CN110295608A - A kind of hot dehumidification supporting construction of loess foundation pit and its construction method - Google Patents

A kind of hot dehumidification supporting construction of loess foundation pit and its construction method Download PDF

Info

Publication number
CN110295608A
CN110295608A CN201910642571.8A CN201910642571A CN110295608A CN 110295608 A CN110295608 A CN 110295608A CN 201910642571 A CN201910642571 A CN 201910642571A CN 110295608 A CN110295608 A CN 110295608A
Authority
CN
China
Prior art keywords
foundation pit
loess
tube
pressure steam
low pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910642571.8A
Other languages
Chinese (zh)
Inventor
王铁行
林芸
金鑫
张亮
王华杰
甘浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201910642571.8A priority Critical patent/CN110295608A/en
Publication of CN110295608A publication Critical patent/CN110295608A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Greenhouses (AREA)

Abstract

The invention discloses a kind of hot dehumidification supporting construction of loess foundation pit and its construction methods, including being provided with several U-tubes on heating tube, return pipe, low pressure steam boiler, heating tube, wherein, each U-tube is inserted in loess base in the region of loess foundation pit to be dug, the water outlet of low pressure steam boiler is successively connected through heating tube, each U-tube and return pipe with the water inlet of low pressure steam boiler, the supporting construction can be realized the supporting of loess foundation pit, and construction is simple, at low cost.

Description

A kind of hot dehumidification supporting construction of loess foundation pit and its construction method
Technical field
The invention belongs to ground pattern foundation pit supporting structure field, it is related to a kind of hot dehumidification supporting construction of loess foundation pit and its construction party Method.
Background technique
It is common that in profile in dry highland of Loess Plateau area, height, which is more than the upright loess slope of 20m,.If loess soil mass of foundation pit is contained Water is reduced to 10% hereinafter, then non-support loess foundation pit vertical cut depth can greatly improve.Based on this thought, applicant It is proposed a kind of new loess foundation ditch strengthening method-hot dehumidification method for strengthening.This method drives hole slope soil by applying high temperature, with heating power Intracorporal moisture generates movement, and the reinforcing scope soil body is gradually discharged, and makes to cheat the significant decrease of slope water content of soil, to significantly mention High strength of loess is stable to achieve the purpose that hole slope.
It is proposed the research achievement in terms of the main theory foundation of hot dehumidification method for strengthening is unsaturated soil body water-energy budget.It is existing Research provides foundation to scientific knowledge and evaluation unsaturation soil body hydro-thermal problem, has had revealed that out that temperature gradient moves moisture The driving effect of shifting, after applying temperature gradient to the soil body, soil body moisture will be migrated from high-temperature region to low-temperature space, cause temperature higher Region water content of soil reduces.After hot dehumidification method for strengthening applies a big temperature gradient to the soil body, it is higher to will lead to temperature Hole slope water content of soil is greatly reduced, and hole slope soil strength greatly improves therewith, so that reaching maintenance hole slope stablizes purpose.
Existing foundation pit supporting method adds the reinforcements such as nail, stake, anchor in the soil body mostly, changes the natural of hole Zhou Tuti The length of structure, reinforcement is also restrained, and project cost is high.
Summary of the invention
It is an object of the invention to overcome the above-mentioned prior art, a kind of hot dehumidification supporting knot of loess foundation pit is provided Structure and its construction method, which can be realized the supporting of loess foundation pit, and construction is simple, at low cost.
In order to achieve the above objectives, the hot dehumidification supporting construction of loess foundation pit of the present invention include heating tube, it is return pipe, low Several U-tubes are provided on pressure steam boiler, heating tube, wherein each U-tube is inserted in loess base to Stabilization of Loess base In the region in hole, the water outlet of low pressure steam boiler successively enters water through heating tube, U-tube and return pipe and low pressure steam boiler Mouth is connected.
The surface in the region of loess foundation pit to be dug offers several soil layers drillings in loess base, wherein a soil layer bores Hole corresponds to a U-tube, wherein each U-tube is inserted in corresponding soil layer drilling, and is backfilled with yellow mud in the drilling of each soil layer Slurry.
It further include for detecting the temperature sensor of low pressure steam boiler exit steam temperature, for controlling low-pressure steam The controller of boiler and Temperature Humidity Sensor for monitoring temperature and humidity in loess foundation pit, wherein controller with it is warm and humid Output end, the output end of temperature sensor and the control terminal of low pressure steam boiler of degree sensor are connected.
It is provided with outlet valve on heating tube, is provided with back-water valve (BWV) on return pipe.
The aperture of soil layer drilling is 120mm.
Low pressure steam boiler is Horizontal electric low pressure steam boiler and Horizontal type natural gas low pressure steam boiler.
The construction method of the hot dehumidification supporting construction of loess foundation pit of the present invention the following steps are included:
1) before loess excavation of foundation pit, along the reinforcing scope for excavating boundary and determining the hole slope soil body of loess foundation pit;
2) soil layer drilling is drilled through in the reinforcing scope of the hole slope soil body;
3) each U-tube on heating tube is inserted in corresponding soil layer drilling, then the drilling of each soil layer is backfilled;
4) heating tube, U-tube, return pipe and low pressure steam boiler are connected, the high-temperature water of low pressure steam boiler output Vapour successively through heating tube 3 and each U-tube, is then back in low pressure steam boiler by return pipe, with heating and the drainage soil body.
The temperature of the high-temperature water of low pressure steam boiler output is less than or equal to 300 DEG C.
The length of U-tube is 1.2 times of loess foundation depth.
The distance between U-tube and soil stabilization zone boundary are 0.4 times of loess foundation depth;
The distance between adjacent U-tube is 0.4 times of loess foundation depth.
The invention has the following advantages:
The hot dehumidification supporting construction of loess foundation pit of the present invention and its construction method are when specific operation, by unsaturated soil Water-energy budget theory is applied to loess foundation pit supporting project, is added by the high-temperature water vapor being passed through into U-tube to loess Heat and the drainage soil body, then carry out the excavation of loess foundation pit, project cost is small, and environmentally protective, changes existing pattern foundation pit supporting structure again Method adds the practice of the reinforcements such as nail, stake, anchor in the soil body, ensure that the natural structure of hole Zhou Tuti to greatest extent, also favorably In solving the problems, such as existing reinforcement length limited.
Detailed description of the invention
Fig. 1 is perspective view of the invention;
Fig. 2 cuts open body figure for of the invention;
Fig. 3 is the pipeline detail drawing of U-tube 2 in the present invention.
Wherein, 1 be low pressure steam boiler, 2 be U-tube, 3 be heating tube, 4 be return pipe, 5 be soil layer drilling.
Specific embodiment
The invention will be described in further detail with reference to the accompanying drawing:
With reference to Fig. 1, Fig. 2 and Fig. 3, the hot dehumidification supporting construction of loess foundation pit of the present invention includes heating tube 3, return pipe 4, low pressure steam boiler 1, be provided with several U-tubes 2 on heating tube 3, wherein each U-tube 2 is inserted in be added in loess base Gu in the region of loess foundation pit, the water outlet of low pressure steam boiler 1 is successively steamed through heating tube 3, U-tube 2 and return pipe 4 and low pressure The water inlet of boiler furnace 1 is connected.
The surface in the region of loess foundation pit to be dug offers several soil layers drillings 5 in loess base, wherein a soil layer bores Hole 5 corresponds to a U-tube 2, wherein each U-tube 2 is inserted in corresponding soil layer drilling 5, and is backfilled in each soil layer drilling 5 Yellow mud.
The invention also includes for detecting 1 exit steam temperature of low pressure steam boiler temperature sensor, for controlling The controller of low pressure steam boiler 1 and Temperature Humidity Sensor for monitoring temperature and humidity in loess foundation pit, wherein control Device is connected with the control terminal of the output end of Temperature Humidity Sensor, the output end of temperature sensor and low pressure steam boiler 1.
It is provided with outlet valve on heating tube 3, is provided with back-water valve (BWV) on return pipe 4;The aperture of soil layer drilling 5 is 120mm;It is low Pressure steam boiler 1 is Horizontal electric low pressure steam boiler and Horizontal type natural gas low pressure steam boiler.
The construction method of the hot dehumidification supporting construction of loess foundation pit of the present invention the following steps are included:
1) before loess excavation of foundation pit, along the reinforcing scope for excavating boundary and determining the hole slope soil body of loess foundation pit;
2) soil layer drilling 5 is drilled through in the reinforcing scope of the hole slope soil body;
3) each U-tube 2 is inserted in corresponding soil layer drilling 5, then each soil layer drilling 5 is filled;
4) heating tube 3, U-tube 2, return pipe 4 and low pressure steam boiler 1 are connected, the height that low pressure steam boiler 1 exports Then warm water vapour is back in low pressure steam boiler 1, to heat and dredge successively through heating tube 3 and each U-tube 2 by return pipe 4 Dry ground body.
Specifically, the temperature for the high-temperature water that low pressure steam boiler 1 exports is less than or equal to 300 DEG C;The length of U-tube 2 is Huang 1.2 times of native foundation depth;The distance between U-tube 2 and soil stabilization zone boundary are 0.4 times of loess foundation depth;Phase The distance between adjacent U-tube 2 is 0.4 times of loess foundation depth.
Controller and temperature sensor jointly control low pressure steam boiler 1 output steam temperature, Temperature Humidity Sensor and Controller synergy monitors the temperature and water content data during soil mass consolidation.
Above-described embodiment is merely a preferred embodiment of the present invention, and it is not intended to limit the protection scope of the present invention, as long as using Design principle of the invention, and the non-creative variation worked and made is carried out on this basis, it should belong to of the invention Within protection scope.

Claims (10)

1. a kind of hot dehumidification supporting construction of loess foundation pit, which is characterized in that including heating tube (3), return pipe (4), low-pressure steam Boiler (1), several U-tubes (2), wherein each U-tube (2) is inserted in the region in loess base to Stabilization of Loess foundation pit, The water outlet of low pressure steam boiler (1) is successively through heating tube (3), U-tube (2) and return pipe (4) and low pressure steam boiler (1) Water inlet is connected.
2. the hot dehumidification supporting construction of loess foundation pit according to claim 1, which is characterized in that loess to be dug in loess base The surface in the region of foundation pit offers several soil layer drillings (5), wherein the corresponding U-tube (2) of a soil layer drilling (5), In, each U-tube (2) is inserted in corresponding soil layer drilling (5), and is backfilled with yellow mud in each soil layer drilling (5).
3. the hot dehumidification supporting construction of loess foundation pit according to claim 1, which is characterized in that further include for detecting low pressure It the temperature sensor of steam boiler (1) exit steam temperature, the controller for controlling low pressure steam boiler (1) and is used for Monitor the Temperature Humidity Sensor of temperature and humidity in loess foundation pit, wherein the output end of controller and Temperature Humidity Sensor, temperature The control terminal of the output end and low pressure steam boiler (1) of sensor is connected.
4. the hot dehumidification supporting construction of loess foundation pit according to claim 1, which is characterized in that heating tube is provided on (3) Outlet valve, return pipe are provided with back-water valve (BWV) on (4).
5. the hot dehumidification supporting construction of loess foundation pit according to claim 1, which is characterized in that the aperture of soil layer drilling (5) For 120mm.
6. the hot dehumidification supporting construction of loess foundation pit according to claim 1, which is characterized in that low pressure steam boiler (1) is Horizontal electric low pressure steam boiler and Horizontal type natural gas low pressure steam boiler.
7. a kind of construction method of the hot dehumidification supporting construction of loess foundation pit described in claim 2, which is characterized in that including following step It is rapid:
1) before loess excavation of foundation pit, along the reinforcing scope for excavating boundary and determining the hole slope soil body of loess foundation pit;
2) soil layer drilling (5) is drilled through in the reinforcing scope of the hole slope soil body;
3) each U-tube (2) is inserted in corresponding soil layer drilling (5), then each soil layer drilling (5) is backfilled;
4) heating tube (3), U-tube (2), return pipe (4) and low pressure steam boiler (1) are connected, low pressure steam boiler (1) is defeated Superheated vapor out is then back to low pressure steam boiler by return pipe (4) successively through heating tube (3) and each U-tube (2) (1) in, with heating and the drainage soil body.
8. the construction method of the hot dehumidification supporting construction of loess foundation pit according to claim 7, which is characterized in that low-pressure steam The temperature of the high-temperature water of boiler (1) output is less than or equal to 300 DEG C.
9. the construction method of the hot dehumidification supporting construction of loess foundation pit according to claim 7, which is characterized in that U-tube (2) Length be 1.2 times of loess foundation depth.
10. the construction method of the hot dehumidification supporting construction of loess foundation pit according to claim 7, which is characterized in that U-tube (2) with the distance between soil stabilization zone boundary is loess foundation depth 0.4 times;
The distance between adjacent U-tube (2) is 0.4 times of loess foundation depth.
CN201910642571.8A 2019-07-16 2019-07-16 A kind of hot dehumidification supporting construction of loess foundation pit and its construction method Pending CN110295608A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910642571.8A CN110295608A (en) 2019-07-16 2019-07-16 A kind of hot dehumidification supporting construction of loess foundation pit and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910642571.8A CN110295608A (en) 2019-07-16 2019-07-16 A kind of hot dehumidification supporting construction of loess foundation pit and its construction method

Publications (1)

Publication Number Publication Date
CN110295608A true CN110295608A (en) 2019-10-01

Family

ID=68031297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910642571.8A Pending CN110295608A (en) 2019-07-16 2019-07-16 A kind of hot dehumidification supporting construction of loess foundation pit and its construction method

Country Status (1)

Country Link
CN (1) CN110295608A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254950A (en) * 2020-02-18 2020-06-09 河海大学 Low-temperature freezing slide-resistant pile for hydrodynamic landslide, and manufacturing method and freezing method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5656239A (en) * 1989-10-27 1997-08-12 Shell Oil Company Method for recovering contaminants from soil utilizing electrical heating
CN102943480A (en) * 2012-10-09 2013-02-27 西安科技大学 Loess foundation pit supporting method
CN204570664U (en) * 2015-01-19 2015-08-19 浙江大学 A kind of thermal vacuum prepressing device with hot type band drain of super reinforcement of soft soil
JP2017179080A (en) * 2016-03-29 2017-10-05 三菱ケミカル株式会社 Aliphatic polyester resin composition and drain material made from the composition
CN207032215U (en) * 2017-06-20 2018-02-23 天津大学 A kind of water circulation type ground heater
CN109853517A (en) * 2019-02-18 2019-06-07 中交天津港湾工程研究院有限公司 A kind of U-shaped circulating hot water consolidation draining system and its construction method
CN208996019U (en) * 2017-09-30 2019-06-18 宁波大学 A kind of heat drain consolidation system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5656239A (en) * 1989-10-27 1997-08-12 Shell Oil Company Method for recovering contaminants from soil utilizing electrical heating
CN102943480A (en) * 2012-10-09 2013-02-27 西安科技大学 Loess foundation pit supporting method
CN204570664U (en) * 2015-01-19 2015-08-19 浙江大学 A kind of thermal vacuum prepressing device with hot type band drain of super reinforcement of soft soil
JP2017179080A (en) * 2016-03-29 2017-10-05 三菱ケミカル株式会社 Aliphatic polyester resin composition and drain material made from the composition
CN207032215U (en) * 2017-06-20 2018-02-23 天津大学 A kind of water circulation type ground heater
CN208996019U (en) * 2017-09-30 2019-06-18 宁波大学 A kind of heat drain consolidation system
CN109853517A (en) * 2019-02-18 2019-06-07 中交天津港湾工程研究院有限公司 A kind of U-shaped circulating hot water consolidation draining system and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254950A (en) * 2020-02-18 2020-06-09 河海大学 Low-temperature freezing slide-resistant pile for hydrodynamic landslide, and manufacturing method and freezing method thereof
CN111254950B (en) * 2020-02-18 2021-06-01 河海大学 Low-temperature freezing slide-resistant pile for hydrodynamic landslide, and manufacturing method and freezing method thereof

Similar Documents

Publication Publication Date Title
CN105134284B (en) One kind is based on horizontal orientation drilling liquid nitrogen circulating freezing resistance anti-reflection mash gas extraction method
Rafi et al. Control of rock jacking considering spread of grout and grouting pressure
Rafi et al. Basic mechanism of elastic jacking and impact of fracture aperture change on grout spread, transmissivity and penetrability
CN105714764A (en) Tunnel ground deep-hole sleeve valve tube grouting construction method
KR101370640B1 (en) Geothermal system which differ in the depth of the construction of geothermal hole
CN101089362B (en) Improved steam oil production method
CN204252967U (en) Hot dry rock multi cycle heating system
CN111535296B (en) Layered grouting freezing device and layered grouting freezing method
CN105674608A (en) Device and method for extracting and utilizing geothermal energy
Ren et al. Field tests on thermal response characteristics of micro-steel-pipe pile under multiple temperature cycles
CN106638556A (en) Heat energy reinforced vacuum preloading soft foundation drainage structure and drainage method
CN108036985A (en) A kind of fracture grouting slurry arteries and veins makes and infiltration coefficient detection device and method
KR101197211B1 (en) System and method for controlling temperature of fluid for improving injectivity in stratum of supercritical carbon dioxide
KR102090954B1 (en) Geothermal heat exchanging system using automatic control device for underground water extraction
CN107419646A (en) It is a kind of to solve the problems, such as the road construction method of road surface plate bottom empty
CN110295608A (en) A kind of hot dehumidification supporting construction of loess foundation pit and its construction method
CN111395965B (en) Safe casing running operation method suitable for easily-leaking stratum
CN107575214A (en) The Forecasting Methodology of temperature and pressure in the pit shaft of process is adopted for noting
CN110067548B (en) Coal mine underground high-temperature hydraulic fracturing permeability-increasing method and system
CN104790376B (en) The modified sharp separation compacting method of soft foundation
CN106761630B (en) Reservoir heating, recovery method and device
CN110067546A (en) The method of discrimination of oil well channeling in steam-drive process
Peng et al. Thermo-mechanical characteristics of laterally loaded energy piles under multiple heating-cooling cycles in mountain area
CN105927271A (en) Grouting backfilling system and grouting backfilling method for vertical shafts in vertical heat exchangers
CN205561323U (en) Draw device that utilizes geothermal energy

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191001

RJ01 Rejection of invention patent application after publication