CN110288253A - Cost optimization management system and method - Google Patents

Cost optimization management system and method Download PDF

Info

Publication number
CN110288253A
CN110288253A CN201910579677.8A CN201910579677A CN110288253A CN 110288253 A CN110288253 A CN 110288253A CN 201910579677 A CN201910579677 A CN 201910579677A CN 110288253 A CN110288253 A CN 110288253A
Authority
CN
China
Prior art keywords
data
exceeded
single datum
cost
process data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910579677.8A
Other languages
Chinese (zh)
Inventor
龚量亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Information Technology Co Ltd Clip
Original Assignee
Chongqing Information Technology Co Ltd Clip
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Information Technology Co Ltd Clip filed Critical Chongqing Information Technology Co Ltd Clip
Priority to CN201910579677.8A priority Critical patent/CN110288253A/en
Publication of CN110288253A publication Critical patent/CN110288253A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to cost management technology field, specially a kind of cost optimization management system and method, the system include data generation module, for generating single datum according to parameter actual information and statistical rules;Single datum is labeled as exceeded data for obtaining normal data, and when single datum exceeds normal data by data analysis module.Method includes the following steps: data generation step, obtains statistical rules, single datum is generated according to parameter actual information and statistical rules generating process data, and according to process data;Data analysis step obtains normal data, and when single datum exceeds normal data, single datum is labeled as exceeded data.Single datum can be automatically generated according to the parameter of acquisition using this programme, and exceeded data can be filtered out according to the single datum of generation and the normal data of setting to remind manager.

Description

Cost optimization management system and method
Technical field
The present invention relates to cost management technology field, specially a kind of cost optimization management system and method.
Background technique
Production cost is that production unit is the every producing cost for producing product or utility service and occurring, including items are directly Connect expenditure and manufacturing expense.Directly expenditure include direct material (raw material, auxiliary material, standby redundancy, fuel and power etc.), Direct pay (wage of producers, subsidy), other direct expenditures (such as welfare fund);Manufacturing expense refers to point in enterprise Factory, workshop produce the general expenses that occurs by organization and management, including subsidiary factory, workshop management personnel wage, depreciation cost and its His manufacturing expense (administrative expenses, travel charge, labor insurance fees etc.).
The profit of enterprise is that sales volume subtracts cost, in order to which net income increase often takes two kinds of measures, first is that increasing sale Volume, second is that reduced cost.And most of enterprise is to strive for maximum profit, often two kinds of measures carry out simultaneously, in expansion city While field increases sales volume, reasonable reduced cost under the premise of guaranteeing quality, therefore enterprise need to carry out the cost of product Analysis and control.The existing enterprise that manufactures is mainly to use monthly to count, then share equally for the accounting of cost and management Mode in every product carries out, and there are following disadvantages for such mode:
1. calculating excessive cycle: can just be exposed in the cost abnormal problem that certain day occurs when calculating, be unfavorable for locating in time Manage cost abnormal problem;
2. the cost calculation inaccuracy that the mode of amortization makes single products: daily production cost and production are total in one month Measure not identical, i.e. the cost of single products corresponding daily is not also identical, the mode monthly shared equally make original cost compared with High product price is lower, and original lower-cost product price is got higher;
3. covering accidental cost abnormal problem: monthly counting and share equally, so that certain day accidental cost abnormal problem quilt It divides in other normal number of days, may just will appear when comprehensive statistics that there is no abnormal situations.
Since there are disadvantages mentioned above, cause manager that can not grasp production cost variation in real time dynamically, while but also Manager does not know set about from which link, carries out production process to require a great deal of time when optimizing production process Analysis may be because causing to consume excessive cost without optimization production process in time and in this analysis phase.
Summary of the invention
The invention is intended to provide a kind of cost optimization management system, individual event number can be automatically generated according to the parameter of acquisition According to, and exceeded data can be filtered out to remind manager according to the single datum of generation and the normal data of setting.
The present invention provides base case: cost optimization management system, including background server, the background server include
Data transmission module, for the actual information that gets parms;
Data generation module, for obtaining statistical rules, and according to parameter actual information and statistical rules generating process number According to, and single datum is generated according to process data;
Data analysis module, for obtaining normal data, and when single datum exceeds normal data, by single datum mark It is denoted as exceeded data.
Noun explanation: statistical rules, which is that enterprise is preset, finds out respective process data, statistical number according to parameter actual information According to the formula or algorithm of, single datum;Parameter actual information is the parameters that the manager obtained requires, including parameter type And parameter name;Process data is the data counted under every kind of parameter type, how many kind parameter type is with regard to how many process Data;Normal data is the price of the acceptable single products cost of enterprise's setting.
The working principle and beneficial effect of base case: being got parms actual information by data transmission module, acquisition Mode can be data picker and directly input, and be also possible to acquire by sensor, can also be directly from existing equipment It obtains.What statistical rules can prestore for system developer, it can also be set and be prestored by company manager, data picker or pipe Reason person inputs relevant parameter, and required process data and single datum just can be directly obtained by statistical rules.It can be by enterprise Statistical rules is set, and single datum is generated according to statistical rules and is checked for the manager of enterprise, grasps Production development in real time.
Judge whether single datum is above standard data by data analysis module, when being more than, illustrate single products at Originally exceeded range is come into, single datum is labeled as exceeded data at this time.By showing exceeded data, manager can Get information about it is exceeded to same day single products cost, to remind manager to pay attention to the management to production process.
Further, the data analysis module is also used to according to the corresponding process data of exceeded data acquisition as exceeded Process data.
The utility model has the advantages that according to the corresponding process data of exceeded data acquisition as exceeded process data, manager can be by Check corresponding data, and then judge to be which link goes wrong in production process so that final single products at This is exceeded, therefore saves on manager and checks each link many multidata times, faster finds problem link, and then solved Certainly.
Further, the data analysis module, is also used to obtain normal process data, and according to normal process data from super Exceeded item is filtered out in mark process data.
Noun illustrates: normal process data is the acceptable cost price of parameters type of enterprise's setting.
It is more than mark by numerical value in exceeded process data the utility model has the advantages that comparing exceeded process data by normal process data The parameter type of quasi- process data is as exceeded item, and manager can intuitively be the discovery which cost is exceeded, such as manpower Cost be exceeded item, then the reason is that manually arrange it is unreasonable etc., such as material cost be exceeded item, then the reason is that substandard product Excessively or supply and marketing quotient floats for commodity price, thus reduces the workload that manager screens exceeded item, manager is use up Fast link of finding the problem, and then handled in time, to reduce the loss of enterprise.
Further, the data analysis module is also used to mark single datum when single datum is more than target data To severely exceed data.
The utility model has the advantages that illustrating that same day single products cost is excessively high when single datum exceeds target data, alreading exceed The standard of enterprise, at this time by the single datum labeled as severe overweight data.Manager's even business survey is needed to produce Journey finds out the main reason for single products cost is exceeded, is convenient for the timely processing cost abnormal problem of manager, to guarantee subsequent life The cost of production process restores normal.
Further, the data transmission module, be also used to get parms actual information while, obtain target data and mark Quasi- data, and it is sent to data analysis module.
The utility model has the advantages that target data and normal data are obtained while getting parms actual information, due to parameter reality Information is uploaded daily by data picker, and target data and normal data can be set according to same day situation, such as same day material Expect that purchasing price is excessively high, then raises target data and normal data, thus more accurately identify exceeded data and severe overweight Data.
Further, the data transmission module is also used to obtain target data and normal data, and is stored in database In.
The utility model has the advantages that target data and normal data are stored in the database by manager, data analysis module directly from It obtains in database, is inputted daily without data picker or manager, save the time, also avoid manually repeatedly causing data defeated The situation for entering mistake occurs.
The invention is intended to provide a kind of cost optimization management method, include the following steps,
Data acquisition step, get parms actual information;
Data generation step obtains statistical rules, according to parameter actual information and statistical rules generating process data, and root Single datum is generated according to process data;
Data analysis step obtains normal data, and when single datum exceeds normal data, single datum is labeled as Exceeded data.
The utility model has the advantages that by data acquisition step, acquisition parameter actual information, and automatically generated by data generation step Process data and single datum analyze cost convenient for subsequent.Exceed standard in single datum by data analysis step When data, single datum is labeled as exceeded data, administrator has found cost abnormal problem by exceeded data in time.
Further, the data analysis step is further comprising the steps of, according to the corresponding exceeded process of exceeded data acquisition Data, and normal process data is obtained, exceeded item is filtered out from exceeded process data according to normal process data.
The utility model has the advantages that by data analysis step according to the corresponding exceeded process data of exceeded data screening, and according to mesh Mark process data filters out exceeded item from exceeded process data.When there is single datum beyond target data, manager is needed Find out the main reason for single products cost is exceeded.The main reason for exceeded item is exceeded is the manager mainly side of investigation To, and need the link of control emphatically.By filtering out exceeded item, save the time of manager's investigation, convenient for manager and When processing cost abnormal problem.
Further, the also described data analysis step is further comprising the steps of, will be single when single datum is more than target data Item data is labeled as severe overweight data.
The utility model has the advantages that target data is to severely exceed line, exist on the day of single datum exceeds target data, that is, illustrates tight The cost excessive problem of weight.Manager even should investigate production link with enterprise, and processing cost is abnormal in time Problem, to guarantee that the cost of subsequent production process restores normal.
Further, the target data and normal data are retrieved as acquisition while getting parms actual information, or Person obtains from database.
The utility model has the advantages that using get parms actual information while obtain target data and normal data, can be more acurrate The exceeded data of label and severely exceed data, using target data and normal data is obtained from database, number can be reduced Target data and normal data are all uploaded daily according to picker or manager, and then reduces the probability for uploading corrupt data, are also saved Save more data acquisition times.
Detailed description of the invention
Fig. 1 is the logic diagram of cost optimization management system embodiment two of the present invention;
Fig. 2 is process of the cost optimization management method embodiment binary signal judgment step of the present invention to comparison Optimization Steps Figure;
Fig. 3 is the logic diagram of cost optimization management system embodiment three of the present invention;
Fig. 4 is process of three data analysis step of cost optimization management method embodiment of the present invention to exceeded statistic procedure Figure;
Fig. 5 is process of the three signal judgment step of cost optimization management method embodiment of the present invention to performance statistic procedure Figure.
Specific embodiment
It is further described below by specific embodiment:
Embodiment one
Cost optimization management system, including background server, setting terminal and acquisition terminal, background server include setting Module, data transmission module, data generation module, data analysis module and database, be stored in database statistical rules and Parameter acquisition table, statistical rules and parameter acquisition table can be set by system developer, can also be whole from setting by company manager End input is set.In the present embodiment, statistical rules and parameter acquisition table are set by manager.
Setting terminal, for the set information that gets parms (in the present embodiment, parameter setting information include human cost, Material cost, basic cost and other costs, wherein human cost includes work post, quantity, operating time, every hourly pay, material Cost includes material category, consumption of materials, material unit price, and basic cost includes basic type, consumption, foundation unit price, His cost includes cost type, cost total value) and statistical rules, and parameter setting information and statistical rules are sent to backstage and taken Business device.
Setting module for receiving parameter setting information, and generates data acquisition tables according to parameter setting information and is stored in Database, and for receiving statistical rules storage (in the present embodiment, statistical rules are as follows: human cost are as follows: tired in the database Quantity × operating time × every hourly pay of each work post is counted, material cost is the consumption of materials × material for adding up every kind of material Unit price, basic cost are to add up every kind of basic consumption × foundation unit price, other costs be add up every class cost cost it is total Volume, totle drilling cost are human cost+material cost+basic cost+other costs).
Acquisition terminal gets parms after actual information is sent to for showing data acquisition tables, and according to data acquisition tables Platform server, for example, the data acquisition tables of the human cost after the actual information that gets parms are as shown in Table 1.Data transmit mould Block is sent to data generation module for receiving parameter actual information, and by parameter actual information.
Table one
Data generation module obtains statistical rules, and according to parameter reality for receiving parameter actual information from database Border information and statistical rules generating process data (in the present embodiment, share Four processes data, respectively human cost, material Expect cost, basic cost, other costs, such as human cost is 10 × 8 × 20+20 × 6 × 15+30 × 8 × 12=6280 Member), and statistical data is generated according to process data, statistical data is sent to setting terminal, and store in the database (at this In embodiment, statistical data is the sum of Four processes data, i.e. totle drilling cost).
Data generation module is also used to obtain production from database, and raw according to statistical data and production It is sent to setting terminal and data analysis module at single datum, and by single datum, and is stored in the database.Setting is eventually End, for being shown and being checked for manager in reception single datum and statistical data.In the present embodiment, statistical data one It total production cost, the production total amount that production is one day, total production cost are that single-piece produces divided by production Product cost, as single datum.
Data analysis module for receiving single datum, and obtains target data, judges target data and single datum The single datum is labeled as by numerical values recited when single datum is greater than target data (single datum exceeds target data) Data are severely exceeded, and are sent to setting terminal.Setting terminal severely exceeds data for receiving, and is shown.
Data analysis module is also used to obtain normal data, and the numerical values recited of judgment criteria data and single datum, when When single datum is greater than normal data (single datum exceeds normal data), which is labeled as exceeded data, is obtained The process data for generating exceeded data is taken (in the present embodiment, to be total to there are four exceeded process data, divide as exceeded process data Wei human cost, material cost, basic cost, other costs), and normal process data is obtained from database, comparison is super Process data and normal process data are marked, it is (i.e. exceeded to filter out exceeded item from exceeded process data according to normal process data Process data is greater than the link of normal process data), and exceeded data and exceeded item are sent to setting terminal.Setting terminal is used In the exceeded data of reception and exceeded item, and shown.
There are two types of acquisition modes for target data and normal data: first is that acquisition terminal is used in the actual information that gets parms Meanwhile obtain target data and normal data, and be sent to background server, data analysis module for receive target data and Normal data.Second is that setting terminal, for obtaining target data and normal data, and is sent to background server, data transmission Module stores in the database for receiving target data and normal data, and data analysis module from database for obtaining Take target data and normal data.In the present embodiment, using the second way.
Cost optimization management method based on cost optimization management system, comprising the following steps:
Rule settings step, get parms set information and statistical rules, generates data acquisition according to parameter setting information Table, in the database by parameter setting information, data acquisition tables, statistical rules storage, parameter setting information are manager's requirement Parameter that data picker fills in, the parameter for requiring sensor or existing equipment to acquire, statistical rules are to be believed according to parameter setting The algorithm that can be generated, the function filled in similar Excel are ceased, parameter setting information can be set as needed in company manager And the statistical rules of result is calculated according to parameter setting information.
Data acquisition step obtains data acquisition tables from database, and is got parms practical letter according to data acquisition tables Breath, parameter actual information includes human cost (work post, quantity, operating time, every hourly pay), material cost (material category, material Expect consumption, material unit price), basic cost (basic type, consumption, foundation unit price), other cost (cost types, cost Total value).Acquisition modes have following three kinds: first is that data picker is manually entered by acquisition terminal;Second is that setting sensor is whole End, passes through sensor automatic collection;Third is that being connect with existing equipment signal, directly acquired from existing equipment.In the present embodiment In, human cost and other costs are obtained using first way, and material cost is obtained using the second way, and basic cost is adopted It is obtained with the third mode (for example, human cost passes through acquisition by manager or data picker by the way of being manually entered Terminal uploads, and material cost acquires weight data by sensor, obtains consumption of materials automatically, basic cost using with it is existing The mode of device signal connection directly obtains corresponding consumption from ammeter, water meter, gas meter), certainly, data picker and pipe Reason person can also pass through first way supplementary material cost and basic cost.
Data generation step obtains statistical rules, according to parameter actual information and statistical rules generating process data, due to Parameter actual information is obtained according to data acquisition tables, can be directly substituted into generating process data in statistical rules, cumulative process Data calculate statistical data and (in the present embodiment, share Four processes data, respectively human cost, material cost, basis Cost, other costs, such as human cost are member, and statistical data is human cost, material cost, basic cost, other costs The sum of, as the same day production cost).Production is obtained from database, and is calculated according to production and statistical data Single datum.
Data analysis step obtains target data from database, and when single datum exceeds target data, by individual event Data markers are to severely exceed data;Normal data is obtained from database, and when single datum exceeds normal data, it will be single Item data is labeled as exceeded data, and according to the corresponding exceeded process data of exceeded data acquisition, and mark is obtained from database Quasi- process data filters out exceeded item according to normal process data from exceeded process data.
Data displaying shows that single datum or severe overweight data or exceeded data, exceeded item are checked for manager.
Embodiment two
The present embodiment and embodiment one the difference is that: as shown in Fig. 1, background server further includes optimization mould Block, optimization module include autoanalysis acquisition submodule, autoanalysis screening submodule, autoanalysis comparison submodule, comparison Analyze acquisition submodule, comparative analysis screening submodule, comparative analysis comparison submodule.
Setting terminal for obtaining self-optimization signal and analysis quantity, and is sent to background server.Optimization module is used After receiving self-optimization signal and analysis quantity, autoanalysis acquisition submodule is used to receive analysis quantity, and according to analysis Temporally inverted order obtains several single datums identical with analysis quantity to quantity from database, and single datum is sent to certainly My Analysis and Screening submodule.In the present embodiment, since measurement period is one day, if current date is on June 16th, 2019, point Analysing quantity is 10, then the individual event number that the single datum obtained generates daily between on June 15,6 days to 2019 June in 2019 According to.
Autoanalysis screening submodule is used to successively compare the size of single datum, obtains the smallest single datum of numerical value and makees For optimal data, and corresponding process data is screened as optimal process data from database according to optimal data, and It is sent to autoanalysis comparison submodule.If the single datum generated daily between on June 15,6 days to 2019 June in 2019 Respectively 577 yuan, 552 yuan, 566 yuan, 584 yuan, 573 yuan, 599 yuan, 580 yuan, 579 yuan, 587 yuan, 563 yuan, then numerical value is minimum Single datum be 552 yuan, i.e., 552 yuan be optimal data, corresponding process data be optimal process data.
Autoanalysis compares submodule, for obtaining the process data for generating current single datum as active procedure number According to, and optimal process data and current process data are compared, numerical value in current process data is greater than to the mark of optimal process data It is denoted as self-optimization item, and self-optimization item is sent to setting terminal and is shown.I.e. current single datum is in June, 2019 Single datum on the 16th, current process data is the corresponding process data of current single datum, if current process data is respectively 127 yuan (human cost), 380 yuan (material cost), 68 yuan (basic cost), 27 yuan (other costs), optimal process data point Not Wei 125 yuan (human cost), 330 yuan (material cost), 70 yuan (basic cost), 27 yuan (other costs), that is, mark from It is human cost and material cost that I, which optimizes item,.
Manager finds out corresponding cost problem according to self-optimization item, such as material cost is self-optimization item, be because Be supply and marketing quotient for commodity price float, product of still failing is excessive, convenient for manager for different cost problems in time into Row analysis and processing.
Setting terminal for obtaining comparison optimization signal and analysis group class, and is sent to background server.Optimization module is used After receiving comparison optimization signal and analysis group class, comparative analysis acquisition submodule is used to receive analysis quantity, and according to analysis Group class obtains several single datums of corresponding production group from database, and single datum is sent to comparative analysis screening submodule Block.In the present embodiment, since measurement period is one day, if current date is on June 16th, 2019, analysis group class is 1-10, Then obtain the single datum for the production group that on June 16th, 2019, number was 1-10.
Size of the submodule for the successively single datum of more each production group is screened in comparative analysis, and it is minimum to obtain numerical value Single datum corresponding process data is screened from database as optimal as optimal data, and according to optimal data Process data, and it is sent to comparative analysis comparison submodule.If the individual event number for the production group that on June 16th, 2019, number was 1-10 According to respectively 577 yuan, 552 yuan, 566 yuan, 584 yuan, 573 yuan, 599 yuan, 580 yuan, 579 yuan, 587 yuan, 563 yuan, then numerical value is most Small single datum is 552 yuan, i.e., 552 yuan are optimal data, and corresponding production group is the production line of number 2, i.e., number is 2 The process data in production group on June 16th, 2019 be optimal process data.
Comparative analysis compares submodule, for obtaining the process data of this production group as current process data, and compares The label that numerical value in current process data is greater than optimal process data is excellent by optimal process data and current process data Change item, and comparison optimization item is sent to setting terminal and is shown.I.e. current single datum is this production group June 16 in 2019 The single datum of day, current process data is the corresponding process data of current single datum, if current process data is respectively 127 First (human cost), 380 yuan (material cost), 68 yuan (basic cost), 27 yuan (other costs), optimal process data are respectively 125 yuan (human cost), 330 yuan (material cost), 70 yuan (basic cost), 27 yuan (other costs), that is, the comparison marked is excellent Changing item is human cost and material cost.
Manager finds out corresponding cost problem according to comparison optimization item, such as material cost is comparison optimization item, be because For floating for commodity price for supply and marketing quotient, product of still failing is excessive, since the process data of the production group of comparison is on the same day Data, then its supply and marketing quotient be for commodity price it is identical, then the reason of leading to the cost problem is more that product of failing is excessive, Manager should increase to the personal management in production process, improve product quality, reduce substandard product.
Cost optimization management method based on cost optimization management system, as shown in Fig. 2, comprising the following steps:
Signal judgment step obtains autoanalysis signal or comparative analysis signal, if getting autoanalysis signal, into Enter self-optimization step, if getting comparative analysis signal, enters comparison Optimization Steps.
Self-optimization step obtains analysis quantity, and obtains several single datums according to analysis quantity, successively judges individual event The size of data filters out the smallest single datum of numerical value as optimal data, filters out the process data for generating optimal data As optimal process data, the process data for generating current single datum is obtained as current process data, and compares optimal mistake The label that numerical value in current process data is greater than optimal process data is item by number of passes evidence and current process data.
Optimization Steps are compared, analysis group class is obtained, and several single datums are obtained according to analysis group class, successively judges individual event The size of data filters out the smallest single datum of numerical value as optimal data, filters out the process data for generating optimal data As optimal process data, obtain the process data of this production group as current process data, and compare optimal process data and The label that numerical value in current process data is greater than optimal process data is optimization item by current process data.
Data displaying shows that self-optimization item and/or comparison optimization item are checked for manager.
Embodiment three
The tightness and management method managed between different managers is different, in order to promote manager aggressive Thinking management method, improve management quality, the wage of manager or production group and cost abnormal problem linked up with, to promote The staff of production group actively improves product quality, and manager is promoted to reinforce the management to product cost in production process.
The present embodiment and embodiment two the difference is that: as shown in Fig. 3, background server further includes exceeded statistics Module, performance adjust module and performance statistical module, are stored with normal data, normal process data, performance ratio in database, Normal data is the standard price or the acceptable cost of highest of the single products cost of enterprise's setting;Normal process data is enterprise The cost of the acceptable links of industry setting;Performance ratio is the accounting between each production link of enterprise's setting.
Data analysis module, for exceeded item to be sent to exceeded statistical module.Exceeded statistical module, it is exceeded for receiving , and exceeded statistical form (exceeded statistical form includes exceeded item and exceeded quantity) is screened from database, it is exceeded when not screening When statistical form, exceeded statistical form is generated according to exceeded item, when screening exceeded statistical form, exceeded statistics is updated according to exceeded item Table, and in the database by the storage of exceeded statistical form.When exceeded item is human cost and material cost, the exceeded statistics of generation Table is as shown in Table 2.
Table two
Setting terminal is sent to background server for obtaining performance statistical signal and performance period.Performance adjusts module After receiving performance statistical signal, performance ratio and exceeded statistical form are obtained from database, and according in exceeded statistical form The exceeded quantity of exceeded item adjusts performance ratio (exceeded quantity is bigger, and the weight of corresponding exceeded item is bigger), and will adjustment Performance ratio afterwards is sent to performance statistical module, and updates performance ratio in the database.
Performance statistical module obtains in the corresponding time for receiving performance period and performance ratio, and according to performance period Several process datas and production, cumulative process data simultaneously obtain performance process data divided by production, according to performance The scoring of process data generating process, and Performance Rating is generated according to process scoring and performance ratio, and Performance Rating is sent to Setting terminal.Setting terminal is shown for receiving Performance Rating.Using Performance Rating as one of manager in performance period A performance assessment criteria, or directly linked up with money wages etc., promote manager to improve management quality.If performance period is 2019 May 31 1 day to 2019 May, then obtain every day in May process data added up after Four processes number According to if Four processes data are respectively 5050 yuan, 81560 yuan, 1560 yuan, 1660 yuan, production adds up to be 100, then achievement Imitating process data is respectively 50.5 yuan, 815.6 yuan, 15.6 yuan, 16.6 yuan.Divided with full marks 10 for total score, if the mistake thus generated Journey scoring is respectively 8.3 points, 9 points, 8.8 points, 7.9 points, and performance ratio is 1:5:3:1, then Performance Rating is 8.3/ (1+5+3+1) × 1+9/ (1+5+3+1) × 5+8.8/ (1+5+3+1) × 3+87.9/ (1+5+3+1) × 1=8.76 points.
Cost optimization management method based on cost optimization management system, further comprising the steps of as shown in attached drawing 4,5:
Exceeded statistic procedure obtains exceeded item, and exceeded statistical form is screened from database, when not screening exceeded statistics When table, exceeded statistical form is generated according to exceeded item, when screening exceeded statistical form, exceeded statistical form is updated according to exceeded item.
Signal judgment step, when judging received signal for performance statistical signal, into performance set-up procedure.
Performance set-up procedure obtains performance ratio and exceeded statistical form, and adjusts performance ratio, root according to exceeded statistical form Increase the weight of corresponding exceeded item according to exceeded quantity.
Performance statistic procedure, obtains performance period and performance ratio adjusted, and according to performance period obtain to it is corresponding when In several process datas and production, cumulative process data and production respectively, after adding up process data and divided by Production obtains performance process data after cumulative, is scored according to performance process data generating process, and according to process scoring and Performance ratio generates Performance Rating.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date Ordinary technical knowledge can know the prior art all in the field, and have using routine experiment hand before the date The ability of section, one skilled in the art can improve and be implemented in conjunction with self-ability under the enlightenment that the application provides This programme, some typical known features or known method should not become one skilled in the art and implement the application Obstacle.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, can also make Several modifications and improvements out, these also should be considered as protection scope of the present invention, these all will not influence the effect that the present invention is implemented Fruit and patent practicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification The records such as body embodiment can be used for explaining the content of claim.

Claims (10)

1. cost optimization management system, including background server, it is characterised in that: the background server includes
Data transmission module, for the actual information that gets parms;
Data generation module, for obtaining statistical rules, and according to parameter actual information and statistical rules generating process data, and Single datum is generated according to process data;
Single datum is labeled as by data analysis module for obtaining normal data, and when single datum exceeds normal data Exceeded data.
2. cost optimization management system according to claim 1, it is characterised in that: the data analysis module is also used to According to the corresponding process data of exceeded data acquisition as exceeded process data.
3. cost optimization management system according to claim 2, it is characterised in that: the data analysis module is also used to Normal process data is obtained, and exceeded item is filtered out from exceeded process data according to normal process data.
4. cost optimization management system according to claim 1-3, it is characterised in that: the data analyze mould Block is also used to when single datum is more than target data, by single datum labeled as severe overweight data.
5. cost optimization management system according to claim 4, it is characterised in that: the data transmission module is also used to Get parms actual information while, obtain target data and normal data, and be sent to data analysis module.
6. cost optimization management system according to claim 4, it is characterised in that: the data transmission module is also used to Target data and normal data are obtained, and is stored in the database.
7. cost optimization management method, it is characterised in that: include the following steps,
Data acquisition step, get parms actual information;
Data generation step obtains statistical rules, according to parameter actual information and statistical rules generating process data, and according to mistake Number of passes is according to generation single datum;
Data analysis step obtains normal data, and when single datum exceeds normal data, by single datum labeled as exceeded Data.
8. cost optimization management method according to claim 7, it is characterised in that: the data analysis step further include with Lower step according to the corresponding exceeded process data of exceeded data acquisition, and obtains normal process data, according to normal process data Exceeded item is filtered out from exceeded process data.
9. cost optimization management method according to claim 7 or 8, it is characterised in that: the data analysis step is also wrapped Following steps are included, when single datum is more than target data, by single datum labeled as severe overweight data.
10. cost optimization management method according to claim 9, it is characterised in that: the target data and normal data Be retrieved as acquisition while getting parms actual information, or obtained from database.
CN201910579677.8A 2019-06-28 2019-06-28 Cost optimization management system and method Pending CN110288253A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910579677.8A CN110288253A (en) 2019-06-28 2019-06-28 Cost optimization management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910579677.8A CN110288253A (en) 2019-06-28 2019-06-28 Cost optimization management system and method

Publications (1)

Publication Number Publication Date
CN110288253A true CN110288253A (en) 2019-09-27

Family

ID=68020169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910579677.8A Pending CN110288253A (en) 2019-06-28 2019-06-28 Cost optimization management system and method

Country Status (1)

Country Link
CN (1) CN110288253A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1536521A (en) * 2003-04-10 2004-10-13 中国石化仪征化纤股份有限公司 On-line real time cost control system in polyester prodeuction industry
CN103984283A (en) * 2013-02-08 2014-08-13 西门子公司 Cost analysis apparatus for numerical control machine tool, and numerical control system
CN105446299A (en) * 2015-12-18 2016-03-30 甘肃银光聚银化工有限公司 Data monitoring and cost accounting system
CN107958357A (en) * 2018-01-22 2018-04-24 东华理工大学 A kind of Cost Management System of BIM projects
CN109344178A (en) * 2018-09-18 2019-02-15 杭州安恒信息技术股份有限公司 A kind of data sheet real-time statistical method, device, equipment and readable storage medium storing program for executing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1536521A (en) * 2003-04-10 2004-10-13 中国石化仪征化纤股份有限公司 On-line real time cost control system in polyester prodeuction industry
CN103984283A (en) * 2013-02-08 2014-08-13 西门子公司 Cost analysis apparatus for numerical control machine tool, and numerical control system
CN105446299A (en) * 2015-12-18 2016-03-30 甘肃银光聚银化工有限公司 Data monitoring and cost accounting system
CN107958357A (en) * 2018-01-22 2018-04-24 东华理工大学 A kind of Cost Management System of BIM projects
CN109344178A (en) * 2018-09-18 2019-02-15 杭州安恒信息技术股份有限公司 A kind of data sheet real-time statistical method, device, equipment and readable storage medium storing program for executing

Similar Documents

Publication Publication Date Title
CN103699966B (en) Various dimensions based on user's request, overall process data managing and control system and management-control method
CN113159339B (en) One-area one-index line loss management method and system based on big data
CN111291076B (en) Abnormal water use monitoring alarm system based on big data and construction method thereof
CN106503959B (en) The monitoring early-warning system of project information
CN105847598B (en) Method for call center multifactorial telephone traffic prediction
CN105811402B (en) A kind of Electric Load Prediction System and its Forecasting Methodology
CN104123590B (en) 95598 Customer Service Center's monitoring operation system and methods
CN105446299B (en) A kind of data monitoring and Cost Accounting System
CN109376924A (en) A kind of method, apparatus, equipment and the readable storage medium storing program for executing of material requirements prediction
CN108846691A (en) Regional grain and oil market price monitoring analysing and predicting system and monitoring method
CN104951905A (en) Equipment dynamic ledger management system
CN103679373A (en) Full chain budget data processing system and method for production infrastructure standard cost system
CN103177341A (en) Line loss lean comprehensive management system and method
CA2394227A1 (en) Computer-based system and method for monitoring the profitability of a manufacturing plant
CN108388955A (en) Customer service strategies formulating method, device based on random forest and logistic regression
CN112529449A (en) Supplier quality evaluation method and system based on big data
CN108090684A (en) Insurance premium appraisal procedure, device, terminal device and storage medium
CN114742607A (en) Multi-user cooperative management system and method based on logistics supply chain
CN115330404A (en) System and method for electric power marketing inspection
CN114971685A (en) Market procurement trade commodity price management method based on big data
CN113010624B (en) Intelligent power distribution inspection system
DE102007013340A1 (en) System and method for managing environmental impacts of companies
CN113361961A (en) PDCA closed-loop management-based national collection full-process monitoring system and intelligent system implementation
CN110288253A (en) Cost optimization management system and method
CN117035532A (en) Electric power marketing management system and method based on marketing index multidimensional linkage analysis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927

RJ01 Rejection of invention patent application after publication