CN110306768A - The auxiliary stand and its construction method of hang ceiling panel are installed - Google Patents
The auxiliary stand and its construction method of hang ceiling panel are installed Download PDFInfo
- Publication number
- CN110306768A CN110306768A CN201910580931.6A CN201910580931A CN110306768A CN 110306768 A CN110306768 A CN 110306768A CN 201910580931 A CN201910580931 A CN 201910580931A CN 110306768 A CN110306768 A CN 110306768A
- Authority
- CN
- China
- Prior art keywords
- ceiling panel
- hang ceiling
- connecting rod
- sunpender
- auxiliary stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 230000001681 protective effect Effects 0.000 claims abstract description 3
- 210000002445 nipple Anatomy 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 10
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 239000000956 alloy Substances 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1838—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
- E04F21/1844—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
- E04F21/185—Temporary edge support brackets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to building engineerings to fit up field, especially a kind of auxiliary stand and its construction method for installing hang ceiling panel.Including rack body, rack body includes sunpender and connecting rod, and there are two sunpender settings, and one end of each sunpender is provided with hook, is connected between two sunpenders by connecting rod;Protective case cylinder is cased with outside connecting rod.Present invention reduces the labor intensity of construction personnel, improve work efficiency, and reduce because construction it is inconvenient caused by the risk damaged of hang ceiling panel.
Description
Technical field
The present invention relates to building engineering fit up field, especially it is a kind of install hang ceiling panel auxiliary stand and its apply
Work method.
Background technique
With the development of the social economy, the standard of the standard of life, working environment is continuously improved in people, it is raw to reach
It lives, handle official business comfortably, while the effect of indoor beauty, office and household house generally use furred ceiling.In numerous ceiling tiles
In, plasterboard, ecological formwork hang ceiling panel, due to the generous main material as ceiling material of cheap floral designs brief introduction
Material.Ceiling tile is generally several size classes such as 400mm*400mm, 500mm*500mm, 600mm*600mm, 800mm*800mm
Type, for the installation of traditional hang ceiling panel using manually installing, when installation, needs construction personnel to lift hang ceiling panel for a long time, and
It needs constantly to adjust panel angle and hang ceiling panel is placed on keel, hang ceiling panel installation could be completed.It is applied in installation process
Worker person's large labor intensity, installation effectiveness is low, high labor cost.
Summary of the invention
In order to solve the above technical problems, the present invention proposes that a kind of reduction is constructed old, the installation furred ceiling of working efficiency is improved
The auxiliary stand and its construction method of panel.
The present invention adopts the following technical scheme:
A kind of auxiliary stand for installing hang ceiling panel, including rack body, rack body include sunpender and connecting rod, sunpender setting
There are two, one end of each sunpender is provided with hook, is connected between two sunpenders by connecting rod;Protective case is cased with outside connecting rod
Cylinder.
A kind of construction method of auxiliary stand that installing hang ceiling panel, carries out as follows:
A kind of construction method of auxiliary stand that installing hang ceiling panel, carries out as follows:
(1) keel are first lifted according to the size of hang ceiling panel, main joist and secondary joist are combined into multiple square frames;
(2) diagonal position by rack body along the square frame lifted is hung on keel;
(3) hang ceiling panel is placed in connecting rod, the protection sleeve along connecting rod tilts upward promotion, until rack body entirety
It is placed on square frame, four angles of hang ceiling panel are placed on the four edges of square frame;
(4) rack body is removed, the angle of horizontal adjustment hang ceiling panel makes four sides of hang ceiling panel ride over square frame
On four sides, i.e., one piece of hang ceiling panel is installed;
(5) step (1) to (4) are repeated, remaining hang ceiling panel is installed.
Compared with prior art, the beneficial effects of the present invention are:
The present invention significantly reduces the labor intensity of construction personnel, improves work efficiency, caused by reducing because of construction inconvenience
Hang ceiling panel destroy, save project inputs cost.
Further, the preferred embodiment that this whose invention uses is:
The side of sunpender is provided with hook, and the other side is provided with nipple.
Hook is placed in the upper end of sunpender.
The both ends of connecting rod are respectively arranged with the threaded hole connecting with nipple.
Sunpender and connecting rod are all made of aluminum alloy material.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of sunpender;
Fig. 3 is the structural schematic diagram of connecting rod;
Fig. 4 is scheme of installation of the invention:
In figure: sunpender 1;Hook 101;Connecting rod 2;Upper connecting rod 201;Lower connecting rod 202;Protect sleeve 3;Upper nipple 4;
Lower nipple 5;Threaded hole 6;Square frame 7;Hang ceiling panel 8.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further described.
A kind of auxiliary stand for installing hang ceiling panel, including rack body, rack body are made of sunpender 1 and connecting rod 2,
Sunpender 1 and connecting rod 2 are all made of aluminium alloy, and there are two the settings of sunpender 1, and the structure of two sunpenders 1 is identical, two sunpenders 1
Between by connecting rod 2 connect (as shown in Figure 1).
As shown in Fig. 2, the upper end of each sunpender 1 is respectively arranged with hook 101, two hooks 101 are respectively placed in respective institute
In the outside (as shown in Figure 1) of sunpender 1, the inside of each sunpender 1 is respectively arranged with upper and lower two nipple ((nipples
Can also be replaced with dismountable screw)), the middle part of sunpender 1, lower screw thread where two upper nipples 4 are respectively placed in respectively
The bottom of sunpender 1 where connector 5 is respectively placed in respectively.
Connecting rod 2 is provided with upper connecting rod 201 and lower connecting rod 202, and 201 both ends of upper connecting rod are respectively arranged with and two
The threaded hole 6 that the upper nipple 5 of sunpender 1 connects, the both ends of lower connecting rod 202 are respectively arranged with the lower spiral shell with two sunpenders 1
The threaded hole 6 that line connector 5 connects.
Rotatable protection sleeve 3 is set with outside every connecting rod 2.
As shown in figure 4, a kind of construction method for the auxiliary stand for installing hang ceiling panel, carries out as follows:
(1) keel are lifted, main joist and secondary joist are combined into the pros being applicable in hang ceiling panel 8 according to the size of hang ceiling panel 8
Shape frame 7.
(2) rack body is assembled, then along the diagonal position hanging bracket ontology of square frame 7.
(3) hang ceiling panel 8 is placed between upper and lower connecting rod, and lower connecting rod 202 is close in the bottom surface of hang ceiling panel 8
It protects on sleeve 3, the upper surface of hang ceiling panel 8 is close to the protection sleeve 3 of upper connecting rod 201, is tilted towards along lower connecting rod 203
Upper promotion hang ceiling panel 8, until rack body is integrally placed on square frame 7, four angles of hang ceiling panel 8 are placed on pros
On the four edges of shape frame 7.
(4) rack body is removed, the rotation of hand rest hang ceiling panel 8 makes four sides of hang ceiling panel 8 just ride over square-shaped frame
On frame 7, i.e., one piece of hang ceiling panel lifting is completed.
(5) step (1) to (4) are repeated, remaining hang ceiling panel 8 is installed.
In the present invention, the length of connecting rod 2 can change according to the actual size of hang ceiling panel 8, by increasing or decreasing
The quantity of connecting rod 2 changes the spacing between two sunpenders 1, can be connected by nipple between connecting rod 2 and connecting rod 2
It connects, for example, the length of every connecting rod 2 is set as 20mm, the size of hang ceiling panel 8 is 400mm*400mm, passes through three 20mm
Short connecting rod be connected as the long connecting rod of a 60mm, then two sunpenders 1 will be made to connect by long connecting rod.
In the present invention, by rack body along the diagonal suspension of square frame 7, two the distance between diagonal maximums make
Both sides all have a margin when hang ceiling panel 8 enters square frame 7;Upper and lower connecting rod is set on rack body, is push furred ceiling face
When plate 8 is mobile, upper connecting rod 201 plays position-limiting action to hang ceiling panel 8, will not be in pushing course, by hang ceiling panel 8 from lower company
Deviate from extension bar 202;Rack body is suspended on the diagonal position of a square frame 7, can will be near the square frame 7
Hang ceiling panel 8 conveying get on, subtracted the step of being dismounted for multiple times rack body;And the protection sleeve 3 of upper connecting rod 201 with hang
Top panel 8 relatively rotates, and the protection sleeve 3 and hang ceiling panel 8 of lower connecting rod 202 relatively rotate, and hang ceiling panel 8 is being pushed to be drop
The low labor intensity of construction personnel, improves work efficiency.
The above is only a specific embodiment of the invention, but are not limited thereto to protection of the invention, relate to this
Technical field technical staff it is thinkable to the technical program technical characteristic propose equivalent change or replacement, all cover
Within protection scope of the present invention.
Claims (6)
1. a kind of auxiliary stand for installing hang ceiling panel, including rack body, it is characterised in that: rack body includes sunpender and company
Extension bar, there are two sunpender settings, and one end of each sunpender is provided with hook, is connected between two sunpenders by connecting rod;Connection
Protective case cylinder is cased with outside bar.
2. the auxiliary stand of installation hang ceiling panel according to claim 1, it is characterised in that: the side of sunpender is provided with extension
Hook, the other side are provided with nipple.
3. the auxiliary stand of installation hang ceiling panel according to claim 1, it is characterised in that: hook is placed in the top of sunpender
Portion.
4. the auxiliary stand of installation hang ceiling panel according to claim 1, it is characterised in that: the both ends of connecting rod are set respectively
It is equipped with the threaded hole connecting with nipple.
5. the auxiliary stand of installation hang ceiling panel according to claim 1, it is characterised in that: sunpender and connecting rod are all aluminium
Alloy material is made.
6. a kind of construction method for the auxiliary stand for installing hang ceiling panel, carries out as follows:
Keel are first lifted according to the size of hang ceiling panel, main joist and secondary joist are combined into multiple square frames;
Diagonal position by rack body along the square frame lifted is hung on keel;
Hang ceiling panel is placed in connecting rod, the protection sleeve along connecting rod tilts upward promotion, until rack body is integrally set
In on square frame, four angles of hang ceiling panel are placed on the four edges of square frame;
Rack body is removed, the angle of horizontal adjustment hang ceiling panel makes four sides of hang ceiling panel ride over the four of square frame
On a side, i.e., one piece of hang ceiling panel is installed;
Step (1) to (4) are repeated, remaining hang ceiling panel is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910580931.6A CN110306768B (en) | 2019-06-29 | 2019-06-29 | Auxiliary bracket for installing ceiling panel and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910580931.6A CN110306768B (en) | 2019-06-29 | 2019-06-29 | Auxiliary bracket for installing ceiling panel and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110306768A true CN110306768A (en) | 2019-10-08 |
CN110306768B CN110306768B (en) | 2024-01-23 |
Family
ID=68079610
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910580931.6A Active CN110306768B (en) | 2019-06-29 | 2019-06-29 | Auxiliary bracket for installing ceiling panel and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110306768B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111663702A (en) * | 2020-06-16 | 2020-09-15 | 盛世瑶兰(深圳)科技有限公司 | Auxiliary support for installing ceiling panel and construction method thereof |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10163850A1 (en) * | 2001-12-20 | 2003-12-18 | Klaus-Dieter Kunze | Modular system for construction of roller system has multi-arm frame, baseplate into which two rods are plugged or screwed, several arm pairs and rollers fitted on rods by rotatable cross sleeves attachable at different heights |
CN104612307A (en) * | 2014-12-24 | 2015-05-13 | 上海中建八局装饰有限责任公司 | Suspended ceiling system and construction method thereof |
CN105133774A (en) * | 2015-09-24 | 2015-12-09 | 青岛建安建设集团有限公司 | Combined assembly type suspended ceiling reverse support system structure and designing and installing integrated method |
CN204919945U (en) * | 2015-08-21 | 2015-12-30 | 浙江银建装饰工程有限公司 | Anti - bearing structure of furred ceiling |
CN105350788A (en) * | 2015-11-23 | 2016-02-24 | 中冶天工集团有限公司 | Method for conducting suspension and equipment pipeline arrangement by means of auxiliary steel frame |
CN206158172U (en) * | 2016-09-27 | 2017-05-10 | 中国核工业华兴建设有限公司 | Entrance to a cave template |
CN206888327U (en) * | 2017-05-22 | 2018-01-16 | 江苏建设控股集团有限公司 | A kind of soft film ceiling mounting structure |
CN107816161A (en) * | 2017-10-31 | 2018-03-20 | 苏州金螳螂建筑装饰股份有限公司 | A kind of furred ceiling assembled type steel frame conversion layer |
CN109610717A (en) * | 2018-12-29 | 2019-04-12 | 贵州建工安顺建筑工程有限公司 | A kind of installation method of W font furred ceiling keelson |
CN208792600U (en) * | 2018-06-28 | 2019-04-26 | 深圳市聚丰缘设计装修工程有限公司 | A kind of assembled steel joist suspended ceiling |
-
2019
- 2019-06-29 CN CN201910580931.6A patent/CN110306768B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10163850A1 (en) * | 2001-12-20 | 2003-12-18 | Klaus-Dieter Kunze | Modular system for construction of roller system has multi-arm frame, baseplate into which two rods are plugged or screwed, several arm pairs and rollers fitted on rods by rotatable cross sleeves attachable at different heights |
CN104612307A (en) * | 2014-12-24 | 2015-05-13 | 上海中建八局装饰有限责任公司 | Suspended ceiling system and construction method thereof |
CN204919945U (en) * | 2015-08-21 | 2015-12-30 | 浙江银建装饰工程有限公司 | Anti - bearing structure of furred ceiling |
CN105133774A (en) * | 2015-09-24 | 2015-12-09 | 青岛建安建设集团有限公司 | Combined assembly type suspended ceiling reverse support system structure and designing and installing integrated method |
CN105350788A (en) * | 2015-11-23 | 2016-02-24 | 中冶天工集团有限公司 | Method for conducting suspension and equipment pipeline arrangement by means of auxiliary steel frame |
CN206158172U (en) * | 2016-09-27 | 2017-05-10 | 中国核工业华兴建设有限公司 | Entrance to a cave template |
CN206888327U (en) * | 2017-05-22 | 2018-01-16 | 江苏建设控股集团有限公司 | A kind of soft film ceiling mounting structure |
CN107816161A (en) * | 2017-10-31 | 2018-03-20 | 苏州金螳螂建筑装饰股份有限公司 | A kind of furred ceiling assembled type steel frame conversion layer |
CN208792600U (en) * | 2018-06-28 | 2019-04-26 | 深圳市聚丰缘设计装修工程有限公司 | A kind of assembled steel joist suspended ceiling |
CN109610717A (en) * | 2018-12-29 | 2019-04-12 | 贵州建工安顺建筑工程有限公司 | A kind of installation method of W font furred ceiling keelson |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111663702A (en) * | 2020-06-16 | 2020-09-15 | 盛世瑶兰(深圳)科技有限公司 | Auxiliary support for installing ceiling panel and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110306768B (en) | 2024-01-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201228207Y (en) | Portable window hoister | |
CN205577327U (en) | Metal clad sheet system is hung futilely to wall body | |
CN110306768A (en) | The auxiliary stand and its construction method of hang ceiling panel are installed | |
CN207245138U (en) | Boat scaffold adjustable in pitch | |
CN206341631U (en) | One kind suspension vertical greening device | |
CN216377268U (en) | Intelligence hoisting accessory for construction | |
CN107687263B (en) | Suspension type protection frame, protection structure and double protection method | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN207312995U (en) | One kind self-control bridge-collision-avoidance wall form hanging device | |
CN207626994U (en) | A kind of curtain rod arm facilitating installing and dismounting curtain | |
CN213015326U (en) | Hanging flower basket for construction safe in utilization | |
CN206477537U (en) | One kind exempts from base treatment vitrified tile thin plate stone material dry suspending structure | |
CN204654843U (en) | A kind of high-rise purging system of Multifunction external wall | |
CN211691525U (en) | Construction device for overhanging type inclined curtain wall | |
CN210195179U (en) | Auxiliary support for installing ceiling panel | |
CN208545949U (en) | A kind of all steel frame of portable fast and easy assembly | |
CN209455982U (en) | A kind of mobile crane for house decoration | |
CN207878812U (en) | Roofing vertically discharges the corner protective device of steel wire rope or cable | |
CN206538918U (en) | The curtain wall that a kind of convenient maintenance is changed | |
CN204356219U (en) | Transition roller table block curtain storage bracket | |
CN205687396U (en) | A kind of rotary suspension hook of wind-power tower | |
CN201943228U (en) | Lifting device for unit type curtain wall plate | |
CN204754225U (en) | Can have enough to meet need a support | |
CN204940887U (en) | The on-hook of stone curtain wall cloth | |
CN215254443U (en) | Scaffold structure is used in installation of slope wall curtain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |