Prior art keywords
ceiling panel
hang ceiling
connecting rod
sunpender
auxiliary stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910580931.6A
Other languages
Chinese (zh)
Other versions
CN110306768B (en
Inventor
于庭富
张翔飞
崔建强
王帅
范昕煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910580931.6A priority Critical patent/CN110306768B/en
Publication of CN110306768A publication Critical patent/CN110306768A/en
Application granted granted Critical
Publication of CN110306768B publication Critical patent/CN110306768B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
    • E04F21/185Temporary edge support brackets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to building engineerings to fit up field, especially a kind of auxiliary stand and its construction method for installing hang ceiling panel.Including rack body, rack body includes sunpender and connecting rod, and there are two sunpender settings, and one end of each sunpender is provided with hook, is connected between two sunpenders by connecting rod;Protective case cylinder is cased with outside connecting rod.Present invention reduces the labor intensity of construction personnel, improve work efficiency, and reduce because construction it is inconvenient caused by the risk damaged of hang ceiling panel.

Description

The auxiliary stand and its construction method of hang ceiling panel are installed
Technical field
The present invention relates to building engineering fit up field, especially it is a kind of install hang ceiling panel auxiliary stand and its apply Work method.
Background technique
With the development of the social economy, the standard of the standard of life, working environment is continuously improved in people, it is raw to reach It lives, handle official business comfortably, while the effect of indoor beauty, office and household house generally use furred ceiling.In numerous ceiling tiles In, plasterboard, ecological formwork hang ceiling panel, due to the generous main material as ceiling material of cheap floral designs brief introduction Material.Ceiling tile is generally several size classes such as 400mm*400mm, 500mm*500mm, 600mm*600mm, 800mm*800mm Type, for the installation of traditional hang ceiling panel using manually installing, when installation, needs construction personnel to lift hang ceiling panel for a long time, and It needs constantly to adjust panel angle and hang ceiling panel is placed on keel, hang ceiling panel installation could be completed.It is applied in installation process Worker person's large labor intensity, installation effectiveness is low, high labor cost.
Summary of the invention
In order to solve the above technical problems, the present invention proposes that a kind of reduction is constructed old, the installation furred ceiling of working efficiency is improved The auxiliary stand and its construction method of panel.
The present invention adopts the following technical scheme:
A kind of auxiliary stand for installing hang ceiling panel, including rack body, rack body include sunpender and connecting rod, sunpender setting There are two, one end of each sunpender is provided with hook, is connected between two sunpenders by connecting rod;Protective case is cased with outside connecting rod Cylinder.
A kind of construction method of auxiliary stand that installing hang ceiling panel, carries out as follows:
A kind of construction method of auxiliary stand that installing hang ceiling panel, carries out as follows:
(1) keel are first lifted according to the size of hang ceiling panel, main joist and secondary joist are combined into multiple square frames;
(2) diagonal position by rack body along the square frame lifted is hung on keel;
(3) hang ceiling panel is placed in connecting rod, the protection sleeve along connecting rod tilts upward promotion, until rack body entirety It is placed on square frame, four angles of hang ceiling panel are placed on the four edges of square frame;
(4) rack body is removed, the angle of horizontal adjustment hang ceiling panel makes four sides of hang ceiling panel ride over square frame On four sides, i.e., one piece of hang ceiling panel is installed;
(5) step (1) to (4) are repeated, remaining hang ceiling panel is installed.
Compared with prior art, the beneficial effects of the present invention are:
The present invention significantly reduces the labor intensity of construction personnel, improves work efficiency, caused by reducing because of construction inconvenience Hang ceiling panel destroy, save project inputs cost.
Further, the preferred embodiment that this whose invention uses is:
The side of sunpender is provided with hook, and the other side is provided with nipple.
Hook is placed in the upper end of sunpender.
The both ends of connecting rod are respectively arranged with the threaded hole connecting with nipple.
Sunpender and connecting rod are all made of aluminum alloy material.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of sunpender;
Fig. 3 is the structural schematic diagram of connecting rod;
Fig. 4 is scheme of installation of the invention:
In figure: sunpender 1;Hook 101;Connecting rod 2;Upper connecting rod 201;Lower connecting rod 202;Protect sleeve 3;Upper nipple 4; Lower nipple 5;Threaded hole 6;Square frame 7;Hang ceiling panel 8.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further described.
A kind of auxiliary stand for installing hang ceiling panel, including rack body, rack body are made of sunpender 1 and connecting rod 2, Sunpender 1 and connecting rod 2 are all made of aluminium alloy, and there are two the settings of sunpender 1, and the structure of two sunpenders 1 is identical, two sunpenders 1 Between by connecting rod 2 connect (as shown in Figure 1).
As shown in Fig. 2, the upper end of each sunpender 1 is respectively arranged with hook 101, two hooks 101 are respectively placed in respective institute In the outside (as shown in Figure 1) of sunpender 1, the inside of each sunpender 1 is respectively arranged with upper and lower two nipple ((nipples Can also be replaced with dismountable screw)), the middle part of sunpender 1, lower screw thread where two upper nipples 4 are respectively placed in respectively The bottom of sunpender 1 where connector 5 is respectively placed in respectively.
Connecting rod 2 is provided with upper connecting rod 201 and lower connecting rod 202, and 201 both ends of upper connecting rod are respectively arranged with and two The threaded hole 6 that the upper nipple 5 of sunpender 1 connects, the both ends of lower connecting rod 202 are respectively arranged with the lower spiral shell with two sunpenders 1 The threaded hole 6 that line connector 5 connects.
Rotatable protection sleeve 3 is set with outside every connecting rod 2.
As shown in figure 4, a kind of construction method for the auxiliary stand for installing hang ceiling panel, carries out as follows:
(1) keel are lifted, main joist and secondary joist are combined into the pros being applicable in hang ceiling panel 8 according to the size of hang ceiling panel 8 Shape frame 7.
(2) rack body is assembled, then along the diagonal position hanging bracket ontology of square frame 7.
(3) hang ceiling panel 8 is placed between upper and lower connecting rod, and lower connecting rod 202 is close in the bottom surface of hang ceiling panel 8 It protects on sleeve 3, the upper surface of hang ceiling panel 8 is close to the protection sleeve 3 of upper connecting rod 201, is tilted towards along lower connecting rod 203 Upper promotion hang ceiling panel 8, until rack body is integrally placed on square frame 7, four angles of hang ceiling panel 8 are placed on pros On the four edges of shape frame 7.
(4) rack body is removed, the rotation of hand rest hang ceiling panel 8 makes four sides of hang ceiling panel 8 just ride over square-shaped frame On frame 7, i.e., one piece of hang ceiling panel lifting is completed.
(5) step (1) to (4) are repeated, remaining hang ceiling panel 8 is installed.
In the present invention, the length of connecting rod 2 can change according to the actual size of hang ceiling panel 8, by increasing or decreasing The quantity of connecting rod 2 changes the spacing between two sunpenders 1, can be connected by nipple between connecting rod 2 and connecting rod 2 It connects, for example, the length of every connecting rod 2 is set as 20mm, the size of hang ceiling panel 8 is 400mm*400mm, passes through three 20mm Short connecting rod be connected as the long connecting rod of a 60mm, then two sunpenders 1 will be made to connect by long connecting rod.
In the present invention, by rack body along the diagonal suspension of square frame 7, two the distance between diagonal maximums make Both sides all have a margin when hang ceiling panel 8 enters square frame 7;Upper and lower connecting rod is set on rack body, is push furred ceiling face When plate 8 is mobile, upper connecting rod 201 plays position-limiting action to hang ceiling panel 8, will not be in pushing course, by hang ceiling panel 8 from lower company Deviate from extension bar 202;Rack body is suspended on the diagonal position of a square frame 7, can will be near the square frame 7 Hang ceiling panel 8 conveying get on, subtracted the step of being dismounted for multiple times rack body;And the protection sleeve 3 of upper connecting rod 201 with hang Top panel 8 relatively rotates, and the protection sleeve 3 and hang ceiling panel 8 of lower connecting rod 202 relatively rotate, and hang ceiling panel 8 is being pushed to be drop The low labor intensity of construction personnel, improves work efficiency.
The above is only a specific embodiment of the invention, but are not limited thereto to protection of the invention, relate to this Technical field technical staff it is thinkable to the technical program technical characteristic propose equivalent change or replacement, all cover Within protection scope of the present invention.

Claims (6)

1. a kind of auxiliary stand for installing hang ceiling panel, including rack body, it is characterised in that: rack body includes sunpender and company Extension bar, there are two sunpender settings, and one end of each sunpender is provided with hook, is connected between two sunpenders by connecting rod;Connection Protective case cylinder is cased with outside bar.
2. the auxiliary stand of installation hang ceiling panel according to claim 1, it is characterised in that: the side of sunpender is provided with extension Hook, the other side are provided with nipple.
3. the auxiliary stand of installation hang ceiling panel according to claim 1, it is characterised in that: hook is placed in the top of sunpender Portion.
4. the auxiliary stand of installation hang ceiling panel according to claim 1, it is characterised in that: the both ends of connecting rod are set respectively It is equipped with the threaded hole connecting with nipple.
5. the auxiliary stand of installation hang ceiling panel according to claim 1, it is characterised in that: sunpender and connecting rod are all aluminium Alloy material is made.
6. a kind of construction method for the auxiliary stand for installing hang ceiling panel, carries out as follows:
Keel are first lifted according to the size of hang ceiling panel, main joist and secondary joist are combined into multiple square frames;
Diagonal position by rack body along the square frame lifted is hung on keel;
Hang ceiling panel is placed in connecting rod, the protection sleeve along connecting rod tilts upward promotion, until rack body is integrally set In on square frame, four angles of hang ceiling panel are placed on the four edges of square frame;
Rack body is removed, the angle of horizontal adjustment hang ceiling panel makes four sides of hang ceiling panel ride over the four of square frame On a side, i.e., one piece of hang ceiling panel is installed;
Step (1) to (4) are repeated, remaining hang ceiling panel is installed.
CN201910580931.6A 2019-06-29 2019-06-29 Auxiliary bracket for installing ceiling panel and construction method thereof Active CN110306768B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910580931.6A CN110306768B (en) 2019-06-29 2019-06-29 Auxiliary bracket for installing ceiling panel and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910580931.6A CN110306768B (en) 2019-06-29 2019-06-29 Auxiliary bracket for installing ceiling panel and construction method thereof

Publications (2)

Publication Number Publication Date
CN110306768A true CN110306768A (en) 2019-10-08
CN110306768B CN110306768B (en) 2024-01-23

Family

ID=68079610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910580931.6A Active CN110306768B (en) 2019-06-29 2019-06-29 Auxiliary bracket for installing ceiling panel and construction method thereof

Country Status (1)

Country Link
CN (1) CN110306768B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663702A (en) * 2020-06-16 2020-09-15 盛世瑶兰(深圳)科技有限公司 Auxiliary support for installing ceiling panel and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10163850A1 (en) * 2001-12-20 2003-12-18 Klaus-Dieter Kunze Modular system for construction of roller system has multi-arm frame, baseplate into which two rods are plugged or screwed, several arm pairs and rollers fitted on rods by rotatable cross sleeves attachable at different heights
CN104612307A (en) * 2014-12-24 2015-05-13 上海中建八局装饰有限责任公司 Suspended ceiling system and construction method thereof
CN105133774A (en) * 2015-09-24 2015-12-09 青岛建安建设集团有限公司 Combined assembly type suspended ceiling reverse support system structure and designing and installing integrated method
CN204919945U (en) * 2015-08-21 2015-12-30 浙江银建装饰工程有限公司 Anti - bearing structure of furred ceiling
CN105350788A (en) * 2015-11-23 2016-02-24 中冶天工集团有限公司 Method for conducting suspension and equipment pipeline arrangement by means of auxiliary steel frame
CN206158172U (en) * 2016-09-27 2017-05-10 中国核工业华兴建设有限公司 Entrance to a cave template
CN206888327U (en) * 2017-05-22 2018-01-16 江苏建设控股集团有限公司 A kind of soft film ceiling mounting structure
CN107816161A (en) * 2017-10-31 2018-03-20 苏州金螳螂建筑装饰股份有限公司 A kind of furred ceiling assembled type steel frame conversion layer
CN109610717A (en) * 2018-12-29 2019-04-12 贵州建工安顺建筑工程有限公司 A kind of installation method of W font furred ceiling keelson
CN208792600U (en) * 2018-06-28 2019-04-26 深圳市聚丰缘设计装修工程有限公司 A kind of assembled steel joist suspended ceiling

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10163850A1 (en) * 2001-12-20 2003-12-18 Klaus-Dieter Kunze Modular system for construction of roller system has multi-arm frame, baseplate into which two rods are plugged or screwed, several arm pairs and rollers fitted on rods by rotatable cross sleeves attachable at different heights
CN104612307A (en) * 2014-12-24 2015-05-13 上海中建八局装饰有限责任公司 Suspended ceiling system and construction method thereof
CN204919945U (en) * 2015-08-21 2015-12-30 浙江银建装饰工程有限公司 Anti - bearing structure of furred ceiling
CN105133774A (en) * 2015-09-24 2015-12-09 青岛建安建设集团有限公司 Combined assembly type suspended ceiling reverse support system structure and designing and installing integrated method
CN105350788A (en) * 2015-11-23 2016-02-24 中冶天工集团有限公司 Method for conducting suspension and equipment pipeline arrangement by means of auxiliary steel frame
CN206158172U (en) * 2016-09-27 2017-05-10 中国核工业华兴建设有限公司 Entrance to a cave template
CN206888327U (en) * 2017-05-22 2018-01-16 江苏建设控股集团有限公司 A kind of soft film ceiling mounting structure
CN107816161A (en) * 2017-10-31 2018-03-20 苏州金螳螂建筑装饰股份有限公司 A kind of furred ceiling assembled type steel frame conversion layer
CN208792600U (en) * 2018-06-28 2019-04-26 深圳市聚丰缘设计装修工程有限公司 A kind of assembled steel joist suspended ceiling
CN109610717A (en) * 2018-12-29 2019-04-12 贵州建工安顺建筑工程有限公司 A kind of installation method of W font furred ceiling keelson

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663702A (en) * 2020-06-16 2020-09-15 盛世瑶兰(深圳)科技有限公司 Auxiliary support for installing ceiling panel and construction method thereof

Also Published As

Publication number Publication date
CN110306768B (en) 2024-01-23

Similar Documents

Publication Publication Date Title
CN201228207Y (en) Portable window hoister
CN205577327U (en) Metal clad sheet system is hung futilely to wall body
CN110306768A (en) The auxiliary stand and its construction method of hang ceiling panel are installed
CN207245138U (en) Boat scaffold adjustable in pitch
CN206341631U (en) One kind suspension vertical greening device
CN216377268U (en) Intelligence hoisting accessory for construction
CN107687263B (en) Suspension type protection frame, protection structure and double protection method
CN202441045U (en) Rail-type electric attached lifting scaffold
CN207312995U (en) One kind self-control bridge-collision-avoidance wall form hanging device
CN207626994U (en) A kind of curtain rod arm facilitating installing and dismounting curtain
CN213015326U (en) Hanging flower basket for construction safe in utilization
CN206477537U (en) One kind exempts from base treatment vitrified tile thin plate stone material dry suspending structure
CN204654843U (en) A kind of high-rise purging system of Multifunction external wall
CN211691525U (en) Construction device for overhanging type inclined curtain wall
CN210195179U (en) Auxiliary support for installing ceiling panel
CN208545949U (en) A kind of all steel frame of portable fast and easy assembly
CN209455982U (en) A kind of mobile crane for house decoration
CN207878812U (en) Roofing vertically discharges the corner protective device of steel wire rope or cable
CN206538918U (en) The curtain wall that a kind of convenient maintenance is changed
CN204356219U (en) Transition roller table block curtain storage bracket
CN205687396U (en) A kind of rotary suspension hook of wind-power tower
CN201943228U (en) Lifting device for unit type curtain wall plate
CN204754225U (en) Can have enough to meet need a support
CN204940887U (en) The on-hook of stone curtain wall cloth
CN215254443U (en) Scaffold structure is used in installation of slope wall curtain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant