CN110275509B CN201910437566.3A CN201910437566A CN110275509B CN 110275509 B CN110275509 B CN 110275509B CN 201910437566 A CN201910437566 A CN 201910437566A CN 110275509 B CN110275509 B CN 110275509B
Authority
CN
China
Prior art keywords
energy storage
iec104
monitoring system
monitoring
simulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910437566.3A
Other languages
Chinese (zh)
Other versions
CN110275509A (en
Inventor
彭志强
卜强生
郑明忠
徐春雷
霍雪松
张琦兵
陈兵
曾飞
夏杰
樊海锋
李虎成
王黎明
张刘冬
张潼
王昊炜
丁瑾
曹伟杰
董可为
周怡君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangsu Electric Power Co ltd Zhenjiang Power Supply Branch
China University of Mining and Technology CUMT
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Wuxi Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Jiangsu Electric Power Co ltd Zhenjiang Power Supply Branch
China University of Mining and Technology CUMT
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Wuxi Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co ltd Zhenjiang Power Supply Branch, China University of Mining and Technology CUMT, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd, Wuxi Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Jiangsu Electric Power Co ltd Zhenjiang Power Supply Branch
Priority to CN201910437566.3A priority Critical patent/CN110275509B/en
Publication of CN110275509A publication Critical patent/CN110275509A/en
Application granted granted Critical
Publication of CN110275509B publication Critical patent/CN110275509B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0213Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/50Testing arrangements

Abstract

The invention discloses a method and a system for testing monitoring functions of an energy storage power station, wherein the testing system comprises an IEC104 server-side simulator, an IEC104 client-side simulator, a message monitoring tool and a comprehensive self-testing instrument; the message monitoring tool is used for monitoring a telemechanical layer message, a station control layer message and an access layer message of the energy storage power station, extracting corresponding message time scales and testing remote measurement, remote signaling and remote control response time; the IEC104 server simulator is used for carrying out an energy storage monitoring system IEC104 communication function test, an avalanche test and a database capacity test; the IEC104 client simulator is used for carrying out telecontrol function test and power control function test on the energy storage monitoring system; the integrated self-testing instrument is used for carrying out remote measurement, remote signaling and remote control function tests on the energy storage power station protection measurement and control device and IEC61850 communication function tests of the energy storage monitoring system. The invention can check whether each function and performance of the energy storage power station monitoring system meet the standard requirements, can ensure the product quality before field application and implementation, and provides technical guarantee for safe and reliable operation of the energy storage power station.

Description

Energy storage power station monitoring function test method and system
Technical Field
The invention relates to the technical field of power system automation, in particular to a method and a system for testing a monitoring function of an energy storage power station.
Background
With successful trial application of the power grid side energy storage power station in the power grid of Jiangsu, more power grid side energy storage power stations are put into commercial operation subsequently, the energy storage monitoring system is a core part of the energy storage power station, and how to effectively and comprehensively develop the test of the energy storage monitoring system is a problem to be solved when the energy storage power station is comprehensively popularized and applied.
The energy storage monitoring system is used for achieving functions of information collection, processing, monitoring, control, operation management and the like of an energy storage power station, the information interaction privacy of the existing energy storage power station monitoring system is strong, the condition that a serial port MODBUS, a non-standard protocol and a protocol converter need to be used exists, and the application function and the performance index have certain difference.
Disclosure of Invention
The invention aims to provide a method and a system for testing monitoring functions of an energy storage power station, which are used for testing the quality of a product before the monitoring system of the energy storage power station accesses a network, testing whether each function and performance of energy storage monitoring meet the requirement of scheduling automation of the access power network, ensuring the quality of the product before field application and implementation, and further providing technical guarantee for safe and reliable operation of the energy storage power station
The technical scheme adopted by the invention is as follows: a monitoring function test method for an energy storage power station is characterized in that controlled equipment is connected with an in-situ monitoring device through an access layer network, and an energy storage monitoring system, a protection measurement and control device, a data communication gateway machine and the in-situ monitoring device are respectively accessed into a station control layer network;
the energy storage power station monitoring function test method comprises the following steps:
respectively monitoring a telemechanical layer message, a station control layer message and an access layer message of the energy storage power station by using a message monitoring tool, extracting corresponding message time marks, and testing remote measurement, remote signaling and remote control response time according to the extracted message time marks;
carrying out an energy storage monitoring system IEC104 communication function test, an avalanche test and a database capacity test by using an IEC104 server simulator of an access station control layer network;
connecting a data communication gateway machine by using an IEC104 client simulator, and performing a telecontrol function test and a power control function test on the energy storage monitoring system;
the comprehensive self-testing instrument is utilized to carry out remote measurement, remote signaling and remote control function tests of the energy storage power station protection measurement and control device and IEC61850 communication function tests of the energy storage monitoring system;
and acquiring output data change information of each controlled device after responding to external triggering, and judging whether the communication function between the controlled device and the energy storage monitoring system is normal or not according to the corresponding external triggering signal and the data change information output to the energy storage monitoring system by the controlled device.
The IEC104 server simulator, the IEC104 client simulator, the message monitoring tool, and the integrated self-testing instrument may respectively adopt the prior art.
Specifically, the communication function test performed by using the IEC104 server simulator is as follows: the IEC104 server simulator starts the IEC104 monitoring service and waits for the connection of the energy storage monitoring system; after the connection is established, the IEC104 server simulator responds to the general call of the energy storage monitoring system, simulates change remote measurement and remote signaling data uploading, and responds to a control command, so that the IEC104 communication function in the energy storage power station monitoring function is tested. Namely, whether the data sent by the energy storage monitoring system is consistent with the data quantity received by the energy storage monitoring system is checked.
The avalanche test using the IEC104 server simulator is as follows: the IEC104 server simulator establishes a plurality of channels, each channel is respectively associated with a remote point table, a data change strategy is configured, after the energy storage monitoring system is connected, avalanche data is sent according to the configuration data change strategy, and whether each monitoring function of the energy storage monitoring system is normal or not and performance indexes are checked under the avalanche condition;
the database capacity test by using the IEC104 server simulator is as follows: the IEC104 server simulator establishes a plurality of channels, configures a data uploading strategy and uploading time, and checks the storage data capacity of the database after the connection of the energy storage monitoring system is established.
The power control function test of the energy storage monitoring system by using the IEC104 client simulator is as follows: and the IEC104 client simulator simulates a scheduling master station to issue a control command and a target value to the energy storage monitoring system, and judges whether the power control function of the energy storage monitoring system is normal or not according to the response results of the energy storage monitoring system and the controlled equipment.
The invention also discloses a system for testing the monitoring function of the energy storage power station, which comprises an IEC104 server-side simulator, an IEC104 client-side simulator, a message monitoring tool and a comprehensive self-testing instrument;
the controlled equipment is connected with the local monitoring device through an access layer network, and the energy storage monitoring system, the protection measurement and control device and the local monitoring device are respectively accessed to a station control layer network;
the message monitoring tool is used for monitoring a telemechanical layer message, a station control layer message and an access layer message of the energy storage power station, extracting a corresponding message time scale, and testing remote measurement, remote signaling and remote control response time according to the extracted message time scale;
the IEC104 server simulator is accessed to a station control layer network and used for carrying out IEC104 communication function testing, avalanche testing and database capacity testing on the energy storage monitoring system;
the IEC104 client simulator is connected with the data communication gateway machine and used for carrying out telecontrol function test and power control function test on the energy storage monitoring system;
the integrated self-testing instrument is connected with the protection measurement and control device and used for carrying out remote measurement, remote signaling and remote control function tests on the protection measurement and control device of the energy storage power station and an IEC61850 communication function test of the energy storage monitoring system.
Preferably, the message monitoring tool is accessed to the switch mirror ports of the telecontrol layer, the station control layer and the access layer.
Preferably, the integrated tester applies a trigger quantity to the protection measurement and control device through a hard wiring.
Advantageous effects
The invention provides a system and a method for testing a monitoring function of an energy storage power station based on the technical current situation of an energy storage monitoring system, which can be used for carrying out the test of the energy storage monitoring system, checking the product quality of the energy storage monitoring system before the energy storage monitoring system is connected to a network, checking whether each function and performance of energy storage monitoring meet the requirement of power grid dispatching automation, checking the interoperation capacity of the energy storage monitoring system with devices such as a BMS (battery management system), a PCS (personal communications system), a protocol converter and the like, and checking whether the energy storage monitoring system meets the requirements of power grid active control and voltage control. The quality of products can be guaranteed before field application and implementation, and technical guarantee is provided for safe and reliable operation of the energy storage power station.
Drawings
Fig. 1 is a schematic structural diagram of a monitoring function test system of an energy storage power station according to the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
The embodiment is a method for testing the monitoring function of an energy storage power station, wherein controlled equipment is connected with an in-situ monitoring device through an access layer network, and an energy storage monitoring system, a protection measurement and control device, a data communication gateway machine and the in-situ monitoring device are respectively accessed into a station control layer network;
the energy storage power station monitoring function test method comprises the following steps:
respectively monitoring a telemechanical layer message, a station control layer message and an access layer message of the energy storage power station by using a message monitoring tool, extracting corresponding message time marks, and testing remote measurement, remote signaling and remote control response time according to the extracted message time marks;
carrying out an energy storage monitoring system IEC104 communication function test, an avalanche test and a database capacity test by using an IEC104 server simulator of an access station control layer network;
connecting a data communication gateway machine by using an IEC104 client simulator, and performing a telecontrol function test and a power control function test on the energy storage monitoring system;
the comprehensive self-testing instrument is utilized to carry out remote measurement, remote signaling and remote control function tests of the energy storage power station protection measurement and control device and IEC61850 communication function tests of the energy storage monitoring system;
and acquiring output data change information of each controlled device after responding to external triggering, and judging whether the communication function between the controlled device and the energy storage monitoring system is normal or not according to the corresponding external triggering signal and the data change information output to the energy storage monitoring system by the controlled device.
The IEC104 server simulator, the IEC104 client simulator, the message monitoring tool, and the integrated self-testing instrument may respectively adopt the prior art.
Specifically, the communication function test performed by using the IEC104 server simulator is as follows: the IEC104 server simulator starts the IEC104 monitoring service and waits for the connection of the energy storage monitoring system; after the connection is established, the IEC104 server simulator responds to the general call of the energy storage monitoring system, simulates change remote measurement and remote signaling data uploading, and responds to a control command, so that the IEC104 communication function in the energy storage power station monitoring function is tested. Namely, whether the data sent by the energy storage monitoring system is consistent with the data quantity received by the energy storage monitoring system is checked.
The avalanche test using the IEC104 server simulator is as follows: the IEC104 server simulator establishes a plurality of channels, each channel is respectively associated with a remote point table, a data change strategy is configured, after the energy storage monitoring system is connected, avalanche data is sent according to the configuration data change strategy, and whether each monitoring function of the energy storage monitoring system is normal or not and performance indexes are checked under the avalanche condition;
the database capacity test by using the IEC104 server simulator is as follows: the IEC104 server simulator establishes a plurality of channels, configures a data uploading strategy and uploading time, and checks the storage data capacity of the database after the connection of the energy storage monitoring system is established.
The power control function test of the energy storage monitoring system by using the IEC104 client simulator is as follows: and the IEC104 client simulator simulates a scheduling master station to issue a control command and a target value to the energy storage monitoring system, and judges whether the power control function of the energy storage monitoring system is normal or not according to the response results of the energy storage monitoring system and the controlled equipment.
Example 2
The embodiment is a system for testing the monitoring function of an energy storage power station, which comprises an IEC104 server-side simulator, an IEC104 client-side simulator, a message monitoring tool and a comprehensive self-testing instrument;
the controlled equipment is connected with the local monitoring device through an access layer network, and the energy storage monitoring system, the protection measurement and control device and the local monitoring device are respectively accessed to a station control layer network;
the message monitoring tool is used for monitoring a telemechanical layer message, a station control layer message and an access layer message of the energy storage power station, extracting a corresponding message time scale, and testing remote measurement, remote signaling and remote control response time according to the extracted message time scale;
the IEC104 server simulator is accessed to a station control layer network and used for carrying out IEC104 communication function testing, avalanche testing and database capacity testing on the energy storage monitoring system;
the IEC104 client simulator is connected with the data communication gateway machine and used for carrying out telecontrol function test and power control function test on the energy storage monitoring system;
the integrated self-testing instrument is connected with the protection measurement and control device and used for carrying out remote measurement, remote signaling and remote control function tests on the protection measurement and control device of the energy storage power station and an IEC61850 communication function test of the energy storage monitoring system.
As shown in fig. 1, the application structure of the energy storage power station monitoring function test system of the present invention includes an energy storage monitoring system, a device accessing the energy storage monitoring system, and an experimental device.
The energy storage monitoring system comprises an energy storage monitoring host, a front-end server, a data server, an active control server, a workstation and the like, and the energy storage monitoring system, the data communication gateway machine, the protection measurement and control device, the local monitoring device and the like are respectively accessed to a station control layer network.
The equipment which is accessed into the energy storage monitoring system through the local monitoring device comprises a Power Conversion System (PCS), a Battery Management System (BMS), auxiliary control equipment and the like; and the PCS, the BMS and the auxiliary control equipment are communicated with the energy storage monitoring system through the local monitoring device and the protocol converter.
The experimental equipment of the energy storage power station monitoring function test system comprises an IEC104 server-side simulator, an IEC104 client-side simulator, a comprehensive self-testing instrument, a network message monitoring tool and the like;
the IEC104 server simulator is accessed to a station control layer network; the IEC104 client simulator is communicated with the data communication gateway; the message monitoring tool is accessed to the switch mirror image ports of the telecontrol layer, the station control layer and the access layer; the comprehensive tester applies trigger quantity to the protection measurement and control device through a hard wiring.
The energy storage monitoring system and the equipment connected with the energy storage monitoring system are the objects to be tested.
The energy storage monitoring function test comprises test items such as data acquisition, data processing, control operation, an alarm function, active control, reactive control, time synchronization, a communication function, an energy storage SOC maintenance function, picture monitoring, network topology, logic locking, a diagnosis and early warning function, a panoramic analysis function and system performance.
The IEC104 client simulator is used for testing the communication function and the power control function of the energy storage monitoring system and the scheduling master station, the IEC104 server simulator is used for testing the communication capacity of the energy storage monitoring system accessing to the IEC104 server, the message monitoring tool is used for testing the data processing response time of the energy storage monitoring system, and the integrated self-tester is used for testing the communication function and the data processing function of the protection measurement and control device accessing to the energy storage monitoring system.
The message monitoring tool collects and analyzes the telecontrol message, the station control layer message and the access layer message, extracts the time scale of the collected messages and realizes the test of the response time of the energy storage monitoring data processing.
When the energy storage power station monitoring function test system is used for testing, the method comprises the following steps:
step one, building an energy storage power station monitoring function test system shown in figure 1;
step two, carrying out an energy storage monitoring system IEC104 communication function test, an avalanche test and a database capacity test by using an IEC104 server simulator;
the IEC104 server simulator is used for developing an avalanche test and a database capacity test, a plurality of IEC104 servers are established through the IEC104 server simulator and are in parallel communication with energy storage monitoring, each IEC104 server is loaded with a remote point table to support batch triggering of remote measurement and remote signaling data change uploading, and the avalanche test and the database capacity test support more than 50 ten thousand points.
Thirdly, carrying out remote measurement, remote signaling and remote control function tests of the protection measurement and control device by using a comprehensive self-testing instrument, and simultaneously carrying out an IEC61850 communication function test of the energy storage monitoring system;
step four, manually triggering data changes of the PCS, the BMS and the auxiliary control equipment to test the communication function of the PCS, the BMS and the auxiliary control equipment accessing the energy storage monitoring system;
step five, carrying out telecontrol function test and power control function test by using an IEC104 client simulator;
the telecontrol function test and the power test are contents of a conventional energy storage monitoring test project; the power control function test comprises an active power control function and a reactive power control function, and the power control function of the energy storage monitoring system is tested by simulating the main station to issue a control command and a target value.
And step six, acquiring messages of each layer by using a message monitoring tool, extracting message time marks, calculating corresponding time, and carrying out data processing response time tests of the energy storage monitoring system, wherein the data processing response time tests comprise remote measurement, remote signaling and remote control response time.
And step six, acquiring messages of an access layer, a station control layer and telecontrol in real time in the processes of remote measurement, remote signaling and remote control, extracting the time scale of acquiring the message of the service application function through analysis, and calculating the data processing time of each link.
The invention can be used for testing the functions and the performances of the energy storage power station monitoring system, checking the product quality of the energy storage power station monitoring system before accessing the network, checking whether each function and performance meet the requirement of the scheduling automation of the access power grid, and ensuring the product quality before the field application is implemented.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. A monitoring function test method for an energy storage power station is characterized in that controlled equipment is connected with an in-situ monitoring device through an access layer network, and an energy storage monitoring system, a protection measurement and control device, a data communication gateway machine and the in-situ monitoring device are respectively accessed into a station control layer network; the method is characterized in that:
the energy storage power station monitoring function test method comprises the following steps:
respectively monitoring a telemechanical layer message, a station control layer message and an access layer message of the energy storage power station by using a message monitoring tool, extracting corresponding message time marks, and testing remote measurement, remote signaling and remote control response time according to the extracted message time marks;
the method comprises the following steps of utilizing an IEC104 server simulator of an access station control layer network to carry out energy storage monitoring system IEC104 communication function test, avalanche test and database capacity test, wherein: the communication function test is carried out by utilizing the IEC104 server simulator, namely, the IEC104 server simulator starts IEC104 monitoring service and waits for the connection of an energy storage monitoring system; after the connection is established, the IEC104 server simulator responds to the general call of the energy storage monitoring system, simulates change remote measurement and remote signaling data uploading, and responds to a control command, so that the IEC104 communication function in the energy storage power station monitoring function is tested;
connecting a data communication gateway machine by using an IEC104 client simulator, and performing a telecontrol function test and a power control function test on the energy storage monitoring system;
the comprehensive self-testing instrument is utilized to carry out remote measurement, remote signaling and remote control function tests of the energy storage power station protection measurement and control device and IEC61850 communication function tests of the energy storage monitoring system;
and acquiring output data change information of each controlled device after responding to external triggering, and judging whether the communication function between the controlled device and the energy storage monitoring system is normal or not according to the corresponding external triggering signal and the data change information output to the energy storage monitoring system by the controlled device.
2. The method of claim 1, wherein the avalanche test using the IEC104 service simulator is: the IEC104 server simulator establishes a plurality of channels, each channel is respectively associated with a remote point table, a data change strategy is configured, after the energy storage monitoring system is connected, avalanche data is sent according to the configuration data change strategy, and whether each monitoring function of the energy storage monitoring system is normal or not and performance indexes are checked under the avalanche condition.
3. The method as claimed in claim 1, wherein the database capacity test using the IEC104 server simulator is: the IEC104 server simulator establishes a plurality of channels, configures a data uploading strategy and uploading time, and checks the storage data capacity of the database after the connection of the energy storage monitoring system is established.
4. The method as claimed in claim 1, wherein the energy storage monitoring system power control function test using the IEC104 client simulator is: and the IEC104 client simulator simulates a scheduling master station to issue a control command and a target value to the energy storage monitoring system, and judges whether the power control function of the energy storage monitoring system is normal or not according to the response results of the energy storage monitoring system and the controlled equipment.
5. An energy storage power station monitoring function testing system adopting the energy storage power station monitoring function testing method of any one of claims 1 to 4, which is characterized by comprising an IEC104 server-side simulator, an IEC104 client-side simulator, a message monitoring tool and a comprehensive self-testing instrument;
the controlled equipment is connected with the local monitoring device through an access layer network, and the energy storage monitoring system, the protection measurement and control device and the local monitoring device are respectively accessed to a station control layer network;
the message monitoring tool is used for monitoring a telemechanical layer message, a station control layer message and an access layer message of the energy storage power station, extracting a corresponding message time scale, and testing remote measurement, remote signaling and remote control response time according to the extracted message time scale;
the IEC104 server simulator is accessed to a station control layer network and used for carrying out IEC104 communication function testing, avalanche testing and database capacity testing on the energy storage monitoring system;
the IEC104 client simulator is connected with the data communication gateway machine and used for carrying out telecontrol function test and power control function test on the energy storage monitoring system;
the integrated self-testing instrument is connected with the protection measurement and control device and used for carrying out remote measurement, remote signaling and remote control function tests on the protection measurement and control device of the energy storage power station and an IEC61850 communication function test of the energy storage monitoring system.
6. The energy storage power station monitoring function test system of claim 5, wherein the message monitoring tool is connected to the switch mirror ports of the telecontrol layer, the station control layer and the access layer.
7. The energy storage power station monitoring function test system of claim 5, wherein the integrated tester applies a trigger to the protection measurement and control device through a hard wire.
CN201910437566.3A 2019-05-24 2019-05-24 Energy storage power station monitoring function test method and system Active CN110275509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910437566.3A CN110275509B (en) 2019-05-24 2019-05-24 Energy storage power station monitoring function test method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910437566.3A CN110275509B (en) 2019-05-24 2019-05-24 Energy storage power station monitoring function test method and system

Publications (2)

Publication Number Publication Date
CN110275509A CN110275509A (en) 2019-09-24
CN110275509B true CN110275509B (en) 2021-10-15

Family

ID=67960087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910437566.3A Active CN110275509B (en) 2019-05-24 2019-05-24 Energy storage power station monitoring function test method and system

Country Status (1)

Country Link
CN (1) CN110275509B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111600760B (en) * 2020-05-25 2023-05-23 南方电网电力科技股份有限公司 Quality detection system, method and equipment of power grid operation monitoring system
CN112350869A (en) * 2020-11-06 2021-02-09 广东电网有限责任公司 Method and system for detecting point-to-point time response performance of substation automation system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201490764U (en) * 2009-04-29 2010-05-26 安徽省电力公司芜湖供电公司 General simulation test system with integrated power grid dispatching and electric quantity acquisition
JP2012095479A (en) * 2010-10-28 2012-05-17 Chugoku Electric Power Co Inc:The Power system monitoring controller
JP2013142571A (en) * 2012-01-10 2013-07-22 Opt-Mechatronix Inc Radiation detection apparatus
CN205846862U (en) * 2016-06-01 2016-12-28 国网河北省电力公司电力科学研究院 A kind of synthetic automatic device for conventional substation detects device
CN106597947A (en) * 2016-12-23 2017-04-26 国网浙江宁波市鄞州区供电公司 Substation equipment test method and system, server and tester
CN107402332A (en) * 2016-05-20 2017-11-28 中国电力科学研究院 A kind of Intelligent power distribution terminal multi-epitope automatic checkout system and its detection method
CN108306753A (en) * 2017-12-20 2018-07-20 中国电力科学研究院有限公司 Simulator, test method and the system of a kind of Ith area data communication network shutdown

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL1850142T3 (en) * 2006-04-24 2009-06-30 Abb Research Ltd System level testing for substation automation systems
CN104731044A (en) * 2013-12-23 2015-06-24 洪明强 Lithium battery pile dynamic monitoring and management system
CN104779658B (en) * 2014-12-31 2017-11-03 国家电网公司 Polymorphic type battery energy storage system communication management and Power Control simulation system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201490764U (en) * 2009-04-29 2010-05-26 安徽省电力公司芜湖供电公司 General simulation test system with integrated power grid dispatching and electric quantity acquisition
JP2012095479A (en) * 2010-10-28 2012-05-17 Chugoku Electric Power Co Inc:The Power system monitoring controller
JP2013142571A (en) * 2012-01-10 2013-07-22 Opt-Mechatronix Inc Radiation detection apparatus
CN107402332A (en) * 2016-05-20 2017-11-28 中国电力科学研究院 A kind of Intelligent power distribution terminal multi-epitope automatic checkout system and its detection method
CN205846862U (en) * 2016-06-01 2016-12-28 国网河北省电力公司电力科学研究院 A kind of synthetic automatic device for conventional substation detects device
CN106597947A (en) * 2016-12-23 2017-04-26 国网浙江宁波市鄞州区供电公司 Substation equipment test method and system, server and tester
CN108306753A (en) * 2017-12-20 2018-07-20 中国电力科学研究院有限公司 Simulator, test method and the system of a kind of Ith area data communication network shutdown

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
智能变电站站控层测试技术的研究;唐志军;《自动化技术与应用》;20171225;正文第115-117页 *

Also Published As

Publication number Publication date
CN110275509A (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN107819645B (en) Internet of things testing method based on software simulation
CN103731182B (en) A kind of power line carrier, PLC method for real-time monitoring and system
CN108399114A (en) A kind of system performance testing method, apparatus and storage medium
WO2014090025A1 (en) On-line and off-line integrated analysis and testing method for smart substation
CN104052633A (en) Integrated testing method for intelligent station 61850 and telecontrol 104 protocol
CN110275509B (en) Energy storage power station monitoring function test method and system
CN108710566B (en) Power distribution dispatching master station integration test system and method
CN113419920B (en) Real-time monitoring method for joint debugging test process of simulation test system of Internet of things management platform
CN110401692A (en) A kind of automatic Acceptance Test System of supervisory control of substation information integral and method
CN108322348A (en) Supervisory control of substation information checks and accepts signal triggering running subsystem and method automatically
CN110174564A (en) The filed detection system and its detection method of equipment for monitoring power quality access main website
CN110556920A (en) Distribution automation monitoring method, system, terminal and storage medium
CN106851513A (en) The method of testing and system of a kind of electronic product
CN101252477B (en) Determining method and analyzing apparatus of network fault root
CN106530653B (en) Power information acquisition method
CN111600760A (en) Quality detection system, method and equipment of power grid operation monitoring system
CN107229499B (en) Master station simulation system and detection method for detecting fault terminal of power acquisition system
CN104038388B (en) Based on distributed Internet of Things Auto-Test System and method of testing
CN108696371B (en) Network fault determination method and system
CN108768995A (en) Substation adaptive access main website method
CN105515192A (en) Monitoring and early warning system and method for power transmission and transformation equipment load data access electric power system
CN109426240B (en) Test method and device
CN111123308A (en) Satellite remote test system
CN101414737A (en) Control method and system for track traffic electric power data acquisition and surveillance
CN107706914B (en) State estimation method and device for secondary system of intelligent substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant