CN110309924A - Production management device, method and storage equipment - Google Patents
Production management device, method and storage equipment Download PDFInfo
- Publication number
- CN110309924A CN110309924A CN201810230851.3A CN201810230851A CN110309924A CN 110309924 A CN110309924 A CN 110309924A CN 201810230851 A CN201810230851 A CN 201810230851A CN 110309924 A CN110309924 A CN 110309924A
- Authority
- CN
- China
- Prior art keywords
- maintenance
- production management
- notice
- information
- management device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 88
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 54
- 238000003860 storage Methods 0.000 title claims abstract description 34
- 238000012423 maintenance Methods 0.000 claims abstract description 110
- 238000007726 management method Methods 0.000 claims abstract description 70
- 230000008569 process Effects 0.000 claims abstract description 67
- 230000008439 repair process Effects 0.000 claims abstract description 9
- 238000012545 processing Methods 0.000 claims description 8
- 238000013523 data management Methods 0.000 claims description 4
- 238000003745 diagnosis Methods 0.000 claims description 4
- 238000004458 analytical method Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000007689 inspection Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 238000012550 audit Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Abstract
The present invention provides a kind of production management device, is suitable for more process equipments of management, the production management device includes: display unit;Processor is adapted for carrying out each instruction;And storage equipment, it is suitable for storing a plurality of instruction, described instruction is suitable for being loaded and being executed by the processor: obtaining the operation information of more process equipments;The operation information is analyzed, judges whether work need to be sent to repair;If judgement need to send work to be repaired, corresponding maintenance personal is searched, the notice of maintenance process is issued.The present invention proposes a kind of production management method and storage equipment simultaneously.
Description
Technical field
The present invention relates to information-oriented production management field, in particular to a kind of production management device, method and storage equipment.
Background technique
With being increasing for plant produced product variety, the continuous improvement of production technology complexity, existing factory
Many process equipments are generally included in production line, cause information relevant to production process increasing, and manager is in face of all
When multi information, it is more difficult to effective management is executed, so that the efficiency of management is low.Also, production process is increasing brought
Another problem is process equipment Frequent Troubles, if the failure of process equipment can not solve in time, can reduce production efficiency.
Summary of the invention
In view of the above situation, it is necessary to a kind of production management system and method are provided, to solve the above problems.
The present invention provides a kind of production management device, is suitable for more process equipments of management, the production management device packet
It includes: display unit;Processor is adapted for carrying out each instruction;And storage equipment, be suitable for storing a plurality of instruction, described instruction be suitable for by
The processor is loaded and is executed: obtaining the operation information of more process equipments;The operation information is analyzed, judgement is
It is no work to be sent to repair;If judgement need to send work to be repaired, corresponding maintenance personal is searched, the notice of maintenance process is issued.
The present invention also provides a kind of production management method, the method includes the steps: obtain the operation of more process equipments
Information;The operation information is analyzed, judges whether work need to be sent to repair;If judgement need to send work to be repaired, search corresponding
Maintenance personal issues the notice of maintenance process.
The present invention also provides a kind of storage equipment, the storage equipment stores a plurality of instruction, and described instruction is suitable for by handling
Device is loaded and is executed: obtaining the operation information of more process equipments;The operation information is analyzed, judges whether that work need to be sent
Maintenance;If judgement need to send work to be repaired, corresponding maintenance personal is searched, the notice of maintenance process is issued.
Above-mentioned production management device, method and storage equipment can operation information to more process equipments in factory into
Row acquisition and analysis, solve the various catastrophic failures of process equipment, to improve production efficiency and the efficiency of management in time.
Detailed description of the invention
Fig. 1 is the module diagram of the production management device of embodiment of the present invention.
Fig. 2 is the module diagram of the production management system of embodiment of the present invention.
Fig. 3 is the module diagram of the information management module of embodiment of the present invention.
Fig. 4 be embodiment of the present invention production management method flow diagram.
Main element symbol description
The present invention that the following detailed description will be further explained with reference to the above drawings.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real
Applying mode, the present invention will be described in detail.It should be noted that in the absence of conflict, presently filed embodiment and reality
The feature applied in mode can be combined with each other.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, described embodiment
It is only some embodiments of the invention, rather than whole embodiments.Based on the embodiment in the present invention, this field is general
Logical technical staff all other embodiment obtained without making creative work, belongs to protection of the present invention
Range.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool
The purpose of the embodiment of body, it is not intended that the limitation present invention.
Term " and or " used herein includes any and all groups of one or more relevant listed items
It closes.
Referring to FIG. 1, Fig. 1 is the functional block diagram of the production management device 100 of an embodiment of the present invention.It is described
Production management device 100 is for being managed the information of more process equipments 200 in factory.Production management device 100 with
Establishing between each process equipment 200 has communication connection.The process equipment 200 is, for example, numerically controlled processing equipment, Milling Process
Equipment etc., but not limited to this.The classification of more process equipments 200 can be identical, can also be different.
The production management device 100 includes processor 10, storage equipment 20 and display unit 30.The storage equipment
20, display unit 30 is electrically connected with the processor 10 respectively.
The processor 10 can be central processing unit, digital signal processor or single-chip microcontroller etc., be adapted for carrying out each finger
It enables.
The storage equipment 20 can store the basic document, every of the classification information of more process equipments 200, fault code
Maintenance personal corresponding to platform process equipment 200, maintenance personal, breakdown maintenance personnel corresponding to every kind of fault category it is basic
Data etc..
It is understood that the storage equipment 20 can be hard disk, floppy disk, USB flash disk, random access memory etc..
In an at least embodiment, the storage equipment 20 can be storage inside system, such as flash memory, random to read
Memory RAM, the memory ROM that can be read.
In an at least embodiment, the storage equipment 20 can also be a storage system, such as video disc, storage
Card or data storage medium.The storage equipment 20 further includes unstable or stable storage equipment.
In an at least embodiment, the storage equipment 20 includes two or more storage equipment, for example, wherein one
A storage equipment is memory body, and it is hard disk drive that another one, which store equipment,.In addition, the storage equipment 20 can also be complete
Portion or part are independently of the production management device 100.
The display unit 30 for showing process equipment 200 and the relevant much information of production, for maintenance personal or
Administrative staff check.
Referring to FIG. 2, for the module diagram of production management system 2 in an embodiment of the present invention.The production management
System 2 is applied on the production management device 100.The production management system 2 includes multiple modules.The multiple module packet
Data obtaining module 21, information analysis module 22 are included, repairs and work module 23, maintenance is sent to reassign module 24, maintenance record module 25
And information management module 26.In one embodiment, data obtaining module 21, information analysis module 22, maintenance send work module 23,
It is to be stored in depositing for the production management device 100 that module 24, maintenance record module 25 and information management module 26 are reassigned in maintenance
It stores up in equipment 20, performed by the processor 10 of the production management device 100 and can complete fixed function
Series of computation machine program instruction section.In other embodiments, multiple modules of the production management system 2 are solidification in place
The hardware cell for managing device 10, for example, solidifies in the firmware of processor 10.
The data obtaining module 21 is used to obtain the operation information of more process equipments 200 in factory, the operation letter
Breath include operate normally in, it is standby in and it is faulty.
In the present embodiment, every process equipment 200 can acquire its operation information, production management device 100 respectively with
Every foundation of process equipment 200 has communication connection, and the data obtaining module 21 is used to receive the sending of every process equipment 200
Operation information.
In another embodiment, the operation information of more process equipments 200 can be by an information collecting device (not shown)
It is acquired, the information collecting device may include monitor.The data obtaining module 21 is for receiving the information collection dress
Set the operation information of sending.
The information analysis module 22 is used to receive the operation information of data obtaining module sending, and to the operation information
It is analyzed and is classified, judge whether there is failure, and judge whether faulty process equipment 200 needs that work is sent to be repaired.
The maintenance sends work module 23 for receiving the judging result of the sending of information analysis module 22, and there are failures for lookup
Maintenance personal corresponding to process equipment 200, and issue the notice of maintenance process.The notice of the maintenance process can be by short
Letter, mail or network are sent on the mobile terminal apparatus of maintenance personal corresponding to faulty process equipment 200.
The request that the maintenance reassigns module 24 to reassign for judging whether there is maintenance, the request that processing maintenance is reassigned,
And issue the notice that maintenance is reassigned.The request that the maintenance is reassigned i.e. request tasks other maintenance people by current maintenance personal
Member, can be inputted by maintenance personal.
The maintenance record module 25 is used to receive the maintenance of maintenance personal's input as a result, and storing the record of maintenance.
Referring to figure 3., the information management module 26 produces relevant multinomial information for managing comprising data management
Submodule 261, maintenance management submodule 262, maintenance care submodule 263, distributed diagnosis submodule 264, spare unit manage submodule
Block 265 and report management submodule 266.The information management module 26 treated every terms of information is carried out by display unit 30
Display.
The data management submodule 261 is used to manage the basic document of more process equipments 200, including process equipment
Classification, fault code basic document, maintenance personal's basic document, the corresponding process equipment 200 in region, the corresponding responsibility in region
People, system parameter, performance appraisal parameter, mail notification time interval, heavy industry information etc..
Maintenance management module 262 is used to manage the list maintenance for sending work maintenance, supervisor to send work maintenance and process equipment manually
Etc. information.What the information that management send work to be repaired manually received that maintenance personal inputs reassigns request, and request will be reassigned to be sent to
Module 24 is reassigned in maintenance.The supervisor sends work maintenance for receiving the msu message for reassigning request of supervisor's input.
The maintenance care submodule 263 is for management and maintance type, maintenance project, maintenance content, maintenance project, maintenance
The information such as change of plan, Production Supervisor's audit, maintenance resume report, maintenance progress report, patrol plan, inspection progress report.
Distributed diagnosis submodule 264 examines the information such as core for management point inspection classification, point inspection content, point inspection resume, point.
Spare unit management submodule 265 for manage warehouse basic document, warehouse in-out-storehouse management, spare unit go out be put in storage detail,
Spare unit neck moves back the information such as resume report and spare unit inquiring stock report.
Report management submodule 266 transfers rate report, equipment loss working hour for supervisor desk calendar history Status Reporting, equipment
Report, loss working hour subdivision report, board alarm inquiry, performance report, fault data report, maintenance man-hours report query, report
Alert timeout treatment report manually sends work information report, repeatedly sends the information such as work day will, equipment performance appraisal report.
It is the control method for being applied to the production management device 100 in an embodiment of the present invention please also refer to Fig. 4
Flow chart.The control method is only a kind of example, because there are many kinds of the modes for implementing the method.Next it to describe
Numerical-control processing method can be performed by module shown in Fig. 2.One or more step that each segment represents in Fig. 4
Suddenly, method or sub-process etc. are as performed by exemplary method.Exemplary method is by step 410.
S410: the operation information of more process equipments 200 is obtained.Specifically, the data obtaining module 21 obtains factory
The operation information of interior all process equipment 200 or part process equipment 200.The operation information include operate normally in, to
It is in machine and faulty.
In the present embodiment, every process equipment 200 acquires its operation information respectively, and production management device 100 is distinguished
There is communication connection with every foundation of process equipment 200, so that the data obtaining module 21 receives the sending of every process equipment 200
Operation information.
S420: analyzing the operation information, judges whether work need to be sent to repair.Specifically, the information analysis mould
Block 22 receives the operation information that data obtaining module 21 issues, and the operation information is analyzed and classified, and judges whether
It is faulty, and judge whether faulty process equipment 200 needs that work is sent to be repaired.If the determination result is YES, then it enters step
S430, if judging result be it is no, terminate.
S430: searching corresponding maintenance personal, issues the notice of maintenance process.
If the determination result is YES, the maintenance sends work module 23 to receive the information that information analysis module 22 issues, and lookup is deposited
The maintenance personal corresponding to the process equipment 200 of failure, and issue the notice of maintenance process.Work module 23 is sent in the maintenance
Corresponding maintenance personal can be searched according to the classification of failure.The notice of the maintenance process can be sent out by short message, mail or network
It is sent on the mobile terminal apparatus of maintenance personal corresponding to faulty process equipment 200.
S440: the request that maintenance is reassigned is judged whether there is.
Specifically, the maintenance reassigns module 24 to judge whether there is the request that maintenance is reassigned.If it has, then entering step
S450, if it has not, then entering step S460.
S450: the request that processing maintenance is reassigned, and issue the notice that maintenance is reassigned.
