CN110285682A CN201910451683.5A CN201910451683A CN110285682A CN 110285682 A CN110285682 A CN 110285682A CN 201910451683 A CN201910451683 A CN 201910451683A CN 110285682 A CN110285682 A CN 110285682A
Authority
CN
China
Prior art keywords
water beam
fitting
heating furnace
groove
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910451683.5A
Other languages
Chinese (zh)
Other versions
CN110285682B (en
Inventor
曲元艇
刘征
张兆朋
朱相国
李丽苹
李丰
王欢
李楠楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Original Assignee
ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANGANG CONSTRUCTION CONSORTIUM Co Ltd filed Critical ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Priority to CN201910451683.5A priority Critical patent/CN110285682B/en
Publication of CN110285682A publication Critical patent/CN110285682A/en
Application granted granted Critical
Publication of CN110285682B publication Critical patent/CN110285682B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23MCASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
    • F23M5/00Casings; Linings; Walls
    • F23M5/04Supports for linings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23MCASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
    • F23M5/00Casings; Linings; Walls
    • F23M5/08Cooling thereof; Tube walls
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D9/00Cooling of furnaces or of charges therein

Abstract

The present invention relates to heating furnace water beam pipe refractory material construction fields, and in particular to a kind of heating furnace water beam Fast Installation fireproof modules and method.Including T-type anchoring piece and water beam module;The multiple T-type anchoring pieces of heating furnace water beam every layer of circumference uniform distribution of pipe, T-type anchoring piece are male member, and T-type anchoring piece is welded on heating furnace water beam pipe;Prefabricated T groove built-in fitting inside the water beam module, T groove built-in fitting are female part, and T groove built-in fitting is adapted to T-type anchoring piece;Water beam module is connect by T groove built-in fitting with T-type anchoring piece bumps, and the installation and removal with T-type anchoring piece are realized by card slot sliding;Every layer of water beam pipe is made of two water beam modules, and intermodule is connected by mother-son groove, and the water beam module of upper and lower level is connected also by mother-son groove.Structure is simple, easy for installation, economic and practical, by shift to an earlier date it is prefabricated be rapidly completed installation, and by toasting in advance, remove baking time from, substantially shorten the construction period, reduce production and construction cost.

Description

A kind of heating furnace water beam Fast Installation fireproof modules and method
Technical field
The present invention relates to heating furnace water beam pipe refractory material construction fields, and in particular to a kind of heating furnace water beam Fast Installation Fireproof modules and method.
Background technique
Heating furnace water beam pipe refractory material is generally Low Cement Castable, fire-retardent fiber felt-rug and anchoring pin structure.Traditional Construction method: firstly, anchor studs are welded on water beam pipe by drawing arrangement, then, fire-retardent fiber felt-rug is wrapped in water beam pipe On, customization water beam mould is fixed, Low Cement Castable construction is finally completed by the way of cast-in-site, is being demoulded It afterwards, could normal use after needing baker that moisture is discharged.This method heavy workload, process is tedious, long construction period.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of heating furnace water beam Fast Installation fireproof modules and methods. Fast Installation is realized in a manner of slip draw-in groove, removes baking time from, is substantially shortened the construction period of heating furnace water beam, is dropped this increasing Effect.
To achieve the above object, the present invention is implemented with the following technical solutions:
A kind of heating furnace water beam Fast Installation fireproof modules, including T-type anchoring piece and water beam module;Heating furnace water beam pipe is every The layer multiple T-type anchoring pieces of circumference uniform distribution, T-type anchoring piece are male member, and T-type anchoring piece is welded on heating furnace water beam pipe; Prefabricated T groove built-in fitting inside the water beam module, T groove built-in fitting are female part, and T groove built-in fitting and T-type anchoring piece are suitable Match;Water beam module is connect by T groove built-in fitting with T-type anchoring piece bumps, and the peace with T-type anchoring piece is realized by card slot sliding Dress and disassembly;Every layer of water beam pipe is made of multiple water beam modules, and intermodule is connected by mother-son groove, the water beam module of upper and lower level It is connected by mother-son groove.
The T-type anchoring piece is T shape, and the T groove built-in fitting is equipped with corresponding T-slot.
The T-type anchoring piece is made of white Steel material, and machining completes.
Fiber insulation layer is equipped between the T-type anchoring piece and heating furnace water beam pipe.
The water beam module includes T groove built-in fitting, bar built-in fitting, Low Cement Castable;T groove built-in fitting and reinforcing bar Built-in fitting welding, Low Cement Castable are coated on outside T groove built-in fitting and bar built-in fitting.
The T groove built-in fitting and bar built-in fitting are all made of white Steel material and make, and machining completes.
Water beam module one end is equipped with trapezoidal protrusion, and the other end is equipped with trapezoidal groove, and every layer of water beam pipe by two water beams Module composition, intermodule are connected by trapezoidal mother-son groove.
The bar built-in fitting is formed by reinforcement welding, and laterally more reinforcing bars are averagely arranged with longitudinal more reinforcing bars, is welded It is fixed.
It is interspersed, misplaces 90 ° between the water beam module of the upper and lower level.
A kind of construction method of heating furnace water beam refractory material, specifically comprises the following steps:
1) T-type anchoring piece is welded on heating furnace water beam pipe;
2) construction of fiber insulation layer is carried out on heating furnace water beam pipe;
3) T groove built-in fitting and bar built-in fitting are fixed in shaper, then carry out low cement by construction reference The construction of castable demoulds after maintenance molding, is toasted, moisture is discharged;
4) it is made of for every layer, is attached between module by letter slot, between upper and lower level module two water beam modules It is attached using mother-son groove, and is rotated by 90 ° between upper and lower level module, avoid stitching again;
5) the T-type groove of water beam module is placed on above T-type anchoring piece, and be aligned, water beam module is along card slot to downslide The dynamic fixed installation for realizing module;
6) gap between water beam module and between water beam module and T-type anchoring piece is sealed using high temperature clay.
Compared with prior art, the beneficial effects of the present invention are:
(1) water beam module is corresponding above T-type anchoring piece by its internal prefabricated T-type groove built-in fitting, passes through card slot Sliding, realization achieve a fixed connection with T-type anchoring piece;It is easy for installation, remove baking time from, substantially shortens applying for heating furnace water beam The work duration, reduce workload, reduces production and construction cost.
(2) water beam module up and down direction be all made of mother-son groove form structure realization connect with adjacent block, internal water Divide baking discharge in advance;It is easy for installation, remove baking time from, substantially shortens the construction period of heating furnace water beam, reduce work Amount, reduces production and construction cost.
