CN110277217A - A kind of production method of magnetic rubber strip magnetizing plate - Google Patents

A kind of production method of magnetic rubber strip magnetizing plate Download PDF

Info

Publication number
CN110277217A
CN110277217A CN201910501442.7A CN201910501442A CN110277217A CN 110277217 A CN110277217 A CN 110277217A CN 201910501442 A CN201910501442 A CN 201910501442A CN 110277217 A CN110277217 A CN 110277217A
Authority
CN
China
Prior art keywords
line
magnetizes
installation
pedestal
pellet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910501442.7A
Other languages
Chinese (zh)
Other versions
CN110277217B (en
Inventor
陈浩楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Chunan New Material Technology Co ltd
Original Assignee
Wenzhou Renhe Cultural Originality Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Renhe Cultural Originality Co Ltd filed Critical Wenzhou Renhe Cultural Originality Co Ltd
Priority to CN201910501442.7A priority Critical patent/CN110277217B/en
Publication of CN110277217A publication Critical patent/CN110277217A/en
Application granted granted Critical
Publication of CN110277217B publication Critical patent/CN110277217B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F13/00Apparatus or processes for magnetising or demagnetising
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F41/00Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties

Abstract

The invention discloses a kind of production methods of magnetic rubber strip magnetizing plate, the following steps are included: production pedestal, the line that magnetizes installs pellet, magnetize line, guide plate, connecting plate and fastening plates, the line that magnetizes is installed to the line that magnetizes and is installed in the line installation through slot that magnetizes being arranged on pellet, connect two lines that magnetize, whether detection for the first time is magnetized is connected between line and the line that magnetizes installation pellet, it polishes the part for being higher than line installation pellet upper end of magnetizing to the line that magnetizes, whether second of detection is magnetized is connected between line and the line that magnetizes installation pellet, it will magnetize line installation pellet and fastening plates installed into the rectangular straight slot being arranged on pedestal and fixed, connecting plate is installed, guide plate is installed, rubber pad is pasted on the lower end surface of pedestal and paints insulated paint on the side wall of pedestal;Present invention saves the set-up times for the line that magnetizes to reduce the Production Time of magnetizing plate so that the curing time of epoxide-resin glue and polyamide reduces.

Description

A kind of production method of magnetic rubber strip magnetizing plate
Technical field
The present invention relates to magnetizing plate technical field, specially a kind of production method of magnetic rubber strip magnetizing plate.
Background technique
Magnetic rubber strip be ferromagnetic oxide powder and a variety of chemical industry additives by mixing, granulation after, squeezed out through screw extruder And a kind of magnetic adhesive tape obtained after magnet charger magnetizes, it is mainly used for refrigerator door seal, disinfection cabinet, bathroom door seal etc..Magnetic Magnetizing for adhesive tape of property needs using magnetic rubber strip magnetizing plate.The production of magnetic rubber strip magnetizing plate is placed in including the line that will magnetize and magnetizes Line is installed in pellet, and magnetize line selection flat type copper wire, and existing installation method is that the line that will first magnetize is straightened, and then will be magnetized under line End is uniform to be pressed into the line installation through slot that magnetizes being arranged on the line installation pellet that magnetizes, so that the line that magnetizes will not be spontaneously by magnet-wire It is run out of in installation through slot, then beats the upper end for the line that magnetizes back and forth along the length direction of magnet-wire installation through slot using rubber hammer, The line that will equably magnetize is knocked in the line installation through slot that magnetizes, and such mounting means is difficult to install, time-consuming and easily leads to and magnetizes Insulation system damage outside line, causes the line install failure that magnetizes, needs to intercept the new line that magnetizes and install again, lead to magnetic rubber strip The manufacturing speed of magnetizing plate is slow, fabrication cycle is long.
Summary of the invention
The purpose of the present invention is to provide a kind of production methods of magnetic rubber strip magnetizing plate, it is intended to which improvement is filled in magnetic rubber strip Magnetic sheet magnetizes during making, and line is difficult to install, time-consuming and easily leads to the insulation system damage magnetized outside line, causes magnetic Property adhesive tape magnetizing plate the problem that manufacturing speed is slow, fabrication cycle is long.
The present invention is implemented as follows: a kind of production method of magnetic rubber strip magnetizing plate, the production method include with Lower step:
S1, pedestal, the line that magnetizes installation pellet, the line that magnetizes, guide plate, connecting plate and fastening plates, pedestal and the line that magnetizes are made The length for installing pellet, guide plate and fastening plates is identical;One square is set along its length direction on the upper surface of pedestal Shape through slot is each provided with one group of guiding along the length direction of pedestal on the upper surface of pedestal and positioned at the two sides of rectangular straight slot Plate mounting hole is provided with cavity along the length direction of pedestal in pedestal;Magnetize line installation pellet upper surface on along Two line installation through slots that magnetize being parallel to each other, the height and rectangular straight slot of the line installation pellet that magnetizes is arranged in its length direction Depth it is identical;Selection thickness sand hill flat type copper wire compatible with the line installation through slot width dimensions that magnetize, which is used as, magnetizes line simultaneously Interception is longer than the length for the line installation pellet that magnetizes, and the height for the line that magnetizes is greater than the depth for the line installation through slot that magnetizes;Guide plate and company Fishplate bar selects insulating materials;Quantity and position both ends corresponding with guide plate mounting hole are provided on guide plate in arc-shaped Strip through-hole, the both ends of connecting plate are provided with connection through-hole;The width of the thickness of fastening plates and the line installation pellet that magnetizes The sum of be less than the width of rectangular straight slot, the height of fastening plates is equal to the height for the line installation pellet that magnetizes;
S2, install the line that magnetizes to the line that magnetizes and install in the line installation through slot that magnetizes being arranged on pellet: the line that will magnetize is at 5 DEG C And its refrigerated in temperature below at least 5 minutes, the line that will magnetize installation pellet heats at least 5 in 100 DEG C -150 DEG C of temperature Minute, the line that then will magnetize installation pellet takes out and fixes, and the line that will magnetize is installed to the line that magnetizes to install after taking out and be set on pellet In the line installation through slot that magnetizes set, reusing pressure plate and pushing down the upper end of the line that magnetizes prevents from magnetizing line and the line installation pellet that magnetizes exists Temperature becomes the identical line that magnetizes before and bends by running out of in the line installation through slot that magnetizes;
Two S3, connection lines that magnetize: two lines that magnetize are located to the insulating layer of one end of line installation pellet the same end of magnetizing Removal, and hold be closely joined together two lines that magnetize herein, two lines that magnetize are connected at interconnection;
S4, for the first time detection magnetize line and the line that magnetizes installation pellet between whether is connected, if conducting if explanation magnetize line with Insulation system between the line that magnetizes installation through slot destroys, and needs to remake and install the line that magnetizes, carries out if being not turned on Next step;
S5, the part for being higher than line installation pellet upper end of magnetizing to the line that magnetizes are polished, the upper end for the line that makes to magnetize with magnetize The upper end that line installs pellet is concordant, and cleans out the copper scale and iron filings to magnetize on line installation pellet upper surface;
Whether S6, second detection magnetize is connected between line and the line that magnetizes installation pellet, if conducting explanation magnetize line with Insulation system between the line that magnetizes installation through slot destroys, and needs to remake and install the line that magnetizes, carries out if being not turned on Next step;
S7, line installation pellet will be magnetized and fastening plates are installed into the rectangular straight slot being arranged on pedestal and fixed;
S8, installation connecting plate: two pieces of connecting plates are separately mounted to pedestal and are connected with each other the one of end far from two lines that magnetize The two sides at end, and the part plate body of connecting plate extend out to the outside of pedestal along the length direction of pedestal;
S9, epoxy resin coagulated mass is made at the both ends of pedestal, epoxy resin coagulated mass is by epoxy resin and epoxy resin Curing agent ginseng match after solidify, epoxy resin coagulated mass is bonded on the end wall at pedestal both ends, epoxy resin coagulated mass it is upper It holds concordant with the upper end of pedestal;
S10, installation guide plate: guide plate is mounted on the guide plate mounting hole of pedestal upper end setting;
S11, rubber pad is pasted on the lower end surface of pedestal, insulated paint is painted on the side wall of pedestal and using heat drying dress Set flash baking.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, in step S1 pedestal the production method is as follows: according to being wanted The drawing of the magnetizing plate of production is selected the square steel all the same with the width of magnetizing plate pedestal and height, and is intercepted identical as pedestal Length, along interception square steel length direction using wire cutting machine square steel is longitudinally cutting at upper square steel and lower square steel two Point, above along one rectangular straight slot of its length direction milling on the upper surface of steel, in the two sides of rectangular straight slot along pedestal Length direction respectively drill one group of guide plate mounting hole, the then tapping on guide plate mounting hole, on the upper surface of lower square steel Along one rectangular channel of its length direction milling, this rectangular channel is cavity, and two through-holes are bored on the lateral wall of lower square steel, point Do not lead to the both ends of rectangular channel, then the tapping on two through-holes, this through-hole is for installing quick connector;In the upper end of lower square steel It is located at one first annular slot of outside milling of rectangular channel on face, corresponds to the position of first annular slot on the lower end surface of steel above It sets and one the second annular groove of size milling;The two sides on the lower end surface of steel positioned at the second annular groove are along upper square steel above Length direction equably drills multiple circular holes, and the tapping on these circular holes, and the position on lower square steel corresponding to circular hole drills Cylindrical ladder hole;Sealing ring is placed in first annular slot and the second annular groove, using hexagon socket head cap screw in circular hole and circle Cylindricality through hole links together upper square steel and lower square steel.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, magnetizing plate installation pellet selects soft magnetic materials system in step S1 Make, the line that magnetizes install through slot use milling machine milling, the line that magnetizes install through slot groove sidewall surface roughness be Ra12.5 and its with Upper precision.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, guide plate and connecting plate are all made of using epoxy in step S1 Insulation board.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, magnetize line and the line peace that magnetizes are detected in step S4 and step S6 Whether be connected between cored block using digital display type multimeter, using diode gear, red test pencil and black meter pen respectively with the line that magnetizes Copper wire and the line installation pellet that magnetizes connect, the explanation that the buzzer on digital display type multimeter beeps, which magnetizes, line and to magnetize line It is connected between installation pellet, the insulation system to magnetize outside line is destroyed, and is needed to remake and is installed the line that magnetizes;Digital display type general-purpose Buzzer on table does not have buzzer sending, then explanation magnetizes does not turn between line and the line that magnetizes installation pellet, magnetizes outside line Insulation system is not destroyed, and the line that magnetizes is installed successfully.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, for the polishing for the line that magnetizes by manually using in step S5 File carries out.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, in step S5 for the polishing for the line that magnetizes using milling machine into Row, the shaft lower end of milling machine are horizontally mounted grinding wheel, and the rotation of milling machine shaft drives grinding wheel rotation;The line that will magnetize installation pellet is fixed on On the feed mechanism of milling machine, the feed mechanism of milling machine drives the line installation pellet that magnetizes to do straight-line feed movement, feeds machine in milling machine Structure straight-line feed movement and grinding wheel rotation collective effect under to magnetize line be higher than magnetize line installation pellet upper end part into Row polishing;It while being polished using grinding wheel the line that magnetizes, blows a cold wind over and is cooled down to burnishing part, the temperature of cold wind is not high In 5 DEG C, wind speed is not less than 3m/s, and cool air hose cold wind outlet diameter is not less than 5mm.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, asphalt mixtures modified by epoxy resin used in the epoxy resin coagulated mass in step S9 Rouge is the epoxy resin of model E44 or E51, and curing agent used is 650 polyamide of low molecule, epoxy resin and polyamides Polyimide resin volume ratio is between 1:1-2:1 and including end value;It is empty in the cuboid that a upper end opening is respectively arranged in pedestal both ends Chamber, the upper end of rectangular cavity and the upper end of pedestal are concordant, and the end wall of pedestal is a side wall of rectangular cavity, will stir The mixture for mixing uniform epoxy resin and epoxy resin coagulator pours into this rectangular cavity, fills this cuboid sky Then pedestal is put into 60-80 DEG C of environment and solidifies by chamber.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, blending epoxy and polyamide use heatable Agitator tank carries out, and is heated to 80-110 DEG C.
In the production method of above-mentioned magnetic rubber strip magnetizing plate, throughout having on the lower end surface of selected rubber pad in step 11 Hemispherical groove.
Compared with prior art, the beneficial effects of the present invention are:
1, the invention enables the lines that magnetizes can easily install very much into the line installation through slot that magnetizes, and saves the installation for the line that magnetizes Time;And do not easily lead to the insulation system to magnetize outside line and be damaged, the once mounting success rate for the line that magnetizes is improved, is reduced The Production Time of magnetizing plate;
2, the present invention can be rapidly uniform by epoxide-resin glue and epoxy resin bar coagulant whisk, saves mixing time, Reduce the Production Time of magnetizing plate;
3, the invention enables the reductions of the curing time of epoxide-resin glue and polyamide, when reducing the production of magnetizing plate Between.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of embodiment of the present invention Attached drawing be briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as It is the restriction to range, it for those of ordinary skill in the art, without creative efforts, can be with root Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of flow chart of the production method of magnetic rubber strip magnetizing plate of the present invention;
Fig. 2 is tiltedly being bowed using a kind of magnetic rubber strip magnetizing plate of the production method production of magnetic rubber strip magnetizing plate of the present invention Perspective view under visual angle;
Fig. 3 is tiltedly being faced upward using a kind of magnetic rubber strip magnetizing plate of the production method production of magnetic rubber strip magnetizing plate of the present invention Perspective view under visual angle;
Fig. 4 is the longitudinal direction using a kind of magnetic rubber strip magnetizing plate of the production method production of magnetic rubber strip magnetizing plate of the present invention Sectional view;
Fig. 5 is the perspective view using a kind of pedestal of the production method production of magnetic rubber strip magnetizing plate of the present invention;
Fig. 6 is the longitdinal cross-section diagram using a kind of pedestal of the production method production of magnetic rubber strip magnetizing plate of the present invention;
Fig. 7 is the solid using a kind of line installation pellet that magnetizes of the production method production of magnetic rubber strip magnetizing plate of the present invention Figure;
Fig. 8 is the perspective view using a kind of guide plate of the production method production of magnetic rubber strip magnetizing plate of the present invention;
Fig. 9 is the perspective view using a kind of connecting plate of the production method production of magnetic rubber strip magnetizing plate of the present invention.
In figure: 1- pedestal, 101- rectangular straight slot, 102- guide plate mounting hole, 103- cavity, 2- magnetize line installation pellet, Magnetize line installation through slot, 3- of 201- magnetizes line, 4- guide plate, 5- connecting plate, 501- connection through-hole, 6- fastening plates, 7- asphalt mixtures modified by epoxy resin Rouge coagulated mass, 8- rubber pad, 801- hemispherical groove, 9- quick connector.
Specific embodiment
To keep the purposes, technical schemes and advantages of embodiment of the present invention clearer, implement below in conjunction with the present invention The technical solution in embodiment of the present invention is clearly and completely described in attached drawing in mode, it is clear that described reality The mode of applying is some embodiments of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ability Domain those of ordinary skill every other embodiment obtained without creative efforts, belongs to the present invention The range of protection.Therefore, the detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit below and is wanted The scope of the present invention of protection is sought, but is merely representative of selected embodiment of the invention.Based on the embodiment in the present invention, Every other embodiment obtained by those of ordinary skill in the art without making creative efforts belongs to this Invent the range of protection.
Embodiment one
Please refer to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8 and Fig. 9, a kind of production side of magnetic rubber strip magnetizing plate Method, comprising the following steps:
S1, production pedestal 1, the line that magnetizes installation pellet 2, the line 3 that magnetizes, guide plate 4, connecting plate 5 and fastening plates 6, pedestal 1 with The length that the line that magnetizes installs pellet 2, guide plate 4 and fastening plates 6 is identical;When making pedestal 1, according to the magnetizing plate to be made Drawing, select the square steel all the same with the width of magnetizing plate pedestal 1 and height, and intercept length identical with pedestal, along The length direction of the square steel of interception is longitudinally cutting at upper square steel and lower square steel two parts by square steel using wire cutting machine, wire cutting Machining allowance is small, machining accuracy is high, and upper square steel and lower square steel fit together essentially identical before rear size is not cut with square steel; Above along one rectangular straight slot 101 of its length direction milling on the upper surface of steel, in the two sides of rectangular straight slot 101 along base The length direction of seat 1 respectively drills one group of guide plate mounting hole 102, the then tapping on guide plate mounting hole 102, in lower square steel Along one rectangular channel of its length direction milling on upper surface, two through-holes are bored on the lateral wall of lower square steel, respectively lead to square The both ends of shape slot, the then tapping on two through-holes, this through-hole is for installing quick connector 9, in use, passing through quick connector 9 Cooling water pipe is connected, cooling water is then passed through into rectangular channel, the temperature generated when magnetizing plate work is taken away, is dropped to magnetizing plate Temperature;It is located at one first annular slot of outside milling of rectangular channel on the upper surface of lower square steel, it is right on the lower end surface of steel above It should be in one the second annular groove in position and size milling of first annular slot;It is located at the second annular groove on the lower end surface of steel above Two sides equably drill multiple circular holes, and the tapping on these circular holes along the length direction of upper square steel, it is right on lower square steel Cylindrical ladder hole should be drilled in the position of circular hole;Sealing ring is placed in first annular slot and the second annular groove, is prevented cold But water oozes out, and then upper square steel and lower square steel are linked together at circular hole and cylindrical hole using hexagon socket head cap screw;It fills Magnetic sheet installs pellet 2 and selects soft magnetic materials production, and soft magnetic materials is easy to demagnetize, in actual production, when magnet charger failure, and soft magnetism material The magnetizing plate installation pellet 2 of material production will not magnetize the adhesive tape containing ferromagnetic oxide powder slipped over by end face thereon, will not be to rear Continuous magnetic force detection device has an impact;The height that the line that magnetizes installs pellet 2 is identical as the depth of rectangular straight slot 101, is magnetizing The line installation through slot that magnetizes being parallel to each other along its length direction using milling machine milling two on the upper surface of line installation pellet 2 201, the line that magnetizes install 201 groove sidewall of through slot surface roughness be Ra12.5 and its above precision, prevent installation magnetize line 3 when Damage the insulation system outside the copper wire for the line 3 that magnetizes;It is compatible with line installation 201 width dimensions of through slot that magnetize to choose thickness Sand hill flat type copper wire is longer than the length for the line installation pellet 2 that magnetizes as the line 3 and intercepting of magnetizing, and the height of the line 3 that magnetizes is greater than the line that magnetizes The depth of through slot 201 is installed;Guide plate 4 and connecting plate 5 are all made of using epoxy insulating board, can prevent because magnetize line 3 with magnetize Electric leakage caused by being surprisingly connected between line installation pellet 2 and pedestal 1 passes to guide plate 4 and connecting plate 5, in turn results in operator The accident of member's electric shock occurs, and the moisture resistivity of epoxy insulating board is good, its surface when magnetic rubber strip enters the slideway on magnetizing plate It is accompanied with a small amount of water, so epoxy insulating board is suitable for such operating condition;Be provided on guide plate 4 quantity and position with guiding The corresponding both ends of plate mounting hole 102 are in the strip through-hole 401 of arc-shaped, and the both ends of connecting plate 5 are provided with connection through-hole 501;The sum of the width of the thickness of fastening plates 6 and the line installation pellet 2 that magnetizes is less than the width of rectangular straight slot 101, convenient for the line that magnetizes The installation and removal of pellet 2 are installed, the height of fastening plates 6 is equal to the height for the line installation pellet 2 that magnetizes.
The line that magnetizes being arranged on S2, the installation of line 3 to the line installation pellet 2 that magnetizes that will magnetize is installed in through slot 201: by the line that magnetizes 3 refrigerate 10 minutes in 5 DEG C of temperature, and the line that will magnetize installation pellet 2 heats 10 minutes in 100 DEG C of temperature, then will fill Magnet-wire installation pellet 2 takes out and fixes, and the line 3 that will magnetize is installed to the line that magnetizes after taking out and installs the line that magnetizes being arranged on pellet 2 It installs in through slot 201, since substance has the property expanded with heat and contract with cold, its thickness after refrigerating of line 3 that magnetizes becomes smaller, the line that magnetizes installation The width for the line installation through slot 201 that magnetizes being arranged on end face thereon after pellet 2 is heated becomes larger, and the line 3 that magnetizes can be installed easily very much To magnetize line installation through slot 201 in, do not need first uniformly be pressed into the lower end for the line 3 that magnetizes magnetize line install through slot 201 in, so The upper end that rubber hammer beats the line 3 that magnetizes along the length direction for the line installation through slot 201 that magnetizes back and forth is reused afterwards, will equably be filled Magnet-wire 3 is knocked in magnet-wire installation through slot 201, and the set-up time for the line 3 that magnetizes is saved;And this improved mounting means will not The insulation system being arranged outside the copper wire for the line 3 that magnetizes is damaged, once mounting success rate is absolutely, to be equivalent to and save the line that magnetizes 3 set-up time;Reusing pressure plate and pushing down the upper end of the line 3 that magnetizes prevents from magnetizing line 3 and the line installation pellet 2 that magnetizes becomes in temperature The identical line 3 that magnetizes before is obtained to bend by running out of in the line installation through slot 201 that magnetizes.
Two S3, connection lines that magnetize: two lines 3 that magnetize are located to the insulation of one end of line installation 2 the same end of pellet of magnetizing Layer removal, and hold be closely joined together two lines 3 that magnetize herein, two lines 3 that magnetize are connected at interconnection.
S4, for the first time detection magnetize line 3 and the line that magnetizes installation pellet 2 between whether is connected, using digital display type multimeter into Row detection, using diode gear, red test pencil and black meter pen connect with the copper wire for the line 3 that magnetizes and the line that magnetizes installation pellet 2 respectively, The explanation that buzzer on digital display type multimeter beeps magnetizes to be connected between line 3 and the line that magnetizes installation pellet 2, and magnetize line 3 Outer insulation system is destroyed, and needs to remake and install the line 3 that magnetizes;Buzzer on digital display type multimeter does not have buzzer It issues, illustrating to magnetize does not turn between line 3 and the line that magnetizes installation pellet 2, and the insulation system to magnetize outside line 3 is not destroyed, is magnetized Line 3 is installed successfully, and next step can be carried out.
S5, the part for being higher than line installation 2 upper end of pellet of magnetizing to the line 3 that magnetizes are polished, the upper end for the line 3 that makes to magnetize with fill Magnet-wire install pellet 2 upper end it is concordant, and clean out magnetize line installation 2 upper surface of pellet on copper scale and iron filings, prevent because The connection of copper scale and iron filings is so that the line 3 that magnetizes is connected to influence the correctness of testing result with the line installation pellet 2 that magnetizes;Polishing By manually being carried out using file, although this polishing mode large labor intensity, low efficiency, the heat that generates when polishing It is few, the insulation system being hardly damaged outside the copper wire for the line 3 that magnetizes.
Whether S6, second of detection magnetize is connected between line 3 and the line that magnetizes installation pellet 2, and the line 3 that magnetizes is illustrated if conducting Insulation system between the line installation through slot 201 that magnetizes destroys, and needs to remake and install the line 3 that magnetizes, if being not turned on Then carry out next step.
In the rectangular straight slot 101 being arranged on S7, will magnetize line installation pellet 2 and the installation to pedestal 1 of fastening plates 6 and fix Firmly.
S8, installation connecting plate 5: two pieces of connecting plates 5 are separately mounted to pedestal 1 and are connected with each other end far from two lines 3 that magnetize One end two sides, and the part plate body of connecting plate 5 extend out to the outside of pedestal 1 along the length direction of pedestal 1, stretching Part is for being fixedly connected with magnetize line 3 and the electrical discharge wire that is connected with the discharge end of magnet charger.
S9, epoxy resin coagulated mass 7 is made at the both ends of pedestal 1, epoxy resin coagulated mass 7 uses model E44 or E51 Epoxy resin and 650 polyamide of low molecule according to the volume ratio of 1:1 carry out ginseng with mixing, blending epoxy and polyamides Polyimide resin is carried out using heatable agitator tank, is heated to 80 DEG C, at room temperature the poor fluidity of epoxy resin and polyamide, Make the uniformly mixed needs of the two are prolonged to stir, heating enhances the mobility of the two, can rapidly by epoxy resin and gather Amide resin stirs evenly, and saves the Production Time of magnetizing plate;At 1 both ends of pedestal, the cuboid of one upper end opening is respectively set The upper end of shape cavity, rectangular cavity is concordant with the upper end of pedestal 1, and the end wall of pedestal 1 is a side of rectangular cavity Wall pours into the mixture of the epoxy resin stirred evenly and polyamide in this rectangular cavity, fills this cuboid Then pedestal 1 is put into 60 DEG C of environment and solidifies by shape cavity, by the curing time of the two at normal temperature by 24 hours or so It foreshortens to 4 hours or so, the curing reaction of epoxide-resin glue and polyamide belongs to chemical reaction, is influenced very by solidification temperature Greatly, temperature increases, and reaction speed is accelerated, and gel time shortens, so shortening the curing time of epoxy resin fixed block, saves Production Time of magnetizing plate;And the product of epoxy resin heating cure either adhesive property, mechanical performance, it is corrosion-resistant and The properties such as anti-aging property will will increase compared with the product of normal temperature cure.
S10, installation guide plate 4: guide plate 4 is mounted on the guide plate mounting hole 102 of 1 upper end of pedestal setting.
S11, rubber pad 8 is pasted on the lower end surface of pedestal 1, throughout there is hemispherical groove 801 on the lower end surface of rubber mat 8, Magnetizing plate in use, rubber pad 8 by pedestal 1 and on magnet charger place magnetizing plate table top separate, pedestal 1 can be prevented and magnetized The table top that magnetizing plate is placed on machine is directly contacted to be damaged caused by table top, prevented also from because of line 3 and the line installation core that magnetizes of magnetizing Equipment operator and the hurtful accident of magnet charger internal electric part occur for electric leakage caused by block 2 and pedestal 1 are connected; Under the action of pedestal 1 and the line installation pellet 2 that magnetizes are self-possessed, rubber pad 8 is compressed, and hemispherical groove 801 has suctorial work With so that magnetizing plate placement is stronger;Insulated paint is painted on the side wall of pedestal 1 and is quickly dried using heating drier It is dry so that magnetizing plate using when more safety and shorten Production Time of magnetizing plate.
Embodiment two
Please refer to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8 and Fig. 9, a kind of production side of magnetic rubber strip magnetizing plate Method, comprising the following steps:
S1, production pedestal 1, the line that magnetizes installation pellet 2, the line 3 that magnetizes, guide plate 4, connecting plate 5 and fastening plates 6, pedestal 1 with The length that the line that magnetizes installs pellet 2, guide plate 4 and fastening plates 6 is identical;When making pedestal 1, according to the magnetizing plate to be made Drawing, select the square steel all the same with the width of magnetizing plate pedestal 1 and height, and intercept length identical with pedestal, along The length direction of the square steel of interception is longitudinally cutting at upper square steel and lower square steel two parts by square steel using wire cutting machine, above steel Upper surface on along one rectangular straight slot 101 of its length direction milling, in the two sides of rectangular straight slot 101 along the length of pedestal 1 Degree direction respectively drills one group of guide plate mounting hole 102, the then tapping on guide plate mounting hole 102, in the upper surface of lower square steel On along one rectangular channel of its length direction milling, two through-holes are bored on the lateral wall of lower square steel, respectively lead to rectangular channel Both ends, the then tapping on two through-holes, this through-hole is for installing quick connector 9;It is located at rectangle on the upper surface of lower square steel One first annular slot of outside milling of slot, above corresponding to the position of first annular slot and size milling on the lower end surface of steel One the second annular groove;Two sides above on the lower end surface of steel positioned at the second annular groove are uniform along the length direction of upper square steel Ground drills multiple circular holes, and the tapping on these circular holes, and it is logical that the position on lower square steel corresponding to circular hole drills cylindrical ladder Hole;Sealing ring is placed in first annular slot and the second annular groove, prevents cooling water from oozing out, then using hexagon socket head cap screw in circle Upper square steel and lower square steel are linked together at hole and cylindrical hole;Magnetizing plate installs pellet 2 and selects soft magnetic materials production, soft Magnetic material is easy to demagnetize, and in actual production, when magnet charger failure, the magnetizing plate installation pellet 2 of soft magnetic materials production will not magnetize The adhesive tape containing ferromagnetic oxide powder slipped over by end face thereon will not generate shadow to the testing result of subsequent magnetic force detection device It rings;The height that the line that magnetizes installs pellet 2 is identical as the depth of rectangular straight slot 101, the edge on the upper surface for the line installation pellet 2 that magnetizes Its length direction using milling machine milling two be parallel to each other magnetize line installation through slot 201, the line that magnetizes install 201 slot side of through slot The surface roughness of wall is Ra12.5 and its above precision, prevents from installing the insulation outside the copper wire for damaging the line 3 that magnetizes when magnetizing line 3 Structure;Choose thickness with magnetize the line compatible sand hill flat type copper wire of installation 201 width dimensions of through slot as magnetize line 3 and section The length for being longer than the line installation pellet 2 that magnetizes is taken, the height for the line 3 that magnetizes is greater than the depth for the line installation through slot 201 that magnetizes;Guide plate 4 It is all made of with connecting plate 5 using epoxy insulating board;Be provided on guide plate 4 quantity and position with 102 phase of guide plate mounting hole Corresponding both ends are in the strip through-hole 401 of arc-shaped, and the both ends of connecting plate 5 are provided with connection through-hole 501;Fastening plates 6 The sum of the width of thickness and the line installation pellet 2 that magnetizes is less than the width of rectangular straight slot 101, convenient for the peace for the line installation pellet 2 that magnetizes Assembly and disassembly, the height of fastening plates 6 are equal to the height for the line installation pellet 2 that magnetizes.
The line that magnetizes being arranged on S2, the installation of line 3 to the line installation pellet 2 that magnetizes that will magnetize is installed in through slot 201: by the line that magnetizes 3 refrigerate 5 minutes in 0 DEG C of temperature, and the line that will magnetize installation pellet 2 heats 5 minutes in 150 DEG C of temperature, then will magnetize Line installation pellet 2 takes out and fixes, and the line peace that magnetizes installed and be arranged on pellet 2 is installed to the line that magnetizes after the line 3 that magnetizes is taken out It fills in through slot 201, reusing pressure plate and pushing down the upper end of the line 3 that magnetizes prevents from magnetizing line 3 and the line installation pellet 2 that magnetizes becomes in temperature The identical line 3 that magnetizes before is obtained to bend by running out of in the line installation through slot 201 that magnetizes.
Two S3, connection lines that magnetize: two lines 3 that magnetize are located to the insulation of one end of line installation 2 the same end of pellet of magnetizing Layer removal, and hold be closely joined together two lines 3 that magnetize herein, two lines 3 that magnetize are connected at interconnection.
S4, for the first time detection magnetize line 3 and the line that magnetizes installation pellet 2 between whether is connected, using digital display type multimeter into Row detection, using diode gear, red test pencil and black meter pen connect with the copper wire for the line 3 that magnetizes and the line that magnetizes installation pellet 2 respectively, The explanation that buzzer on digital display type multimeter beeps magnetizes to be connected between line 3 and the line that magnetizes installation pellet 2, and magnetize line 3 Outer insulation system is destroyed, and needs to remake and install the line 3 that magnetizes;Buzzer on digital display type multimeter does not have buzzer It issues, illustrating to magnetize does not turn between line 3 and the line that magnetizes installation pellet 2, and the insulation system to magnetize outside line 3 is not destroyed, is magnetized Line 3 is installed successfully, and next step can be carried out.
S5, the part for being higher than line installation 2 upper end of pellet of magnetizing to the line 3 that magnetizes are polished, the upper end for the line 3 that makes to magnetize with fill The upper end that magnet-wire installs pellet 2 is concordant, and cleans out the copper scale and iron filings to magnetize on line installation 2 upper surface of pellet, and magnetize line 3 Polishing carried out using milling machine, the shaft lower end of milling machine is horizontally mounted grinding wheel, and the rotation of milling machine shaft drives grinding wheel rotation;It will magnetize Line installation pellet 2 is fixed on the feed mechanism of milling machine, and the feed mechanism of milling machine drives the line installation pellet 2 that magnetizes to do straight-line feed Movement is higher than the line peace that magnetizes to the line 3 that magnetizes under the collective effect of straight-line feed movement and the grinding wheel rotation of milling machine feeding mechanism It polishes the part of 2 upper end of cored block;While being polished using grinding wheel the line 3 that magnetizes, to burnishing part blow a cold wind over into Row cooling, the temperature of cold wind are 5 DEG C, wind speed 3m/s, and cool air hose cold wind outlet diameter is 10mm, and grinding wheel speed is fast, polishing When can generate a large amount of heat, easily lead to the insulation system to magnetize on line 3 and be destroyed, cause to magnetize line 3 and the line installation core that magnetizes Block 2 is connected, and thus needs to reinstall the line 3 that magnetizes;So blowing a cold wind over to burnishing part, it is cold to carry out while using grinder buffing But, by grinder buffing magnetize line 3 when the heat that generates eliminate in time, both ensure that the insulation system to magnetize on line 3 will not be broken It is bad, and the polishing speed to the line 3 that magnetizes is accelerated, save the time required for the line that magnetizes is polished.
Whether S6, second of detection magnetize is connected between line 3 and the line that magnetizes installation pellet 2, and the line 3 that magnetizes is illustrated if conducting Insulation system between the line installation through slot 201 that magnetizes destroys, and needs to remake and install the line 3 that magnetizes, if being not turned on Then carry out next step.
In the rectangular straight slot 101 being arranged on S7, will magnetize line installation pellet 2 and the installation to pedestal 1 of fastening plates 6 and fix Firmly.
S8, installation connecting plate 5: two pieces of connecting plates 5 are separately mounted to pedestal 1 and are connected with each other end far from two lines 3 that magnetize One end two sides, and the part plate body of connecting plate 5 extend out to the outside of pedestal 1 along the length direction of pedestal 1, stretching Part is for being fixedly connected with magnetize line 3 and the electrical discharge wire that is connected with the discharge end of magnet charger.
S9, epoxy resin coagulated mass 7 is made at the both ends of pedestal 1, epoxy resin coagulated mass 7 uses model E44 or E51 Epoxy resin and 650 polyamide of low molecule according to the volume ratio of 1:1 carry out ginseng with mixing, blending epoxy and polyamides Polyimide resin is carried out using heatable agitator tank, is heated to 110 DEG C;At 1 both ends of pedestal, the rectangular of one upper end opening is respectively set The upper end of cone cavity, rectangular cavity is concordant with the upper end of pedestal 1, and the end wall of pedestal 1 is one of rectangular cavity The mixture of the epoxy resin stirred evenly and polyamide is poured into this rectangular cavity, it is rectangular to fill this by side wall Then pedestal 1 is put into 80 DEG C of environment and solidifies by cone cavity.
S10, installation guide plate 4: guide plate 4 is mounted on the guide plate mounting hole 102 of 1 upper end of pedestal setting.
S11, rubber pad 8 is pasted on the lower end surface of pedestal 1, throughout there is hemispherical groove 801 on the lower end surface of rubber mat 8, Insulated paint is painted on the side wall of pedestal 1 and uses heating drier flash baking.
The foregoing is merely the preferred embodiment of the present invention, are not intended to restrict the invention, for this field For technical staff, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of production method of magnetic rubber strip magnetizing plate, it is characterised in that: the production method the following steps are included:
S1, production pedestal (1), the line that magnetizes installation pellet (2), the line that magnetizes (3), guide plate (4), connecting plate (5) and fastening plates (6), pedestal (1) is identical as the length of line installation pellet (2), guide plate (4) and fastening plates (6) that magnetizes;In the upper of pedestal (1) One rectangular straight slot (101) is set along its length direction on end face, along the length of pedestal (1) on the upper surface of pedestal (1) Degree direction and be located at rectangular straight slot (101) two sides be each provided with one group of guide plate mounting hole (102), in pedestal (1) along The length direction of pedestal (1) is provided with cavity (103);Along its length direction on the upper surface for line installation pellet (2) of magnetizing Two line installations through slot (201) of magnetizing being parallel to each other, the height and rectangular straight slot of line installation pellet (2) of magnetizing are set (101) depth is identical;Thickness sand hill flat type copper wire compatible with line installation through slot (201) width dimensions that magnetize is chosen to make For the line that magnetizes (3) and the length for being longer than the line that magnetizes and installing pellet (2) is intercepted, it is logical that the height of the line that magnetizes (3) is greater than line installation of magnetizing The depth of slot (201);Guide plate (4) and connecting plate (5) select insulating materials;Quantity is provided on guide plate (4) and position is equal Both ends corresponding with guide plate mounting hole (102) are in the strip through-hole (401) of arc-shaped, and the both ends of connecting plate (5) are bored It is formed with connection through-hole (501);The sum of the thickness of fastening plates (6) and the width for line installation pellet (2) of magnetizing are less than rectangular straight slot (101) width, the height of fastening plates (6) are equal to the height for line installation pellet (2) of magnetizing;
In line installation through slot (201) of magnetizing being arranged on S2, line (3) installation to line installation pellet (2) of magnetizing that will magnetize: will magnetize Line (3) refrigerates at least 5 minutes in 5 DEG C and its temperature below, and will magnetize temperature of line installation pellet (2) at 100 DEG C -150 DEG C Heated in degree at least 5 minutes, the line that then will magnetize installation pellet (2) take out simultaneously fix, will magnetize line (3) take out after install to In line installation through slot (201) of magnetizing being arranged in the line that magnetizes installation pellet (2), reuses pressure plate and push down the upper of the line that magnetizes (3) End prevents from magnetizing line (3) and the line that magnetizes installs pellet (2) line (3) that magnetizes before temperature becomes identical and bends by the line that magnetizes It is run out of in installation through slot (201);
Two S3, connection lines that magnetize: two lines that magnetize (3) are located to the insulation of one end of line installation pellet (2) the same end of magnetizing Layer removal, and hold be closely joined together two lines that magnetize (3) herein, two lines that magnetize (3) are connected at interconnection;
Whether S4, for the first time detection are magnetized is connected between line (3) and the line that magnetizes installation pellet (2), and the line that magnetizes is illustrated if conducting (3) insulation system between line installation through slot (201) of magnetizing destroys, and needs to remake and install magnetize line (3), if It is not turned on, carries out next step;
S5, the part that the line that magnetizes (3) are higher than with line installation pellet (2) upper end of magnetizing are polished, the upper end for the line (3) that makes to magnetize with The upper end that the line that magnetizes installs pellet (2) is concordant, and cleans out the copper scale and iron filings to magnetize on line installation pellet (2) upper surface;
Whether S6, for the second time detection are magnetized is connected between line (3) and the line that magnetizes installation pellet (2), and the line that magnetizes is illustrated if conducting (3) insulation system between line installation through slot (201) of magnetizing destroys, and needs to remake and install magnetize line (3), if It is not turned on, carries out next step;
It is in the rectangular straight slot (101) being arranged in S7, the line that will magnetize installation pellet (2) and fastening plates (6) installation to pedestal (1) and solid It lives calmly;
S8, installation connecting plate (5): two pieces of connecting plates (5) are separately mounted to pedestal (1) and are mutually interconnected far from two lines that magnetize (3) The two sides of the one end at end are connect, and the part plate body of connecting plate (5) extend out to pedestal (1) along the length direction of pedestal (1) Outside;
S9, epoxy resin coagulated mass (7) are made at the both ends of pedestal (1), epoxy resin coagulated mass (7) is by epoxy resin and epoxy Resin curing agent ginseng solidifies after matching, and epoxy resin coagulated mass (7) is bonded on the end wall at pedestal (1) both ends, epoxy resin The upper end of coagulated mass (7) is concordant with the upper end of pedestal (1);
S10, installation guide plate (4): guide plate (4) is mounted on the guide plate mounting hole (102) of pedestal (1) upper end setting;
S11, rubber pad (8) are pasted on the lower end surface of pedestal (1), insulated paint is painted on the side wall of pedestal (1) and using heat Drying unit flash baking.
2. a kind of production method of magnetic rubber strip magnetizing plate according to claim 1, it is characterised in that: in the step S1 Pedestal (1) the production method is as follows: according to the drawing for the magnetizing plate to be made, select with the width of magnetizing plate pedestal (1) and Square steel highly all the same, and length identical with pedestal is intercepted, wire cutting machine is used along the length direction of the square steel of interception Square steel is longitudinally cutting at upper square steel and lower square steel two parts, above along its length direction milling one on the upper surface of steel Rectangular straight slot (101) respectively drills one group of guide plate installation along the length direction of pedestal (1) in the two sides of rectangular straight slot (101) Hole (102), the then tapping on guide plate mounting hole (102), along its length direction milling one on the upper surface of lower square steel A rectangular channel, this rectangular channel are cavity (103), and two through-holes are bored on the lateral wall of lower square steel, respectively lead to rectangular channel Both ends, the then tapping on two through-holes, this through-hole is for installing quick connector (9);It is located at square on the upper surface of lower square steel One first annular slot of outside milling of shape slot, above corresponding to the position of first annular slot and size milling on the lower end surface of steel Make second annular groove;Two sides above on the lower end surface of steel positioned at the second annular groove are equal along the length direction of upper square steel Multiple circular holes, and the tapping on these circular holes are drilled evenly, and the position on lower square steel corresponding to circular hole drills cylindrical ladder Through-hole;Sealing ring is placed in first annular slot and the second annular groove, using hexagon socket head cap screw at circular hole and cylindrical hole Upper square steel and lower square steel are linked together.
3. a kind of production method of magnetic rubber strip magnetizing plate according to claim 1, it is characterised in that: in the step S1 Magnetizing plate installs pellet (2) and selects soft magnetic materials production, and the line that magnetizes installs through slot (201) and uses milling machine milling, the line that magnetizes installation The surface roughness of through slot (201) groove sidewall is Ra12.5 and its above precision.
4. a kind of production method of magnetic rubber strip magnetizing plate according to claim 1, it is characterised in that: in the step S1 Guide plate (4) and connecting plate (5) are all made of using epoxy insulating board.
5. a kind of production method of magnetic rubber strip magnetizing plate according to claim 1, it is characterised in that: the step S4 and Whether detection is magnetized in step S6 is connected between line (3) and the line that magnetizes installation pellet (2) using digital display type multimeter, uses two poles Pipe gear, red test pencil and black meter pen connect with the copper wire of the line that magnetizes (3) and the line that magnetizes installation pellet (2) respectively, digital display type general-purpose The explanation that buzzer on table beeps magnetizes to be connected between line (3) and the line that magnetizes installation pellet (2), and the line that magnetizes (3) is outside Insulation system is destroyed, and needs to remake and install magnetize line (3);Buzzer on digital display type multimeter does not have buzzer hair Out, illustrating to magnetize and not turned between line (3) and the line that magnetizes installation pellet (2), the insulation system of the line that magnetizes (3) outside is not destroyed, The line (3) that magnetizes is installed successfully.
6. a kind of production method of magnetic rubber strip magnetizing plate according to claim 1, it is characterised in that: in the step S5 For the line that magnetizes (3) polishing by manually being carried out using file.
7. a kind of production method of magnetic rubber strip magnetizing plate according to claim 1, it is characterised in that: in the step S5 The polishing of the line that magnetizes (3) is carried out using milling machine, the shaft lower end of milling machine is horizontally mounted grinding wheel, and the rotation of milling machine shaft drives sand Wheel rotation;The line that will magnetize installation pellet (2) is fixed on the feed mechanism of milling machine, and the feed mechanism of milling machine drives line installation of magnetizing Pellet (2) does straight-line feed movement, to filling under the collective effect of straight-line feed movement and the grinding wheel rotation of milling machine feeding mechanism It polishes the part that magnet-wire (3) is higher than line installation pellet (2) upper end of magnetizing;It is being polished using grinding wheel the line that magnetizes (3) While, it blows a cold wind over and is cooled down to burnishing part, the temperature of cold wind is not higher than 5 DEG C, and wind speed is not less than 3m/s, cool air hose cold wind row Outlet diameter is not less than 5mm.
8. a kind of production method of magnetic rubber strip magnetizing plate according to claim 1, it is characterised in that: in the step S9 Epoxy resin coagulated mass (7) used in epoxy resin be model E44 or E51 epoxy resin, curing agent used be it is low 650 polyamide of molecule, epoxy resin and polyamide volume ratio are between 1:1-2:1 and including end value;In pedestal (1) The rectangular cavity of a upper end opening is respectively arranged in both ends, and the upper end of rectangular cavity is concordant with the upper end of pedestal (1), base The end wall of seat (1) is a side wall of rectangular cavity, by the mixed of the epoxy resin stirred evenly and epoxy resin coagulator Close object pour into this rectangular cavity, fill this rectangular cavity, then by pedestal (1) be put into 60-80 DEG C of environment into Row solidification.
9. a kind of production method of magnetic rubber strip magnetizing plate according to claim 8, it is characterised in that: blending epoxy It is carried out with polyamide using heatable agitator tank, is heated to 80-110 DEG C.
10. a kind of production method of magnetic rubber strip magnetizing plate according to claim 1, it is characterised in that: institute in step 11 It selects on the lower end surface of rubber pad (8) throughout there is hemispherical groove (801).
CN201910501442.7A 2019-06-11 2019-06-11 Manufacturing method of magnetic adhesive tape magnetizing plate Active CN110277217B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910501442.7A CN110277217B (en) 2019-06-11 2019-06-11 Manufacturing method of magnetic adhesive tape magnetizing plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910501442.7A CN110277217B (en) 2019-06-11 2019-06-11 Manufacturing method of magnetic adhesive tape magnetizing plate

Publications (2)

Publication Number Publication Date
CN110277217A true CN110277217A (en) 2019-09-24
CN110277217B CN110277217B (en) 2021-03-09

Family

ID=67960670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910501442.7A Active CN110277217B (en) 2019-06-11 2019-06-11 Manufacturing method of magnetic adhesive tape magnetizing plate

Country Status (1)

Country Link
CN (1) CN110277217B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111627645A (en) * 2020-06-01 2020-09-04 北京卫星环境工程研究所 Method for reducing magnetism of ferromagnetic material by Halbach permanent magnet array

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2141736B2 (en) * 1970-08-31 1976-07-15 METHOD AND DEVICE FOR FITTING A NUMBER OF STRIPED MAGNETIC POLES TO A PERMANENT MAGNETIC BODY
DE3506757A1 (en) * 1984-09-22 1986-08-28 Erich Dr.-Ing. 5300 Bonn Steingroever Magnetising device for permanent magnets
CN87101641A (en) * 1986-08-09 1988-02-17 魏恩谢姆化学厂有限公司 Be used to magnetize the device of the layer band, tape, band and the thin slice that contain magnetisable material
JPH07505977A (en) * 1992-04-14 1995-06-29 アールゼーエフ インターナショナル コーポレイション Magnetized material with enhanced magnetic attraction and method and apparatus for multipolar magnetization of this material
CN2591725Y (en) * 2002-12-30 2003-12-10 顾椿 Precision magnetizing plate
CN203729040U (en) * 2014-01-02 2014-07-23 东莞市福纬纺织机械科技有限公司 Electromagnetic needle selector of computerized flat knitting machine
CN106999979A (en) * 2014-11-27 2017-08-01 锡克拜控股有限公司 Apparatus and method for being orientated to sheet-like magnetic or magnetisable pigment particles
CN206541688U (en) * 2016-11-07 2017-10-03 杭州铭哲磁电科技有限公司 It is a kind of to be magnetized the equipment that workpiece magnetizes for many magnetic poles of bar shaped
CN206711695U (en) * 2017-04-05 2017-12-05 杭州象限科技有限公司 A kind of special-shaped magnet steel shaped formation and the device to magnetize
CN208173338U (en) * 2018-04-03 2018-11-30 安徽万朗磁塑股份有限公司 A kind of soft magnetic stripe magnetizing clamp
CN208385124U (en) * 2018-07-18 2019-01-15 赣州诚正稀土新材料股份有限公司 Magnet charger is used in a kind of production of neodymium iron boron magnetic body semi-finished product
CN109360709A (en) * 2018-11-23 2019-02-19 山东大学 A kind of microminiature magnetic patch automatic magnetism-charging device and magnetization method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2141736B2 (en) * 1970-08-31 1976-07-15 METHOD AND DEVICE FOR FITTING A NUMBER OF STRIPED MAGNETIC POLES TO A PERMANENT MAGNETIC BODY
DE3506757A1 (en) * 1984-09-22 1986-08-28 Erich Dr.-Ing. 5300 Bonn Steingroever Magnetising device for permanent magnets
CN87101641A (en) * 1986-08-09 1988-02-17 魏恩谢姆化学厂有限公司 Be used to magnetize the device of the layer band, tape, band and the thin slice that contain magnetisable material
JPH07505977A (en) * 1992-04-14 1995-06-29 アールゼーエフ インターナショナル コーポレイション Magnetized material with enhanced magnetic attraction and method and apparatus for multipolar magnetization of this material
CN2591725Y (en) * 2002-12-30 2003-12-10 顾椿 Precision magnetizing plate
CN203729040U (en) * 2014-01-02 2014-07-23 东莞市福纬纺织机械科技有限公司 Electromagnetic needle selector of computerized flat knitting machine
CN106999979A (en) * 2014-11-27 2017-08-01 锡克拜控股有限公司 Apparatus and method for being orientated to sheet-like magnetic or magnetisable pigment particles
CN206541688U (en) * 2016-11-07 2017-10-03 杭州铭哲磁电科技有限公司 It is a kind of to be magnetized the equipment that workpiece magnetizes for many magnetic poles of bar shaped
CN206711695U (en) * 2017-04-05 2017-12-05 杭州象限科技有限公司 A kind of special-shaped magnet steel shaped formation and the device to magnetize
CN208173338U (en) * 2018-04-03 2018-11-30 安徽万朗磁塑股份有限公司 A kind of soft magnetic stripe magnetizing clamp
CN208385124U (en) * 2018-07-18 2019-01-15 赣州诚正稀土新材料股份有限公司 Magnet charger is used in a kind of production of neodymium iron boron magnetic body semi-finished product
CN109360709A (en) * 2018-11-23 2019-02-19 山东大学 A kind of microminiature magnetic patch automatic magnetism-charging device and magnetization method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
易新宇: "橡塑磁条双面充磁极板装置的结构设计与研究", 《科技创业家》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111627645A (en) * 2020-06-01 2020-09-04 北京卫星环境工程研究所 Method for reducing magnetism of ferromagnetic material by Halbach permanent magnet array

Also Published As

Publication number Publication date
CN110277217B (en) 2021-03-09

Similar Documents

Publication Publication Date Title
US6918983B2 (en) Adhesion method and electronic component
CN110277217A (en) A kind of production method of magnetic rubber strip magnetizing plate
CN206937137U (en) A kind of L-type hole position micro-fluidic chip leads to liquid fixture
CN112727139B (en) Curing method of concrete for repairing cracks in cold regions in winter
CN208929881U (en) A kind of pipe fitting deburring machine of automatic loading/unloading
CN109015585B (en) Automatic graphite electrode marking device and method
CN107247071B (en) Rubber material temperature resistance testing instrument
CN205701293U (en) A kind of screw rod point glue pump
CN208239390U (en) A kind of 3 cubic metres of test chambers of comprehensive test
CN208432365U (en) A kind of electromagnetic valve body air-tightness detection device
CN207780179U (en) Test fixture for circuit board testing
CN212328740U (en) Heat-conducting glue smearing device
CN209736928U (en) Welding equipment for copper pipe of gas-pressure meter
CN108672211A (en) Adhesive supplier and glue fill method
CN211137635U (en) Concrete mixing box
CN209856651U (en) Plugging device for pipeline leakage
CN105352533B (en) Multifunctional vacuum experimental bench
CN110696254A (en) Device for quickly manufacturing magnetic adhesive tape magnetizing plate
CN208384047U (en) A kind of wire and cable tracking test machine
CN208681829U (en) A kind of concrete fast cooling device of architectural engineering
CN206046388U (en) A kind of spot gluing equipment
CN215862242U (en) Three-way connecting assembly for air conditioner refrigerating pipe
CN206847838U (en) A kind of tight valve test machine
CN211138198U (en) Knife scraping cloth splicing and repairing device
CN210879238U (en) Grinding wheel rod for polishing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240315

Address after: 237000 San Shi Pu Zhen sang he Cun, Jin'an District, Lu'an City, Anhui Province

Patentee after: Anhui Chunan New Material Technology Co.,Ltd.

Country or region after: China

Address before: 325000 Zhejiang Province, Ouhai District, Wenzhou City, Sanyuan Street, Huangyu Village Temple in front of the joint construction of 9 buildings 4

Patentee before: WENZHOU RENHE CULTURAL CREATIVITY CO.,LTD.

Country or region before: China

TR01 Transfer of patent right