The request reassigned of the processing maintenance of module 24 is reassigned in the maintenance, searches the information of the maintenance personal after reassigning, and to
Maintenance personal after reassigning issues the notice that maintenance is reassigned.The notice that the maintenance is reassigned equally can be by short message, mail or net
Network is sent on the mobile terminal apparatus of the maintenance personal after reassigning.
S360: the information of maintenance result is received, the record of maintenance is stored.
The maintenance record module 25 receives the information of the maintenance process result inputted by maintenance personal, and stores maintenance
Record.
Production management device 100, method and storage equipment of the invention can be to more process equipments 200 in factory
Operation information is acquired and analyzes, and grasps Production development in real time, solves the various catastrophic failures of process equipment 200 in time, from
And improve production efficiency and the efficiency of management.In addition, production management device 100 of the invention, method and storage equipment can also
More process equipments produce relevant multinomial information in integrated management factory, information to cover face wider, it is easy to use, thus into
One step improves the efficiency of management.
It is appreciated that in other embodiments, the notice of the maintenance process and it is described repair the notice reassigned can also
For sound-light alarm.
It is appreciated that in other embodiments, step S440, S450 can be omitted, as long as completing maintenance sends the logical of work
Know.
It is appreciated that in other embodiments, step S360 can be omitted.
It is appreciated that in other embodiments, the information management module 26 may also comprise data management submodule
261, maintenance management submodule 262, maintenance care submodule 263, distributed diagnosis submodule 264, spare unit management submodule 265 and
At least one of report management submodule 266 is a variety of.
Those of ordinary skill in the art will appreciate that realizing all or part of process in above embodiment, being can be with
Relevant hardware is instructed to complete by computer program, the program can be stored in a computer-readable storage medium
In, described program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.
It, can also be in addition, each functional unit in each embodiment of the present invention can integrate in same processor
It is that each unit physically exists alone, can also be integrated in same unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of hardware adds software function module.
The above-mentioned integrated unit being realized in the form of SFU software functional unit can store and computer-readable deposit at one
In storage media.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are with so that an electronics is set
It is standby (to can be hand-held electronic equipment, such as smart phone, laptop, personal digital assistant (Personal Digital
Assistant, PDA), intellectual wearable device etc., be also possible to Table top type electronic equipment, such as desktop computer, smart television)
Or processor (processor) executes the part steps of each embodiment the method for the present invention.And storage medium above-mentioned
It include: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random
Access Memory, RAM), the various media that can store program code such as magnetic or disk.
It is obvious to a person skilled in the art that the present invention is not limited to the details of above-mentioned exemplary embodiment, and
Without departing from the spirit or essential characteristics of the present invention, the present invention can be realized in other specific forms.Therefore, nothing
By from the point of view of which point, it should all regard embodiment as exemplary, and be non-limiting, the scope of the present invention is by institute
Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims
All changes are included in the present invention.Right involved in should not treating any reference in the claims as limiting is wanted
It asks.Furthermore, it is to be understood that one word of " comprising " is not excluded for other units or step, odd number is not excluded for plural number.It is stated in system claims
Multiple units or system can also be implemented through software or hardware by the same unit or system.The first, the second equal words
Language is used to indicate names, and is not indicated any particular order.
Finally it should be noted that embodiment of above is only used to illustrate the technical scheme of the present invention and not to limit it, although ginseng
It is described the invention in detail according to better embodiment, those skilled in the art should understand that, it can be to this hair
Bright technical solution is modified or equivalent replacement, without departing from the spirit and scope of the technical solution of the present invention.
Claims (10)
1. a kind of production management device, suitable for managing the information of more process equipments, which is characterized in that the production management dress
It sets and includes:
Display unit;
Processor is adapted for carrying out each instruction;And
Equipment is stored, is suitable for storing a plurality of instruction, described instruction is suitable for being loaded and being executed by the processor:
Obtain the operation information of more process equipments;
The operation information is analyzed, judges whether work need to be sent to repair;
If judgement need to send work to be repaired, corresponding maintenance personal is searched, the notice of maintenance process is issued.
2. production management device as described in claim 1, which is characterized in that described instruction is suitable for by processor load simultaneously
It executes:
After the notice for issuing maintenance process, the information of maintenance result is received, and stores the record of maintenance.
3. production management device as described in claim 1, which is characterized in that described instruction is suitable for by processor load simultaneously
It executes:
After the notice for issuing maintenance process, the request that maintenance is reassigned is judged whether there is;
If judgement has the request that processing maintenance is reassigned, the request that maintenance is reassigned is handled, and issues the notice that maintenance is reassigned.
4. production management device as described in claim 1, which is characterized in that be stored with every processing in the storage equipment and set
The information of standby corresponding maintenance personal.
5. production management device as described in claim 1, which is characterized in that the notice of the maintenance process passes through short message, postal
Part or network are sent on the mobile terminal apparatus of maintenance personal.
6. production management device as described in claim 1, which is characterized in that described instruction is suitable for by processor load simultaneously
It executes:
It manages in production information, including data management, maintenance management, maintenance care, distributed diagnosis, spare unit management and report management
It is one or more, the production information is shown by the display unit.
7. a kind of production management method, which is characterized in that the method includes the steps:
Obtain the operation information of more process equipments;
The operation information is analyzed, judges whether work need to be sent to repair;
If judgement need to send work to be repaired, corresponding maintenance personal is searched, the notice of maintenance process is issued.
8. production management method as claimed in claim 7, which is characterized in that the method also includes:
After the notice for issuing maintenance process, the information of maintenance result is received, and stores the record of maintenance.
9. production management method as claimed in claim 7, which is characterized in that the method also includes:
After the notice for issuing maintenance process, the request that maintenance is reassigned is judged whether there is;
The request that processing maintenance is reassigned, and issue the notice that maintenance is reassigned.
10. a kind of storage equipment, which is characterized in that the storage equipment stores a plurality of instruction, and described instruction is suitable for by processor
It loads and executes:
Obtain the operation information of more process equipments;
The operation information is analyzed, judges whether work need to be sent to repair;
If judgement need to send work to be repaired, corresponding maintenance personal is searched, the notice of maintenance process is issued.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810230851.3A CN110309924A (en) | 2018-03-20 | 2018-03-20 | Production management device, method and storage equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810230851.3A CN110309924A (en) | 2018-03-20 | 2018-03-20 | Production management device, method and storage equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110309924A true CN110309924A (en) | 2019-10-08 |
Family
ID=68073506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810230851.3A Pending CN110309924A (en) | 2018-03-20 | 2018-03-20 | Production management device, method and storage equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110309924A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112950068A (en) * | 2021-03-30 | 2021-06-11 | 中交第三航务工程局有限公司 | Scheduling management system for intelligent ship management system |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002140446A (en) * | 2000-10-31 | 2002-05-17 | Kawasaki Heavy Ind Ltd | Maintenance management system |
CN101022385A (en) * | 2007-03-29 | 2007-08-22 | 王忠伟 | Interconnection network-based long-distance monitering system and monitoring method |
US20090089140A1 (en) * | 2007-09-28 | 2009-04-02 | Fujitsu Limited | Support management method, support management system and information processing device |
US20100131643A1 (en) * | 2008-11-21 | 2010-05-27 | Hitachi, Ltd. | Remotely managed device |
CN202522900U (en) * | 2011-12-09 | 2012-11-07 | 深圳市万科物业服务有限公司 | Remote monitoring management system for property equipment |
CN105373839A (en) * | 2015-12-15 | 2016-03-02 | 国网北京市电力公司 | Intelligent worksheet dispatching method and apparatus |
CN106448083A (en) * | 2016-10-14 | 2017-02-22 | 国网山东省电力公司泰安供电公司 | Power equipment fault wireless alarm apparatus and method |
CN206060359U (en) * | 2016-09-28 | 2017-03-29 | 石家庄科林电气股份有限公司 | A kind of Centralized Monitoring operational system of photovoltaic power station |
CN106951966A (en) * | 2017-02-17 | 2017-07-14 | 深圳市嘉力达节能科技股份有限公司 | Device management method and system |
CN107491871A (en) * | 2017-08-15 | 2017-12-19 | 深圳达实智能股份有限公司 | A kind of hospital's electromechanical equipment fault alarm closed-loop management method and its terminal |
-
2018
- 2018-03-20 CN CN201810230851.3A patent/CN110309924A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002140446A (en) * | 2000-10-31 | 2002-05-17 | Kawasaki Heavy Ind Ltd | Maintenance management system |
CN101022385A (en) * | 2007-03-29 | 2007-08-22 | 王忠伟 | Interconnection network-based long-distance monitering system and monitoring method |
US20090089140A1 (en) * | 2007-09-28 | 2009-04-02 | Fujitsu Limited | Support management method, support management system and information processing device |
US20100131643A1 (en) * | 2008-11-21 | 2010-05-27 | Hitachi, Ltd. | Remotely managed device |
CN202522900U (en) * | 2011-12-09 | 2012-11-07 | 深圳市万科物业服务有限公司 | Remote monitoring management system for property equipment |
CN105373839A (en) * | 2015-12-15 | 2016-03-02 | 国网北京市电力公司 | Intelligent worksheet dispatching method and apparatus |
CN206060359U (en) * | 2016-09-28 | 2017-03-29 | 石家庄科林电气股份有限公司 | A kind of Centralized Monitoring operational system of photovoltaic power station |
CN106448083A (en) * | 2016-10-14 | 2017-02-22 | 国网山东省电力公司泰安供电公司 | Power equipment fault wireless alarm apparatus and method |
CN106951966A (en) * | 2017-02-17 | 2017-07-14 | 深圳市嘉力达节能科技股份有限公司 | Device management method and system |
CN107491871A (en) * | 2017-08-15 | 2017-12-19 | 深圳达实智能股份有限公司 | A kind of hospital's electromechanical equipment fault alarm closed-loop management method and its terminal |
Non-Patent Citations (1)
Title |
---|
宋昕等: "制造企业生产设备维护系统设计", 《科技广场》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112950068A (en) * | 2021-03-30 | 2021-06-11 | 中交第三航务工程局有限公司 | Scheduling management system for intelligent ship management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ding | Study of smart warehouse management system based on the IOT | |
Fusko et al. | Basics of designing maintenance processes in Industry 4.0. | |
KR101808702B1 (en) | Enterprise Diagnostic Method Using Enterprise Diagnosis And Evaluation Integration System | |
Wang et al. | A new-generation automated warehousing capability | |
Wang et al. | A hybrid-data-on-tag–enabled decentralized control system for flexible smart workpiece manufacturing shop floors | |
CN115423289B (en) | Intelligent plate processing workshop data processing method and terminal | |
Costa et al. | Improving visibility using RFID–the case of a company in the automotive sector | |
Saygin et al. | RFID-enabled shared resource management for aerospace maintenance operations: a dynamic resource allocation model | |
CN112184005A (en) | Operation task classification method, device, equipment and storage medium | |
CN110599093A (en) | Airport luggage full-flow tracking method and system | |
CN113988725A (en) | System and method for managing and controlling full life cycle of equipment by using record carrier | |
Pradhan et al. | A Novel IIoT Based ERP-PLM System for MSME of Indian Market | |
CN110309924A (en) | Production management device, method and storage equipment | |
KR100850785B1 (en) | A Intelligent Regular Auditing System and A Auditing Methode thereof | |
CN113592378A (en) | BOM construction method and management system of large complex equipment | |
CN107730081A (en) | A kind of data acquisition analysis method and system based on RFID technique | |
CN110586485A (en) | Airport luggage emergency sorting method and system based on RFID technology | |
CN110458455A (en) | A kind of employee's adjustmenting management method and system | |
CN115423361A (en) | Data processing method and device for risk view, storage medium and equipment | |
CN115860465A (en) | Enterprise associated data processing early warning method, system and device | |
CN115292580A (en) | Data query method and device, computer equipment and storage medium | |
WO2021111558A1 (en) | Information processing device, control method, and storage medium | |
CN111026705A (en) | Building engineering file management method, system and terminal equipment | |
CN111352968A (en) | Intelligent manufacturing element identification method based on block chain network | |
KR100958969B1 (en) | Estimation Method and Corporation Support by using Module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 451162 the second and third floors of building B07, zone B, comprehensive bonded zone, east side of Zhenxing Road, Hangkong District, Zhengzhou City, Henan Province Applicant after: Fulian Yuzhan Technology (Henan) Co.,Ltd. Address before: 451162 the second and third floors of building B07, zone B, comprehensive bonded zone, east side of Zhenxing Road, Hangkong District, Zhengzhou City, Henan Province Applicant before: HENAN YUZHAN PRECISION TECHNOLOGY Co.,Ltd. |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191008 |