CN110309929A - The method of elevator maintenance and estate management shared data - Google Patents

The method of elevator maintenance and estate management shared data Download PDF

Info

Publication number
CN110309929A
CN110309929A CN201910613422.9A CN201910613422A CN110309929A CN 110309929 A CN110309929 A CN 110309929A CN 201910613422 A CN201910613422 A CN 201910613422A CN 110309929 A CN110309929 A CN 110309929A
Authority
CN
China
Prior art keywords
elevator
maintenance
property
work order
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910613422.9A
Other languages
Chinese (zh)
Inventor
张志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yunjung Information Technology Co Ltd
Original Assignee
Shanghai Yunjung Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yunjung Information Technology Co Ltd filed Critical Shanghai Yunjung Information Technology Co Ltd
Priority to CN201910613422.9A priority Critical patent/CN110309929A/en
Publication of CN110309929A publication Critical patent/CN110309929A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • G06Q50/163Real estate management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

The invention discloses the methods of the elevator maintenance in elevator maintenance and related property administrative skill field and estate management shared data, including logging in the elevator property public platform logged in maintenance staff Step 1: establishing and being respectively used to property user;Step 2: user can select troublshooting module in property public platform, using the relevant information of elevator, the fault message that elevator occurs is issued, and generate elevator service work order;Step 3: passing through the middle basic information according to related elevator, the present invention can be when elevator occurs elevator pass people, stops ladder, maintenance failure, user can use wechat public platform publication elevator and close people, stop ladder, maintenance failure, and elevator is closed people, stops ladder, maintenance failure information sharing to elevator maintenance unit and elevator maintenance staff by middle service;The middle key node information sharing by elevator maintenance staff's maintenance work is to Tenement and user;Elevator service evaluation is shared to elevator maintenance company and maintenance people by middle.

Description

The method of elevator maintenance and estate management shared data
Technical field
The present invention relates to elevator maintenance and related property administrative skill field, specially elevator maintenance and estate management is shared The method of data.
Background technique
Major part infrastructure management company and unit give elevator management carte blanches to maintenance unit at present, are not engaged in elevator During maintenance, also fail to effectively supervise elevator maintenance process;Lift facility occurs when elevator malfunction, elevator stop terraced failure Information publication channel also stops traditional mode, and maintenance unit, Tenement and user's (maintenance staff, elevator passenger) fail altogether Enjoy same data.
Existing information publication channel needs to have the lift car of part real-estate management not cover shifting also using cell phone network Dynamic network, may result in the passenger in lift car cannot be given out information using wechat, can only utilize electricity in this case Tripartite, five side's intercommunications in terraced carriage carry out carry out news release, are inconvenient.
Based on this, the method that the present invention devises elevator maintenance Yu estate management shared data, to solve the above problems.
Summary of the invention
The purpose of the present invention is to provide the methods of elevator maintenance and estate management shared data, to solve above-mentioned background skill The existing information publication channel proposed in art needs to have the lift car of part real-estate management not cover also using cell phone network Mobile network, may result in the passenger in lift car cannot be given out information using wechat, can only be utilized in this case Tripartite, five side's intercommunications in lift car carry out carry out news release, the problem of being inconvenient.
To achieve the above object, the invention provides the following technical scheme: the side of elevator maintenance and estate management shared data Method, comprising the following steps:
The elevator property public platform logged in maintenance staff is logged in Step 1: establishing and being respectively used to property user;
Step 2: user can select troublshooting module in property public platform, the relevant information of elevator, publication electricity are utilized The fault message that ladder occurs, and generate elevator service work order;
Step 3: by the middle basic information according to related elevator, and Auto-matching updates the maintenance list of corresponding elevator The public platform information of position, and middle platform automatically creates job order according to elevator service work order in Elevator Service System, and will send work Single name with elevator property public platform is pushed to elevator maintenance staff and carries out order;
Step 4: job placement and degree of priority of the maintenance staff according to elevator maintenance company, receive elevator maintenance company Job order or due to carrying out sign-out operation when other reasons cannot carry out maintenance as required, and generate maintenance work order;
Step 5: maintenance staff require according to maintenance work order, start to carry out maintenance work by each requirement, and middle platform is more New maintenance work order state, updating elevator service work order state is " in maintenance ";
Step 6: after maintenance staff complete each maintenance requirement, confirmation of finally signing at maintenance brief summary is completed maintenance and is appointed Business;
Step 7: middle platform updates maintenance work order state according to the signature confirmation message of maintenance staff, elevator service work is updated Single state is " maintenance completion ", and the more new state of elevator service work order is pushed into the property transported in property public platform by middle platform User.
Preferably, the property user public platform in the step 1 and maintenance staff's public platform are respectively used to obtain corresponding human The identity information and matched application permission of member.
Preferably, the relevant information of the elevator in the step 2 includes the two dimensional code letter that can be used for the identification of property public platform The location information of breath and elevator;The fault message that elevator occurs includes that elevator closes people, stops ladder and other maintenance failure letters Breath.
Preferably, in the step 4 after generating maintenance work order, middle can automatically update maintenance work order state, and update Elevator service work order state is " order ", and middle platform is pushed into the more new state of elevator service work order to be transported to property public platform In property user.
It preferably, can be to elevator service knot in the step 7 after property user receives " maintenance completion " information Fruit is objectively evaluated, and evaluation information is updated in " evaluation " information bank in middle, and middle platform can believe evaluation Breath automatically updates the related maintenance staff being pushed into transport in elevator public platform.
Compared with prior art, the beneficial effects of the present invention are: the present invention can close people when elevator occurs for elevator, stop When ladder, maintenance failure, user can use wechat public platform publication elevator and close people, stop ladder, maintenance failure, and middle services elevator It closes people, stop ladder, maintenance failure information sharing to elevator maintenance unit and elevator maintenance staff;Middle by elevator maintenance staff's maintenance The key node information sharing of work is to Tenement and user;Middle by elevator service evaluation share to elevator maintenance company and Maintenance people.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is overall flow frame diagram of the present invention;
Fig. 2 is process component of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution: the method for elevator maintenance and estate management shared data referring to FIG. 1-2, The following steps are included:
The elevator property public platform logged in maintenance staff is logged in Step 1: establishing and being respectively used to property user;
Step 2: user can select troublshooting module in property public platform, the relevant information of elevator, publication electricity are utilized The fault message that ladder occurs, and generate elevator service work order;
Step 3: by the middle basic information according to related elevator, and Auto-matching updates the maintenance list of corresponding elevator The public platform information of position, and middle platform automatically creates job order according to elevator service work order in Elevator Service System, and will send work Single name with elevator property public platform is pushed to elevator maintenance staff and carries out order;
Step 4: job placement and degree of priority of the maintenance staff according to elevator maintenance company, receive elevator maintenance company Job order or due to carrying out sign-out operation when other reasons cannot carry out maintenance as required, and generate maintenance work order;
Step 5: maintenance staff require according to maintenance work order, start to carry out maintenance work by each requirement, and middle platform is more New maintenance work order state, updating elevator service work order state is " in maintenance ";
Step 6: after maintenance staff complete each maintenance requirement, confirmation of finally signing at maintenance brief summary is completed maintenance and is appointed Business;
Step 7: middle platform updates maintenance work order state according to the signature confirmation message of maintenance staff, elevator service work is updated Single state is " maintenance completion ", and the more new state of elevator service work order is pushed into the property transported in property public platform by middle platform User.
Further embodiment is property user public platform and maintenance staff's public platform difference in the step 1 For obtaining the identity information and matched application permission of corresponding personnel.
Further embodiment is that the relevant information of the elevator in the step 2 includes that can be used for property public platform The two-dimensional barcode information of identification and the location information of elevator;Elevator occur fault message include elevator close people, stop ladder and its His maintenance failure information.
Further embodiment is that in the step 4 after generating maintenance work order, middle can automatically update maintenance Work order state, and updating elevator service work order state is " order ", and middle platform pushes away the more new state of elevator service work order To the property user being transported in property public platform.
Further embodiment is, can in the step 7 after property user receives " maintenance completion " information To be objectively evaluated to elevator service result, and evaluation information is updated in " evaluation " information bank in middle, and Middle can automatically update evaluation information the related maintenance staff being pushed into transport in elevator public platform;
It should be noted that can close people using method of the invention when elevator occurs for elevator, stop ladder, maintenance failure When, user can use wechat public platform publication elevator close people, stop ladder, maintenance failure, middle service by elevator close people, stop ladder, Maintenance failure information sharing is to elevator maintenance unit and elevator maintenance staff;The middle key that elevator maintenance staff's maintenance works Nodal information shares to Tenement and user;Elevator service evaluation is shared to elevator maintenance company and maintenance people by middle, in The data of lift facility, owner's information and lift facility, maintenance engineer in elevator maintenance in the shared estate management of platform.When After user issues elevator people from pass, stops ladder, maintenance failure information, corresponding maintenance list in middle Auto-matching elevator basic information Position, and elevator service demand is pushed to the maintenance staff in elevator wechat public platform.Maintenance staff carry out elevator maintenance work When, middle is pushed to the key node message that elevator maintenance works the user in property public platform.End user, property list Position, elevator maintenance company, maintenance staff share same information source.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (5)

1. the method for elevator maintenance and estate management shared data, it is characterised in that: the following steps are included:
The elevator property public platform logged in maintenance staff is logged in Step 1: establishing and being respectively used to property user;
Step 2: user can select troublshooting module in property public platform, using the relevant information of elevator, issues elevator and go out Existing fault message, and generate elevator service work order;
Step 3: by the middle basic information according to related elevator, and Auto-matching updates the maintenance unit of corresponding elevator Public platform information, and middle platform automatically creates job order according to elevator service work order in Elevator Service System, and by job order with The name of elevator property public platform is pushed to elevator maintenance staff and carries out order;
Step 4: job placement and degree of priority of the maintenance staff according to elevator maintenance company, receive elevator maintenance company and send work Singly or due to carrying out sign-out operation when other reasons cannot carry out maintenance as required, and maintenance work order is generated;
Step 5: maintenance staff require according to maintenance work order, start to carry out maintenance work by each requirement, and middle platform updates dimension Work order state is protected, updating elevator service work order state is " in maintenance ";
Step 6: after maintenance staff complete each maintenance requirement, maintenance task is completed in confirmation of finally signing at maintenance brief summary;
Step 7: middle platform updates maintenance work order state according to the signature confirmation message of maintenance staff, elevator service work order shape is updated State is " maintenance completion ", and the more new state of elevator service work order is pushed into the property transported in property public platform and used by middle platform Family.
2. the method for elevator maintenance and estate management shared data according to claim 1, it is characterised in that: the step Property user public platform and maintenance staff's public platform in one be respectively used to obtain the identity information of corresponding personnel and with its phase Matched application permission.
3. the method for elevator maintenance and estate management shared data according to claim 1, it is characterised in that: the step The relevant information of elevator in two includes the two-dimensional barcode information that can be used for the identification of property public platform and the location information of elevator;Electricity The fault message that ladder occurs includes that elevator closes people, stops ladder and other maintenance failure information.
4. the method for elevator maintenance and estate management shared data according to claim 1, it is characterised in that: the step In four after generating maintenance work order, middle can automatically update maintenance work order state, and updating elevator service work order state is " to have connect It is single ", and the more new state of elevator service work order is pushed into the property user being transported in property public platform by middle platform.
5. the method for elevator maintenance and estate management shared data according to claim 1, it is characterised in that: the step In seven after property user receives " maintenance completion " information, elevator service result can be objectively evaluated, and will evaluation In " evaluation " information bank in information update to middle, and evaluation information can be automatically updated and be pushed into transport to elevator public affairs by middle platform Related maintenance staff in many numbers.
CN201910613422.9A 2019-07-09 2019-07-09 The method of elevator maintenance and estate management shared data Pending CN110309929A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910613422.9A CN110309929A (en) 2019-07-09 2019-07-09 The method of elevator maintenance and estate management shared data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910613422.9A CN110309929A (en) 2019-07-09 2019-07-09 The method of elevator maintenance and estate management shared data

Publications (1)

Publication Number Publication Date
CN110309929A true CN110309929A (en) 2019-10-08

Family

ID=68079478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910613422.9A Pending CN110309929A (en) 2019-07-09 2019-07-09 The method of elevator maintenance and estate management shared data

Country Status (1)

Country Link
CN (1) CN110309929A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111709541A (en) * 2020-06-05 2020-09-25 航电建筑科技(深圳)有限公司 Property equipment maintenance work order transaction flow method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105293236A (en) * 2015-10-13 2016-02-03 张泽锋 Elevator repairing and maintaining monitoring system
CN205151423U (en) * 2015-10-13 2016-04-13 张泽锋 Maintenance supervisory systems is maintained to elevator
CN206100061U (en) * 2016-08-26 2017-04-12 重庆市质量和标准化研究院 Supervisory systems is protected to elevator dimension based on internet of things
CN106586753A (en) * 2017-01-24 2017-04-26 南京新蓝摩显示技术有限公司 Intelligent handling system and method for elevator failure repair
CN107368898A (en) * 2017-06-30 2017-11-21 佛山职业技术学院 A kind of intelligence report barrier maintenance monitoring method
CN107473040A (en) * 2017-09-22 2017-12-15 阳泉市联宇星信息技术有限公司 Special safety equipment operation state supervision monitoring method and device based on SAAS and Beacon

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105293236A (en) * 2015-10-13 2016-02-03 张泽锋 Elevator repairing and maintaining monitoring system
CN205151423U (en) * 2015-10-13 2016-04-13 张泽锋 Maintenance supervisory systems is maintained to elevator
CN206100061U (en) * 2016-08-26 2017-04-12 重庆市质量和标准化研究院 Supervisory systems is protected to elevator dimension based on internet of things
CN106586753A (en) * 2017-01-24 2017-04-26 南京新蓝摩显示技术有限公司 Intelligent handling system and method for elevator failure repair
CN107368898A (en) * 2017-06-30 2017-11-21 佛山职业技术学院 A kind of intelligence report barrier maintenance monitoring method
CN107473040A (en) * 2017-09-22 2017-12-15 阳泉市联宇星信息技术有限公司 Special safety equipment operation state supervision monitoring method and device based on SAAS and Beacon

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111709541A (en) * 2020-06-05 2020-09-25 航电建筑科技(深圳)有限公司 Property equipment maintenance work order transaction flow method

Similar Documents

Publication Publication Date Title
Martínez et al. Rural telemedicine for primary healthcare in developing countries
CN110335187A (en) A kind of smart city operating system
CN102364921A (en) Realization method and equipment for enterprise service bus and corresponding platform
CN107835240A (en) A kind of standard is uniformly accessed into the multi-vendor access system of platform and cut-in method
CN103366255A (en) Innovative social management intelligent network platform
ES2909530T3 (en) Secure mobile information system
CN106384312A (en) Tour group service management platform
CN104253810A (en) Safe login method and system
CN107453780A (en) A kind of calendar information synchronous method, device and system
CN107302564A (en) Event information processing method, device, computer equipment and storage medium
CN106683244A (en) Key distribution system and key distributing and sending/receiving method
CN101739603B (en) Concentrate shared digital urban management application platform system and implementation method
CN110309929A (en) The method of elevator maintenance and estate management shared data
CN103379015B (en) The data transmission method of Website server and IM client and its device and system
US20230377700A1 (en) Method and distributed ledger system for supporting sharing of digital health data of travelers in a travel environment
Lu et al. System wide information management for heterogeneous information sharing and interoperability
Irvine et al. The C hristchurch earthquake: Dialysis experience and emergency planning
Porter et al. Local health department 2009 H1N1 influenza vaccination clinics—CDC staffing model comparison and other best practices
CN113380389B (en) Intelligent regional medical first-aid method, system architecture, equipment and storage medium
CN115134378A (en) Block chain intelligent medical system
Fizzell et al. Blessings in disguise: public health emergency preparedness for World Youth Day 2008
CN104283893B (en) Receiving method and server in a kind of security information
CN104618494A (en) Method for configuring service rules of intelligent storage cabinet online
CN104661188A (en) Police dispatching desk management method and system based on database sharing mode
CN109377027A (en) A kind of electric business enterprise incubator management platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191008