CN110282399A - A kind of two-tube synchronize of flat rectangular tube turns over pipe centralizing system - Google Patents
A kind of two-tube synchronize of flat rectangular tube turns over pipe centralizing system Download PDFInfo
- Publication number
- CN110282399A CN110282399A CN201910603269.1A CN201910603269A CN110282399A CN 110282399 A CN110282399 A CN 110282399A CN 201910603269 A CN201910603269 A CN 201910603269A CN 110282399 A CN110282399 A CN 110282399A
- Authority
- CN
- China
- Prior art keywords
- tube
- over pipe
- plate
- pipe
- gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007306 turnover Effects 0.000 claims abstract description 45
- 238000000926 separation method Methods 0.000 claims description 11
- 230000005540 biological transmission Effects 0.000 claims description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 2
- 229910000831 Steel Inorganic materials 0.000 abstract description 11
- 239000010959 steel Substances 0.000 abstract description 11
- 238000000034 method Methods 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 abstract description 4
- 230000008569 process Effects 0.000 abstract description 4
- 238000013461 design Methods 0.000 abstract description 2
- 230000006835 compression Effects 0.000 description 16
- 238000007906 compression Methods 0.000 description 16
- 230000001360 synchronised effect Effects 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000012271 agricultural production Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009776 industrial production Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B41—PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
- B41J—TYPEWRITERS; SELECTIVE PRINTING MECHANISMS, i.e. MECHANISMS PRINTING OTHERWISE THAN FROM A FORME; CORRECTION OF TYPOGRAPHICAL ERRORS
- B41J3/00—Typewriters or selective printing or marking mechanisms characterised by the purpose for which they are constructed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G47/00—Article or material-handling devices associated with conveyors; Methods employing such devices
- B65G47/22—Devices influencing the relative position or the attitude of articles during transit by conveyors
- B65G47/24—Devices influencing the relative position or the attitude of articles during transit by conveyors orientating the articles
- B65G47/248—Devices influencing the relative position or the attitude of articles during transit by conveyors orientating the articles by turning over or inverting them
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Specific Conveyance Elements (AREA)
Abstract
The invention belongs to steel pipes to process technical field, it is related to a kind of two-tube synchronize of flat rectangular tube and turns over pipe centralizing system, including chain delivery section, control unit, it is characterized by also including turn over pipe portion, turn over pipe driving portion, two-tube delivery section, keyholed back plate portion, chain delivery section and two-tube delivery section are arranged side by side, and turn over pipe driving portion and are set to two-tube delivery section side, turn over pipe portion one and be set to ground, another portion is set in two-tube delivery section, and control unit, which is set to, to be turned in pipe portion.Design is scientific and reasonable for structure of the invention, can overturn, two righting, conveying steel pipes simultaneously, have many advantages, such as that saving manpower, speed are fast, high-efficient, applied widely, is that a kind of two-tube synchronize of the flat rectangular tube with higher innovation turns over pipe centralizing system.
Description
Technical field
The invention belongs to steel pipes to process technical field, in particular to two-tube synchronize of a kind of flat rectangular tube turns over pipe righting system
System.
Background technique
Flat rectangular tube is widely used in the various aspects of industrial and agricultural production and daily life.Flat rectangular tube is processing
In the process, it usually needs carry out stamp, existing flat rectangular tube coder usually requires flat rectangular tube narrow side to carry out to upper and lower
Stamp is exactly that flat rectangular tube erects stamp.And when actual production operation, when the overturning of flat rectangular tube enters stamp line, mostly in certainly
By falling state, for flat rectangular tube, it is substantially broadside to crouching on deposit mechanism and rollgang up and down, this shape
State is unable to satisfy stamp needs.The multi-functional full-automatic steel pipe stamp system of my company's independent research be provided with can righting determine face
Rectangular tube turns over pipe device, but the device can only also carry out single tube and turn over pipe, i.e., can only a ground turn over, that there is only speed is slow,
The problems such as low efficiency, is also unable to satisfy the stamp demand with double spray head ink jet numbering machines.
Summary of the invention
It two-tube can be synchronized it is an object of the invention to overcome the deficiencies of the prior art and provide one kind and turn over pipe, righting, speed
Fastly, two-tube synchronize of high-efficient flat rectangular tube turns over pipe centralizing system.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of two-tube synchronize of flat rectangular tube turns over pipe centralizing system, including chain delivery section, control unit, it is characterised in that: also
Including turning over pipe portion, turning over pipe driving portion, two-tube delivery section, keyholed back plate portion, chain delivery section and two-tube delivery section are arranged side by side, and turn over pipe drive
Dynamic portion is set to two-tube delivery section side, turns over pipe portion one and is set to ground, another portion is set in two-tube delivery section, control unit
It is set to and turns in pipe portion.
Moreover, the pipe portion of turning over is two groups or more, two groups or more turns over the setting of pipe portion interval, and uniform portion is set
It is placed in ground, another portion is set on main support, by mounting plate, erection device, gear pipe device, linkage drive units, turns over pipe
Device, separation device composition, mounting plate are installed on main support, and erection device, gear pipe device are installed on mounting plate, are linked
Transmission device is installed in ground, turns over pipe device one end hinge loaded on mounting plate, the other end and linkage drive units hinge fill, and are in charge of dress
It sets top to be slideably positioned on mounting plate, lower part and linkage drive units hinge fill.
Moreover, the linkage drive units, by gear-box, gear-box pillar, input gear, output gear, output gear
Axis, linkage board composition, gear-box pillar are installed in ground gear-box and are installed on gear-box pillar, output gear shaft rotation setting
In on gear-box, input gear, output gear be installed in linkage driving axis respectively, on output gear shaft and is intermeshed, and links
Plate is installed in passive tooth axle outer end.
Moreover, described turn over pipe device, by turn over pipe arm, turn over pipe push plate, arc gear tube head forms, turn over pipe arm outer end hinge loaded on peace
It in loading board, turns over pipe push plate upper end and turns over pipe arm inner end hinge dress, lower end and linkage board hinge fill, and arc gear tube head, which is formed on, turns over pipe arm end
Portion.
Moreover, the separation device, by be in charge of guiding hoop, be in charge of plate, be in charge of connecting plate, arc is in charge of head and is formed, be in charge of
Guiding hoop is installed in mounting plate side, is in charge of plate and is slideably positioned in and is in charge of in guiding hoop, and upper end setting arc is in charge of head, lower end with
It is in charge of connecting plate hinge dress, is in charge of connecting plate hinge loaded on being in charge of between plate and linkage board.
Moreover, the erection device, is in charge of head and is formed by inner side limiting-position plate, outside limit plate, realizing middle limiting plate, taper,
Inner side limiting-position plate medial and lateral limit plate outside, realizing middle limiting plate be installed on mounting plate laterally side by side between two parties, taper is in charge of head
It is set to realizing middle limiting plate top.
Moreover, the gear pipe device, is made of outer baffle tube vertical plate, interior gear pipe vertical plate, outer baffle tube vertical plate, interior gear pipe vertical plate point
It is not installed in outer end and inner end on mounting plate.
Moreover, described turn over pipe driving portion, it is made of driving cylinder, linkage driving axis, driving cylinder is set to ground, links
Drive shaft, which is set to, to be turned between pipe portion, driving cylinder, the transmission connection of linkage driving axis.
Moreover, the driving cylinder and turn over pipe portion and correspond to two or more, two or more driving cylinders
Interval setting, equal pedestal are installed in ground, and top and linkage driving axis are sequentially connected, are all provided between top and linkage driving axis
It is equipped with connection handle.
Moreover, the two-tube delivery section is two-tube rollgang, it is made of main support, two-tube conveying roller, main support is fixedly mounted with
In ground, two-tube conveying roller is arranged at intervals at the top of main support.
The advantages and benefits of the present invention are:
1. flat two-tube synchronize of rectangular tube of the present invention turns over the two-tube delivery section of pipe centralizing system, turns over pipe portion, it can overturn, help simultaneously
Just, two steel pipes are conveyed, manpower is saved, speed is high-efficient fastly.
2. the flat rectangular tube of the present invention is two-tube to be synchronized and turn over pipe centralizing system and be provided with keyholed back plate portion, it can avoid subsequent steel pipe and weigh up and down
It is folded, it influences normally to convey.
3. the flat rectangular tube of the present invention is two-tube to be synchronized and turns over pipe centralizing system and be provided with inner side limiting-position plate, outside limit plate, centre
Limit plate, between form adjustable size receive tube seat, be applicable to the flat rectangular tube of plurality of specifications.
4. the flat rectangular tube of the present invention is two-tube to be synchronized and turn over pipe centralizing system and be provided with that arc is in charge of head, taper is in charge of head, it is in charge of
Smooth, effect is guaranteed.
5. the flat rectangular tube of the present invention is two-tube to synchronize that turn over pipe centralizing system scientific structure design reasonable, can overturn simultaneously, righting,
Two steel pipes are conveyed, have many advantages, such as that saving manpower, speed are fast, high-efficient, applied widely, are a kind of with higher innovation
Two-tube synchronize of flat rectangular tube turn over pipe centralizing system.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is schematic structural view of the invention (part);
Fig. 3 is schematic structural view of the invention (part);
Fig. 4 is schematic structural view of the invention (partial top view);
Fig. 5 is the A direction view (reverse rotation 180 degree) of Fig. 4;
Fig. 6 is keyholed back plate portion structural schematic diagram.
Attached drawing mark explanation:
The two-tube delivery section of 1-, 2- turn over pipe driving portion, 3- chain delivery section, 4- keyholed back plate portion, and 5- keeps off pipe device, and 6- turns over pipe dress
It sets, 7- linkage drive units, 8- separation device, 9- control unit, 10- erection device, 11- mounting plate, 12- output gear, 13- connection
Movable plate, 14- output gear shaft, 15- input gear, 16- connection handle, 17- linkage driving axis, 18- gear-box, 19- gear-box branch
Column, 20- drive cylinder, and 21- arc is in charge of head, and 22- is in charge of plate, and 23- is in charge of guiding hoop, and 24- is in charge of connecting plate, and 25- turns over pipe arm,
26- turns over pipe push plate, and 27- arc keeps off tube head, 28- inner side limiting-position plate, 29- realizing middle limiting plate, limit plate on the outside of 30-, and 31- is two-tube defeated
Send roller, 32- main support, 33- first receives tube seat, and 34- taper is in charge of head, and 35- second receives tube seat, 36- compression bar bracket, 37- compression bar
Sleeve, 38- compression bar positioning screw, 39- compression bar.
Specific embodiment
Below by specific embodiment, the invention will be further described, and it is not limit that following embodiment, which is descriptive,
Qualitatively, this does not limit the scope of protection of the present invention.
A kind of two-tube synchronize of flat rectangular tube turns over pipe centralizing system, including chain delivery section 3, control unit 9, and innovation exists
In: it further include turning over pipe portion, turning over pipe driving portion 2, two-tube delivery section 1, keyholed back plate portion 4;Chain delivery section is set side by side with two-tube delivery section
It sets, turns over pipe driving portion and be set to two-tube delivery section side, turn over pipe portion one and be set to ground, another portion is set to two-tube delivery section
On, control unit, which is set to, to be turned in pipe portion.Chain delivery section is used to convey the flat rectangular tube of flat rectangular tube production line machine-shaping
It is transmitted to and turns over pipe portion, two-tube delivery section is for assembling other component and flat rectangular tube being transmitted to stamp in two synchronous modes
Device turns over pipe portion, turns over pipe driving portion for flat rectangular tube to be turned to two-tube delivery section, keyholed back plate from chain delivery section for two every time
Portion for control subsequent flat rectangular tube it is single it is smooth enter turn over pipe portion, prevent and avoid turn over pipe portion occur the accumulation of flat rectangular tube,
Phenomena such as overlapping.Control unit, which is used to start, to be turned over the driving cylinder of pipe driving portion and carries out turning over pipe in due course, when detecting two-tube conveying roller
When not having steel pipe on road, having steel pipe in chain delivery section, i.e., starting driving cylinder carries out turning over pipe.
Two-tube delivery section is two-tube rollgang, is made of main support 32, two-tube conveying roller 31, main support is installed in ground
Face, two-tube conveying roller are arranged at intervals at the top of main support.Two-tube conveying roller can convey two flat rectangular tubes simultaneously.
Pipe driving portion is turned over, is made of driving cylinder 20, linkage driving axis 17, driving cylinder is set to ground, linkage driving
Axis, which is set to, to be turned between pipe portion through two or more gear-boxes, and cylinder, the transmission connection of linkage driving axis are driven.Driving
It cylinder and turns over pipe portion and corresponds to two or more, two or more driving cylinder intervals settings, equal pedestal is installed in
Ground, top and linkage driving axis are sequentially connected, and connection handle 16 is provided between top and linkage driving axis.Drive gas
Cylinder, linkage driving axis cooperate for driving input gear to drive turn over pipe device, separation device movement turn over pipe and
It is in charge of, meanwhile, linkage driving axis is also used to install input gear.According to flat rectangular tube length specification, settable two or two
Above driving cylinder the present embodiment is three.Connection handle can make to drive brisk.
Turn over pipe portion by mounting plate 11, erection device 10, gear pipe device 5, linkage drive units 7, turn over pipe device 6, be in charge of dress
8 compositions are set, mounting plate is installed on main support, and erection device, gear pipe device, linkage drive units are installed in ground, turns over pipe dress
One end hinge is set loaded on mounting plate, the other end and linkage drive units hinge fill, and separation device top is slideably positioned on mounting plate,
Lower part and linkage drive units hinge fill.Two groups or more can be set as according to length of steel pipe by turning over pipe portion, the present embodiment three
Group, three groups are turned over the setting of pipe portion interval, and uniform portion is set to ground, and another portion is set on main support.Mounting plate is helped for assembling
Equipment, turns over pipe device, separation device at gear pipe device, linkage drive units;Erection device founds flat rectangular tube for guiding
It rises, makes leptoprosopy to upper and lower;Gear pipe device turns over the upturned flat rectangular tube of pipe device for blocking, and is in centre using flat rectangular tube
Position;Linkage drive units are for pipe device to be turned in driving, separation device carries out turning over pipe and be in charge of under the driving of linkage driving axis;
It turns over pipe device to be used to flat rectangular tube being turned to double roller delivery section from chain delivery section, two every time;Separation device is used for two
Flat rectangular tube point makes it respectively fall in first and receive tube seat and second and receives tube seat to both sides.
Linkage drive units, by gear-box 18, gear-box pillar 19, input gear 15, output gear 12, output gear shaft
14, linkage board 13 forms, and gear-box pillar is installed in ground gear-box and is installed on gear-box pillar, and output gear shaft rotation is set
It is placed on gear-box, input gear, output gear be installed in linkage driving axis respectively, on output gear shaft and is intermeshed, and joins
Movable plate is installed in passive tooth axle outer end.
Turn over pipe device, by turn over pipe arm 25, turn over pipe push plate 26, arc gear tube head 27 form, turn over pipe arm outer end hinge loaded on installation
It on plate, turns over pipe push plate upper end and turns over pipe arm inner end hinge dress, lower end and linkage board hinge fill, and arc gear tube head, which is formed on, turns over pipe arm end.
Separation device, by be in charge of guiding hoop 23, be in charge of plate 22, be in charge of connecting plate 24, arc is in charge of first 21 and is formed, be in charge of and lead
Be installed in mounting plate side to hoop, be in charge of plate and be slideably positioned in and be in charge of in guiding hoop, upper end setting arc is in charge of head, lower end with point
Pipe connecting plate hinge dress is in charge of connecting plate hinge loaded on being in charge of between plate and linkage board.Arc is in charge of head can go up downward on being in charge of plate
It is whole, when flat rectangular tube specification is larger, arc is in charge of head and is turned up slightly up.
Erection device is made of inner side limiting-position plate 28, outside limit plate 30, realizing middle limiting plate 29, including inner side limiting-position plate,
Outside limit plate is outside, realizing middle limiting plate is installed on mounting plate laterally side by side between two parties.
Inner side limiting-position plate, outside limit plate, realizing middle limiting plate, between be respectively formed first receive tube seat 33, second receive pipe
Slot 35.Bar shaped screw hole is formed on inner side limiting-position plate, outside limit plate, inner side limiting-position plate, outside limit Board position can control tune
It is whole, when flat rectangular tube specification is larger, it can make to receive tube seat increase to external-adjuster.
Realizing middle limiting plate is provided with taper and is in charge of first 34.
Keyholed back plate portion is made of compression bar bracket 36, compression bar sleeve 37, compression bar 39, compression bar positioning screw 38, and compression bar bracket is fixedly mounted with
In on double roller delivery section main support, compression bar sleeve is installed on compression bar bracket, and compression bar is slideably positioned in compression bar sleeve, and compression bar is fixed
Position screw rod is set on compression bar sleeve.When flat rectangular tube converts specification, the height of adjustable compression bar and flat rectangular tube specification phase
It adapts to.
Control unit is infrared sensor, and infrared sensor is set on interior gear pipe vertical plate.Infrared sensor is two, one
Opposite chain delivery section, a two-tube rollgang of opposite direction.
Pipe device is kept off, is made of outer baffle tube vertical plate, interior gear pipe vertical plate, outer baffle tube vertical plate, interior gear pipe vertical plate are installed in respectively
Outer end and inner end on mounting plate.When flat rectangular tube is delivered to two-tube rollgang by chain delivery section, by interior gear Guan Li
Plate blocks.Outer baffle tube vertical plate is a positioning plate for having outer inclined-plane.It turns over after pipe arm turns over two flat rectangular tubes, it is automatic to glide
To outer baffle tube vertical plate, stopped by outer baffle tube vertical plate, after turning over pipe arm and falling, two flat rectangular tubes just occupy middle position.
The working principle of the invention:
In production process, after steel pipe formed, is cut off and is delivered to chain delivery section, flat rectangular tube is by chain delivery section
Chain-driving, it is gradually close to two-tube rollgang, it turns over above pipe arm end until coming to by the interior gear pipe vertical plate of gear pipe device
It blocks and stops.The chain delivery section detected is had pipe or without pipe, two-tube rollgang by the infrared sensor of control unit at this time
On there is pipe or the information without pipe to be transmitted to control centre, if chain delivery section has pipe, two-tube rollgang without pipe, start driving
Cylinder carries out turning over pipe.Cylinders retract is driven, the input tooth for driving linkage driving axis through connection handle and being installed on linkage driving axis
Wheel rotates clockwise, thus drive output gear, output gear shaft and be installed in output gear shaft end linkage board it is counterclockwise
Rotation, and then drive and turn over pipe push plate, turn over pipe arm and be raised above and two flat rectangular tubes are held up into overturning, while driving and being in charge of connection
Plate is in charge of plate and is fallen downwards;At this point, two flat rectangular tubes under self gravitation effect to two-tube rollgang direction glide until
Gear pipe device is blocked and occupy two-tube rollgang center.Later, control centre's control driving cylinder rises, and drives gas
Cylinder drives linkage driving axis and the input gear being installed on linkage driving axis to rotate counterclockwise through connection handle, to drive output
It gear, output gear shaft and is installed in the linkage board of output gear shaft end and rotates clockwise, and then drive and turn over pipe push plate, turn over pipe
Arm is fallen, while being driven and being in charge of connecting plate, being in charge of plate to being raised above, and the arc being in charge of on plate during rising is in charge of head for two
Flat rectangular tube is jacked up by intermediate side, makes gradually to erect and at the top of realizing middle limiting plate in the flat rectangular tube overturning of laid-flat status
Taper be in charge of head be snapped down to respectively first receive tube seat, second receive in tube seat until under fall on two-tube conveying roller and be transported to down
One process carries out coding, and flat rectangular tube is in erected state, i.e. leptoprosopy to upper and lower at this time.It loops back and forth like this.Pipe arm is turned over to rise
When, due to the blocking of arc gear tube head, subsequent flat rectangular tube will not be transported in advance to be turned over below pipe arm, is only turned over pipe arm and is fallen
When, subsequent flat rectangular tube, which can be just transported to, turns over above pipe arm two.
Although disclosing the embodiment of the present invention and attached drawing for the purpose of illustration, those skilled in the art can be managed
Solution: do not departing from the present invention and spirit and scope of the appended claims in, various substitutions, changes and modifications be all it is possible,
Therefore, the scope of the present invention is not limited to the embodiment and attached drawing disclosure of that.
Claims (10)
1. a kind of two-tube synchronize of flat rectangular tube turns over pipe centralizing system, including chain delivery section, control unit, it is characterised in that: also wrap
It includes and turns over pipe portion, turn over pipe driving portion, two-tube delivery section, keyholed back plate portion, chain delivery section and two-tube delivery section are arranged side by side, and turn over pipe driving
Portion is set to two-tube delivery section side, turns over pipe portion one and is set to ground, another portion is set in two-tube delivery section, and control unit is set
It is placed in and turns in pipe portion.
2. two-tube synchronize of flat rectangular tube according to claim 1 turns over pipe centralizing system, it is characterised in that: the pipe portion of turning over is
Two groups or more, two groups or more turns over the setting of pipe portion interval, and uniform portion is set to ground, and another portion is set to main branch
On frame, by mounting plate, erection device, gear pipe device, linkage drive units, turn over pipe device, separation device forms, mounting plate is solid
Loaded on main support, erection device, gear pipe device are installed on mounting plate, and linkage drive units are installed in ground, turn over pipe dress
One end hinge is set loaded on mounting plate, the other end and linkage drive units hinge fill, and separation device top is slideably positioned on mounting plate,
Lower part and linkage drive units hinge fill.
3. two-tube synchronize of flat rectangular tube according to claim 2 turns over pipe centralizing system, it is characterised in that: the linkage transmission
Device is made of gear-box, gear-box pillar, input gear, output gear, output gear shaft, linkage board, and gear-box pillar is solid
It is installed on gear-box pillar loaded on ground gear-box, output gear shaft is rotatably dispose on gear-box, input gear, output gear
Wheel is installed in linkage driving axis respectively, on output gear shaft and is intermeshed, and linkage board is installed in passive tooth axle outer end.
4. two-tube synchronize of flat rectangular tube according to claim 2 turns over pipe centralizing system, it is characterised in that: described to turn over pipe dress
Set, by turn over pipe arm, turn over pipe push plate, arc gear tube head forms, turn over pipe arm outer end hinge loaded on mounting plate, turn over pipe push plate upper end and turn over
Pipe arm inner end hinge dress, lower end and linkage board hinge fill, and arc gear tube head, which is formed on, turns over pipe arm end.
5. two-tube synchronize of flat rectangular tube according to claim 2 turns over pipe centralizing system, it is characterised in that: described to be in charge of dress
Set, by be in charge of guiding hoop, be in charge of plate, be in charge of connecting plate, arc is in charge of head and is formed, be in charge of guiding hoop and be installed in mounting plate side,
It is in charge of plate and is slideably positioned in and be in charge of in guiding hoop, upper end setting arc is in charge of head, lower end and is in charge of connecting plate hinge and fills, and is in charge of connection
Plate hinge, which is loaded on, to be in charge of between plate and linkage board.
6. two-tube synchronize of flat rectangular tube according to claim 2 turns over pipe centralizing system, it is characterised in that: the righting dress
It sets, is in charge of head by inner side limiting-position plate, outside limit plate, realizing middle limiting plate, taper and is formed, inner side limiting-position plate is limited in medial and lateral
Plate outside, realizing middle limiting plate be installed on mounting plate laterally side by side between two parties, taper is in charge of head and is set to realizing middle limiting plate top.
7. two-tube synchronize of flat rectangular tube according to claim 2 turns over pipe centralizing system, it is characterised in that: the gear pipe dress
It sets, is made of outer baffle tube vertical plate, interior gear pipe vertical plate, outer baffle tube vertical plate, interior gear pipe vertical plate are installed in outer end on mounting plate respectively
And inner end.
8. two-tube synchronize of flat rectangular tube according to claim 1 turns over pipe centralizing system, it is characterised in that: described to turn over pipe driving
Portion is made of driving cylinder, linkage driving axis, and driving cylinder is set to ground, and linkage driving axis, which is set to, to be turned between pipe portion, is driven
Take offence cylinder, linkage driving axis transmission connection.
9. two-tube synchronize of flat rectangular tube according to claim 8 turns over pipe centralizing system, it is characterised in that: the driving cylinder
Two or more are corresponded to pipe portion is turned over, two or more driving cylinder interval settings, equal pedestal is installed in ground,
Top and linkage driving axis are sequentially connected, and are provided with connection handle between top and linkage driving axis.
10. two-tube synchronize of flat rectangular tube according to claim 1 turns over pipe centralizing system, it is characterised in that: described two-tube defeated
Sending portion is two-tube rollgang, is made of main support, two-tube conveying roller, main support is installed in ground, and two-tube conveying roller interval is set
It is placed at the top of main support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910603269.1A CN110282399B (en) | 2019-07-05 | 2019-07-05 | Flat rectangular pipe double-pipe synchronous pipe turning and righting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910603269.1A CN110282399B (en) | 2019-07-05 | 2019-07-05 | Flat rectangular pipe double-pipe synchronous pipe turning and righting system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110282399A true CN110282399A (en) | 2019-09-27 |
CN110282399B CN110282399B (en) | 2024-04-26 |
Family
ID=68020803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910603269.1A Active CN110282399B (en) | 2019-07-05 | 2019-07-05 | Flat rectangular pipe double-pipe synchronous pipe turning and righting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110282399B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112719829A (en) * | 2020-12-17 | 2021-04-30 | 沧州永康医药用品有限公司 | Quick assembly device for virus sampling pipe |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1288897B (en) * | 1967-08-08 | 1969-02-06 | Windmoeller & Hoelscher | Machine for making paper or plastic bags |
CN202729296U (en) * | 2012-09-17 | 2013-02-13 | 天津市兆利达钢管有限公司 | No-damage automatic tube overturning device |
CN204524397U (en) * | 2015-03-26 | 2015-08-05 | 苏州金凯达机械科技有限公司 | A kind of rectangular tube automatic charging device |
CN105599128A (en) * | 2016-02-29 | 2016-05-25 | 周兆弟 | Fully-automatic tubular pile production line |
CN207642906U (en) * | 2017-12-22 | 2018-07-24 | 天津市宝利华峰五金制品有限公司 | A kind of automatic steel tube feeding unit |
CN108481920A (en) * | 2018-05-23 | 2018-09-04 | 天津市天应泰钢管有限公司 | A kind of multi-functional full-automatic steel pipe stamp system |
CN108726857A (en) * | 2018-07-02 | 2018-11-02 | 黎泽新 | A kind of auto tube feeding for Production of Glass and intubation production line |
CN210236314U (en) * | 2019-07-05 | 2020-04-03 | 天津市天应泰钢管有限公司 | Flat rectangular pipe double-pipe synchronous pipe overturning and straightening system |
-
2019
- 2019-07-05 CN CN201910603269.1A patent/CN110282399B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1288897B (en) * | 1967-08-08 | 1969-02-06 | Windmoeller & Hoelscher | Machine for making paper or plastic bags |
CN202729296U (en) * | 2012-09-17 | 2013-02-13 | 天津市兆利达钢管有限公司 | No-damage automatic tube overturning device |
CN204524397U (en) * | 2015-03-26 | 2015-08-05 | 苏州金凯达机械科技有限公司 | A kind of rectangular tube automatic charging device |
CN105599128A (en) * | 2016-02-29 | 2016-05-25 | 周兆弟 | Fully-automatic tubular pile production line |
CN207642906U (en) * | 2017-12-22 | 2018-07-24 | 天津市宝利华峰五金制品有限公司 | A kind of automatic steel tube feeding unit |
CN108481920A (en) * | 2018-05-23 | 2018-09-04 | 天津市天应泰钢管有限公司 | A kind of multi-functional full-automatic steel pipe stamp system |
CN108726857A (en) * | 2018-07-02 | 2018-11-02 | 黎泽新 | A kind of auto tube feeding for Production of Glass and intubation production line |
CN210236314U (en) * | 2019-07-05 | 2020-04-03 | 天津市天应泰钢管有限公司 | Flat rectangular pipe double-pipe synchronous pipe overturning and straightening system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112719829A (en) * | 2020-12-17 | 2021-04-30 | 沧州永康医药用品有限公司 | Quick assembly device for virus sampling pipe |
CN112719829B (en) * | 2020-12-17 | 2021-12-21 | 沧州永康医药用品有限公司 | Quick assembly device for virus sampling pipe |
Also Published As
Publication number | Publication date |
---|---|
CN110282399B (en) | 2024-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106738305B (en) | Automatic dismounting pipe die all-in-one machine | |
CN105422148B (en) | Rotary Large Copacity is automatically positioned anchor pole storehouse | |
CN208037526U (en) | A kind of pcb board grasping mechanism | |
CN110282399A (en) | A kind of two-tube synchronize of flat rectangular tube turns over pipe centralizing system | |
CN110255115A (en) | A kind of supporting roller mechanism of mining machinery conveyer | |
CN108453198A (en) | A kind of bar straightening disconnecting device | |
CN206417494U (en) | A kind of chain and pan conveyor with positioner | |
CN202316332U (en) | Continuous production equipment capable for sorting random-length steel bars | |
CN202244219U (en) | Carton-taking device for ceramic tile packager | |
CN209550925U (en) | Tubing feeding automatic positioning equipment | |
CN102389873A (en) | Sorting continuous production device for reinforcing bars of disordered sizes | |
CN105645115A (en) | Common cover stacking machine and packaging technique thereof | |
CN208195510U (en) | A kind of bar straightening disconnecting device | |
CN208218316U (en) | The embedded lifting and driving production work platform of assembled architecture out-hung panel | |
CN112173646B (en) | Pipe arranging machine | |
CN209337598U (en) | Tubing turns round feeding device | |
CN211938791U (en) | Automatic plate feeding device of plate rolling machine | |
CN110206318A (en) | A kind of build concrete ground pump terminal auxiliary casting system | |
CN210392726U (en) | Dual-output transmission case and ampoule bottle horizontal-to-vertical device applied by same | |
CN202321633U (en) | Mechanical arm capable of automatically adapting to deflection angles | |
CN221700100U (en) | Full-automatic deviation correcting device of movable double-plow discharger in whole process | |
CN218438447U (en) | Anti-tilt righting device for high-rise building | |
CN209889176U (en) | Packaging barrel filling equipment | |
CN109399183A (en) | Tubing turns round feeding device | |
CN220886140U (en) | Stacking device for aerated concrete bricks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: No. 14, Hengtai Road, Daqiuzhuang Town, Jinghai District, Tianjin 301600 Applicant after: TIANJIN TIANYINGTAI STEEL PIPE Co.,Ltd. Address before: 301600 west of Dazhai village, yangchengzhuang Township, Jinghai County, Tianjin (cancelled) Applicant before: TIANJIN TIANYINGTAI STEEL PIPE Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |