CN110295711A - The construction method of pre-buried connector - Google Patents

The construction method of pre-buried connector Download PDF

Info

Publication number
CN110295711A
CN110295711A CN201910575564.0A CN201910575564A CN110295711A CN 110295711 A CN110295711 A CN 110295711A CN 201910575564 A CN201910575564 A CN 201910575564A CN 110295711 A CN110295711 A CN 110295711A
Authority
CN
China
Prior art keywords
sleeve
reinforced bar
reinforcing bar
protection cap
reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910575564.0A
Other languages
Chinese (zh)
Inventor
康铀
卢亚军
肖健
廖红玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201910575564.0A priority Critical patent/CN110295711A/en
Publication of CN110295711A publication Critical patent/CN110295711A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/161Protective caps for the ends of reinforcing bars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The object of the present invention is to provide a kind of construction method of pre-buried connector, reinforced bar sleeve corresponding with reinforcing bar model is made, and configures sleeve protection cap;Glass cement is smeared on an end face of reinforced bar sleeve, sleeve protection cap is blocked reinforced bar sleeve one end with after the closely knit connection of reinforced bar sleeve by glass cement;Foam filling agent is protruded into and injects from the open one end of reinforced bar sleeve, foam filling agent has reserved reinforcement installation space in leading portion, and sleeve protection cap is padded up since back segment;Machined good externally threaded reinforcing bar and reinforced bar sleeve are tightened in place, as processing finished product protection;By reinforcing bar and reinforced bar sleeve and main reinforcement positioning welding, it is adjusted in place rear pre-buried and casting concrete;After the completion of concreting, reinforced bar sleeve is dug out, remove sleeve protection cap and clears up foam filling agent, after the connection space for cleaning out external reinforcing bar, is connect with external reinforcing bar.This method is good to the protecting effect of reinforced bar sleeve, reduces costs, easy to operate.

Description

The construction method of pre-buried connector
Technical field
The invention belongs to building engineering construction fields, and in particular to a kind of construction method of pre-buried connector.
Background technique
In building engineering construction, when especially progress underground overlapping wall construction is constructed, needing to be widely used connector will Two reinforcing bar connections, this is building enclosure and main structure forms whole key member, therefore is controlled the quality of connector It is particularly critical.
Currently, construction in connector be primarily present following problems: pre-buried connector after excavation is dug out, it is generally existing because Caused connector corrosion, the destruction of silk tooth and other issues, are wanted so that connector survival rate is not achieved in slurry compounding connector It asks, causes construction in later period difficult, increased costs.From the foregoing, it will be observed that pre-buried connector is not protected well, existing solution Certainly there are two types of schemes, one is connector end, poor effect is protected with protection cap, another kind is using the same model of bar shaped Steel is bolted, and plays positioning protective effect, but higher cost, and is unable to satisfy the guarantor of connector not on the same line Shield effect.
Summary of the invention
The object of the present invention is to provide a kind of construction method of pre-buried connector, protecting effect of this method to reinforced bar sleeve It is good, it reduces costs, it is easy to operate.
The technical scheme adopted by the invention is that:
A kind of construction method of pre-buried connector, comprising steps of
S1, production reinforced bar sleeve corresponding with reinforcing bar model, and configure sleeve protection cap;
S2, glass cement is smeared on an end face of reinforced bar sleeve, sleeve protection cap is closely knit by glass cement and reinforced bar sleeve Reinforced bar sleeve one end is blocked after connection;
S3, foam filling agent is protruded into and injects from the open one end of reinforced bar sleeve, foam filling agent has reserved steel in leading portion Muscle installation space is padded up sleeve protection cap since back segment;
S4, machined good externally threaded reinforcing bar and reinforced bar sleeve are tightened in place, as processing finished product protection;
S5, by reinforcing bar and reinforced bar sleeve and main reinforcement positioning welding, be adjusted in place rear pre-buried and casting concrete;
After the completion of S6, concreting, reinforced bar sleeve is dug out, remove sleeve protection cap and clears up foam filling agent, is cleared up Out after the connection space of external reinforcing bar, it is connect with external reinforcing bar.
Further, the screw thread on reinforcing bar, external reinforcing bar and reinforced bar sleeve is straight thread.
Further, sleeve protection cap includes cover board and the fill block for being located at cover board middle inside, and cover board inside edge passes through Glass cement and the closely knit connection of reinforced bar sleeve, fill block are filled in reinforced bar sleeve.
Further, in S3, the filling length of foam filling agent has reached the half of entire reinforced bar sleeve.
Further, in S4, reinforcing bar and reinforced bar sleeve are tightened in place by torque wrench.
Further, in S6, sleeve protection cap is pried open by screwdriver, chooses foam filling agent.
The beneficial effects of the present invention are:
Sleeve protection cap and reinforced bar sleeve prevent the shock in concreting process from protect sleeve by glass glue connection Protecting cover falls off, and protecting effect is good, while foam filling agent carries out second protection to reinforced bar sleeve, prevents in concrete and water entrance Portion further protects screw environment inside reinforced bar sleeve not contaminated.By previous experiments and practice of construction, reserve connector at Motility rate is promoted significantly, and even up to 100%;Reinforced bar sleeve and sleeve protection cap can be produced in batches in advance, and Global Macros mention High working efficiency and finished product protection rate;Glass cement and foam filling agent are relatively cheap, and reinforced bar sleeve and sleeve protection cap Production is simple, and consumptive material is less, reduces costs;In whole process, the connection of reinforcing bar and reinforced bar sleeve, the installation of sleeve protection cap And taking-up and the filling of foam filling agent and cleaning, it is all very simple, it is easy to operate.
Detailed description of the invention
Reinforced bar sleeve loads onto sleeve protection cap and has filled the schematic diagram after foam filling agent in Fig. 1 embodiment of the present invention.
Schematic diagram after reinforced bar sleeve is connect with reinforcing bar in Fig. 2 embodiment of the present invention.
Sleeve protection cap is removed in Fig. 3 embodiment of the present invention and clears up the schematic diagram after foam filling agent.
In figure: 1- reinforced bar sleeve;2- sleeve protection cap;3- glass cement;4- foam filling agent;5- reinforcement installation space;6- Reinforcing bar;7- connection space.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
A kind of construction method of pre-buried connector, comprising steps of
S1, production reinforced bar sleeve 1 corresponding with reinforcing bar model, and configure sleeve protection cap 2;
S2, as shown in Figure 1, on an end face of reinforced bar sleeve 1 smear glass cement 3, sleeve protection cap 2 pass through glass cement 3 1 one end of reinforced bar sleeve is blocked with after the closely knit connection of reinforced bar sleeve 1;
S3, as shown in Figure 1, protruding into and injecting foam filling agent 4 from the open one end of reinforced bar sleeve 1, foam filling agent 4 exists Leading portion has reserved reinforcement installation space 5, and sleeve protection cap 2 is padded up since back segment;
S4, as shown in Fig. 2, machined good externally threaded reinforcing bar 6 is tightened in place with reinforced bar sleeve 1, as processing finished product Protection;
S5, by reinforcing bar 6 and reinforced bar sleeve 1 and main reinforcement positioning welding, be adjusted in place rear pre-buried and casting concrete;
S6, as shown in figure 3, after the completion of concreting, dig out reinforced bar sleeve 1, remove sleeve protection cap 2 and clear up foam Filler 4 after the connection space 7 for cleaning out external reinforcing bar, is connect with external reinforcing bar.
Sleeve protection cap 2 is connect with reinforced bar sleeve 1 by glass cement 3, prevents the shock in concreting process from making to cover Cylinder protection cap 2 fall off, protecting effect is good, at the same foam filling agent 4 to reinforced bar sleeve 1 carry out second protection, prevent concrete and Water enters inside, further protects 1 inside screw environment of reinforced bar sleeve not contaminated.By previous experiments and practice of construction, in advance Connector survival rate is stayed to be promoted significant, even up to 100%;Reinforced bar sleeve 1 and sleeve protection cap 2 can batch lifes in advance It produces, Global Macros, improves working efficiency and finished product protection rate;Glass cement 3 and foam filling agent 4 are relatively cheap, and reinforcing bar Sleeve 1 and sleeve protection cap 2 make simply, and consumptive material is less, reduces costs;In whole process, reinforcing bar 6 and reinforced bar sleeve 1 Connection, the installation and taking-up of sleeve protection cap 2 and the filling and cleaning of foam filling agent 4, it is all very simple, it is easy to operate.
Screw thread on reinforcing bar 6, external reinforcing bar and reinforced bar sleeve 1 can use multiple types, preferably straight in the present embodiment Screw thread, straight thread is easy to process, and tensile strength is high, and connector is suitble to use.
As depicted in figs. 1 and 2, in the present embodiment, sleeve protection cap 2 includes cover board and is located at filling out for cover board middle inside Block, cover board inside edge are filled in reinforced bar sleeve 1 by glass cement 3 and the closely knit connection of reinforced bar sleeve 1, fill block.Fill block both played The effect of positioning, and partially radially power can be undertaken.
In S3, the filling length of foam filling agent 4 has reached the half of entire reinforced bar sleeve 1.
In S4, reinforcing bar 6 and reinforced bar sleeve 1 are preferably tightened in place by torque wrench.Torque wrench is tightened compared to other Tool haves the advantages that easy to operate, time saving and energy saving, torque is adjustable.
In S6, sleeve protection cap 2 is preferably pried open by screwdriver, chooses foam filling agent 4.Because screwdriver is more normal See, it is faster than pure manual operations.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (6)

1. a kind of construction method of pre-buried connector, it is characterised in that: including step,
S1, production reinforced bar sleeve corresponding with reinforcing bar model, and configure sleeve protection cap;
S2, glass cement is smeared on an end face of reinforced bar sleeve, sleeve protection cap passes through glass cement and the closely knit connection of reinforced bar sleeve Reinforced bar sleeve one end is blocked afterwards;
S3, foam filling agent is protruded into and injects from the open one end of reinforced bar sleeve, foam filling agent has reserved reinforcing bar peace in leading portion Space is filled, sleeve protection cap is padded up since back segment;
S4, machined good externally threaded reinforcing bar and reinforced bar sleeve are tightened in place, as processing finished product protection;
S5, by reinforcing bar and reinforced bar sleeve and main reinforcement positioning welding, be adjusted in place rear pre-buried and casting concrete;
After the completion of S6, concreting, reinforced bar sleeve is dug out, remove sleeve protection cap and clears up foam filling agent, is cleaned out outer After connecing the connection space of reinforcing bar, it is connect with external reinforcing bar.
2. the construction method of pre-buried connector as described in claim 1, it is characterised in that: reinforcing bar, external reinforcing bar and reinforcing bar set Screw thread on cylinder is straight thread.
3. the construction method of pre-buried connector as described in claim 1, it is characterised in that: sleeve protection cap includes cover board and sets In the fill block of cover board middle inside, reinforcing bar set is filled in by glass cement and the closely knit connection of reinforced bar sleeve, fill block in cover board inside edge In cylinder.
4. the construction method of the pre-buried connector as described in claims 1 to 3 is any, it is characterised in that: in S3, foam filling The filling length of agent has reached the half of entire reinforced bar sleeve.
5. the construction method of the pre-buried connector as described in claims 1 to 3 is any, it is characterised in that: in S4, reinforcing bar and steel Muscle sleeve is tightened in place by torque wrench.
6. the construction method of the pre-buried connector as described in claims 1 to 3 is any, it is characterised in that: in S6, pass through screw Knife pries open sleeve protection cap, chooses foam filling agent.
CN201910575564.0A 2019-06-28 2019-06-28 The construction method of pre-buried connector Pending CN110295711A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910575564.0A CN110295711A (en) 2019-06-28 2019-06-28 The construction method of pre-buried connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910575564.0A CN110295711A (en) 2019-06-28 2019-06-28 The construction method of pre-buried connector

Publications (1)

Publication Number Publication Date
CN110295711A true CN110295711A (en) 2019-10-01

Family

ID=68029480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910575564.0A Pending CN110295711A (en) 2019-06-28 2019-06-28 The construction method of pre-buried connector

Country Status (1)

Country Link
CN (1) CN110295711A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111549980A (en) * 2020-05-21 2020-08-18 中建八局轨道交通建设有限公司 Protection device and protection method for steel bar pre-buried sleeve
CN113737861A (en) * 2021-09-06 2021-12-03 浙大城市学院 Angle-adjustable fixing and positioning device for embedded steel bar connector and construction method
CN113833130A (en) * 2021-09-06 2021-12-24 苏州中车建设工程有限公司 Fixing device for embedded steel bar connector and construction method
CN114250915A (en) * 2021-12-27 2022-03-29 中建八局轨道交通建设有限公司 Self-protection steel bar pre-buried connector and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104250974A (en) * 2013-06-28 2014-12-31 中冶天工上海十三冶建设有限公司 Bolt sleeve separation device for back-grouting and using method thereof
CN105672486A (en) * 2016-01-07 2016-06-15 中国电建集团华东勘测设计研究院有限公司 Method for embedding anchor bars in concrete
CN106149893A (en) * 2015-03-27 2016-11-23 天津力达科创金属制品有限公司 A kind of building built-in part being provided with safety alarm device
CN107013040A (en) * 2017-06-02 2017-08-04 杭州宥盛建筑科技有限公司 The construction method of floor is poured after a kind of sleeve built-in type
CN206513044U (en) * 2017-02-18 2017-09-22 中铁华铁工程设计集团有限公司 A kind of reserved opening splice protection device
CN208685674U (en) * 2018-09-07 2019-04-02 北京市政建设集团有限责任公司 A kind of protective device of underground overlapping wall reinforcing bar connector
CN109610737A (en) * 2018-12-06 2019-04-12 中铁十四局集团大盾构工程有限公司 One kind being molded into concrete embedded reinforcing bar connector and construction technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104250974A (en) * 2013-06-28 2014-12-31 中冶天工上海十三冶建设有限公司 Bolt sleeve separation device for back-grouting and using method thereof
CN106149893A (en) * 2015-03-27 2016-11-23 天津力达科创金属制品有限公司 A kind of building built-in part being provided with safety alarm device
CN105672486A (en) * 2016-01-07 2016-06-15 中国电建集团华东勘测设计研究院有限公司 Method for embedding anchor bars in concrete
CN206513044U (en) * 2017-02-18 2017-09-22 中铁华铁工程设计集团有限公司 A kind of reserved opening splice protection device
CN107013040A (en) * 2017-06-02 2017-08-04 杭州宥盛建筑科技有限公司 The construction method of floor is poured after a kind of sleeve built-in type
CN208685674U (en) * 2018-09-07 2019-04-02 北京市政建设集团有限责任公司 A kind of protective device of underground overlapping wall reinforcing bar connector
CN109610737A (en) * 2018-12-06 2019-04-12 中铁十四局集团大盾构工程有限公司 One kind being molded into concrete embedded reinforcing bar connector and construction technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴雪峰: "上海某大型酒店工程地下连续墙施工质量控制探讨", 《城市道桥与防洪》 *
彭嵚等: "盖挖逆作车站叠合墙结构预埋接驳器施工技术", 《施工技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111549980A (en) * 2020-05-21 2020-08-18 中建八局轨道交通建设有限公司 Protection device and protection method for steel bar pre-buried sleeve
CN111549980B (en) * 2020-05-21 2021-11-12 中建八局轨道交通建设有限公司 Protection device and protection method for steel bar pre-buried sleeve
CN113737861A (en) * 2021-09-06 2021-12-03 浙大城市学院 Angle-adjustable fixing and positioning device for embedded steel bar connector and construction method
CN113833130A (en) * 2021-09-06 2021-12-24 苏州中车建设工程有限公司 Fixing device for embedded steel bar connector and construction method
CN113737861B (en) * 2021-09-06 2022-11-18 浙大城市学院 Angle-adjustable fixing and positioning device for embedded steel bar connector and construction method
CN114250915A (en) * 2021-12-27 2022-03-29 中建八局轨道交通建设有限公司 Self-protection steel bar pre-buried connector and construction method thereof

Similar Documents

Publication Publication Date Title
CN110295711A (en) The construction method of pre-buried connector
CN103277105B (en) Strong rock burst tunnel micro seismic monitoring and stress relieving construction method
CN201202890Y (en) Novel flexible water-proof sleeve pipe for pipeline mounting construction
CN103089276B (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN202913682U (en) Embedded wall connecting piece
KR101819089B1 (en) Steel pipe type multi staged grouting device and construction method
CN207553314U (en) A kind of concrete postposition beam anchor bar constructing structure
CN204358338U (en) The repair structure of PCCP pipe
CN206636570U (en) A kind of tunnel abutment wall collapses the supporting construction at place
CN110409457A (en) Deep foundation pit supporting structure and its construction method under the conditions of a kind of karst area
CN206571135U (en) It is a kind of not influence the outer scaffold wall connector of construction
CN207538032U (en) Perceive anchor pole
JP2009108546A (en) Nut for rockbolt
CN206972285U (en) A kind of Full-thread anchor rod steel for roadway support
CN205159976U (en) Scalable terminal box
CN213774575U (en) Building engineering pre-buried exposed steel bar rust prevention device
CN216196522U (en) Detachable embedded wall connecting piece
CN105089551A (en) Casing pipe running reinforcing process of grouting hole opening pipe
CN104652449A (en) Safety and maintenance guarantee mechanism for automatic servo system steel support
CN103114723B (en) Application method of fixing formwork device
CN205077869U (en) Can dismantle stagnant water screw rod
CN218175799U (en) Soft soil foundation treatment device
CN214062995U (en) Device of underground structure seepage water slip casting syringe needle
CN219221637U (en) Faucet steel mould for repairing cement pipeline
CN213953617U (en) Hydraulic shield tunnel segment bolt hole sealing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191001