It is the configuration of the present invention is simple, easy for installation, economic and practical, the structure type of water beam Guan Naicai wrapping is changed, is reduced The cumbersome process of previous scene formwork pouring construction, by shift to an earlier date it is prefabricated installation is rapidly completed, and pass through and toast in advance, remove baking from The roasting time, substantially shortens the construction period of heating furnace water beam, reduce workload, reduce production and construction cost.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is sectional view along A-A, that is, T-type anchoring piece schematic cross-section of Fig. 1;
Fig. 3 is B-B direction cross-sectional view, that is, water beam module schematic cross-section of Fig. 1;
Fig. 4 is T-type anchor arrangement schematic front view of the present invention;
Fig. 5 is T-type anchor arrangement diagrammatic bottom view of the present invention;
Fig. 6 is water beam module structural representation front view of the present invention;
Fig. 7 is the C-C of Fig. 6 to cross-sectional view;
Fig. 8 is the D-D of Fig. 7 to cross-sectional view;
Fig. 9 is T-type groove embedded part structure schematic diagram.
In figure: 1-T type anchoring piece 2- water beam module 3- water beam pipe 4-T groove built-in fitting 5- bar built-in fitting 6- is low Cement pouring material 7- fiber insulation layer
Specific embodiment
A specific embodiment of the invention is further illustrated with reference to the accompanying drawing:
Embodiment:
As shown in Figure 1, a kind of heating furnace water beam Fast Installation fireproof modules and construction method, a kind of heating furnace water beam are quick Installing fireproof modules includes T-type anchoring piece 1, water beam module 2.
As shown in Fig. 2, T-type anchoring piece 1 is welded on heating furnace water beam pipe 3 by fixed dimension, T-type anchoring piece 1 presses water beam Pipe 34 every layer are evenly distributed, and spacing 200mm is arranged between every layer.
As shown in figure 3, the construction of fiber insulation layer 6 is carried out after the completion of T-type anchoring piece 1 welds, finally, 2 water of installation Beam module.
The height of water beam module 2 is 200mm, and the top corresponding position slide downward of T-type anchoring piece 1 on water beam pipe 3 is led to T groove built-in fitting 4 is crossed to achieve a fixed connection with the T-type anchoring piece 1 on water beam pipe 3.
Every layer is made of two water beam modules 2, is attached between module by T shape letter slot, between upper and lower level module Also it is attached using mother-son groove, and is rotated by 90 ° between upper and lower level module, avoid stitching again, between module and module and T-type anchor Gap between firmware 1 is sealed using high temperature clay.
As shown in Figure 4, Figure 5, the T-type anchoring piece 1 is white steel material, machining production;T-type anchoring piece 1T shape.
As shown in Fig. 6, Fig. 7, Fig. 8, water beam module 2 includes T groove built-in fitting 4, bar built-in fitting 5, Low Cement Castable 6 Material production.T groove built-in fitting 4 and bar built-in fitting 5 are white steel material, machining production;As shown in figure 9, T groove is pre-buried Part 4 is equipped with T-slot corresponding with T-type anchoring piece 1.
The manufacturing process of water beam module 2: T groove built-in fitting 4 and bar built-in fitting 5, reinforcing bar are fixed in shaper Built-in fitting 5 is formed using 6 reinforcement welding of φ, and laterally 2, longitudinal 5 average arrangements are welded and fixed, then by construction reference into The construction of row Low Cement Castable 6 demoulds after maintenance molding, is toasted, moisture is discharged.
Water beam module 2 is corresponding above T-type anchoring piece 1 by its internal prefabricated T-type groove built-in fitting 4, passes through card slot Sliding, realization achieve a fixed connection with T-type anchoring piece 1;It is easy for installation, remove baking time from, substantially shortens heating furnace water beam Construction period reduces workload, reduces production and construction cost.
Water beam module 2 up and down direction be all made of mother-son groove form structure realization connect with adjacent block, internal moisture Baking discharge in advance;It is easy for installation, remove baking time from, substantially shortens the construction period of heating furnace water beam, reduce workload, Reduce production and construction cost.
A kind of construction method of heating furnace water beam refractory material, specifically comprises the following steps:
1) T-type anchoring piece 1 is welded on heating furnace water beam pipe 3 by fixed dimension, and T-type anchoring piece 1 presses every layer 4 of water beam pipe 3 A to be evenly distributed, spacing 200mm is arranged between every layer.
2) after the completion of T-type anchoring piece 1 welds, the construction of fiber insulation layer 6 is carried out on heating furnace water beam pipe 3.
3) T groove built-in fitting 4 and bar built-in fitting 5 are fixed in shaper, bar built-in fitting 5 uses 6 reinforcing bar of φ It is welded, laterally 2, longitudinal 5 average arrangements are welded and fixed, then carry out Low Cement Castable 6 by construction reference Construction demoulds after maintenance molding, is toasted, moisture is discharged.
4) be made of two water beam modules 2 for every layer, be attached between module by T shape letter slot, upper and lower level module it Between be also attached using mother-son groove, and be rotated by 90 ° between upper and lower level module, avoid stitching again, between module and module and T Gap between type anchoring piece 1 is sealed using high temperature clay.
5) the T-type groove of water beam module 2 is placed on 1 side on T-type anchoring piece, and be aligned, 2 slide downward of water beam module is real The fixed installation of existing module;
6) gap between water beam module 2 and between water beam module 2 and T-type anchoring piece 1 is sealed using high temperature clay.
It is the configuration of the present invention is simple, easy for installation, economic and practical, the structure type of water beam Guan Naicai wrapping is changed, is reduced The cumbersome process of previous scene formwork pouring construction, by shift to an earlier date it is prefabricated installation is rapidly completed, and pass through and toast in advance, remove baking from The roasting time, substantially shortens the construction period of heating furnace water beam, reduce workload, reduce production and construction cost.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of heating furnace water beam Fast Installation fireproof modules, it is characterised in that: including T-type anchoring piece and water beam module;Heating The multiple T-type anchoring pieces of furnace water beam every layer of circumference uniform distribution of pipe, T-type anchoring piece are male member, and T-type anchoring piece is welded on heating furnace On water beam pipe;Prefabricated T groove built-in fitting inside the water beam module, T groove built-in fitting are female part, T groove built-in fitting and T-type Anchoring piece adaptation;Water beam module is connect by T groove built-in fitting with T-type anchoring piece bumps, is realized and T-type anchor by card slot sliding The installation and removal of firmware;Every layer of water beam pipe is made of two water beam modules, and intermodule is connected by mother-son groove, the water of upper and lower level Beam module is connected also by mother-son groove.
2. a kind of heating furnace water beam Fast Installation fireproof modules according to claim 1, it is characterised in that: the T-type anchor Firmware is T shape, and the T groove built-in fitting is equipped with corresponding T-slot.
3. a kind of heating furnace water beam Fast Installation fireproof modules according to claim 1, it is characterised in that: the T-type anchor Firmware is made of white Steel material, and machining completes.
4. a kind of heating furnace water beam Fast Installation fireproof modules according to claim 1, it is characterised in that: the T-type anchor Fiber insulation layer is equipped between firmware and heating furnace water beam pipe.
5. a kind of heating furnace water beam Fast Installation fireproof modules according to claim 1, it is characterised in that: the water beam form Block includes T groove built-in fitting, bar built-in fitting, Low Cement Castable;T groove built-in fitting and bar built-in fitting weld, low cement Castable is coated on outside T groove built-in fitting and bar built-in fitting.
6. a kind of heating furnace water beam Fast Installation fireproof modules according to claim 5, it is characterised in that: the T groove Built-in fitting and bar built-in fitting are all made of white Steel material and make, and machining completes.
7. a kind of heating furnace water beam Fast Installation fireproof modules according to claim 1, it is characterised in that: the water beam form Block one end is equipped with trapezoidal protrusion, and the other end is equipped with trapezoidal groove, and every layer of water beam pipe is made of 2 water beam modules, and intermodule passes through Trapezoidal mother-son groove connection.
8. a kind of heating furnace water beam Fast Installation fireproof modules according to claim 5, it is characterised in that: the reinforcing bar is pre- Embedded part is formed by reinforcement welding, and laterally more reinforcing bars are averagely arranged with longitudinal more reinforcing bars, is welded and fixed.
9. a kind of heating furnace water beam Fast Installation fireproof modules according to claim 1, it is characterised in that: the upper and lower level Water beam module between be interspersed, misplace 90 °.
10. a kind of construction method of the heating furnace water beam refractory material based on module described in claim 1, which is characterized in that tool Body includes the following steps:
1) T-type anchoring piece is welded on heating furnace water beam pipe;
2) construction of fiber insulation layer is carried out on heating furnace water beam pipe;
3) T groove built-in fitting and bar built-in fitting are fixed in shaper, then carry out low cement casting by construction reference The construction of material demoulds after maintenance molding, is toasted, moisture is discharged;
4) it is made of two water beam modules for every layer, is attached between module by letter slot, is also used between upper and lower level module Mother-son groove is attached, and is rotated by 90 ° between upper and lower level module, avoids stitching again;
5) the T-type groove of water beam module is placed on above T-type anchoring piece, and be aligned, water beam module is real along card slot slide downward The fixed installation of existing module;
6) gap between water beam module and between water beam module and T-type anchoring piece is sealed using high temperature clay.
CN201910451683.5A 2019-05-28 2019-05-28 Heating furnace water beam rapid installation fire-resistant module and method Active CN110285682B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910451683.5A CN110285682B (en) 2019-05-28 2019-05-28 Heating furnace water beam rapid installation fire-resistant module and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910451683.5A CN110285682B (en) 2019-05-28 2019-05-28 Heating furnace water beam rapid installation fire-resistant module and method

Publications (2)

Publication Number Publication Date
CN110285682A true CN110285682A (en) 2019-09-27
CN110285682B CN110285682B (en) 2020-12-18

Family

ID=68002655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910451683.5A Active CN110285682B (en) 2019-05-28 2019-05-28 Heating furnace water beam rapid installation fire-resistant module and method

Country Status (1)

Country Link
CN (1) CN110285682B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201695522U (en) * 2010-06-18 2011-01-05 江苏东强股份有限公司 Sliding-slot embedded part
CN103217019A (en) * 2013-04-22 2013-07-24 赵桐斌 Ceramic fiber combined type binding block used for binding heating furnace water beam and binding method thereof
CN103388055A (en) * 2013-08-07 2013-11-13 武汉钢铁(集团)公司 Furnace beam and vertical column fire-resistant thermal insulation lining structure of walking beam furnace for heating high-temperature oriented silicon steel and manufacturing method of structure
US20150040505A1 (en) * 2012-04-27 2015-02-12 Mingjin CHU Precast reinforced concrete structure and method for forming the same
CN204478803U (en) * 2014-12-29 2015-07-15 通达耐火技术股份有限公司 A kind of cement rotary kiln burner abrasion-proof and refractory structure
CN105444579A (en) * 2014-09-26 2016-03-30 鞍钢股份有限公司 Heating furnace water beam binding method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201695522U (en) * 2010-06-18 2011-01-05 江苏东强股份有限公司 Sliding-slot embedded part
US20150040505A1 (en) * 2012-04-27 2015-02-12 Mingjin CHU Precast reinforced concrete structure and method for forming the same
CN103217019A (en) * 2013-04-22 2013-07-24 赵桐斌 Ceramic fiber combined type binding block used for binding heating furnace water beam and binding method thereof
CN103388055A (en) * 2013-08-07 2013-11-13 武汉钢铁(集团)公司 Furnace beam and vertical column fire-resistant thermal insulation lining structure of walking beam furnace for heating high-temperature oriented silicon steel and manufacturing method of structure
CN105444579A (en) * 2014-09-26 2016-03-30 鞍钢股份有限公司 Heating furnace water beam binding method
CN204478803U (en) * 2014-12-29 2015-07-15 通达耐火技术股份有限公司 A kind of cement rotary kiln burner abrasion-proof and refractory structure

Also Published As

Publication number Publication date
CN110285682B (en) 2020-12-18

Similar Documents

Publication Publication Date Title
CN204920990U (en) Two lining rebar positioning fixture in tunnel
CN204386018U (en) Autoclaved aerated concrete slabs steel sheet arrangement of reinforcement
CN110285682A (en) A kind of heating furnace water beam Fast Installation fireproof modules and method
CN217204203U (en) Crack control structure of overlength raft board
CN205399733U (en) 2 structures of slip casting simultaneously of assembly steel bars of shear wall muffjoint
CN107750295A (en) wall construction device
RU117161U1 (en) STAND FOR MAKING PRELIMINARY STRESSED REINFORCED CONCRETE SUPPORTS
CN101596740A (en) The preparation method of socket type pore-forming mold, socket type pore-forming and device and porous brick thereof
CN103866971B (en) Heating furnace water-cooled column, water-cooled beam pouring construction mould and pouring construction method thereof
CN106064422B (en) The production mould and its application method of refined steel ladles small-sized precast block
US4039172A (en) Outlet trough for a molten product
CN103866970B (en) Heating furnace water-cooled column, water-cooled beam pouring construction mould
CN201434594Y (en) Fire-resistant and abrasion-resistant lining structure for heat insulation surface of industrial furnace
CN106017104B (en) The offline building method of baking furnace flame path wall
CN106150171B (en) Formwork support platform and its application inside a kind of reinforced concrete silo
CN207392470U (en) A kind of improved T plate bottom plate piece construction
CN203489667U (en) Top structure of communication flame path of open type annular roasting furnace
CN201343793Y (en) Energy-saving sandwich composite wall steel tie
CN207761151U (en) Reinforced block structure in one kind
CN209304764U (en) The production system of precast concrete pile
CN101504250A (en) Fire-resistant abrasion-proof inner lining structure for heat insulation surface of industrial furnace
CN211341292U (en) Prefabricated shear wall with space steel truss platform and capable of realizing cast-in-place connection
CN110409708A (en) A kind of combination beam permanent post-tensioned prestressing set decking and its installation method
CN105544813B (en) Big-arch shelter wall and installation method
CN103640083B (en) A kind of automatic material distributing device and equipment producing superposed type concrete self-insulating composite block

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant