CN110282910A - A kind of useless rubber plastic road surface construction method - Google Patents

A kind of useless rubber plastic road surface construction method Download PDF

Info

Publication number
CN110282910A
CN110282910A CN201910577932.5A CN201910577932A CN110282910A CN 110282910 A CN110282910 A CN 110282910A CN 201910577932 A CN201910577932 A CN 201910577932A CN 110282910 A CN110282910 A CN 110282910A
Authority
CN
China
Prior art keywords
rubber
road surface
construction method
plastic
modified pitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910577932.5A
Other languages
Chinese (zh)
Other versions
CN110282910B (en
Inventor
何敏
伍任雄
李潇
余杰
庞道济
史灵玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Original Assignee
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd filed Critical Chongqing Construction Engineering Group Co Ltd
Priority to CN201910577932.5A priority Critical patent/CN110282910B/en
Publication of CN110282910A publication Critical patent/CN110282910A/en
Application granted granted Critical
Publication of CN110282910B publication Critical patent/CN110282910B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B17/00Recovery of plastics or other constituents of waste material containing plastics
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/26Bituminous materials, e.g. tar, pitch
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/26Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
    • E01C7/265Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre with rubber or synthetic resin, e.g. with rubber aggregate, with synthetic resin binder
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00017Aspects relating to the protection of the environment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/62Plastics recycling; Rubber recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention proposes a kind of useless rubber plastic road surface construction methods, characterized by the following steps: (1) preparation of construction;(2) rubber and plastic height sticks modified pitch processing and storage;(3) rubber and plastic height sticks modified pitch OGFC construction;(4) acceptance of work;(5) open to traffic.By added in matrix pitch rubber powder, waste plastics and at high temperature mixed and stirred after constitute rubber and plastic height and stick modified pitch, and modified pitch and limestone gravel, lime rock debris, miberal powder are sticked by rubber and plastic height and mix and stir into progress OGFC construction after mixture;Modified pitch is sticked by the rubber and plastic height of independent research and replaces import high viscosity modified pitch, and can achieve the effect that import high viscosity modified pitch in bituminous pavement laying, greatly reduces production cost.

Description

A kind of useless rubber plastic road surface construction method
Technical field
The present invention relates to pavement construction technical fields, and in particular to a kind of useless rubber plastic road surface construction method.
Background technique
With the development that highway in China is built, the requirement of people's road pavement is higher and higher.The structure on asphalt highway surface layer It makes depth not enough and Moisture Damage problem is never well solved, urban road and long tunnel road surface to noise reduction and resist Sliding demand is also higher, and build open grade asphalt wear layer (pervious asphalt surface layer, abbreviation OGFC) then can be well solved above Problem.Since the road surface of OGFC structure has the characteristics that big gap, permeable, to propose the ability of cohering of pitch and building stones higher Requirement, generally require to meet its service performance and life requirement using high-viscosity asphalt, due to the country starting evening, at present High viscosity modified pitch needed for building OGFC is import, also has many research institutions and material manufacturer high glutinous in exploitation in recent years Modifying agent is spent, but actual effect is unsatisfactory;It is at high cost using import modified pitch in existing pavement construction.
Summary of the invention
For the deficiency in the presence of the prior art, the present invention provides a kind of useless rubber plastic road surface construction methods, solve Using the problem that import modified pitch is at high cost in existing pavement construction.
To achieve the above object, present invention employs the following technical solutions:
A kind of useless rubber plastic road surface construction method, characterized by the following steps:
(1) preparation of construction;(2) rubber and plastic height sticks modified pitch processing and storage;(3) rubber and plastic height sticks modified pitch OGFC and applies Work;(4) acceptance of work;(5) open to traffic;
The construction method of the step (2) includes the following steps:
1. matrix pitch is heated to 170 DEG C~180 DEG C;
2. being heated to 180 DEG C~200 DEG C after rubber powder, waste plastics is added in matrix pitch and being mixed and stirred, the mixing time For 45min~120min;
3. carrying out reaction 60min under the conditions of 200 DEG C~210 DEG C of temperature after uniform mixing, the glutinous modified drip of rubber and plastic height is obtained It is green;
4. sticking modified pitch to rubber and plastic height temporarily to be stored under the conditions of 145 DEG C~155 DEG C;
The construction method of the step (3) the following steps are included:
A, mixture mixes and stirs, and sticks modified pitch using limestone gravel, lime rock debris, miberal powder and rubber and plastic height and is mixed It is greater than 60s with, mixing time;
B, it transports, charging method carries out mixture charging before, during and after being used by dumper of the load-carrying greater than 25t, simultaneously It is covered using the double-deck tarpaulin, transports discharging after paving site;
C, pave, clean original ground, by crawler-type paver according to less than 3m/min movement speed to mixture into Row paves, and coefficient of loose laying is 1.1~1.15;
D, it rolls, is pressed using double-steel wheeled vibratory formula road roller by first pressing, again, road pavement is rolled final pressure respectively;Its In, first pressing process is a static pressure and three times vibroroller cmpactings, and multiple pressure is three times vibroroller cmpactings, and final pressure is twice of static pressure;It has rolled Road pavement is sprinkled water after finishing;
E, joint treatment.
Preferably, grinding compacting is carried out to lower sleeping bitumen layer in the step (1), lower sleeping pitch layer surface is done Dry, cleaning.
Preferably, rubber powder additive amount is the 2%~4% of matrix pitch weight in the step (2);The addition of waste plastics Amount is the 5%~8% of matrix pitch weight, and waste plastics is those semi-crystalline materials thermoplastic resin.
Preferably, paver screed temperature is preheated before paving in the step (3) is greater than 100 DEG C.
Preferably, mixture temperature >=150 DEG C during the first pressing in the step (3), mixture warm during pressing again >=110 DEG C of degree, mixture temperature >=90 DEG C during final pressure.
Preferably, the rolling speed of road roller is 2~4km/h during the first pressing in the step (3), during multiple pressure The rolling speed of road roller is 3~4km/h, and the rolling speed of road roller is 3~6km/h during final pressure.
Preferably, the bitumen aggregate ratio of the mixture is 5.0%.
Preferably, pavement seepage measurement is carried out using pavement seepage experimental rig road pavement in the step (4).
Preferably, 4 support rods that the pavement seepage experimental rig includes pedestal and is vertically fixed on pedestal, 4 Support rod symmetrical parallel setting two-by-two is equipped with support plate on 4 support rods;The support plate is equipped with for measuring discharging liquid Long-pending measurement component, measurement component is for discharging liquid into pedestal;It further include the hold-down mechanism for compressing pedestal, the pressure Tight mechanism includes the positioning plate of cyclic structure, is vertically connected with the 4 piece locking screws uniformly distributed along its circumferencial direction on the positioning plate Bar, the compression ring flat-plate for compressing pedestal is arranged on 4 tie down screws, and every tie down screw stretches out on the position for compressing ring flat-plate It is equipped with locking nut;Dashpot is offered on the lower surface of the pedestal, is offered on the pedestal and dashpot perforation Through-hole.
Preferably, the measurement component includes affixed installation loop coil on the supporting plate, and screw thread connects on the installation loop coil It is connected to steel bushing, graduated cylinder is installed in steel bushing, the strip-shaped hole for exposing cylinder scale is offered on the steel bushing;The support plate On be equipped with and lead shell with the taper that is connected of installation loop coil, taper leads the diversion pipe for being connected with and being extended down into through-hole on shell, institute It states and shut-off valve is installed on diversion pipe.
Compared with the prior art, the invention has the following beneficial effects:
1, by matrix pitch add rubber powder, waste plastics and at high temperature mixed and stirred after constitute rubber and plastic height stick change Property pitch, and by rubber and plastic height stick modified pitch mix and stir into mixture with limestone gravel, lime rock debris, miberal powder after carry out OGFC construction;Modified pitch is sticked by the rubber and plastic height of independent research and replaces import high viscosity modified pitch, and can be in bituminous pavement Achieve the effect that import high viscosity modified pitch in laying, greatly reduces production cost;
2, rubber powder, the waste plastics main source used is also beneficial to using waste tire of automobile closed matereial cycle Natural resources is saved in environmental protection.
Detailed description of the invention
Fig. 1 is process flow chart of the invention;
Fig. 2 is the structural schematic diagram of pavement seepage experimental rig;
Fig. 3 is the structural schematic diagram of device positioning plate;
Fig. 4 is the structural schematic diagram that device compresses ring flat-plate;
In figure, pedestal 1, dashpot 101, through-hole 102, sharp portion 103, support rod 2, support plate 3, measurement component 4, installation Loop coil 41, steel bushing 42, strip-shaped hole 420, graduated cylinder 43, taper lead shell 44, diversion pipe 45, shut-off valve 46, hold-down mechanism 5, positioning plate 51, sharp portion 510, tie down screw 52, compress ring flat-plate 53, location hole 530, locking nut 54, ejection nut 55, lug boss 56, Alignment pin 6, limit pin shaft 7.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
As shown in Figure 1, including the following steps: that (1) construction is quasi- the present invention provides a kind of useless rubber plastic road surface construction method It is standby;(2) rubber and plastic height sticks modified pitch processing and storage;(3) rubber and plastic height sticks modified pitch OGFC construction;(4) acceptance of work;(5) Open to traffic.
Grinding compacting is carried out to lower sleeping bitumen layer in advance in step (1), and lower sleeping pitch layer surface is dried, clearly It is clean;Guarantee that substrate surface meets the requirements without surface dust and its flatness, road camber degree, just can be carried out OGFC surface layer after meeting examination Making.
After preparation of construction process, rubber and plastic height is carried out in the place close to paved base site and sticks modified pitch processing and deposits Storage avoids long-distance transportation from causing the case where cooling down;Include the following steps: in the construction method of step (2)
1. matrix pitch is heated to 170 DEG C~180 DEG C;
2. being heated to 180 DEG C~200 DEG C after rubber powder, waste plastics is added in matrix pitch and being mixed and stirred, the mixing time For 45min~120min;
3. carrying out reaction 60min under the conditions of 200 DEG C~210 DEG C of temperature after uniform mixing, the glutinous modified drip of rubber and plastic height is obtained It is green;
4. sticking modified pitch to rubber and plastic height temporarily to be stored under the conditions of 145 DEG C~155 DEG C;
It is sticked in Modified Bitumen Production Procedure carrying out rubber and plastic height, matrix pitch, rubber powder and waste plastics is added separately to In each holding vessel, while matrix pitch is quickly heated up to 170 DEG C~180 DEG C;Then it is dripped to the matrix for being heated to predetermined temperature Rubber powder is added in blueness, waste plastics is pre-mixed in blender as after modifying agent, and guarantees to reach in whipping process 200 DEG C~210 DEG C of whipping temp;Matrix pitch after being sufficiently mixed is reacted in reactor tank with rubber powder, waste plastics, instead Temperature should be kept to be located at 200 DEG C~210 DEG C in the process, can be obtained rubber and plastic height after duration 60min and stick modified pitch.
In above-mentioned steps, rubber powder additive amount is the 2%~4% of matrix pitch weight;The additive amount of waste plastics is base The 5%~8% of matter pitch weight, waste plastics are those semi-crystalline materials thermoplastic resin;And the main source of rubber powder, waste plastics It is to be shredded by waste tire, wherein the particle of waste plastics is greater than the particle of rubber powder;So as to largely utilize waste tire, Environment is protected, the waste of natural resources is reduced.Wherein, matrix pitch will meet the requirement of the quality technology in table 1, modeling of giving up Material performance meets the technical requirements in table 2, and the chemistry of rubber powder, physical technique index meet table 3, the technical requirements in table 4.
The requirement of 1 matrix pitch quality technology of table
2 waste plastics performance of table
The chemical technology index of 3 shoddy of table
The physical technique index of 4 shoddy of table
Project Moisture (%) Fiber content (%) Tenor (%) Relative density
Technical indicator < 0.75 < 0.50 < 0.01 1.10~1.30
Rubber and plastic height after production sticks modified pitch and answers now-making-now-using in principle, and carrying out interim storage also should ensure that storage Temperature is under the conditions of 145 DEG C~155 DEG C, and storage time is no more than 3 days.
Scene is direct plungeed into after paved base site carries out the processing of OGFC mixture to carry out using avoiding long-distance transportation from causing The cooling situation of mixture, therefore, the production of mixture directly carries out at the scene;And mixture needs to reach corresponding technology It is required that indices are both needed to reach requirement as listed in table 5.
5 OGFC mixture technical requirements of table
Step (3) construction method the following steps are included:
A, mixture mixes and stirs, and sticks modified pitch using limestone gravel, lime rock debris, miberal powder and rubber and plastic height and is mixed It is greater than 60s with, mixing time;Wherein, the bitumen aggregate ratio of mixture is 5.0%.During being mixed and stirred, the glutinous modified drip of rubber and plastic height When green viscosity is greater than 2.5Pas, temperature should be properly increased to 10 DEG C;When being mixed and stirred, continous way or intermittent can be used Two kinds of agitating modes.Wherein, the technical requirements of limestone gravel such as table 6, the technical requirements of lime rock debris such as table 7, miberal powder Technical requirements such as table 8;
The requirement of 6 limestone gravel quality technology of table
The requirement of 7 lime rock debris quality technology of table
Project Unit Technical standard Test method
Sand equivalent, is not less than % 60 T0334
Clay content (content less than 0.075mm), is not more than % 3 T0333
Apparent relative density is not less than - 2.50 T0328
8 powdered ore quality technical requirements of table
B, it transports, charging method carries out mixture charging before, during and after being used by dumper of the load-carrying greater than 25t, simultaneously It is covered using the double-deck tarpaulin, transports discharging after paving site;Three sections of chargings, discharging respectively before, during and after, can Reduce residence time of the mixture on dumper;Before being charged, need to completely being cleaned in dumper, and clear One layer of anti-adhesion agent is uniformly sprayed after sweeping.
Meanwhile during transportation, there are meet with rainwater in foul or transport not can enter booth then on live road surface if it exists Spread process;Discharging is carried out after meeting making requirement to pave.
C, pave, clean original ground, by crawler-type paver according to less than 3m/min movement speed to mixture into Row paves, and coefficient of loose laying is 1.1~1.15;In paving process, dumper should stop at 100m~300m in front of paver, Into after paving, dumper and paver synchronizing moving guarantee that the temperature of mixture in paving process is met the requirements;It paves Before, paver screed temperature will be preheating to greater than 100 DEG C;And the surface temperature for the bitumen layer that crouches under in paving process And paving thickness controls the paving material of mixture, such as table 9, is either paved mixing by low temperature paved mixture or high temperature Expect, such as table 10, to be kept the temperature using tarpaulin in paving process to control the temperature of mixture.
9 rubber and plastic height of table sticks the minimum paving material of modified asphalt mixture
The paving material of the glutinous modified drip mixture of the different rubber and plastic height of table 10
It can be 8~10m for particulate formula OGFC mixture progress in paving process, and it is mixed for middle grain formula OGFC Closing material need to be worked at the same time using two pavers when being paved, the lap width of the reserved 30~60cm in centre, and front and back is staggered 10 ~20m, the working width of a paver are 6m;Road pavement carries out compaction treatment after the completion of paving.
D, it rolls, is pressed using double-steel wheeled vibratory formula road roller by first pressing, again, road pavement is rolled final pressure respectively;Its In, first pressing process is a static pressure and three times vibroroller cmpactings, and multiple pressure is three times vibroroller cmpactings, and final pressure is twice of static pressure;It has rolled Road pavement is sprinkled water after finishing;When progress road surface is rolled, the road roller of use preferably uses the model less than 12 tons of load-carrying, and double Steel wheel will not be cohered under the glutinous state of height.Such as table 11, table 12, mixture temperature >=150 DEG C during first pressing, rolling speed For 2~4km/h;Mixture temperature >=110 DEG C during multiple pressure, rolling speed are 3~4km/h;Mixture warm during final pressure >=90 DEG C of degree, rolling speed are 3~6km/h;Side is rolled to center outside road surface at level road position, is having sloping position The place of setting hoists from lower and rolls.
11 rubber and plastic height of table sticks modified asphalt mixture and rolls temperature
12 road roller rolling speed (km/h) of table
Road roller type First pressing Multiple pressure Final pressure
Steel-wheeled vibrated roller 2~4 3~5 -
Static load steel roller 2~3 - 3~6
In carrying out roller compaction process, road roller cannot be vibrated using the prime time, avoid excessively compacted between thicker gather materials make At broken situation;And after the completion of rolling, a small amount of water is sprayed on road surface before road surface is uncolled, to reduce open to traffic The glutinous band on road surface and tire afterwards acts on.
E, joint treatment;The new mixture of making is carried out to reserved overlapping the slot after rolling to overlap, and can be passed through Artificial or rock drill vertically excludes the position not gone out regardless of thickness, guarantees the requirement that vertical carvel joint is able to satisfy when seam.
After the completion of entire laying of roadway, road pavement is needed to carry out the acceptance of work, by the way that friendship could be opened after the acceptance of work It is logical to use.In step (4), OGFC mixture construction quality is checked, specific check criteria such as table 13.
13 OGFC mixture upper layer construction quality check criteria of table
When road pavement infiltration coefficient is measured, carried out by pavement seepage experimental rig.
Pavement seepage experimental rig, including pedestal 1 and vertical 4 support rods, 2,4 support rods 2 being fixed on pedestal 1 Symmetrical parallel setting two-by-two is equipped with support plate 3 on 4 support rods 2, stablizes to install support plate 3, on support rod 2 End is equipped with the step of installation support plate 3, and passes through nut check support rod 2.It is equipped in support plate 3 for measuring drain volume Measurement component 4, measurement component 4 is for discharging liquid into pedestal 1;Wherein, dashpot is offered on the lower surface of pedestal 1 101, the through-hole 102 penetrated through with dashpot 101 is offered on the pedestal 1.Measurement component 4 includes being fixed in support plate 3 Loop coil 41 is installed, steel bushing 42 is threaded on installation loop coil 41, graduated cylinder 43 is installed in steel bushing 42, is opened on the steel bushing 42 Equipped with the strip-shaped hole 420 for exposing 43 scale of graduated cylinder, by the mating reaction of steel bushing 42 and installation loop coil 41, steel bushing can be allowed 42 are dismantled, and convenient for assembling, are carried;The taper being connected with installation loop coil 41 is installed in support plate 3 and leads shell 44, taper is led It is connected with the diversion pipe 45 extended down into through-hole 102 on shell 44, shut-off valve 46 is installed on the diversion pipe 45, by opening Closing shut-off valve 46 allows the water in graduated cylinder 43 to be discharged on ground, and is delayed by the water of 101 pairs of dashpot discharges on pedestal 1 Punching;Meanwhile the stability in order to guarantee diversion pipe 45, connecting rod has been respectively and fixedly connected between diversion pipe 45 and 4 piece support rod 2.
When being installed on ground to pedestal 1, needs to be connected and sealed between pedestal 1 and ground, pass through sealing material Material is bonded, and sealing material generally uses glass putty, plasticine etc.;It needs to apply pressure to pedestal 1 and guarantees sealing effect, It further include the hold-down mechanism 5 for compressing pedestal 1, hold-down mechanism 5 includes the positioning plate 51 of cyclic structure, vertical on positioning plate 51 It is connected with the pressure being arranged with along uniformly distributed 4 tie down screws, 52,4 tie down screws 52 of its circumferencial direction for compressing pedestal 1 Tight ring flat-plate 53, every tie down screw 52, which stretches out on the position for compressing ring flat-plate 53, is equipped with locking nut 54;By positioning plate 51 on ground After being fixed on face using same fixed form, 53 sets of ring flat-plate will be compressed on 4 tie down screws 52 and be pressed in pedestal 1 On, it is locked by rotation lock nut 54 by ring flat-plate 53 is compressed, can guarantee that sealing on the ground is installed after allowing pedestal 1 to be pressurized Property.
The case where will not generating shaking after ring flat-plate 53 is pressed on pedestal 1 is compressed in order to allow, is equipped on pedestal 1 along its circumference 4 uniformly distributed alignment pins 6 of direction offer limit hole in each alignment pin 6, are equipped with limit pin shaft 7 in limit hole;? The location hole 530 for offering on ring flat-plate 53 and cooperating with alignment pin 6 is compressed, ring flat-plate 53 is compressed and is being positioned by 530 sets of location hole After pin shaft 6, the position that 7 pairs of limit pin shaft compression ring flat-plates 53 are inserted into limit hole is limited, and is allowed and is compressed ring flat-plate 53 to pedestal 1 It will not there is a situation where swing when being compressed.
When needing to dismantle pedestal 1 after measurement, auxiliary raising can also be carried out by hold-down mechanism 5, locked The position for being located at positioning plate 51 on screw rod 52 and compressing between ring flat-plate 53 is equipped with ejection nut 55, ejects nut by rotation 55, to compress ring flat-plate 53 promoted, compress ring flat-plate 53 by alignment pin 6, limit pin shaft 7 position-limiting action under, pass through It compresses ring flat-plate 53 and offer service hoisting power when dismantling to pedestal 1 is provided to pedestal 1.
Apply external force for the ease of carrying out rotation to ejection nut 55, locking nut 54, in ejection nut 55 and locking screw It is equipped on mother 54 convenient for pulling and outwardly extending lug boss 56.
Meanwhile in order to which the adsorption capacity being subject to when guaranteeing pedestal 1, the installation of positioning plate 51 on the ground is stronger, mounting stability It is higher, several sharp portions 103 extended downwardly are equipped on the lower surface of pedestal 1;If being equipped on the lower surface of positioning plate 51 The dry sharp portion 510 extended downwardly;After being inserted into sealing material by sharp portion 103, sharp portion 510, pedestal can be increased 1,51 mounting stability of positioning plate and leakproofness.
When carrying out infiltration test, after pedestal 1, positioning plate 51 are fixed on the road surface OGFC by sealing material, to Clear water is added in graduated cylinder 43, the clear water in graduated cylinder 43 is discharged by switch shut-off valve 46;During carrying out clear water release, when Difference timing is T1, T2 when clear water in graduated cylinder 43 reaches 100ml graduation mark and 500ml graduation mark, is then carried out by formula It calculates, formula is as follows:
In formula, Cw--- pavement seepage coefficient (ml/min);
T1--- clear water reaches 100ml graduation mark timing time (s);
T2--- clear water reaches 500ml graduation mark timing time (s);
In test, needs to detect 5 measuring points in each detection section, calculate its average value as testing result.
After the acceptance of work, allow entire road surface natural cooling can after the surface temperature on entire road surface is lower than 50 DEG C Open to traffic;The speed that the cooling mode of watering accelerates pavement temperature reduction can also be used.
Entirely in useless rubber plastic road surface work progress, rubber powder, the waste plastics of production are recycled by using waste tire The glutinous modified pitch of rubber and plastic height for improving the characteristic of matrix pitch as additive and obtaining can reach the modified drip of import high viscosity Green effect, but at home for preparation, the storage etc. of rubber plastics modified bitumen are all standardized, effectively reduce road surface The purchase cost of material.OGFC construction technology has been standardized simultaneously, guarantees that road surface keeps macrovoid, permeable advantage.
To sum up, first is that source using a large amount of waste tire as rubber powder, waste plastics, belongs to closed matereial cycle, Be conducive to environmental protection, save natural resources and improve living environment;Second is that using rubber powder, waste plastics as after additive There is good generalization, reproducibility in OGFC Bituminous Pavement Construction and prevention maintenance;It can also effectively prevent bituminous pavement table Layer generates the case where Moisture Damage.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this In the scope of the claims of invention.

Claims (10)

1. a kind of useless rubber plastic road surface construction method, characterized by the following steps:
(1) preparation of construction;(2) rubber and plastic height sticks modified pitch processing and storage;(3) rubber and plastic height sticks modified pitch OGFC construction;(4) The acceptance of work;(5) open to traffic;
The construction method of the step (2) includes the following steps:
1. matrix pitch is heated to 170 DEG C~180 DEG C;
2. rubber powder is added in matrix pitch, is heated to 180 DEG C~200 DEG C after waste plastics and is mixed and stirred, the mixing time is 45min~120min;
3. carrying out reaction 60min under the conditions of 200 DEG C~210 DEG C of temperature after uniform mixing, obtains rubber and plastic height and stick modified pitch;
4. sticking modified pitch to rubber and plastic height temporarily to be stored under the conditions of 145 DEG C~155 DEG C;
The construction method of the step (3) the following steps are included:
A, mixture mixes and stirs, and sticks modified pitch using limestone gravel, lime rock debris, miberal powder and rubber and plastic height and is mixed and stirred, is mixed It is greater than 60s with the time;
B, it transports, charging method carries out mixture charging before, during and after being used by dumper of the load-carrying greater than 25t, uses simultaneously The double-deck tarpaulin is covered, and discharging after paving site is transported;
C, it paves, cleans original ground, mixture is spread out according to the movement speed less than 3m/min by crawler-type paver Paving, coefficient of loose laying are 1.1~1.15;
D, it rolls, is pressed using double-steel wheeled vibratory formula road roller by first pressing, again, road pavement is rolled final pressure respectively;Wherein, just Cheng Weiyi is pressed through all over static pressure and three times vibroroller cmpactings, multiple pressure is three times vibroroller cmpactings, and final pressure is twice of static pressure;It is right after rolling It sprinkles water on road surface;
E, joint treatment.
2. a kind of useless rubber plastic road surface construction method according to claim 1, it is characterised in that: in the step (1) under Sleeping bitumen layer carries out grinding compacting, is dried, cleans to lower sleeping pitch layer surface.
3. a kind of useless rubber plastic road surface construction method according to claim 1, it is characterised in that: rubber in the step (2) Powder additive amount is the 2%~4% of matrix pitch weight;The additive amount of waste plastics is the 5%~8% of matrix pitch weight, modeling of giving up Material is those semi-crystalline materials thermoplastic resin.
4. a kind of useless rubber plastic road surface construction method according to claim 1, it is characterised in that: pave in the step (3) Preceding preheating paver screed temperature is greater than 100 DEG C.
5. a kind of useless rubber plastic road surface construction method according to claim 1, it is characterised in that: first in the step (3) Mixture temperature >=150 DEG C during pressure, mixture temperature >=110 DEG C during multiple pressure, mixture temperature during final pressure >= 90℃。
6. a kind of useless rubber plastic road surface construction method according to claim 4 or 5, it is characterised in that: in the step (3) The rolling speed of road roller is 2~4km/h during first pressing, and the rolling speed of road roller is 3~4km/h during multiple pressure, eventually The rolling speed of road roller is 3~6km/h during pressure.
7. a kind of useless rubber plastic road surface construction method according to claim 6, it is characterised in that: the bitumen aggregate ratio of the mixture It is 5.0%.
8. a kind of useless rubber plastic road surface construction method according to claim 1, it is characterised in that: used in the step (4) Pavement seepage experimental rig road pavement carries out pavement seepage measurement.
9. a kind of useless rubber plastic road surface construction method according to claim 8, it is characterised in that: the pavement seepage test dress 4 support rods (2) set including pedestal (1) and be vertically fixed on pedestal (1), 4 support rods (2) are symmetrical parallel two-by-two to be set It sets, support plate (3) is installed on 4 support rods (2);The support plate (3) is equipped with the measurement group for measuring drain volume Part (4), measurement component (4) are used to discharge liquid into pedestal (1);
It further include for compressing the hold-down mechanism of pedestal (1) (5), the hold-down mechanism (5) includes the positioning plate of cyclic structure (51), the 4 piece tie down screws (52) uniformly distributed along its circumferencial direction, 4 tie down screws are vertically connected on the positioning plate (51) (52) the compression ring flat-plate (53) for compressing pedestal (1) is arranged on, every tie down screw (52), which is stretched out, compresses ring flat-plate (53) Locking nut (54) are equipped on position;
It is offered dashpot (101) on the lower surface of the pedestal (1), offers on the pedestal (1) and passed through with dashpot (101) Logical through-hole (102).
10. a kind of useless rubber plastic road surface construction method according to claim 9, it is characterised in that: measurement component (4) packet The installation loop coil (41) being fixed on support plate (3) is included, is threaded with steel bushing (42), steel bushing on the installation loop coil (41) (42) it is equipped with graduated cylinder (43) in, the strip-shaped hole (420) for exposing graduated cylinder (43) scale is offered on the steel bushing (42);
The taper being connected with installation loop coil (41) is installed to lead shell (44) on the support plate (3), taper is led affixed on shell (44) There is the diversion pipe (45) extended down into through-hole (102), shut-off valve (46) are installed on the diversion pipe (45).
CN201910577932.5A 2019-06-28 2019-06-28 Construction method of waste rubber and plastic pavement Active CN110282910B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910577932.5A CN110282910B (en) 2019-06-28 2019-06-28 Construction method of waste rubber and plastic pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910577932.5A CN110282910B (en) 2019-06-28 2019-06-28 Construction method of waste rubber and plastic pavement

Publications (2)

Publication Number Publication Date
CN110282910A true CN110282910A (en) 2019-09-27
CN110282910B CN110282910B (en) 2023-08-04

Family

ID=68019678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910577932.5A Active CN110282910B (en) 2019-06-28 2019-06-28 Construction method of waste rubber and plastic pavement

Country Status (1)

Country Link
CN (1) CN110282910B (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1257470A1 (en) * 1985-01-08 1986-09-15 Проектный и научно-исследовательский институт "Донецкий ПромстройНИИпроект" Divice for determining permeability of porous materials to liquid
RU2044300C1 (en) * 1991-01-15 1995-09-20 Научно-исследовательский физико-химический институт им.Л.Я.Карпова Device for hermetically sealing cell for measuring permeability or diffusion through membranes
JPH10123042A (en) * 1996-10-23 1998-05-15 Oozeki Kagaku Kogyo Kk Pressurization-type water permeability testing machine
CN202928932U (en) * 2012-12-07 2013-05-08 周磊 Highway pavement water seepage instrument
CN104151846A (en) * 2014-08-20 2014-11-19 重庆交通大学 Rubber and plastic alloy high viscosity modification asphalt
CN104568707A (en) * 2015-01-30 2015-04-29 湖南科技大学 Waterproof side leakage device for multi-field coupling test specimen
CN204536162U (en) * 2015-03-11 2015-08-05 新疆生产建设兵团公路科学技术研究所 Infiltration detector
CN204831984U (en) * 2015-08-14 2015-12-02 山西省交通科学研究院 Road surface infiltration appearance
CN204988964U (en) * 2015-06-09 2016-01-20 沈阳建筑大学 A infiltration appearance for measuring hypotonic river system number
CN106608718A (en) * 2015-10-22 2017-05-03 上海公路桥梁(集团)有限公司 Warm mix asphalt drainage pavement mixture, drainage pavement, preparation methods and application
CN107142810A (en) * 2017-05-23 2017-09-08 济南汇通联合市政工程有限责任公司 A kind of high-viscosity bitumen modifier asphalt paving construction method
KR101796549B1 (en) * 2017-04-13 2017-11-14 주식회사 로드코리아 Premix type modified asphalt composition and
CN107486727A (en) * 2017-08-18 2017-12-19 成都陵川特种工业有限责任公司 The connector processing tool of vibrations can be reduced
CN206891923U (en) * 2017-07-01 2018-01-16 江苏宏达工程管理有限公司 A kind of pavement seepage instrument
CN207937325U (en) * 2018-04-04 2018-10-02 广西交通科学研究院有限公司 Automatic test bituminous paving infiltration coefficient device
CN109440567A (en) * 2018-09-07 2019-03-08 重庆建工住宅建设有限公司 A kind of penetrated asphalt pavement construction method

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1257470A1 (en) * 1985-01-08 1986-09-15 Проектный и научно-исследовательский институт "Донецкий ПромстройНИИпроект" Divice for determining permeability of porous materials to liquid
RU2044300C1 (en) * 1991-01-15 1995-09-20 Научно-исследовательский физико-химический институт им.Л.Я.Карпова Device for hermetically sealing cell for measuring permeability or diffusion through membranes
JPH10123042A (en) * 1996-10-23 1998-05-15 Oozeki Kagaku Kogyo Kk Pressurization-type water permeability testing machine
CN202928932U (en) * 2012-12-07 2013-05-08 周磊 Highway pavement water seepage instrument
CN104151846A (en) * 2014-08-20 2014-11-19 重庆交通大学 Rubber and plastic alloy high viscosity modification asphalt
CN104568707A (en) * 2015-01-30 2015-04-29 湖南科技大学 Waterproof side leakage device for multi-field coupling test specimen
CN204536162U (en) * 2015-03-11 2015-08-05 新疆生产建设兵团公路科学技术研究所 Infiltration detector
CN204988964U (en) * 2015-06-09 2016-01-20 沈阳建筑大学 A infiltration appearance for measuring hypotonic river system number
CN204831984U (en) * 2015-08-14 2015-12-02 山西省交通科学研究院 Road surface infiltration appearance
CN106608718A (en) * 2015-10-22 2017-05-03 上海公路桥梁(集团)有限公司 Warm mix asphalt drainage pavement mixture, drainage pavement, preparation methods and application
KR101796549B1 (en) * 2017-04-13 2017-11-14 주식회사 로드코리아 Premix type modified asphalt composition and
CN107142810A (en) * 2017-05-23 2017-09-08 济南汇通联合市政工程有限责任公司 A kind of high-viscosity bitumen modifier asphalt paving construction method
CN206891923U (en) * 2017-07-01 2018-01-16 江苏宏达工程管理有限公司 A kind of pavement seepage instrument
CN107486727A (en) * 2017-08-18 2017-12-19 成都陵川特种工业有限责任公司 The connector processing tool of vibrations can be reduced
CN207937325U (en) * 2018-04-04 2018-10-02 广西交通科学研究院有限公司 Automatic test bituminous paving infiltration coefficient device
CN109440567A (en) * 2018-09-07 2019-03-08 重庆建工住宅建设有限公司 A kind of penetrated asphalt pavement construction method

Also Published As

Publication number Publication date
CN110282910B (en) 2023-08-04

Similar Documents

Publication Publication Date Title
CN103882788B (en) Based on the method for constructing roadway of the modification roller compacted concrete surface layer of enzyme soil cured substrate layer
CN112627154B (en) Water network zone lime solidified soil test section filling design method
CN108505409B (en) Solidified muddy soil and construction waste regenerated aggregate composite inorganic material and forming method thereof
CN112681079A (en) Soil body solidification and concrete cap surface gathering construction method applied to temporary road foundation
CN113123197A (en) Method and process for stabilizing macadam base with cement
CN106522073A (en) Construction method of high-added water-stable milled waste base
CN112359688A (en) Construction method for in-situ cold regeneration of highway cement stabilized macadam base
CN114775357A (en) Construction method for upper surface layer of steel slag asphalt mixture
CN108570897A (en) A kind of paving method of pavement of road base
CN114163187A (en) Emulsified asphalt plant-mixed cold-recycling mixture and construction process thereof
CN106495563A (en) A kind of environmental protection freeze-thawing resistant type porous pavement pavement material and preparation method thereof
CN113699852A (en) Environment-friendly high-strength solidified soil construction process
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN211472012U (en) Signal lamp crossing filling type composite pavement
CN103161119B (en) A kind of new method of rebuilding old road of turning waste into wealth
CN112301826A (en) Emulsified asphalt cold-recycling pavement structure and rapid curing method for pavement
CN110282910A (en) A kind of useless rubber plastic road surface construction method
CN111455765A (en) Mechanical rolling construction method for pervious concrete
CN112982058A (en) Vibration mixing construction method for cement stabilized macadam
KR101014184B1 (en) Ground pavement method without expansion joint
CN110714382B (en) Road base construction method for cement stabilized macadam mixture in high-temperature season
CN110438896B (en) Polyurethane rubber drainage pavement structure for concrete bridge floor and construction method thereof
CN113756148A (en) Construction method of pouring type composite pavement
CN202787016U (en) Novel water seepage concrete member
CN114808586B (en) Construction method for asphalt pavement anti-cracking in severe cold region

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant