CN110276176A - A kind of operational system of marine store management - Google Patents
A kind of operational system of marine store management Download PDFInfo
- Publication number
- CN110276176A CN110276176A CN201910568016.5A CN201910568016A CN110276176A CN 110276176 A CN110276176 A CN 110276176A CN 201910568016 A CN201910568016 A CN 201910568016A CN 110276176 A CN110276176 A CN 110276176A
- Authority
- CN
- China
- Prior art keywords
- unit
- control unit
- control
- database
- permission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Computer Security & Cryptography (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Finance (AREA)
- Human Resources & Organizations (AREA)
- Accounting & Taxation (AREA)
- Software Systems (AREA)
- Development Economics (AREA)
- Computer Hardware Design (AREA)
- Entrepreneurship & Innovation (AREA)
- General Engineering & Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- General Factory Administration (AREA)
Abstract
The invention discloses a kind of operational systems of marine store management, it include: to log in unit, control unit, personal information typing unit, database, material to go out to be put in storage recording unit and material data updating unit, the personal information the typing unit each personal information of typing and corresponding each administration authority in the database;The storage that goes out that the material goes out to be put in storage the various materials of recording unit records records;Meanwhile the material data updating unit receives the control of described control unit, updates the information of the various materials changed due to storage because going out in the database;The information for logging in the current login personnel of unit typing;Can described control unit determines the administration authority of the current login personnel from the database, determine go out to be put in storage recording unit to the personal information typing unit, material according to the administration authority or material data updating unit controls.The management of scientific order is carried out to marine store.
Description
Technical field
The present invention relates to field of ship management more particularly to the operational systems of marine store management.
Background technique
Ship's Elements is the important component of ships goods, marine store mainly include all kinds of navigation datas, fresh water,
Life and appliances for labor protection and other articles.Marine store is the guarantee for guaranteeing crewman and living, working during operation of ship.
The normal operation and crewman's life and work of ship be unable to do without the support of marine store, from material is during the normal operation of ship
To important function.
Ship's Elements is many kinds of, since operation of ship and crewman's life and work are closely bound up, to marine store carry out section
The operation costs of ship can be substantially reduced by learning orderly management.
Summary of the invention
The purpose of the present invention is to provide a kind of operational systems of marine store management, carry out scientific order to marine store
Management.
Realizing the technical solution of above-mentioned purpose is:
A kind of operational system of marine store management, comprising: log in unit, control unit, personal information typing unit, number
Go out to be put in storage recording unit and material data updating unit according to library, material, wherein
The personal information typing unit receives the control of described control unit, in the database each personnel of typing
Information and corresponding each administration authority;
The material, which goes out, is put in storage the control that recording unit receives described control unit, and record various materials goes out storage note
Record;Meanwhile the material data updating unit receives the control of described control unit, is updated in the database because going out to be put in storage
And the information of the various materials changed;
The information for logging in the current login personnel of unit typing;
Described control unit determines the current login personnel according to the information of current login personnel from the database
Can administration authority determine go out to be put in storage recording unit or object to the personal information typing unit, material according to the administration authority
Material data updating unit is controlled.
Preferably, further includes: when administration authority allows, receive the control of described control unit, for monitoring the number
According to the stock material monitoring unit of material inventory status various in library.
Preferably, further includes: when administration authority allows, receive the control of described control unit, according to keyword from institute
State the fuzzy query unit for the information that corresponding material is retrieved in database.
Preferably, described control unit includes:
Control the personal information typing unit, material goes out to be put in storage recording unit, material data updating unit, stock material
Administrator's control unit of monitoring unit and fuzzy query unit;
The material is controlled to go out to be put in storage recording unit, material data updating unit, stock material monitoring unit and fuzzy look into
Ask the level-one permission control unit of unit;
Control the second level permission control unit of the stock material monitoring unit and fuzzy query unit;And
Control the three-level permission control unit of the fuzzy query unit.
Preferably, further includes: when administration authority allows, receive the control of described control unit, for sending to general headquarters
The material request unit of material request.
Preferably, described control unit further includes control selections unit, and the control selections unit is according to current login personnel
Information, the administration authority of the current login personnel is determined from database, and select the administrator to control according to administration authority
Unit, level-one permission control unit, second level permission control unit or three-level permission control unit processed realize control.
The beneficial effects of the present invention are: the present invention is realized by effective and reasonable design to marine store scientific order
Management, is effectively reduced the working strength of crewman, improves efficiency, so as to reduce vessel operating cost.
Detailed description of the invention
Fig. 1 is the structure chart of the operational system of marine store management of the invention;
Fig. 2 is the structure chart of control unit in the present invention.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings.
The operational system of marine store management of the invention referring to FIG. 1-2, comprising: log in unit 1, control unit 2,
Personal information typing unit 3, database 4, material go out to be put in storage recording unit 5, material data updating unit 6, stock material monitoring
Unit 7 and fuzzy query unit 8.
Personal information typing unit 3 receives the control of control unit 2, in database 4 each personal information of typing and
Corresponding each administration authority.
Material, which goes out, is put in storage the control that recording unit 5 receives control unit 2, and record various materials goes out storage record.Meanwhile
Material data updating unit 6 receives the control of control unit 2, in database 4 update because material go out be put in storage due to change it is various
The information of material.
Log in the information of the current login personnel of 1 typing of unit.Control unit 2 is according to the information of current login personnel, from number
It, can be to personal information typing unit according to administration authority decision according to the administration authority for determining the current login personnel in library 4
3, material goes out to be put in storage recording unit 5, material data updating unit 6, stock material monitoring unit 7 or fuzzy query unit 8 and carry out
Control.
Stock material monitoring unit 7 receives the control of control unit 2, for various stock material shapes in monitor database 4
State.Fuzzy query unit 8 receives the control of control unit 2, retrieves the information of corresponding material from database 4 according to keyword.
Control unit 2 includes: control selections unit 25, administrator's control unit 21, level-one permission control unit 22, second level
Permission control unit 23 and three-level permission control unit 24.
Administrator's control unit 21 can controllers data input unit 3, material go out be put in storage recording unit 5, material number
According to updating unit 6, stock material monitoring unit 7 and fuzzy query unit 8.
Level-one permission control unit 22 can control material and go out to be put in storage recording unit 5, material data updating unit 6, material
Stock's monitoring unit 7 and fuzzy query unit 8.Second level permission control unit 23 can control stock material monitoring unit 7 and mould
Paste query unit 8.Three-level permission control unit 24 can control fuzzy query unit 8.
Control selections unit 25 determines the current login personnel according to the information of current login personnel from database 4
Administration authority, and select administrator's control unit 21, level-one permission control unit 22, second level permission to control list according to administration authority
Member 23 or three-level permission control unit 24 are controlled.
In this way, the orderly management of marine store can be realized effectively.Furthermore it is possible to which material application unit is arranged, managing
When permission allows, receive the control of control unit 2, for sending material request to general headquarters, material can be replenished in time, avoid lacking
It loses.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field
Member, without departing from the spirit and scope of the present invention, can also make various transformation or modification, therefore all equivalent
Technical solution also should belong to scope of the invention, should be limited by each claim.
Claims (6)
1. a kind of operational system of marine store management characterized by comprising log in unit, control unit, personal information record
Enter unit, database, material to go out to be put in storage recording unit and material data updating unit, wherein
The personal information typing unit receives the control of described control unit, in the database each personal information of typing
And corresponding each administration authority;
The material, which goes out, is put in storage the control that recording unit receives described control unit, and record various materials goes out storage record;Together
When, the material data updating unit receives the control of described control unit, updates become due to storage because going out in the database
The information of dynamic various materials;
The information for logging in the current login personnel of unit typing;
Described control unit determines the management of the current login personnel according to the information of current login personnel from the database
Can permission determine go out to be put in storage recording unit or material number to the personal information typing unit, material according to the administration authority
It is controlled according to updating unit.
2. the operational system of marine store management according to claim 1, which is characterized in that further include: in administration authority
When permission, receive the control of described control unit, for monitoring the stock material of various material inventory status in the database
Monitoring unit.
3. the operational system of marine store management according to claim 2, which is characterized in that further include: in administration authority
When permission, receive the control of described control unit, retrieves the mould of the information of corresponding material from the database according to keyword
Paste query unit.
4. the operational system of marine store management according to claim 3, which is characterized in that described control unit includes:
Control the personal information typing unit, material goes out to be put in storage recording unit, material data updating unit, stock material monitoring
Administrator's control unit of unit and fuzzy query unit;
The material is controlled to go out to be put in storage recording unit, material data updating unit, stock material monitoring unit and fuzzy query list
The level-one permission control unit of member;
Control the second level permission control unit of the stock material monitoring unit and fuzzy query unit;And
Control the three-level permission control unit of the fuzzy query unit.
5. the operational system of marine store management according to claim 1, which is characterized in that further include: in administration authority
When permission, receive the control of described control unit, for sending the material request unit of material request to general headquarters.
6. the operational system of marine store management according to claim 4, which is characterized in that described control unit further includes
Control selections unit, the control selections unit determine the current login people according to the information of current login personnel from database
The administration authority of member, and administrator's control unit, level-one permission control unit, second level permission control are selected according to administration authority
Unit processed or three-level permission control unit realize control.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910568016.5A CN110276176B (en) | 2019-06-27 | 2019-06-27 | Operation and maintenance system for ship material management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910568016.5A CN110276176B (en) | 2019-06-27 | 2019-06-27 | Operation and maintenance system for ship material management |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110276176A true CN110276176A (en) | 2019-09-24 |
CN110276176B CN110276176B (en) | 2023-04-25 |
Family
ID=67963514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910568016.5A Active CN110276176B (en) | 2019-06-27 | 2019-06-27 | Operation and maintenance system for ship material management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110276176B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040143517A1 (en) * | 2002-12-27 | 2004-07-22 | Tsai Ming Fang | System and method for managing material distribution and returned materials |
CN106327127A (en) * | 2016-08-26 | 2017-01-11 | 国网山东省电力公司滨州市滨城区供电公司 | Power distribution equipment material warehousing management and monitoring system |
CN108241664A (en) * | 2016-12-26 | 2018-07-03 | 天津仟禧重丰监控科技有限公司 | A kind of Warehouse Management System |
-
2019
- 2019-06-27 CN CN201910568016.5A patent/CN110276176B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040143517A1 (en) * | 2002-12-27 | 2004-07-22 | Tsai Ming Fang | System and method for managing material distribution and returned materials |
CN106327127A (en) * | 2016-08-26 | 2017-01-11 | 国网山东省电力公司滨州市滨城区供电公司 | Power distribution equipment material warehousing management and monitoring system |
CN108241664A (en) * | 2016-12-26 | 2018-07-03 | 天津仟禧重丰监控科技有限公司 | A kind of Warehouse Management System |
Also Published As
Publication number | Publication date |
---|---|
CN110276176B (en) | 2023-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Petersen et al. | A comparison of picking, storage, and routing policies in manual order picking | |
Harris et al. | Employee responses to culture change efforts | |
EP1384135B1 (en) | Logical view and access to physical storage in modular data and storage management system | |
CN106202346A (en) | A kind of data load and clean engine, dispatch and storage system | |
CN101315621A (en) | Method for implementing document sharing editting | |
CA2275399A1 (en) | Computer executable workflow control system | |
Azab et al. | The block relocation problem with appointment scheduling | |
US6750766B1 (en) | Alerts monitor | |
Dong et al. | Retrieval scheduling in crane-based 3D automated retrieval and storage systems with shuttles | |
US10210284B2 (en) | Method and system for managing data in a manufacturing execution system | |
CN110276176A (en) | A kind of operational system of marine store management | |
MX2021015268A (en) | Automated plant monitoring systems and methods. | |
Mark et al. | What happened to our document in the shared workspace? The need for Groupware conventions | |
Schwab | A decentralized control strategy for high density material flow systems with automated guided vehicles | |
CN110188899A (en) | A kind of operational system of ship POL management | |
Truss | Shifting the paradigm in human resource management: From the resource based view to complex adaptive systems | |
KR101073256B1 (en) | System and method for managing production of ship building | |
Ndiaye et al. | A hybrid ant colony and genetic algorithm to solve the container stacking problem at seaport terminal | |
CN114579364A (en) | Cloud native database backup method based on hybrid cloud | |
Goffee et al. | Proprietorial Control in Family Firms: Some Functions of “Quasi‐Organic” Management System | |
Munawar | Literature Review the Effect of Technology, Environment and Organizational Strategy on Organizational Structure | |
Habl et al. | Operating High-Powered Automated Vehicle Storage and Retrieval Systems in Multi-Deep Storage | |
Wu et al. | Research on evolution model of employees’ relationship and task conflict in enterprise clusters: A complex network perspective | |
CN114347016B (en) | Multi-bin robot control method and related equipment | |
Gong et al. | Forecast of Wartime Clothing Support Demand Based on Big Data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |