchoring embedded steel tube components 18 of pre-buried anchoring assembly, anchoring embedded steel tube component include The side anchoring embedded steel tube 16 being disposed therein in prefabricated principal piece 2 and cantilever segment 3, in order to ensure side is anchored with pre-buried The position of steel pipe 16 is accurate, and one piece of positioning plate (not shown), side anchoring embedded steel tube 16 are respectively embedded at both ends It is in anchoring reinforcing bar 17 of the suitable bridge to setting in, to setting, being inside equipped with along bridge same;Anchoring embedded steel tube component 18 Quantity requires to be designed selection, this reality according to the minimum average B configuration compression of design setting, the self weight of cantilever segment 3 and Mosaic face Apply and specifically select two groups of anchoring embedded steel tube components 18 in example, and two groups of anchorings with embedded steel tube component 18 in it is setting up and down simultaneously In same vertical plane;The length of anchoring reinforcing bar 17 exceeds the suitable bridge Xiang Kuandu of corresponding position principal piece 2 and cantilever segment 3, I.e. anchoring stretches out in principal piece 2 and cantilever segment 3 with the both ends of reinforcing bar 17, and anchoring is mounted with anchoring ear with the revealed section of reinforcing bar 17 First two groups of anchoring embedded steel tube components 18 are formed firm stress entirety, second anchorage effect formed here by plate 9 Point, convenient for wearing side deformed bar 10.The anchoring otic placode of two pre-buried anchoring assemblies of the same side of i.e. prefabricated bent cap it Between drawknot carried out by side deformed bar 10 fix, passed to being self-possessed the part of cantilever segment 3 by side anchor It is handed to principal piece 2, further realizes being fixed temporarily to cantilever segment 3.
As shown in Figs 1-4, steel construction hanger includes two hanger main bodys 4, and hanger main body 4 is in inverted L shape, is symmetrical arranged Rising wood in two non-splicing sides of cantilever segment 3, i.e. the top of hanger main body 4 is shelved on the side of precast segment bent cap On, and the lower inside of hanger main body 4 then abuts the side wall of precast segment bent cap.The top of two hanger main bodys 4 by across The connector 20 of 3 top surface of cantilever segment is attached fixation, and according to the weight of cantilever segment 3, the connector 20 in the present embodiment is specific Selecting two diameters is the fining twisted steel of 40mm.The lower part of each hanger main body 4 offers earhole, in the inside of cantilever segment 3 It is provided with pin stick embedded steel tube 13, pin stick embedded steel tube 13 is in along bridge to setting, and axis passes through two hanger main bodys 4 The hole heart of earhole;The lower part of two hanger main bodys 4 carries out drawknot by pin rod assembly 5 and fixes, specifically, pin rod assembly 5 includes Hollow pins stick 15 and pin stick reinforcing bar 14, hollow pins stick 15 is set in 14 periphery of pin stick reinforcing bar, and sells rod assembly 5 and be then threaded through Stick is sold with 13 inside of embedded steel tube and passes through the earhole of hanger main body 4;It sells stick and backing plate is installed with the both ends of reinforcing bar 14, and pass through Nut is pierced into pin stick reinforcing bar 14 and is fastened to hollow pins stick 15, prevents hollow pins stick 6 from slipping, but allows hollow pins stick 6 Restricted rotational movement occurs, meets the rotating requires of steel construction hanger in the construction process, the outer diameter and hanger main body 4 of hollow pins stick 15 Earhole diameter difference require within 5mm.Steel construction hanger can play guidance 3 water of cantilever segment in 3 hoisting process of cantilever segment Translation is dynamic and accurate in place.
As shown in Figs 1-4, the front support end of hanger main body 4 stretches out in Mosaic face 8, i.e. front support end is supported on principal piece 2 On top surface, then support end is then supported on the top surface of cantilever segment 3, and front support end is equipped with unidirectional top-fastening rod 19, and by being somebody's turn to do Unidirectional top-fastening rod 19 carries out power transmission, and unidirectional top-fastening rod 19 includes inner thread steel pipe and matched external screw thread rod iron, outer spiral shell The smooth evagination in the front end of line rod iron can transmit vertical pressure, it is synchronous guarantee vertical deformation, while can satisfy horizontal direction Position adjusts demand.Principal piece 2 is embedded with front support pressure-bearing steel plate in the underface corresponding position at the front support end of hanger main body 4 10, and cantilever segment 2 is embedded with rear support pressure-bearing steel plate 11 in the underface corresponding position at the rear support end of hanger main body 4, from And prevent the unnecessary contact of hanger main body 4 and precast segment bent cap from causing the structural failure of precast segment bent cap.The present embodiment The distance between the fulcrum and the fulcrum at rear support end at the front support end of middle hanger main body 4 are 2.5m, and the fulcrum at front support end arrives The distance of Mosaic face 8 is 0.5m, and the distance of fulcrum to the Mosaic face 8 at rear support end is 2m, by spatial numerical analysis, steel construction Design maximum bearing capacity of the hanger at pin rod assembly 5 is greater than 100t, even if the shear connector at Mosaic face is all not involved in transmitting Cantilever segment 3 is self-possessed, and also ensures that the self weight of cantilever segment 3 can be all transmitted in principal piece 2 by steel construction hanger.
As viewed in figures 5-8, the installation and application of the precast segment bent cap cantilever segment assembling construction device in the present embodiment It is as follows:
(1) anchor block 6, pin stick embedded steel tube 13 and side anchor is arranged in prefabricated principal piece 2 and cantilever segment 3 in prefabrication process Admittedly using embedded steel tube 16.
(2) lifting of principal piece 2 is fixed in place, steel construction hanger is installed, is set to two hanger main bodys 4 in installation process On the side of cantilever segment 3, hollow pins stick 15 is then set in pin stick with the peripheral ear for sequentially passing through hanger main body 4 again of reinforcing bar 14 Hole and pin stick with embedded steel tube 13 and are anchored, and the preliminary installation of steel construction hanger is completed;Then mounting hung rack main body 4 it Between connector 20, and carry out tensioning and fix, to balance hanger main body 4 in construction because of the horizontal force that is generated by eccentric load, Two hanger main bodys 4 are made to form entirety.
(3) anchoring embedded steel tube component 18 is installed, i.e., anchoring reinforcing bar 17 is threaded through side anchoring embedded steel tube In 16, anchoring otic placode is fixedly mounted in the revealed section of anchoring reinforcing bar 17, and is fixed with nut.
(4) smear epoxy glue on Mosaic face 8, sling cantilever segment 3 using ground crane in 30 minutes, after lifting from Overhead gradually moves down, and the front support end of steel construction hanger 4 is located at the top of principal piece 2 at this time;Then, it is guided using steel construction hanger Cantilever segment 3 moves horizontally, and keeps cantilever segment 3 preliminary in place, cantilever segment 3 and the Mosaic face of principal piece 28 are substantially flush at this time, unidirectional to push up Tight bar 19 and front support pressure-bearing steel plate 21 are aligned;Prefastened unidirectional top-fastening rod 19, it is ensured that tight between steel construction hanger and principal piece 2 The transmitting of contiguity touching and power.
(5) it is ascended a height machine using ground, the side of seating side deformed bar 10, the symmetrical prefabricated bent cap two sides of tensioning is answered in advance It is anchored after power reinforcing bar 10 to design value;Unidirectional top-fastening rod 19 is fastened again, and unidirectional top-fastening rod is made to be supported on front support pressure-bearing steel plate On 21, the preliminary latch of cantilever segment 3 is completed;
(6) top surface deformed bar 7 is installed, in groups symmetrical tensioning top surface deformed bar 7, the top surface prestressing force in the present embodiment Reinforcing bar 7 includes two groups, every group two;First group of top surface deformed bar 7 carries out the tensioning of three stages, per stage tensioning to design value After hold lotus for a period of time, then correspondingly unload the design hoist of ground crane, be further continued for holding lotus carry out afterwards for a period of time it is next Stage tensioning, until deformed bar reaches tensioning design value and is anchored;Second group of top surface deformed bar 7 carries out two ranks Duan Zhangla holds lotus for a period of time after per stage tensioning to design value, then correspondingly unloads the design hoist of ground crane, followed by It is continuous to hold lotus progress next stage tensioning afterwards for a period of time, it is anchored after top surface deformed bar 7 reaches tensioning design value; Ground crane can unload whole cantilever segments 3 and be self-possessed at this time, and cantilever segment 3 and principal piece 2 realize complete temporary consolidation;Cleaning in time is simultaneously Strike off the epoxy glue that 8 edge of Mosaic face is extruded;By numerical analysis and calculating, do not occur on Mosaic face 8 in construction overall process Tensile stress, after the completion of temporary consolidation, the average compressive stress on segmental joints face 7 reaches 0.5Mpa, it is ensured that the stabilization of temporary consolidation Property.
(7) other side cantilever segment 3 is installed using foregoing schemes, completes the quick-assembling of prefabricated bent cap.
Top surface anchor, side anchor and steel construction hanger three's collective effect in the present embodiment, by cantilever In weight transfer to principal piece 2 suffered by section 3, so that can be achieved in 3 hoisting process of cantilever segment quick interim solid with principal piece 2 It is fixed, accelerate the assembled efficiency of precast segment bent cap cantilever.
The beneficial effect of the present embodiment is: by anchoring piece pre-buried in prefabricated bent cap, and steel knot is installed on cantilever segment The equipment such as structure hanger can play in place guiding function, and top surface anchor and side anchor to the lifting of cantilever segment Cantilever segment and principal piece interim drawknot can be anchored together, play good intermal force, accelerate splicing efficiency.

Claims (9)

1. a kind of precast segment bent cap free cantilever erection constructing device, the prefabricated bent cap includes principal piece and cantilever segment, and feature exists In the constructing device include top surface anchor, side anchor and steel construction hanger, in which:
The top surface anchor includes the anchoring for respectively corresponding the top surface of the top surface for being set to the principal piece and the cantilever segment Several top surface deformed bars in direction across bridge setting of two anchor blocks of block and connection;
The side anchor include respectively correspond be set in the principal piece and the cantilever segment in along bridge to setting The side prestressing force in direction across bridge setting of the same side end of two pre-buried anchoring assemblies of pre-buried anchoring assembly and connection Reinforcing bar;
The steel construction hanger includes the two hanger main bodys and connection for being set to two side rising woods of the cantilever segment Two hanger main bodys in the connector and pin rod assembly along bridge to setting.
2. a kind of precast segment bent cap free cantilever erection constructing device according to claim 1, it is characterised in that described pre-buried Anchoring assembly includes from several in the anchoring embedded steel tube groups formed to the embedded steel tube of setting along bridge, in the embedded steel tube It is equipped with anchoring reinforcing bar, the both ends revealed section of anchoring reinforcing bar is mounted with anchoring otic placode.
3. a kind of precast segment bent cap free cantilever erection constructing device according to claim 2, it is characterised in that described pre-buried The quantity of steel pipe is two, and two embedded steel tubes are in setting up and down and are located in same vertical plane.
4. a kind of precast segment bent cap free cantilever erection constructing device according to claim 1, it is characterised in that the hanger The front support end of main body stretches out in the Mosaic face of the cantilever segment and is supported in the top surface of the principal piece, after the hanger main body Support end is supported in the top surface of the cantilever segment.
5. a kind of precast segment bent cap free cantilever erection constructing device according to claim 4, it is characterised in that the hanger The lower part of main body offers earhole, is provided in the cantilever segment in the embedded steel tube along bridge to setting, the embedded steel tube Central axes pass through the earhole the hole heart, the pin rod assembly include the anchoring reinforcing bar being threaded through in the embedded steel tube and The both ends of the hollow pins stick being set in outside the anchoring reinforcing bar, anchoring reinforcing bar are mounted with backing plate.
6. a kind of precast segment bent cap free cantilever erection constructing device according to claim 4, it is characterised in that the hanger The top surface that the front support of main body rectifies the principal piece of lower section, which corresponds to, is embedded with front support pressure-bearing steel plate, after the hanger main body The top surface correspondence of the cantilever segment immediately below support end is embedded with rear support pressure-bearing steel plate.
7. a kind of precast segment bent cap free cantilever erection constructing device according to claim 4, it is characterised in that the hanger The front support end of main body is equipped with vertically arranged unidirectional top-fastening rod, the unidirectional top-fastening rod include inner thread steel pipe and with it is described The external screw thread rod iron that inner thread steel pipe matches.
8. a kind of precast segment bent cap free cantilever erection constructing device according to claim 1, it is characterised in that the principal piece Epoxy glue is coated with on the Mosaic face of the cantilever segment.
9. a kind of precast segment bent cap free cantilever erection constructing device according to claim 1, it is characterised in that the principal piece Shear connector is arranged at intervals with on the Mosaic face of the cantilever segment.
CN201910627578.2A 2019-07-12 2019-07-12 Construction equipment is assembled to prefabricated bent cap cantilever of festival section Active CN110318342B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910627578.2A CN110318342B (en) 2019-07-12 2019-07-12 Construction equipment is assembled to prefabricated bent cap cantilever of festival section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910627578.2A CN110318342B (en) 2019-07-12 2019-07-12 Construction equipment is assembled to prefabricated bent cap cantilever of festival section

Publications (2)

Publication Number Publication Date
CN110318342A true CN110318342A (en) 2019-10-11
CN110318342B CN110318342B (en) 2024-06-18

Family

ID=68123299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910627578.2A Active CN110318342B (en) 2019-07-12 2019-07-12 Construction equipment is assembled to prefabricated bent cap cantilever of festival section

Country Status (1)

Country Link
CN (1) CN110318342B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820531A (en) * 2019-10-18 2020-02-21 同济大学 Repeatedly-detachable capping beam structure design and implementation method
CN112112052A (en) * 2020-08-26 2020-12-22 绍兴文理学院 Prefabricated bent cap longitudinal connecting system for assembled beam bridge and construction method of prefabricated bent cap longitudinal connecting system
CN112627059A (en) * 2020-12-21 2021-04-09 中建八局第三建设有限公司 Pier-beam integrated bridge girder erection machine and via hole construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320164A (en) * 2016-08-22 2017-01-11 上海应用技术学院 Large prefabricated assembly cap beam with corbel structure and construction method
US20170175376A1 (en) * 2014-07-07 2017-06-22 Fundacion Tecnalia Research & Innovation Dry joint joining device between columns and beams of precast reinforced concrete
CN109183629A (en) * 2018-10-31 2019-01-11 上海城建市政工程(集团)有限公司 A kind of great cantilever bent cap precast assembly method
CN109468946A (en) * 2018-04-12 2019-03-15 上海公路投资建设发展有限公司 A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection
CN109853362A (en) * 2019-03-29 2019-06-07 上海应用技术大学 A kind of interim prestress anchoraging prefabricated bent cap of segmentation and interim method for applying prestressing force
CN210621476U (en) * 2019-07-12 2020-05-26 上海城建市政工程(集团)有限公司 Segment prefabricated bent cap cantilever assembling construction device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170175376A1 (en) * 2014-07-07 2017-06-22 Fundacion Tecnalia Research & Innovation Dry joint joining device between columns and beams of precast reinforced concrete
CN106320164A (en) * 2016-08-22 2017-01-11 上海应用技术学院 Large prefabricated assembly cap beam with corbel structure and construction method
CN109468946A (en) * 2018-04-12 2019-03-15 上海公路投资建设发展有限公司 A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection
CN109183629A (en) * 2018-10-31 2019-01-11 上海城建市政工程(集团)有限公司 A kind of great cantilever bent cap precast assembly method
CN109853362A (en) * 2019-03-29 2019-06-07 上海应用技术大学 A kind of interim prestress anchoraging prefabricated bent cap of segmentation and interim method for applying prestressing force
CN210621476U (en) * 2019-07-12 2020-05-26 上海城建市政工程(集团)有限公司 Segment prefabricated bent cap cantilever assembling construction device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820531A (en) * 2019-10-18 2020-02-21 同济大学 Repeatedly-detachable capping beam structure design and implementation method
CN112112052A (en) * 2020-08-26 2020-12-22 绍兴文理学院 Prefabricated bent cap longitudinal connecting system for assembled beam bridge and construction method of prefabricated bent cap longitudinal connecting system
CN112627059A (en) * 2020-12-21 2021-04-09 中建八局第三建设有限公司 Pier-beam integrated bridge girder erection machine and via hole construction method

Also Published As

Publication number Publication date
CN110318342B (en) 2024-06-18

Similar Documents

Publication Publication Date Title
CN110409304A (en) A kind of precast segment bent cap free cantilever erection construction method
CN110318342A (en) A kind of precast segment bent cap free cantilever erection constructing device
CN110886423B (en) BIM technology-based steel structure tension beam roof construction method
CN102162774B (en) Steel-structure distribution-girder-type double-track whole opening box girder static load test device and construction method thereof
CN105178163B (en) continuous beam type track
CN206815197U (en) A kind of prestress anchoraging angle-table bracket construction of mass concrete construction of encorbelmenting
CN102086677A (en) Prefabricated reinforced concrete beam and connection joint of reinforced concrete column and beam
CN103388408A (en) External pre-stressed tendon reinforcing steering block for building structure
CN106639355A (en) Reinforced concrete beam structure
CN101705660B (en) Reaction frame prestress anchoring system and method for vertical rotating steel pipe arch on concrete bridge
CN110528380A (en) A kind of anchor case of adaptive sunpender angle
CN202787099U (en) Reinforced concrete cap beam external prestressing structure
CN210529499U (en) Segment, pier are assembled in pier prefabrication
CN210916962U (en) Segmental precast beam of cantilever assembly bridge and splicing structure thereof
CN210621476U (en) Segment prefabricated bent cap cantilever assembling construction device
CN201945464U (en) Steel structure spreader beam type double-line full span box beam static loading test device
CN112376549B (en) Prestressed concrete pipe pile anti-seismic connecting device and using method thereof
CN208869942U (en) A kind of long-span continuous rigid-framed bridge external prestressing load system
CN202064276U (en) Cable-girder anchorage structure of railway steel truss cable stayed bridge
CN110409647A (en) A kind of easy reparation assembly concrete steel frame ductility energy dissipation node of unilateral surrender
CN210621477U (en) Steel structure hanging frame for cantilever assembly of segment prefabricated bent cap
CN109778717A (en) A kind of passive method of adjustment of the mechanical state of cantilever beam
CN209010959U (en) A kind of prestressing force connecting structure of bridge pier and Extended chemotherapy
CN208201514U (en) The connecting structure and track girder system of suspension type monorail prefabricated crossbeam and precast pier
CN113756554A (en) Construction platform and construction method for cast-in-place reinforced concrete support cantilever scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant