CN110262411B CN201910435879.5A CN201910435879A CN110262411B CN 110262411 B CN110262411 B CN 110262411B CN 201910435879 A CN201910435879 A CN 201910435879A CN 110262411 B CN110262411 B CN 110262411B
Authority
CN
China
Prior art keywords
information
wharf
patrol
terminal
personnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910435879.5A
Other languages
Chinese (zh)
Other versions
CN110262411A (en
Inventor
汪昌勇
夏侃
元幼荣
董辉
王如波
虞恒杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Meishan Island International Container Terminal Co ltd
Original Assignee
Ningbo Meishan Island International Container Terminal Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Meishan Island International Container Terminal Co ltd filed Critical Ningbo Meishan Island International Container Terminal Co ltd
Priority to CN201910435879.5A priority Critical patent/CN110262411B/en
Publication of CN110262411A publication Critical patent/CN110262411A/en
Application granted granted Critical
Publication of CN110262411B publication Critical patent/CN110262411B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a field management system applied to a container terminal, which relates to the field of terminal management and solves the problem of inconvenient information management of the container terminal; the technical scheme comprises the following steps: the wharf operation presetting unit is preset with wharf operation presetting information of unit time and work class acquired by the information control center equipment; the terminal personnel management unit stores terminal personnel management information acquired by the information control center equipment; the terminal equipment comprises a wharf field management unit, a wharf terminal and a terminal equipment, wherein the wharf field management unit stores wharf field management information input by inspection personnel through the terminal equipment; the information control center equipment stores wharf operation preset information, wharf personnel management information, wharf site management information and mechanical guarantee management information to a local and/or synchronous uploading server, so that workers can inquire required information through the terminal equipment; the field management system applied to the container terminal is convenient for managing the information of the container terminal and improves the operation efficiency of the terminal.

Description

On-site management system applied to container terminal
Technical Field
The invention relates to the field of wharf management, in particular to a field management system applied to a container wharf.
Background
The container terminal refers to a well-defined place which can accommodate the complete container loading and unloading operation process and comprises water areas such as harbor ponds, anchorage sites, entrance channels, berths and the like and land areas such as freight stations, storage yards, wharf fronts, office living areas and the like.
In the actual application of the container terminal, although a computer is used, the operation command, the loading and stowage, and the position processing of the containers are still under manual control and are designated one by one. These not only consume a lot of manpower, material resources, but also more importantly, many operations (ship loading, ship unloading, the ship, loading, unloading, yard adjustment, yard transfer, etc.) of the whole wharf can only be completed by division of labor, and the unified command of the whole wharf cannot be realized. The situation of each container terminal makes the information management of the container terminal inconvenient, causes operation conflict, uneven busy and idle of mechanical equipment, and the efficiency of the terminal cannot be improved, so that the container terminal has improved space.
Disclosure of Invention
The invention aims to provide a field management system applied to a container terminal, which is convenient for managing the information of the container terminal and improves the operation efficiency of the terminal.
The technical purpose of the invention is realized by the following technical scheme:
a field management system applied to a container terminal, wherein the system is applied to at least one information control center device which is in communication connection with a terminal device, and comprises:
the wharf operation presetting unit is preset with wharf operation presetting information of unit time and work class acquired by the information control center equipment;
the terminal personnel management unit stores terminal personnel management information acquired by the information control center equipment;
the terminal equipment comprises a wharf field management unit, a wharf terminal and a terminal equipment, wherein the wharf field management unit stores wharf field management information input by inspection personnel through the terminal equipment;
the wharf mechanical guarantee management unit stores wharf mechanical guarantee management information of the machinery used by the wharf;
the information control center device stores wharf operation preset information, wharf personnel management information, wharf site management information and mechanical guarantee management information to a local and/or synchronous uploading server, and workers can inquire required information through the terminal device.
By adopting the technical scheme, the wharf operation presetting unit, the wharf personnel management unit, the wharf field management unit and the wharf mechanical guarantee management unit are arranged, so that information of all aspects of the wharf is stored, integration of all aspects of the information is realized, and management is convenient;
the information control center device stores wharf operation preset information, wharf personnel management information, wharf site management information and mechanical guarantee management information to a local server and/or uploads the wharf operation preset information, the wharf personnel management information, the wharf site management information and the mechanical guarantee management information to a cloud server synchronously, so that workers can inquire required information through terminal devices, wharf information sharing is achieved, and the problems of operation conflict and uneven busy and idle mechanical devices caused by the situation of each party are solved.
The invention is further configured to: the wharf operation presetting unit comprises:
the wharf operation planning module is provided with a work shift schedule and a post attendance list which are acquired by the information control center equipment; the post attendance list comprises the attendance frequency of a bridge crane, a gantry crane, a stacking machine and a truck and the number of tallies and attendance people.
By adopting the technical scheme, the wharf operation planning module provided with the work shift schedule and the post attendance list is convenient for workers to know work schedule through the terminal equipment so as to make work arrangement; and secondly, management personnel can conveniently backtrack to a work shift schedule and a post attendance list according to later-stage operation conditions.
The invention is further configured to: the tallying area is provided with a collecting camera for collecting video images containing the tallying personnel moving area; a processing module is loaded in the acquisition camera;
the processing module comprises image preprocessing for performing balance adjustment on the video image containing the tally staff activity area, line-row scanning on the video image containing the tally staff activity area after the image preprocessing so as to determine staff positioning of the area where the staff is located, and tally attendance statistics for providing staff quantity statistics after the staff positioning.
By adopting the technical scheme, the tally personnel activity area video image is subjected to image preprocessing of balance adjustment, the tally personnel activity area video image is subjected to line-row scanning after the image preprocessing so as to determine the staff positioning of the area where the staff is located, and tally personnel attendance statistics of staff quantity statistics is performed after the staff positioning, so that the accuracy is high.
The invention is further configured to: the image preprocessing comprises the operations of automatic white balance, automatic exposure and gamma correction, edge enhancement and contrast adjustment on video images containing the tally clerk activity area.
By adopting the technical scheme, the video images including the tally personnel active area are subjected to automatic white balance, automatic exposure, gamma correction, edge enhancement and contrast adjustment, so that the acquired video images are clear, and the error rate of personnel statistics is reduced.
The invention is further configured to: the wharf site management unit comprises a staff patrol module, wherein patrol staff patrol position information, time information, patrol item information and discovery condition information are arranged in the staff patrol module.
By adopting the technical scheme, due to the arrangement of the patrol module, the patrol personnel can conveniently eliminate the hidden trouble of the wharf in time through patrol; and secondly, the arrangement of the position information, the time information, the inspection item information and the found condition information of the inspection personnel plays a certain role in supervision on the inspection personnel, and the inspection quality of the inspection personnel is improved.
The invention is further configured to: the dock site management unit further comprises:
the inspection information supplement module comprises inspection information which needs to be supplemented by historical inspection route information of inspectors; the patrol personnel historical patrol route information comprises the following steps: a plurality of regional position information positioned on the historical patrol route of the patrol personnel;
and when the current patrol position information of the patrol personnel is matched with the position information of a certain area, the information control center equipment loads the patrol information which needs to be supplemented and corresponds to the position information of the area into the terminal equipment corresponding to the patrol personnel.
By adopting the technical scheme and the arrangement of the patrol information supplementing module, when the current patrol position information of the patrol personnel is matched with the region position information, the information control center equipment loads the patrol information which needs to be supplemented and corresponds to the region position information into the terminal equipment corresponding to the patrol personnel, so that the patrol personnel who patrol to the place can solve the region position information together.
The invention is further configured to: the dock site management unit further comprises:
and the inspection photo uploading module is used for uploading the image shot by the inspector in unit time, and the uploaded image is bound with inspection item information or discovery condition information.
By adopting the technical scheme, the inspection photo uploading module is used for uploading the image shot by the inspector in unit time, and the inspection quality is further improved.
The invention is further configured to: the dock mechanical security management unit comprises:
the wharf mechanical maintenance planning module stores mechanical equipment maintenance planning information of the current shift and the next shift;
the wharf mechanical failure repair module is used for storing the mechanical equipment information of the current-class failure repair;
and the wharf machinery deactivation module stores deactivated machinery equipment information.
By adopting the technical scheme, the wharf mechanical maintenance planning module, the wharf mechanical failure repair module and the wharf mechanical stopping module are arranged, so that the management of wharf mechanical equipment is facilitated, and the working efficiency is improved.
In conclusion, the invention has the following beneficial effects:
1. the wharf operation presetting unit, the wharf personnel management unit, the wharf field management unit and the wharf mechanical guarantee management unit are arranged, information of all aspects of the wharf is stored, integration of all aspects of the information is achieved, and management is convenient;
2. the information control center device stores wharf operation preset information, wharf personnel management information, wharf site management information and mechanical guarantee management information to a local server and/or uploads the wharf operation preset information, the wharf personnel management information, the wharf site management information and the mechanical guarantee management information to a cloud server synchronously, so that workers can inquire required information through terminal devices, wharf information sharing is achieved, and the problems of operation conflict and uneven busy and idle mechanical devices caused by the situation of each party are solved.
Drawings
Fig. 1 is a topological diagram of the on-site management system of the container terminal of the present invention;
fig. 2 is a topological diagram of a terminal operation presetting unit in the field management system of the container terminal of the present invention;
fig. 3 is a topological diagram of a terminal site management unit in the site management system of the container terminal of the present invention;
fig. 4 is a topological diagram of a mechanical security management unit of the container terminal in the field management system of the container terminal according to the present invention;
fig. 5 is a topological diagram of a terminal patrol management unit in the field management system of the container terminal according to the present invention.
Detailed Description
The present invention is described in further detail below with reference to figures 1-5.
Referring to fig. 1, an embodiment of the present invention provides an on-site management system applied to a container terminal, where the system is applied to at least one information control center device, and the information control center device is in communication connection with a terminal device; further comprising:
the wharf operation presetting unit is preset with wharf operation presetting information of unit time and work class acquired by the information control center equipment;
the terminal personnel management unit stores terminal personnel management information acquired by the information control center equipment;
the terminal equipment comprises a wharf field management unit, a wharf terminal and a terminal equipment, wherein the wharf field management unit stores wharf field management information input by inspection personnel through the terminal equipment;
the wharf mechanical guarantee management unit stores wharf mechanical guarantee management information of the machinery used by the wharf;
the information control center device stores wharf operation preset information, wharf personnel management information, wharf site management information and mechanical guarantee management information to a local and/or synchronous uploading server, and workers can inquire required information through the terminal device.
The wharf operation presetting unit, the wharf personnel management unit, the wharf field management unit and the wharf mechanical guarantee management unit are arranged, information of all aspects of the wharf is stored, integration of all aspects of the information is achieved, and management is convenient; the information control center device stores wharf operation preset information, wharf personnel management information, wharf site management information and mechanical guarantee management information to a local server and/or uploads the wharf operation preset information, the wharf personnel management information, the wharf site management information and the mechanical guarantee management information to a cloud server synchronously, so that workers can inquire required information through terminal devices, wharf information sharing is achieved, and the problems of operation conflict and uneven busy and idle mechanical devices caused by the situation of each party are solved.
Referring to fig. 2, the dock job presetting unit includes: the wharf operation planning module is provided with a work shift schedule and a post attendance list which are acquired by the information control center equipment; the post attendance list comprises the attendance frequency of a bridge crane, a gantry crane, a stacking machine and a truck of a shift and the number of tally attendance persons; the work shift schedule is also the day and night schedule of the work shift schedule. The wharf operation planning module is also provided with operation planning item arrangement, and the information control center equipment can pop up reminding information in modes of short messages, WeChat, mails and the like at the mobile phone end on time according to the recorded item execution time.
Referring to fig. 2, the wharf job presetting unit further includes a wharf production target module, in which a loading and unloading throughput planning target of a work class, a loading and unloading advance and advance job scheduling target of the work class, a single-machine efficiency and ship-hour efficiency of the work class, and an on-berth efficiency planning target are set, wherein when the efficiency target of the work class is modifiable and deleted, a worker can review the efficiency target of the previous work class.
The information control center device can be a central processing unit, and the central processing unit can be manually input through the terminal device or the terminal device scans paper files to obtain wharf work preset information of unit time and work class to be stored in the central processing unit.
The tallying area is provided with a collecting camera for collecting video images containing the tallying personnel moving area; a processing module is loaded in the acquisition camera;
the processing module comprises image preprocessing for performing balance adjustment on the video image containing the tally staff activity area, line-row scanning on the video image containing the tally staff activity area after the image preprocessing so as to determine staff positioning of an area where the staff is located, and tally attendance statistics for providing staff quantity statistics after the staff positioning. The image preprocessing comprises the operations of automatic white balance, automatic exposure, gamma correction, edge enhancement and contrast adjustment on the video image containing the cargo handling personnel activity area, so that the acquired video image is clear, and the error rate of personnel attendance statistics is reduced.
Referring to fig. 3, the dock field management unit includes a staff patrol module, and the staff patrol module is provided with patrol staff patrol position information, time information, patrol item information, and discovery status information. Here, the entry of the patrol person patrol location information may be input by the patrol person through a terminal device, and the patrol person patrol time information is a time for the patrol person to save the current location patrol information.
Referring to fig. 3, the dock site management unit further includes: the inspection information supplement module comprises inspection information which needs to be supplemented by historical inspection route information of inspectors; the historical patrol route information of the patrol personnel comprises the following steps: a plurality of regional position information positioned on the historical patrol route of the patrol personnel;
when the current patrol position information of the patrol personnel is matched with the position information of a certain area, the information control center equipment loads the patrol information which needs to be supplemented and corresponds to the position information of the area into the terminal equipment corresponding to the patrol personnel. The method comprises the steps that a plurality of GPS transmitters are arranged on a historical patrol route of a patrol worker, the patrol worker carries a GPS receiver on the patrol worker, when the patrol worker arrives at a certain area position, a transmitting signal of the GPS transmitter at the position is received by the GPS receiver, and at the moment, the information control center device loads patrol information which needs to be supplemented and corresponds to the area position into terminal equipment corresponding to the patrol worker. The patrol information required to be supplemented to contain the patrol personnel historical patrol route information can be patrol contents temporarily needing to be added, patrol cautions temporarily needing to be added, patrol contents temporarily needing to be deleted and the like at the position of the area.
Referring to fig. 3, the dock site management unit further includes: and the inspection photo uploading module is used for uploading the images shot by the inspection personnel in unit time, and the uploaded images are bound with inspection item information or discovery condition information.
Referring to fig. 4, the dock machinery safety management unit includes:
the wharf mechanical maintenance planning module stores mechanical equipment maintenance planning information of the current shift and the next shift;
the wharf mechanical failure repair module is used for storing the mechanical equipment information of the current-class failure repair;
the wharf mechanical deactivation module stores deactivated mechanical equipment information;
the dock mechanical security management unit further comprises a hidden danger uploading module for uploading text description and pictures related to the potential safety hazards.
The central processing unit can manually input or scan a paper file through the terminal device so as to obtain mechanical device maintenance plan information, fault repair mechanical device information, disabled mechanical device information and text description and photos related to potential safety hazards, and the information is stored in the central processing unit.
Referring to fig. 4, the mechanical security management unit of the terminal further includes a hidden danger query module, a dangerous goods information query module, and a safety system module. The hidden danger inquiry module can inquire the historical uploaded text description and photos of the hidden danger; the dangerous goods information inquiry module can inquire the dangerous goods information in the field: box number, box size, hazardous article category, site location; and the safety system module can upload and inquire word documents and photos of the safety system.
Dock mechanical guarantee management unit still includes special operation module, and special operation module includes:
information about the refrigerator, i.e. the refrigerator number, the box size, and the location information to be made by the shift;
dangerous goods related information, dangerous goods box number to be made at work, box type size and position information;
the related information of the overrun case, the number of the overrun case to be made by the shift, the size of the case and the position information;
the information about the oil tank box, the number of the oil tank box to be made at the shift, the box type size and the position information;
tank case relevant information, tank case number, box size, positional information that will do on duty.
The central processor can be manually input through the terminal equipment or the terminal equipment scans the paper files to store the related information in the special operation module to the central processor.
Referring to fig. 5, the field management system applied to the container terminal further includes a terminal patrol managing unit including:
dispatching arrangement, namely arrangement conditions of workers, a work class bridge crane, a gantry crane, a positive pile, a truck, tallies (work numbers, names) and mechanical equipment (mechanical equipment numbers);
personnel grade, the skill grade of corresponding personnel such as a working bridge crane, a gantry crane, a positive pile, a truck, tally and the like;
and (3) staff operation evaluation, wherein a specific manager selects and evaluates the staff on the terminal equipment: excellent, qualified and unqualified.
In the invention, a face recognition characteristic database of a specific manager is preset in the information control center equipment, and when the extracted face characteristics are matched with the characteristics in the face recognition characteristic database when a face recognition interface is opened at the terminal equipment, an employee operation evaluation interface can be opened on the terminal equipment and can be subjected to gating evaluation.
It will be clear to those skilled in the art that, for convenience and simplicity of description, the foregoing division of the functional modules is merely used as an example, and in practical applications, the above function distribution may be performed by different functional modules according to needs, that is, the internal structure of the device is divided into different functional modules to perform all or part of the above described functions.
In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other manners. For example, the above-described apparatus embodiments are merely illustrative, and for example, a module or a unit may be divided into only one logical function, and may be implemented in other ways, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
Units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present application may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The integrated unit, if implemented in the form of a software functional unit and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present application may be substantially implemented or contributed to by the prior art, or all or part of the technical solution may be embodied in a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, a network device, or the like) or a processor (processor) to execute all or part of the steps of the method of the embodiments of the present application. And the aforementioned storage medium includes: u disk, removable hard disk, read only memory, random access memory, magnetic or optical disk, etc. for storing program codes.
The above embodiments are only used to describe the technical solutions of the present application in detail, but the above embodiments are only used to help understanding the method and the core idea of the present invention, and should not be construed as limiting the present invention. Those skilled in the art should also appreciate that they can easily conceive of various changes and substitutions within the technical scope of the present disclosure.

Claims (6)

1. The field management system applied to the container terminal is applied to at least one information control center device, and the information control center device is in communication connection with a terminal device, and comprises:
the wharf operation presetting unit is preset with wharf operation presetting information of unit time and work class acquired by the information control center equipment;
the terminal personnel management unit stores terminal personnel management information acquired by the information control center equipment;
the terminal equipment comprises a wharf field management unit, a wharf terminal and a terminal equipment, wherein the wharf field management unit stores wharf field management information input by inspection personnel through the terminal equipment;
the wharf mechanical guarantee management unit stores wharf mechanical guarantee management information of the machinery used by the wharf;
the information control center equipment stores wharf operation preset information, wharf personnel management information, wharf site management information and mechanical guarantee management information to a local and/or synchronous uploading server, so that workers can inquire required information through terminal equipment;
the wharf site management unit comprises a personnel patrol module, wherein patrol personnel patrol position information, time information, patrol item information and discovery condition information are arranged in the personnel patrol module; the input of the patrol position information of the patrol personnel is input by the patrol personnel through terminal equipment;
the dock site management unit further comprises: the inspection information supplement module comprises inspection information which needs to be supplemented by historical inspection route information of inspectors; the patrol personnel historical patrol route information comprises the following steps: a plurality of regional position information positioned on the historical patrol route of the patrol personnel;
arranging a plurality of GPS transmitters on a historical patrol route of a patrol worker, arranging a GPS receiver on terminal equipment, receiving a transmission signal of the GPS transmitter at a certain area position by the GPS receiver when the patrol worker reaches the area position, and loading the patrol information which needs to be supplemented and corresponds to the area position into the terminal equipment corresponding to the patrol worker by information control center equipment;
the patrol information which contains the patrol personnel historical patrol route information and needs to be supplemented comprises patrol content which needs to be added temporarily at the position of the area, patrol caution items which need to be added temporarily and patrol content which needs to be deleted temporarily.
2. The field management system for a container terminal according to claim 1, wherein: the wharf operation presetting unit comprises:
the wharf operation planning module is provided with a work shift schedule and a post attendance list which are acquired by the information control center equipment; the post attendance list comprises the attendance frequency of a bridge crane, a gantry crane, a stacking machine and a truck and the number of tallies and attendance people.
3. The field management system for a container terminal according to claim 2, wherein: the tallying area is provided with a collecting camera for collecting video images containing the tallying personnel moving area; a processing module is loaded in the acquisition camera; the processing module comprises image preprocessing for performing balance adjustment on the video image containing the tally staff activity area, line-row scanning on the video image containing the tally staff activity area after the image preprocessing so as to determine staff positioning of the area where the staff is located, and tally attendance statistics for providing staff quantity statistics after the staff positioning.
4. The field management system for a container terminal according to claim 3, wherein: the image preprocessing comprises the operations of automatic white balance, automatic exposure and gamma correction, edge enhancement and contrast adjustment on video images containing the tally clerk activity area.
5. The field management system for a container terminal according to claim 4, wherein: the dock site management unit further comprises:
and the inspection photo uploading module is used for uploading the image shot by the inspector in unit time, and the uploaded image is bound with inspection item information or discovery condition information.
6. The field management system for a container terminal according to claim 1, wherein: the dock mechanical security management unit comprises:
the wharf mechanical maintenance planning module stores mechanical equipment maintenance planning information of the current shift and the next shift;
the wharf mechanical failure repair module is used for storing the mechanical equipment information of the current-class failure repair;
and the wharf mechanical deactivation module stores deactivated mechanical equipment information.
CN201910435879.5A 2019-05-23 2019-05-23 On-site management system applied to container terminal Active CN110262411B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910435879.5A CN110262411B (en) 2019-05-23 2019-05-23 On-site management system applied to container terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910435879.5A CN110262411B (en) 2019-05-23 2019-05-23 On-site management system applied to container terminal

Publications (2)

Publication Number Publication Date
CN110262411A CN110262411A (en) 2019-09-20
CN110262411B true CN110262411B (en) 2021-11-19

Family

ID=67915318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910435879.5A Active CN110262411B (en) 2019-05-23 2019-05-23 On-site management system applied to container terminal

Country Status (1)

Country Link
CN (1) CN110262411B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113837536A (en) * 2021-08-18 2021-12-24 宁波北仑涌和集装箱码头有限公司 Real-time intelligent evaluation method and system for bridge crane and gantry crane drivers

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106779355B (en) * 2016-11-29 2021-03-12 大连大学 Automatic information management system and method for container terminal
CN107133737A (en) * 2017-05-03 2017-09-05 大连大学 A kind of container terminal intelligent operation management system and management method
CN109533997B (en) * 2018-11-16 2020-06-30 大连大学 Intelligent management system for automatic wharf ship entering and exiting port
CN109523161A (en) * 2018-11-16 2019-03-26 大连大学 Harbour operation management system based on technology of Internet of things
CN109584100A (en) * 2018-11-20 2019-04-05 国网河南省电力公司信息通信公司 A kind of electric inspection process method and system
CN109508940A (en) * 2018-12-20 2019-03-22 大连大学 The container hargour dispatching management information system that a kind of JAVA technology and B/S mode combine

Also Published As

Publication number Publication date
CN110262411A (en) 2019-09-20

Similar Documents

Publication Publication Date Title
US20200104790A1 (en) Smart terminal facility and method suitable for the handling of cargo containers
CN104599102A (en) Cold-chain logistics storage supervisory system and method
CN104571044A (en) Cold-chain logistics visual monitoring system and method
CN110598987A (en) Port scheduling system and method based on unmanned driving
CN107240165A (en) Security cruising inspection system
WO2015101190A1 (en) Whole-course visualization system and method for logistics articles
US20080252417A1 (en) System, method, apparatus, and computer program product for monitoring the tranfer of cargo to and from a transporter
CN110348613A (en) Distribution Center Intelligent logistics management method and system
CN110458263B (en) Intelligent management system for containers
CN109949015A (en) One kind being based on B/S structure container storage yard management information system
CN103927620A (en) Ship dispatch managing system for port operation
Vrakas et al. The effects of evolving port technology and process optimisation on operational performance: The case study of an Australian container terminal operator
CN107089464A (en) The goods automatic sorting method and its system of a kind of intelligent repository
Hu et al. Application of RFID technology at the entrance gate of container terminals
CN110262411B (en) On-site management system applied to container terminal
CN112613814A (en) Warehousing and ex-warehouse management method, device, medium and equipment
JP2019104577A (en) Distribution arrangement system of cargo handling machine utilizing artificial intelligence
US20030088486A1 (en) System and method for managing inspection of cargo
CN117094636A (en) Anti-loss warehouse management system and method for unmanned real-time intelligent inventory
CN102208068A (en) Container highway collection and distribution scheduling system
CN218100445U (en) Intelligent field management system for vehicle dispatching and loading of coal washing plant
CN107944812A (en) The intelligent lease management system of automated three-dimensional storage
CN113554402A (en) Network freight scheduling system
CN103208059A (en) Multi-port multi-time-unloading information management system and method
CN112070426A (en) Big data intelligent management system based on wharf service

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant