CN110303585A - Precast concrete subterranean tunnel curing system - Google Patents

Precast concrete subterranean tunnel curing system Download PDF

Info

Publication number
CN110303585A
CN110303585A CN201910703111.1A CN201910703111A CN110303585A CN 110303585 A CN110303585 A CN 110303585A CN 201910703111 A CN201910703111 A CN 201910703111A CN 110303585 A CN110303585 A CN 110303585A
Authority
CN
China
Prior art keywords
tunnel
ontology
precast concrete
tunnel ontology
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910703111.1A
Other languages
Chinese (zh)
Inventor
胡建宾
王媛媛
张志高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Urban Construction Engineering Co Ltd
Original Assignee
Shanxi Urban Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Urban Construction Engineering Co Ltd filed Critical Shanxi Urban Construction Engineering Co Ltd
Priority to CN201910703111.1A priority Critical patent/CN110303585A/en
Publication of CN110303585A publication Critical patent/CN110303585A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/247Controlling the humidity during curing, setting or hardening

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention discloses a kind of precast concrete subterranean tunnel curing system, realizes that various types of concrete prefabricated element uninterruptedly continuously conserves, improves production efficiency, reduce production cost, shorten the time of delivery;Tunnel ontology is arranged in underground, tunnel ontology inlet is provided with Vertical Channel, tunnel body bottom portion is provided with two guide rails along tunnel direction, matching is provided with station board on guide rail, station board is arranged on guide rail by driving device matching, and station board drives it to move on guide rail by driving device, multiple precast concretes conserved are vertically arranged on station board, PC component template is provided between two adjacent precast concretes, precast concrete and PC component template interval are arranged and are fixed together, multiple steam (vapor) outlets are provided on the inner wall of tunnel ontology, steam (vapor) outlet is connected to by pipeline with the boiler on ground, heat source is provided by steam for tunnel ontology, ensure to maintain 60 DEG C~80 DEG C in tunnel ontology.

Description

Precast concrete subterranean tunnel curing system
Technical field
A kind of precast concrete subterranean tunnel curing system of the present invention, belongs to precast concrete conservation technology field.
Background technique
The production method of present wet type precast concrete is to add concrete water mixing to be adjusted to concrete Degree of collapsing the case where being greater than 0mm, then by concrete casting in the mold for having placed stiffener (such as reinforcing bar), and with shaking Concrete ram-jolt, the as far as possible stomata in elimination concrete are increased the intensity of manufactured goods by device.It pours and the concrete through ram-jolt needs A period of time is stood, it, just can be by mould after concrete hardening to certain intensity (about 13.5MPa) until concrete completion solidification Tool removes, and time of repose regards cement grade and early strength determines, and typically about 12-14 hours.Time of repose is longer, required Mold and production site it is more, cause investment big, high production cost, the time of delivery is long.Therefore, aforementioned production method exists The defect that investment is big, high production cost and time of delivery are long.
Summary of the invention
The present invention overcomes deficiencies existing for plane maintenance room in existing concrete prefabricated components production process, provide one Kind precast concrete subterranean tunnel curing system, realizes various types of concrete prefabricated element and uninterruptedly continuously supports Shield, substantially increases production efficiency, reduces production cost, shorten the time of delivery.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention are as follows: precast concrete subterranean tunnel maintenance System, including tunnel ontology, the tunnel ontology setting is in underground, and laterally setting, the inlet setting of the tunnel ontology There is Vertical Channel, which is used to the precast concrete conserved hanging in tunnel ontology, the tunnel by ground power house The bottom of road ontology is provided with two guide rails along tunnel direction, and matching is provided with station board on the guide rail, and the station board is logical Over-driving device matching is arranged on guide rail, and the station board drives it to move on guide rail by driving device, the work Multiple precast concretes conserved are vertically arranged on the plate of position, are provided with PC between two adjacent precast concretes Component template, the precast concrete and PC component template interval are arranged and are fixed together, the inner wall of the tunnel ontology On be provided with multiple steam (vapor) outlets, the steam (vapor) outlet be connected to by pipeline with the boiler on ground, is tunnel ontology by steam There is provided heat source, it is ensured that 60 DEG C~80 DEG C are maintained in tunnel ontology.
The either end of the tunnel ontology or both ends are provided with blower, and the blower is for accelerating the intrinsic air in tunnel Flowing, it is ensured that each spot temperature is balanced in tunnel ontology.
Guide rail extending direction is provided with rhone between the guide rail, the rhone is for discharging because vapor liquefies Liquefy the water generated.
The both ends of the tunnel ontology are provided with heat holding curtain, and the heat holding curtain is by multiple strip flexible heat-insulating structure groups At, it is ensured that the disengaging of precast concrete is not influenced.
Multiple temperature sensors are provided in the tunnel ontology, the temperature sensor is intrinsic for monitoring tunnel Temperature.
The driving device is track chain drive structure.
Compared with the prior art, the invention has the beneficial effects that: the present invention cooperates precast concrete automated production Line uses, and precast concrete automatic production line will prepare the steel mesh, ready-mixed concrete, molding coagulation of precast concrete After native prefabricated component, composition automatic production line is conserved into precast concrete, realizes automatic, information, environment protection production Industry chain, workshop production steel mesh and concrete and production stamped concrete prefabricated component, right in the tunnel that underground is built on the ground Precast concrete is conserved, and not only produces quickly upgrading to factory modularization, but also reduce originally in construction building When the artificial, consumption of materials and various aspects unfavorable factor cost, improve the total quality of labor productivity and building of constructing. The PC component performance that the present invention produces is good, density is high and intensity is high, and outer surface structure is smooth, smooth, dimensional accuracy is high, sale Market is at low cost.
Detailed description of the invention
Following further describes the present invention with reference to the drawings.
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is transverse structure schematic diagram of the invention.
In figure: 1 being tunnel ontology, 2 be guide rail, 3 be station board, 4 be driving device, 5 be precast concrete, 6 be PC Component template, 7 be steam (vapor) outlet, 8 be blower, 9 be rhone.
Specific embodiment
As shown in Figure 1 and Figure 2, precast concrete subterranean tunnel curing system of the present invention, including tunnel ontology 1, the tunnel In underground, and laterally, setting, the inlet of the tunnel ontology 1 are provided with Vertical Channel to the setting of road ontology 1, which uses In the precast concrete conserved is hung in tunnel ontology 1 by ground power house, the bottom of the tunnel ontology 1 is along tunnel direction Two guide rails 2 are provided with, matching is provided with station board 3 on the guide rail 2, and the station board 3 passes through the matching setting of driving device 4 On guide rail 2, and the station board 3 drives it to move on guide rail 2 by driving device 4, is vertically arranged on the station board 3 There are multiple precast concretes 5 conserved, is provided with PC component template 6, institute between two adjacent precast concretes 5 It states precast concrete 5 and the interval of PC component template 6 is arranged and is fixed together, be provided on the inner wall of the tunnel ontology 1 Multiple steam (vapor) outlets 7, the steam (vapor) outlet 7 are connected to by pipeline with the boiler on ground, are that tunnel ontology 1 provides heat by steam Source, it is ensured that 60 DEG C~80 DEG C are maintained in tunnel ontology 1.
The either end of the tunnel ontology 1 or both ends are provided with blower 8, and the blower 8 is for accelerating in tunnel ontology 1 Air flowing, it is ensured that each spot temperature is balanced in tunnel ontology 1.
2 extending direction of guide rail is provided with rhone 9 between the guide rail 2, the rhone 9 is for discharging because of vapor The water that liquefaction liquefaction generates.
The both ends of the tunnel ontology 1 are provided with heat holding curtain, and the heat holding curtain is by multiple strip flexible heat-insulating structure groups At, it is ensured that the disengaging of precast concrete 5 is not influenced.
Multiple temperature sensors are provided in the tunnel ontology 1, the temperature sensor is for monitoring in tunnel ontology 1 Temperature.
The driving device 4 is track chain drive structure, by the way that motor to be fixed below track, drives transmission chain Item, driving chain are laid among track, so that station board 3 realizes that transmission is accurate, is driven great efforts while mobile.
The present invention cooperates precast concrete automatic production line to use, and precast concrete automatic production line will be prepared After the steel mesh of precast concrete, ready-mixed concrete, stamped concrete prefabricated component, helped into precast concrete maintenance group Automatic assembly line realizes automatic, information, the industrial chain of environment protection, on the ground workshop production steel mesh and concrete and life Stamped concrete prefabricated component is produced, precast concrete is conserved in the tunnel that underground is built, not only to factory modularization Production quickly upgrading, and reduce the artificial, consumption of materials in construction building originally and various aspects unfavorable factor at This, improves the total quality of labor productivity and building of constructing.The PC component performance that the present invention produces is good, density is high and strong Degree is high, and outer surface structure is smooth, smooth, dimensional accuracy is high, and selling market is at low cost.
The present invention is explained in detail above in conjunction with embodiment, but the present invention is not limited to above-described embodiments, at this Field those of ordinary skill within the scope of knowledge, can also make various changes without departing from the purpose of the present invention Change.

Claims (6)

1. precast concrete subterranean tunnel curing system, which is characterized in that including tunnel ontology (1), the tunnel ontology (1) In underground, and laterally, setting, the inlet of the tunnel ontology (1) are provided with Vertical Channel for setting, which is used for will The precast concrete conserved is hung in tunnel ontology (1) by ground power house, and the bottom of the tunnel ontology (1) is along tunnel direction Two guide rails (2) are provided with, matches and is provided with station board (3) on the guide rail (2), the station board (3) passes through driving device (4) matching is arranged on guide rail (2), and the station board (3) drives it to move on guide rail (2) by driving device (4), institute It states and is vertically arranged with multiple precast concretes (5) conserved on station board (3), two adjacent precast concretes (5) Between be provided with PC component template (6), the precast concrete (5) and PC component template (6) interval be arranged and be fixed on Together, it is provided with multiple steam (vapor) outlets (7) on the inner wall of the tunnel ontology (1), the steam (vapor) outlet (7) passes through pipeline and ground The boiler in face is connected to, and is that tunnel ontology (1) provides heat source by steam, it is ensured that maintain 60 DEG C~80 DEG C in tunnel ontology (1).
2. according to precast concrete subterranean tunnel curing system described in claim (1), which is characterized in that the tunnel sheet The either end of body (1) or both ends are provided with blower (8), and the blower (8) is used to that the air in tunnel ontology (1) to be accelerated to flow, Ensure that each spot temperature is balanced in tunnel ontology (1).
3. precast concrete subterranean tunnel curing system according to claim 1, which is characterized in that the guide rail (2) Between be provided with rhone (9) along guide rail (2) extending direction, the rhone (9) for discharge because vapor liquefy liquefaction produce Raw water.
4. precast concrete subterranean tunnel curing system according to claim 1, which is characterized in that the tunnel ontology (1) both ends are provided with heat holding curtain, and the heat holding curtain is by multiple strip flexible heat-insulating structure compositions, it is ensured that does not influence concrete The disengaging of prefabricated component (5).
5. precast concrete subterranean tunnel curing system according to claim 1, which is characterized in that the tunnel ontology (1) multiple temperature sensors are provided in, the temperature sensor is used to monitor the temperature in tunnel ontology (1).
6. precast concrete subterranean tunnel curing system according to claim 1, which is characterized in that the driving device It (4) is track chain drive structure.
CN201910703111.1A 2019-07-31 2019-07-31 Precast concrete subterranean tunnel curing system Pending CN110303585A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910703111.1A CN110303585A (en) 2019-07-31 2019-07-31 Precast concrete subterranean tunnel curing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910703111.1A CN110303585A (en) 2019-07-31 2019-07-31 Precast concrete subterranean tunnel curing system

Publications (1)

Publication Number Publication Date
CN110303585A true CN110303585A (en) 2019-10-08

Family

ID=68082573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910703111.1A Pending CN110303585A (en) 2019-07-31 2019-07-31 Precast concrete subterranean tunnel curing system

Country Status (1)

Country Link
CN (1) CN110303585A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116901235A (en) * 2023-07-13 2023-10-20 中交第三公路工程局有限公司 Reinforced concrete prefabricated part production equipment and process

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103692542A (en) * 2013-12-12 2014-04-02 三一汽车制造有限公司 Precast concrete curing kiln, curing system and production system
CN204585509U (en) * 2015-03-31 2015-08-26 中民筑友有限公司 Precuring storehouse, underground and the prefabricated components production system containing this precuring storehouse, underground
CN206048480U (en) * 2016-09-12 2017-03-29 中民筑友科技投资有限公司 Vertical curing kilns and concrete prefabricated element curing system
CN106863566A (en) * 2017-03-07 2017-06-20 刘祥锦 The maintenance tunnel of prefabricated concrete element
CN107081845A (en) * 2017-06-16 2017-08-22 刘祥锦 A kind of three-dimensional maintenance tunnel of prefabricated concrete element
CN108000694A (en) * 2018-01-05 2018-05-08 河北益铁机电科技有限公司 Pretensioning prestressed concrete track board assembly line curing system and its application
CN108705666A (en) * 2018-08-17 2018-10-26 正方利民(天镇)建筑工业化有限公司 Building concrete wallboard prefabricated components production line curing kilns
CN208529376U (en) * 2018-03-23 2019-02-22 山东交通学院 The steam-cured mechanism of track plates flow production line and system
CN208557885U (en) * 2018-05-18 2019-03-01 甘昌成 Steam tunnel kiln
CN210651243U (en) * 2019-07-31 2020-06-02 山西城建建设工程有限公司 Concrete prefabricated member underground tunnel maintenance system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103692542A (en) * 2013-12-12 2014-04-02 三一汽车制造有限公司 Precast concrete curing kiln, curing system and production system
CN204585509U (en) * 2015-03-31 2015-08-26 中民筑友有限公司 Precuring storehouse, underground and the prefabricated components production system containing this precuring storehouse, underground
CN206048480U (en) * 2016-09-12 2017-03-29 中民筑友科技投资有限公司 Vertical curing kilns and concrete prefabricated element curing system
CN106863566A (en) * 2017-03-07 2017-06-20 刘祥锦 The maintenance tunnel of prefabricated concrete element
CN107081845A (en) * 2017-06-16 2017-08-22 刘祥锦 A kind of three-dimensional maintenance tunnel of prefabricated concrete element
CN108000694A (en) * 2018-01-05 2018-05-08 河北益铁机电科技有限公司 Pretensioning prestressed concrete track board assembly line curing system and its application
CN208529376U (en) * 2018-03-23 2019-02-22 山东交通学院 The steam-cured mechanism of track plates flow production line and system
CN208557885U (en) * 2018-05-18 2019-03-01 甘昌成 Steam tunnel kiln
CN108705666A (en) * 2018-08-17 2018-10-26 正方利民(天镇)建筑工业化有限公司 Building concrete wallboard prefabricated components production line curing kilns
CN210651243U (en) * 2019-07-31 2020-06-02 山西城建建设工程有限公司 Concrete prefabricated member underground tunnel maintenance system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116901235A (en) * 2023-07-13 2023-10-20 中交第三公路工程局有限公司 Reinforced concrete prefabricated part production equipment and process

Similar Documents

Publication Publication Date Title
CN110303585A (en) Precast concrete subterranean tunnel curing system
CN105464010A (en) Concrete box culvert construction method and system based on automatic transportation
CN105365036A (en) Process for mounting template for manufacturing sectional box girders
CN114409289A (en) Carbon sequestration system and method for reinforcing recycled aggregate and recycled brick
CN114919055A (en) Subway shield constructs section of jurisdiction production line informationization construction system
CN104786367A (en) Pipe joint prefabricating workshop
CN210651243U (en) Concrete prefabricated member underground tunnel maintenance system
CN103286846A (en) Manufacturing process of concrete-composited self-heat-insulating blocks
CN111231051A (en) Shield segment production process with corrosion resistance and shear resistance functions
CN209491933U (en) A kind of prefabricated components production line
CN104002374A (en) Plaster concrete building block forming machine
CN104405171B (en) Anticorrosion chimney and anti-corrosion construction method thereof
WO2018010307A1 (en) Concrete mixing plant
CN102241066B (en) Industrial production method for housing wall body module
CN110682424A (en) Precast concrete board curing room
CN203570324U (en) Traction self-propelled concrete sprayer with spraying nozzle capable of automatically rotating
CN207362669U (en) Cement pavement crack repairing car
CN110259144A (en) A kind of novel energy-saving environment-friendly ash concrete lightweight wall plate construction method
CN207972115U (en) Prefabricated reinforced concrete section of jurisdiction automatic production line
CN204546787U (en) A kind of production system of cinder light block
CN210563502U (en) System for controlling internal and external temperature difference of large volume concrete by using air cooling principle
CN203834752U (en) Sleeper wall partition structure
CN204622340U (en) Aerated blocks produces automatic blending stirring system
CN203216180U (en) Ice-output device of ice machine
CN203994199U (en) Plaster concrete block machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination