CN110262351A - A kind of configuration method - Google Patents

A kind of configuration method Download PDF

Info

Publication number
CN110262351A
CN110262351A CN201910590915.5A CN201910590915A CN110262351A CN 110262351 A CN110262351 A CN 110262351A CN 201910590915 A CN201910590915 A CN 201910590915A CN 110262351 A CN110262351 A CN 110262351A
Authority
CN
China
Prior art keywords
configuration
equipment
configuration equipment
template
measuring point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910590915.5A
Other languages
Chinese (zh)
Inventor
张照雪
陈世锋
刘怀照
代兴华
刘栋
赵毅
魏小锋
孙玉民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang Dianke Xj Storage Technology Co Ltd
Xuji Group Co Ltd
Original Assignee
Xuchang Dianke Xj Storage Technology Co Ltd
Xuji Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuchang Dianke Xj Storage Technology Co Ltd, Xuji Group Co Ltd filed Critical Xuchang Dianke Xj Storage Technology Co Ltd
Priority to CN201910590915.5A priority Critical patent/CN110262351A/en
Publication of CN110262351A publication Critical patent/CN110262351A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24024Safety, surveillance

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Small-Scale Networks (AREA)

Abstract

The present invention relates to a kind of configuration method, this method will classify first, in accordance with communication protocol and point table to configuration equipment;Then whole station database is set up, the whole station database includes device numbering and its measuring point number, and the device numbering is that uniquely, same class waits for that the measuring point number of configuration equipment is consistent, and each measuring point number to configuration equipment is different;The configuration equipment template that each type waits for configuration equipment is drawn then according to whole station database, and same class waits for that configuration equipment switches to such all in accordance with demand and waits in the corresponding configuration equipment template of configuration equipment, realizes the configuration that configuration equipment is waited for such;Wherein, a kind of to create a configuration equipment template to configuration equipment, a configuration equipment template can only once switch to one to carry out configuration in configuration equipment.The present invention reduces the same category of device more live configuration times, improve debugging efficiency, facilitate later period modification maintenance.

Description

A kind of configuration method
Technical field
The invention belongs to Configure Software fields, and in particular to a kind of configuration method.
Background technique
With the development of society, new energy power station capacity is increasing, live key equipment such as photovoltaic DC-to-AC converter, energy storage become Stream device etc. is more and more, these key equipments are required to be monitored and be controlled.Configuration can be realized to automation process and dress Standby monitoring and control.It can acquire various information from automation process and equipment, and information is easy to manage with graphical etc. The mode of solution is shown, management or operator is enable intuitively to carry out the monitoring and control of automation process or device.
Currently, one is traditional configuration method, every equipment creates a picture, so there are mainly two types of configuration methods The pel configuration work between database and picture is carried out on picture afterwards.Second is intelligent configuration method, for example, authorization is public It accuses number Chinese invention patent for being CN105204458B and just discloses a kind of intelligent configuration method, same category of device establishes a picture Template, template by the method that intelligent algorithm replicates copies same category of device picture after carrying out, all to the type to complete Configuration to configuration equipment.
Above two method is that how many equipment monitor just needs how many pictures, once configuration is completed, finds device Template Error needs to be required to when increasing on interface, reducing or modify pel or curve to the institute for using wrong template There is picture to be modified one by one, especially in the case where certain one kind equipment is more, undoubtedly makes configuration work amount pole Greatly, working efficiency is extremely low, is not easy to later maintenance.
Summary of the invention
The present invention provides a kind of configuration methods, to solve configuration method heavy workload, the working efficiency of the prior art Low problem.
In order to solve the above technical problems, technical solution of the present invention and having the beneficial effect that
A kind of configuration method of the invention, includes the following steps:
1) will classify to configuration equipment according to communication protocol and point table;2) whole station database, the whole station number are set up It include device numbering and its measuring point number according to library, the device numbering is that uniquely, same class waits for the measuring point number of configuration equipment It is consistent, each measuring point number to configuration equipment is different;3) each type is drawn according to whole station database and waits for group The configuration equipment template of state equipment, same class wait for that configuration equipment switches to such all in accordance with demand and waits for the corresponding configuration of configuration equipment In equipment template, realize the configuration that configuration equipment is waited for such;Wherein, a kind of to create a configuration equipment mould to configuration equipment Plate, a configuration equipment template can only once switch to one to carry out configuration in configuration equipment.
Its advantages: the configuration method is a kind of to use a configuration equipment template to configuration equipment when carrying out configuration, The configuration that same class waits for configuration equipment is completed by way of switching so that later maintenance or need to modify pel/ Need to only modify in a configuration equipment template when curve can complete to own under the corresponding type of configuration equipment template The maintenance of equipment reduces the same category of device more live configuration time, improves debugging efficiency, facilitates later period modification maintenance.
As further improvements in methods, equipment is numbered for convenience, the device numbering is carried out using number Number.
As further improvements in methods, measuring point is numbered for convenience, the measuring point number is carried out using number Number.
As further improvements in methods, equipment is numbered for convenience, the device numbering uses number in order Word is numbered.
As further improvements in methods, measuring point is numbered for convenience, the measuring point number uses number in order Word is numbered.
As further improvements in methods, switch for convenience, is pressed by the way that equipment switching is arranged in configuration equipment template Button makes to switch in corresponding configuration equipment template to configuration equipment.
As further improvements in methods, switch for convenience, under the quantity and locating type of the equipment switching push button It is consistent to configuration number of devices.
Detailed description of the invention
Fig. 1 is the flow chart of the configuration method in embodiment of the method for the invention.
Specific embodiment
To keep the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, to the present invention It is described in further detail.
Embodiment of the method:
Step 1, configuration equipment (calling equipment or configuration equipment in the following text) is treated to classify, communication protocol is identical with point table Equipment is classified as one kind.
Step 2, database facility template is set up.The measuring point title of equipment is numbered with number, different measuring points title Corresponding different number, is named as preposition point number (or measuring point number) for this number, same class waits for the preposition point number of configuration equipment It is consistent.By the preposition point number can track equipment specific measuring point title and corresponding address, and then can be with Collect the specific object of the measuring point.
Step 3, whole station database is set up according to database facility template.Different device names is equally carried out with number Number, different device names correspond to different numbers, this number is named as data acquisition sources number (or device numbering).Number It is unique according to acquisition source number, specific equipment can be tracked by data acquisition sources number, numbered by data acquisition sources Different equipment can also be switched to.
Step 4, configuration equipment template is drawn.First draw the configuration equipment template of certain a kind of equipment, measuring point, curve in template And pel etc. is all made of two attributes, is data acquisition sources number and preposition point number respectively.For example, No. 1 of No. 1 equipment is surveyed Point, preposition point number are 1, and data acquisition sources number is 1, and preposition point number is fixed, then on the configuration template of such equipment The preposition point number of related pel related to No. 1 measuring point is configured to 1, and data acquisition sources number be not it is fixed, be configured to The automatic data acquisition sources number for reading current interface.
Step 5, increase equipment switching push button in configuration equipment template, how many corresponding equipment of this kind just configures several Button makes a kind of configuration equipment only need a configuration equipment template, when carrying out the configuration of some equipment, as long as by setting Standby switching push button will switch in the corresponding configuration equipment template of type locating for the equipment, moreover, a configuration equipment template It can only once switch in an equipment and carry out configuration.Device name and number are added on button, pass through mouse click button Incoming data acquisition sources number assigns current interface corresponding data acquisition sources number, and the measuring point and pel on picture are read automatically The data acquisition sources of current interface are taken to number, to complete to position the specific measuring point of some specific equipment.
Step 6, step 4 and step 5 are repeated, completes the drafting of other types device configuration equipment template, and then complete institute There is the configuration of equipment.
A specific example is named this method to be further detailed.
For example, certain engineering is 24MW/48MWH large-scale power grid side energy storage project, it include 3 outlet routes, 6 inlet wire lines Road, each inlet wire route includes 8 PCS (energy accumulation current converter), 8 BMS (battery management system), and is respectively provided on every route There is a route protection.Through analyzing, which needs the equipment acquired to have 3 outlet route protections, 6 inlet wire routes to protect Shield, 48 PCS and 48 BMS.Specific configuration process is as follows:
Step 1, classify to equipment, specifically, 3 outlet route protections are 1 class, 6 inlet wire route protections are 1 Class, 48 PCS are 1 class, and 48 BMS are 1 class.
Step 2, database facility template is set up.By taking PCS as an example, PCS telemetering totally 77 measuring points, the 1st measuring point " wattful power The preposition point number that the preposition point number of rate " is set as the 1, the 2nd measuring point " reactive power " is set as 2, remaining measuring point is corresponding preposition Point number is successively increased according to measuring point title, and the preposition point number of the 77th measuring point " constant current mode current-order " is set as 77.Remote signalling, Remote regulating, remote pulse start backward in number 77, similarly number.
Step 3, whole station database is set up according to database facility template.In a certain order and bonding apparatus number is built Mould, data acquisition sources number are corresponded with device name, for example, the data acquisition sources number of 1# outlet route protection is set as The data acquisition sources number that the data acquisition sources number of 1,2# outlet route protection is set as 2,3# outlet route protection is set as 3;The data acquisition sources number that the data acquisition sources number of 1# inlet wire route protection is set as 4,2# inlet wire route protection is set as 5, the data acquisition sources number of remaining inlet wire route protection is successively increased according to the number of corresponding inlet wire route protection title, The data acquisition sources number of 6# inlet wire route protection is set as 9;The data acquisition sources side number of 1#PCS is set as 10, remaining The data acquisition sources number of PCS is successively increased according to the number of corresponding PCS, and the data acquisition sources side number of 48#PCS is set as 57;The data acquisition sources side number of 1#BMS is set as 58, the data acquisition sources of remaining BMS number the volume according to corresponding BMS It number successively increases, the data acquisition sources side number of 48#BMS is set as 105;Then whole station modeling is completed, whole station database is constructed.
Step 4, configuration equipment template is drawn.For 48 PCS this kind, PCS telemetering is made of 77 measuring points, 77 surveys Respectively from 1 to 77, the automatic data acquisition sources for reading current interface of data acquisition sources number configuration are compiled for the preposition point number configuration of point Number.For example, measuring point " active power ", preposition point number is 1, and when data acquisition sources number is 10, which is the active of 1#PCS Power becomes the active power that measuring point is 48#PCS when data acquisition sources number is 57.Similarly, in the configuration equipment template Complete the configuration of other class measuring points.
Step 5, increase equipment switching push button in configuration equipment template.Increase equipment switching push button on configuration template, This button hyperlink is passed to the data acquisition sources number of relevant device.For example, for 48 PCS this kind, PCS configuration equipment mould 48 buttons are needed on plate, are numbered respectively from 1#PCS~48#PCS, it is 10,2# button that 1# button associated data, which acquires source number, It is 11 that associated data, which acquires source number, is successively increased, and associated data acquires source number 57 on 48# button, can pass through mouse at this time The button switching that punctuate is hit on interface is linked to different equipment, to show the information of distinct device.Other class device configurations are set The drafting of standby template is similarly.
Step 6, step 4 and step 5 are repeated, constantly to complete other class equipment (including outlet route protection, inlet wire route Protection, BMS) configuration equipment template drafting, to complete whole station configuration.
In this embodiment, different equipment, the different measuring points of equipment are all made of the form of sequence digital number to be subject to It distinguishes.It as other embodiments, can not number in sequence, as long as different set can be distinguished using different numbers Standby, equipment different measuring points.Currently, other differentiation modes, such as letter or word can also be used.
In this embodiment, it is provided with multiple equipment switching push button in a configuration equipment template, equipment switching push button Quantity is consistent to configuration number of devices under locating type, clicks corresponding button switching in configuration equipment template to realize It is linked to different equipment.As other embodiments, an also settable button just makes its link for example, every click To next equipment of current device.
It is discussed in detail although the contents of the present invention have passed through above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read above content, for of the invention A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (7)

1. a kind of configuration method, which comprises the steps of:
1) will classify to configuration equipment according to communication protocol and point table;
2) whole station database is set up, the whole station database includes device numbering and its measuring point number, and the device numbering is only One, same class waits for that the measuring point number of configuration equipment is consistent, and each measuring point number to configuration equipment is different;
3) the configuration equipment template that each type waits for configuration equipment is drawn according to whole station database, same class waits for the equal root of configuration equipment Such is switched to according to demand to wait in the corresponding configuration equipment template of configuration equipment, realizes the configuration for waiting for such configuration equipment;Its In, a kind of to create a configuration equipment template to configuration equipment, a configuration equipment template can only once switch to one to group Configuration is carried out in state equipment.
2. configuration method according to claim 1, which is characterized in that in step 2), the device numbering using number into Row number.
3. configuration method according to claim 1 or 2, which is characterized in that in step 2), the measuring point number is using number It is numbered.
4. configuration method according to claim 2, which is characterized in that the device numbering uses number to be compiled in order Number.
5. configuration method according to claim 3, which is characterized in that the measuring point number is compiled using number in order Number.
6. configuration method according to claim 1, which is characterized in that in step 3), by being set in configuration equipment template Standby switching push button is installed to make to switch in corresponding configuration equipment template to configuration equipment.
7. configuration method according to claim 6, which is characterized in that the quantity and locating type of the equipment switching push button Under it is consistent to configuration number of devices.
CN201910590915.5A 2019-07-02 2019-07-02 A kind of configuration method Pending CN110262351A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910590915.5A CN110262351A (en) 2019-07-02 2019-07-02 A kind of configuration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910590915.5A CN110262351A (en) 2019-07-02 2019-07-02 A kind of configuration method

Publications (1)

Publication Number Publication Date
CN110262351A true CN110262351A (en) 2019-09-20

Family

ID=67923933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910590915.5A Pending CN110262351A (en) 2019-07-02 2019-07-02 A kind of configuration method

Country Status (1)

Country Link
CN (1) CN110262351A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111931017A (en) * 2020-08-25 2020-11-13 国家能源集团乌海能源有限责任公司 Intelligent configuration method and system suitable for coal preparation plant
CN112764396A (en) * 2019-11-04 2021-05-07 北京国电智深控制技术有限公司 Configuration method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101964081A (en) * 2010-09-13 2011-02-02 中国恩菲工程技术有限公司 Production information system based on factory management infrastructure platform
CN102880462A (en) * 2012-08-29 2013-01-16 青岛海信网络科技股份有限公司 Method and device for generating configuration monitoring object based on graph mode integration
CN103092585A (en) * 2011-11-04 2013-05-08 上海宝信软件股份有限公司 Image library configuration design system for integrated supervision software
CN105204458A (en) * 2015-08-11 2015-12-30 许继集团有限公司 Intelligent configuration method
WO2017002222A1 (en) * 2015-07-01 2017-01-05 株式会社日立製作所 System deployment device and system deployment method
CN109144635A (en) * 2018-07-31 2019-01-04 南京因泰莱电器股份有限公司 A kind of processing method that the mobile super capacitor energy-storage device data of self-configuring is shown

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101964081A (en) * 2010-09-13 2011-02-02 中国恩菲工程技术有限公司 Production information system based on factory management infrastructure platform
CN103092585A (en) * 2011-11-04 2013-05-08 上海宝信软件股份有限公司 Image library configuration design system for integrated supervision software
CN102880462A (en) * 2012-08-29 2013-01-16 青岛海信网络科技股份有限公司 Method and device for generating configuration monitoring object based on graph mode integration
WO2017002222A1 (en) * 2015-07-01 2017-01-05 株式会社日立製作所 System deployment device and system deployment method
CN105204458A (en) * 2015-08-11 2015-12-30 许继集团有限公司 Intelligent configuration method
CN109144635A (en) * 2018-07-31 2019-01-04 南京因泰莱电器股份有限公司 A kind of processing method that the mobile super capacitor energy-storage device data of self-configuring is shown

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112764396A (en) * 2019-11-04 2021-05-07 北京国电智深控制技术有限公司 Configuration method and device
CN111931017A (en) * 2020-08-25 2020-11-13 国家能源集团乌海能源有限责任公司 Intelligent configuration method and system suitable for coal preparation plant

Similar Documents

Publication Publication Date Title
CN109829125A (en) Show the platform of user management of dispatching of power netwoks operation data
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN104600840A (en) Intelligent dispatching and mis-operation preventing management system and method
CN112698953A (en) Power grid intelligent operation and detection platform based on micro-service
CN105843182A (en) Power dispatching accident handling scheme preparing system and power dispatching accident handling scheme preparing method based on OMS
CN105071994B (en) A kind of mass data monitoring system
CN110262351A (en) A kind of configuration method
CN103207730B (en) One can locate pull-alongs flow process drawing generating method and process flow diagram maker
CN110456750A (en) Information collecting device, forging mold production information acquisition system and its working method
CN111967789A (en) Debugging system is transferred in distribution automation terminal warehouse debugging
CN113612306A (en) Distributed power distribution cabinet and control system thereof
CN111241488B (en) Distribution network protection fixed value setting system based on full information data flow
CN104202328B (en) A kind of method, configuration module and the subscription end of subscription GOOSE/SMV messages
CN110795583A (en) Intelligent management method for pump station trash remover
CN108228749A (en) A kind of quick migration method of general time series data
CN110854725A (en) Service linkage system and method between multiple power substations
CN103049551A (en) Method for automatic association of data points of database in configuration software
CN105305619A (en) Method and device for three-remote configuration based on distribution automation
CN103440396A (en) Intelligent analysis ticket making method and system of dispatch operation ticket
CN104377831A (en) Intelligent substation automatic monitoring system and implementation method
CN113673903B (en) Task management system for off-site nuclear emergency and control method thereof
CN103545805A (en) Modeling-based railway power supply arm monitoring method
CN105978715A (en) Data access interface uniform management method based on real time data center
CN102707174A (en) Detection system and method of operation state of resistor type superconductive current limiter
CN112258149B (en) Method, device, equipment and storage medium for determining line rotatable power supply rate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920

RJ01 Rejection of invention patent application after publication