CN110306727A - Precast prestressed steel core concrete column and construction method - Google Patents

Precast prestressed steel core concrete column and construction method Download PDF

Info

Publication number
CN110306727A
CN110306727A CN201910497576.6A CN201910497576A CN110306727A CN 110306727 A CN110306727 A CN 110306727A CN 201910497576 A CN201910497576 A CN 201910497576A CN 110306727 A CN110306727 A CN 110306727A
Authority
CN
China
Prior art keywords
steel pipe
concrete
outer steel
locating device
concrete column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910497576.6A
Other languages
Chinese (zh)
Other versions
CN110306727B (en
Inventor
丛术平
张征
韩金生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201910497576.6A priority Critical patent/CN110306727B/en
Publication of CN110306727A publication Critical patent/CN110306727A/en
Application granted granted Critical
Publication of CN110306727B publication Critical patent/CN110306727B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of precast prestressed steel core concrete column and construction method.By outer steel pipe, upper steel pipe, lower steel pipe and coagulation local soil type at;Outer steel pipe, upper steel pipe and lower steel pipe are all round steel pipe;Upper steel pipe is located at the top of outer steel pipe, and outer steel pipe is stretched out in one end, and lower steel pipe is located at the lower part of outer steel pipe, does not stretch out outer steel pipe;Outer steel pipe and upper steel duct fill concrete, lower steel duct do not have concrete.In construction, concrete is formed to the side surface dabbing of cylinder, top and bottom polish, and heat outer steel pipe, and outer steel pipe is covered on the cylinder that concrete is formed, and outer steel pipe cooling meat forms prestressed steel tube concrete columns.The present invention is able to solve load-bearing initial stage steel pipe to the restricted problem of concrete, improves the stress performance of service stage steel core concrete column, and is able to achieve assembly construction.

Description

Precast prestressed steel core concrete column and construction method
Technical field
The present invention relates to the Prefabricated concrete-filled steel tube column fields in assembled composite structure.
Background technique
The stress performance of steel core concrete column is good, and under the constraint of outer steel pipe, compression strength improves concrete, and outer steel pipe exists Under the support of inner concrete, it is not easy to buckling failure occur.But outer steel pipe to the constraint of inner concrete be passively, Load-bearing initial stage, the Poisson's ratios of steel are greater than the Poisson's ratio of concrete, steel pipe to concrete without effect of contraction, when the Poisson of concrete When Poisson's ratio than being greater than steel, the transversely deforming of concrete is greater than the transversely deforming of steel pipe, transverse direction of the concrete by steel pipe Constraint, concrete are three dimension stress state, and intensity improves, so this effect of contraction does not work at load initial stage, in steel pipe Concrete column approaches competence exertion maximum effect when destroying.Currently, steel reinforced concrete assembling structure obtains wide application, dress It is not applied also with formula steel core concrete column.Therefore, it is necessary to a kind of service stages can play the prefabricated pre- of outer steel pipe effect of contraction Stress steel core concrete column and corresponding construction method.
Summary of the invention
In order to solve steel pipe to the initial stage restricted problem of inner concrete, and realize fabricated construction, the present invention discloses one The precast prestressed steel core concrete column of kind and construction method, have many advantages, such as that stress performance is good, easy for construction.
The technical solution of precast prestressed steel core concrete column of the invention is: by outer steel pipe, upper steel pipe, lower steel pipe and mixing Solidifying local soil type at;Outer steel pipe, upper steel pipe and lower steel pipe are all round steel pipe, and the axis of outer steel pipe, upper steel pipe and lower steel pipe is overlapped;Upper steel Pipe is located at the top of outer steel pipe, and outer steel pipe is stretched out in one end, and the length for stretching out outer steel pipe is not less than the half of outer steel pipe internal diameter, protrudes into The length of outer steel pipe is equal to extension elongation;Lower steel pipe is located at the lower part of outer steel pipe, does not stretch out outer steel pipe, and the internal diameter of lower steel pipe is equal to The length of the outer diameter of upper steel pipe, lower steel pipe is 1mm bigger than the extension elongation of upper steel pipe;Outer steel pipe and upper steel duct fill coagulation Soil, lower steel duct do not have concrete;The outer diameter and wall thickness of upper steel pipe are determined according to design, and outer diameter is not more than outer steel pipe internal diameter Half;The wall thickness of lower steel pipe is determined according to design, can bear the radial pressure in prestress stage.
For the outer steel pipe before not constructing, internal diameter is less than the diameter that concrete forms cylinder, keeps outer steel pipe swollen by heating It is swollen, it can cover on the cylinder that concrete is formed, outer steel pipe cooling meat generates compressive pre-stress, compressive pre-stress to concrete Primarily radial compression also generates certain axial compression stress.The outer surface of the concrete carries out dabbing processing, increase with The coefficient of friction of outer steel pipe enables outer steel pipe preferably to work together with concrete.
The construction method of precast prestressed steel core concrete column of the invention is: by lower steel pipe socket lower locating device protrusion Portion makes the top surface of lower steel pipe and the either flush of lower locating device top plate, is connected with steel form and lower locating device, by upper positioning Device is fixed by bolts on steel form, upper steel pipe is penetrated into the casing of upper locator, is fixed with fastening screw;In steel form With the inside casting concrete of upper steel pipe;It tears steel form, upper locator and lower locating device open, concrete is formed to the side surface of cylinder The top and bottom that concrete forms cylinder are polished, the concrete of upper steel pipe top are polished by dabbing;The both ends of outer steel pipe add Work groove heats outer steel pipe, and outer steel pipe is covered on the cylinder that concrete is formed.
The upper locator is made of casing, fastening screw and bracket, and casing is round steel pipe, and casing inner diameter is equal to upper steel pipe Outer diameter, fastening screw is mounted in the screw hole on casing, and bracket is integrally welded with casing, there is bolt hole on bracket, props up Frame bottom is concordant with sleeve bottom.The lower locating device is made of bottom plate, top plate and pillar, and the diameter of top plate is equal to lower steel pipe To be round, the center of circle of bottom plate and top plate is located on same perpendicular for internal diameter, bottom plate and top plate, there is bolt hole, Zhi Zhugao on bottom plate Degree plus top plate thickness are equal to the length of lower steel pipe, and bottom plate, top plate and pillar are integrally welded.
When precast prestressed steel core concrete column joint connection in site of the invention, applied on the concrete surface at the top of lower floor's post Grouting material is smeared, smears grouting material in the upper steel pipe top of lower floor's post, by the lower steel pipe socket of upper strata post on the upper steel pipe of lower floor's post, It is welded between lower floor's post and the outer steel pipe of upper strata post, forms butt weld.The length of lower steel pipe is bigger than the extension elongation of upper steel pipe 1mm is to be filled and led up gap by grouting material in order to avoid component fabrication error bring assembles inconvenience.
Precast prestressed steel core concrete column simple structure of the invention applies compressive pre-stress to inner concrete in advance, The compression strength for improving concrete, the effect of contraction of steel pipe can be played at load-bearing initial stage, stress performance is good.By upper steel pipe and Lower steel pipe can connect two precast prestressed steel core concrete columns, can Transfer of Shear well.The construction method It can be realized prestressed application.The present invention is able to solve load-bearing initial stage steel pipe to the restricted problem of concrete, improves and uses rank The stress performance of section steel core concrete column, and it is able to achieve assembly construction.
Detailed description of the invention
The following further describes the present invention with reference to the drawings.
Fig. 1 is the cross-sectional view of precast prestressed steel core concrete column of the invention.
Fig. 2 is the axonometric drawing of precast prestressed steel core concrete column of the invention.
Fig. 3 is the work progress figure of precast prestressed steel core concrete column of the invention.
Fig. 4 is the cross-sectional view and top view of upper locator of the invention.
Fig. 5 is the cross-sectional view and top view of lower locating device of the invention.
Fig. 6 is the assembled in situ schematic diagram of precast prestressed steel core concrete column of the invention.
In figure: 1-outer steel pipe, 2-upper steel pipes, 3-lower steel pipes, 4-concrete, 5-steel forms, 6-upper locators, 7-lower locating devices, 8-bolts, 9-bolts hole, 10-grouting materials, 11-butt welds, 61-casings, 62-fastening screws, 63-brackets, 71-bottom plates, 72-top plates, 73-pillars.
Specific embodiment
As shown in Figs. 1-2, a kind of precast prestressed steel core concrete column, by outer steel pipe (1), upper steel pipe (2), lower steel pipe (3) it is formed with concrete (4);Outer steel pipe (1), upper steel pipe (2) and lower steel pipe (3) are all round steel pipe, outer steel pipe (1), upper steel pipe (2) it is overlapped with the axis of lower steel pipe (3);Upper steel pipe (2) is located at the top of outer steel pipe (1), and outer steel pipe (1) is stretched out in one end, stretches out The length of outer steel pipe (1) is not less than the half of outer steel pipe (1) internal diameter, and the length that upper steel pipe (2) protrudes into outer steel pipe (1), which is equal to, stretches out Length;Lower steel pipe (3) is located at the lower part of outer steel pipe (1), does not stretch out outer steel pipe (1), and the internal diameter of lower steel pipe (3) is equal to upper steel pipe (2) length of outer diameter, lower steel pipe (3) is 1mm bigger than the extension elongation of upper steel pipe (2);Outer steel pipe (1) and upper steel pipe (2) are internal Fill concrete (4), lower steel pipe (3) is internal not to have concrete (4);The outer diameter and wall thickness of upper steel pipe (2) according to design determine, and Outer diameter is not more than the half of outer steel pipe (1) internal diameter;The wall thickness of lower steel pipe (3) is determined according to design, can bear the prestress stage Radial pressure.
Fig. 3 be precast prestressed steel core concrete column of the invention work progress figure, entire work progress be divided into a, b, C, tetra- steps of d, specific work progress are as follows: construction procedure a as shown in Fig. 3 (a) covers lower steel pipe (3) in lower locating device (7) protruding portion makes the top surface of lower steel pipe (3) and the either flush of lower locating device (7) top plate (72), connects steel with bolt (8) Upper locator (6) is fixed on steel form (5) with bolt (8), upper steel pipe (2) is penetrated by template (5) and lower locating device (7) It is fixed with fastening screw (62) into the casing (61) of upper locator (6);Construction procedure b, as shown in Figure 3 (b), in steel form (5) and the inside casting concrete (4) of upper steel pipe (2);Construction procedure c tears steel form (5), upper locator open as shown in Figure 3 (c) (6) and lower locating device (7) the side surface dabbing that concrete (4), are formed to cylinder, by concrete (4) formed cylinder top surface and Bottom surface polishes, and the concrete (4) at the top of upper steel pipe (2) is polished;Construction procedure d, as shown in Fig. 3 (d), the two of outer steel pipe (1) Finished edge is held, is heated outer steel pipe (1), outer steel pipe (1) is covered on the cylinder that concrete (4) are formed.
As shown in figure 4, Fig. 4 (a) is the cross-sectional view of upper locator of the invention, Fig. 4 (b) is upper locator of the invention Top view, locator (6) are made of casing (61), fastening screw (62) and bracket (63), and casing (61) is round steel pipe, fasten spiral shell Nail (62) is mounted in the screw hole on casing (61), and bracket (63) and casing (61) are integrally welded, and bracket has spiral shell on (63) Keyhole (9), bracket (63) bottom are concordant with casing (61) bottom.
As shown in figure 5, Fig. 5 (a) is the cross-sectional view of lower locating device of the invention, Fig. 5 (b) is lower locating device of the invention Top view, lower locating device (7) are made of bottom plate (71), top plate (72) and pillar (73), and bottom plate (71) and top plate (72) are circle, The center of circle of bottom plate (71) and top plate (72) is located on same perpendicular, has on bottom plate (71) bolt hole (9), bottom plate (71), top plate (72) and pillar (73) is integrally welded.
As shown in fig. 6, concrete when precast prestressed steel core concrete column assembled in situ of the invention, at the top of lower floor's post (4) grouting material (10) are smeared on surface, grouting material (10) is smeared at the top of the upper steel pipe (2) of lower floor's post, by the lower steel pipe of upper strata post (3) it covers on the upper steel pipe (2) of lower floor's post, is welded between the outer steel pipe (1) of lower floor's post and upper strata post, form butt weld (11).

Claims (2)

1. a kind of precast prestressed steel core concrete column, by outer steel pipe, upper steel pipe, lower steel pipe and coagulation local soil type at, it is characterized in that: Outer steel pipe, upper steel pipe and lower steel pipe are all round steel pipe, and the axis of outer steel pipe, upper steel pipe and lower steel pipe is overlapped;Upper steel pipe is located at outer Outer steel pipe is stretched out in the top of steel pipe, one end, and the length for stretching out outer steel pipe is not less than the half of outer steel pipe internal diameter, protrudes into outer steel pipe Length is equal to extension elongation;Lower steel pipe is located at the lower part of outer steel pipe, does not stretch out outer steel pipe, and the internal diameter of lower steel pipe is equal to upper steel pipe The length of outer diameter, lower steel pipe is 1mm bigger than the extension elongation of upper steel pipe;Outer steel pipe and upper steel duct fill concrete, lower steel pipe Inside does not have concrete.
2. a kind of construction method for realizing precast prestressed steel core concrete column described in claim 1, it is characterized in that: by lower steel Pipe sleeve makes the top surface of lower steel pipe and the either flush of lower locating device top plate, is connected with punching block in the protruding portion of lower locating device Upper locator is fixed by bolts on steel form by plate and lower locating device, upper steel pipe is penetrated into the casing of upper locator, is used Fastening screw is fixed;In the inside casting concrete of steel form and upper steel pipe;Tear steel form, upper locator and lower locating device open, it will Concrete forms the side surface dabbing of cylinder, and the top and bottom that concrete forms cylinder are polished, by the mixed of upper steel pipe top Solidifying soil polishes;The both ends finished edge of outer steel pipe heats outer steel pipe, and outer steel pipe is covered on the cylinder that concrete is formed.
CN201910497576.6A 2019-06-10 2019-06-10 Prefabricated prestressed steel pipe concrete column and construction method Expired - Fee Related CN110306727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910497576.6A CN110306727B (en) 2019-06-10 2019-06-10 Prefabricated prestressed steel pipe concrete column and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910497576.6A CN110306727B (en) 2019-06-10 2019-06-10 Prefabricated prestressed steel pipe concrete column and construction method

Publications (2)

Publication Number Publication Date
CN110306727A true CN110306727A (en) 2019-10-08
CN110306727B CN110306727B (en) 2021-07-02

Family

ID=68075941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910497576.6A Expired - Fee Related CN110306727B (en) 2019-06-10 2019-06-10 Prefabricated prestressed steel pipe concrete column and construction method

Country Status (1)

Country Link
CN (1) CN110306727B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984472A (en) * 2019-12-30 2020-04-10 扬州大学 High-temperature prestressed FRP pipe constraint profile steel recycled concrete column and preparation method thereof
CN111119409A (en) * 2019-12-30 2020-05-08 扬州大学 Prestressed steel pipe constraint steel concrete column and preparation method thereof
CN111501520A (en) * 2020-05-08 2020-08-07 重庆交通大学 Pouring process for preventing concrete filled steel tube from being emptied
CN112922152A (en) * 2021-01-18 2021-06-08 罗洪湖 Steel pipe concrete beam column structure for building and manufacturing method thereof
CN113700221A (en) * 2021-08-11 2021-11-26 河北省建筑工程质量检测中心有限公司 Prefabricated prestressed steel pipe concrete column and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050050837A1 (en) * 2003-09-08 2005-03-10 Jiaduo Wang Meshed (porous) steel pipe/tube used as concrete reinforcement
EP1567735B1 (en) * 2002-10-22 2012-06-06 Fearn, Richard Neil Fabric column and pad concrete form
CN103240802A (en) * 2013-05-16 2013-08-14 淮海工学院 Production method of prestress concrete filled steel tube
CN205637144U (en) * 2016-05-26 2016-10-12 长安大学 Double entry circular steel tube confined concrete post and concrete beam node structure
CN208533704U (en) * 2018-05-30 2019-02-22 常州工程职业技术学院 A kind of prefabricated post node connecting structure using rebound pin key fixed structure
CN109653437A (en) * 2019-01-14 2019-04-19 沈阳建筑大学 A kind of preparation method of the strength round steel pipe concrete column using steel pipe active constraint

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1567735B1 (en) * 2002-10-22 2012-06-06 Fearn, Richard Neil Fabric column and pad concrete form
US20050050837A1 (en) * 2003-09-08 2005-03-10 Jiaduo Wang Meshed (porous) steel pipe/tube used as concrete reinforcement
CN103240802A (en) * 2013-05-16 2013-08-14 淮海工学院 Production method of prestress concrete filled steel tube
CN205637144U (en) * 2016-05-26 2016-10-12 长安大学 Double entry circular steel tube confined concrete post and concrete beam node structure
CN208533704U (en) * 2018-05-30 2019-02-22 常州工程职业技术学院 A kind of prefabricated post node connecting structure using rebound pin key fixed structure
CN109653437A (en) * 2019-01-14 2019-04-19 沈阳建筑大学 A kind of preparation method of the strength round steel pipe concrete column using steel pipe active constraint

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984472A (en) * 2019-12-30 2020-04-10 扬州大学 High-temperature prestressed FRP pipe constraint profile steel recycled concrete column and preparation method thereof
CN111119409A (en) * 2019-12-30 2020-05-08 扬州大学 Prestressed steel pipe constraint steel concrete column and preparation method thereof
CN111119409B (en) * 2019-12-30 2022-03-04 扬州大学 Prestressed steel pipe constraint steel concrete column and preparation method thereof
CN111501520A (en) * 2020-05-08 2020-08-07 重庆交通大学 Pouring process for preventing concrete filled steel tube from being emptied
CN111501520B (en) * 2020-05-08 2021-08-24 重庆交通大学 Pouring process for preventing concrete filled steel tube from being emptied
CN112922152A (en) * 2021-01-18 2021-06-08 罗洪湖 Steel pipe concrete beam column structure for building and manufacturing method thereof
CN113700221A (en) * 2021-08-11 2021-11-26 河北省建筑工程质量检测中心有限公司 Prefabricated prestressed steel pipe concrete column and construction method

Also Published As

Publication number Publication date
CN110306727B (en) 2021-07-02

Similar Documents

Publication Publication Date Title
CN110306727A (en) Precast prestressed steel core concrete column and construction method
US11293183B2 (en) Precast column base joint and construction method therefor
CN108301561B (en) Connection structure of assembled steel pipe concrete column shaft
CN108005309B (en) Prefabricated assembled embedded steel sleeve connecting concrete column and assembling method thereof
CN105735112A (en) Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier
CN108589915A (en) A kind of external steel plate of assembly concrete column is to drawing connecting node and its construction method
JP5236152B2 (en) Method of joining precast concrete column beams
CN111648467B (en) High-position splicing energy-consumption beam column node and manufacturing method
KR101847904B1 (en) Prestressed concrete-steel composite pile, form of prestressed concrete-steel composite pile and construction method using same
JP2016075149A (en) Pile reinforcement structure for existing building, and construction method for the pile reinforcement structure
JP2009097261A (en) Foundation pile structure, prefabricated concrete pile, and joint hardware for prefabricated concrete pile and steel pipe pile
CN108643350A (en) A kind of prefabricated assembled concrete continuous beam is bolted dry type node
CN207934195U (en) One kind can repair prefabricated assembled concrete-filled steel square tubular column foot node
CN111962381B (en) Double diabolo-shaped steel-mixed combined pier beam connecting structure and construction method thereof
CN220848067U (en) Connecting node of prefabricated steel tube type steel concrete column and steel tube type concrete beam
CN212426701U (en) Double-diabolo-shaped steel-concrete combined pier beam connecting structure
CN221030200U (en) Connecting piece and combination support stand of steel-pipe column and prefabricated square pile
JPH02112537A (en) Column leg base structure
JP3245158U (en) Self-locking device for fittings in prefabricated structures
KR102629212B1 (en) Precast Composite Pile Structure and its Construction Method
JP2004270416A (en) Pile with large-diameter bearing plate, and structure for joining pile head thereof
CN115419166B (en) Prefabricated beam column support-free connecting node of fabricated concrete frame structure and construction method
CN214658265U (en) Prefabricated bamboo integrated configuration and connection structure thereof
KR102235422B1 (en) Modul unit joint structure and modul unit method thereby
JP4803438B2 (en) Existing foundation renovation structure and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210702

CF01 Termination of patent right due to non-payment of annual fee