CN110259157B - Brickwork pipe auxiliary device - Google Patents
Brickwork pipe auxiliary device Download PDFInfo
- Publication number
- CN110259157B CN110259157B CN201910487679.4A CN201910487679A CN110259157B CN 110259157 B CN110259157 B CN 110259157B CN 201910487679 A CN201910487679 A CN 201910487679A CN 110259157 B CN110259157 B CN 110259157B
- Authority
- CN
- China
- Prior art keywords
- angle frame
- sliding
- sleeve
- auxiliary device
- brickwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 50
- 229910001018 Cast iron Inorganic materials 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 239000011449 brick Substances 0.000 abstract description 9
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000009897 systematic effect Effects 0.000 abstract 1
- 230000008439 repair process Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1808—Holders for bricklayers' lines, bricklayers' bars; Sloping braces
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a brickwork pipe auxiliary device, comprising: the supporting mechanism is characterized in that the surface of the supporting mechanism is slidably connected with a rotating mechanism, a first auxiliary right-angle frame and a second auxiliary right-angle frame relative to the supporting mechanism are arranged at the bottom of the rotating mechanism, and the second auxiliary right-angle frame is located at the top of the first auxiliary right-angle frame and is slidably connected with the first auxiliary right-angle frame. The invention can adjust the first auxiliary right angle frame and the second auxiliary right angle frame to form rectangular cross sections, thereby achieving the square cylinder structure built into different cross sections, meeting different requirements under actual working conditions, planning positions for the next layer of bricks, rotating the rotating sleeve while adjusting the rotating mechanism, so that the first auxiliary right angle frame and the second auxiliary right angle frame deviate by a certain angle relative to the previous layer of bricks, and the structure can lead the operation to be more systematic and simple, improve the working efficiency and have the beneficial effects of practicability and economy.
Description
Technical Field
The invention belongs to the technical field of building tools, and particularly relates to a brickwork pipe auxiliary device.
Background
The building is a generic name of building and structure, and is an artificial environment constructed by utilizing the mastered material technical means and applying a certain scientific rule and aesthetic rule in order to meet the social life needs.
It is often necessary to construct square tubular structures with bricks for smoke evacuation or ventilation. The existing method for repairing the square cylindrical structure mainly depends on brickwork to repair bricks and cement by oneself, is complex and tedious in operation, and has the defects of low efficiency and low fault tolerance.
There is comparatively simple auxiliary device among the prior art structure, but still has the complicated problem of operation, can not change the size of the cross section of bricklaying square tube according to actual need simultaneously, and practicality is not high, also can't satisfy the bricklaying demand of current heliciform square tube building structure simultaneously.
Disclosure of Invention
The invention aims to provide a bricklaying pipe auxiliary device which aims to solve the technical problems that a square cylinder and a spiral structure are difficult to repair and a complete auxiliary device mechanism is not available.
The technical scheme for solving the technical problems is as follows: a brickwork pipe auxiliary device, comprising: the supporting mechanism is characterized in that the surface of the supporting mechanism is slidably connected with a rotating mechanism, a first auxiliary right-angle frame and a second auxiliary right-angle frame which are symmetrical to each other with respect to the supporting mechanism are arranged at the bottom of the rotating mechanism, and the second auxiliary right-angle frame is located at the top of the first auxiliary right-angle frame and is slidably connected with the first auxiliary right-angle frame.
The invention adopts the auxiliary device for bricklaying pipes, and the auxiliary device is further provided with: the surface of supporting mechanism has seted up the bar recess, the bottom fixedly connected with base of supporting mechanism, just the base is cast iron seat.
The invention adopts the auxiliary device for bricklaying pipes, and the auxiliary device is further provided with: the rotating mechanism comprises a sliding sleeve sleeved on the supporting mechanism, a first positioning bolt penetrating through the surface of the sliding sleeve and matched with the strip-shaped groove, a rotating sleeve rotationally connected with the sliding sleeve, and a first connecting rod and a second connecting rod fixedly connected with the outer side surface of the rotating sleeve, wherein the first connecting rod and the second connecting rod are symmetrical about the center of the rotating sleeve and are collinear in two axes.
The invention adopts the auxiliary device for bricklaying pipes, and the auxiliary device is further provided with: the sliding sleeve is a stepped cylindrical sleeve with a small diameter and a large diameter, the rotating sleeve is a sleeve with a small diameter and a large diameter, the upper end of the rotating sleeve is sleeved at the lower end of the sliding sleeve, an angle value is carved on the outer surface of the sliding sleeve, and the minimum measurement unit is one degree.
The invention adopts the auxiliary device for bricklaying pipes, and the auxiliary device is further provided with: the first auxiliary right-angle frame comprises a first right-angle frame and a first sliding vertical rod fixedly connected with the top of the right-angle frame, wherein first strip-shaped sliding grooves are formed in the tops of two cross rods of the first right-angle frame, and the top of the first sliding vertical rod is in sliding connection with the first connecting rod.
The invention adopts the auxiliary device for bricklaying pipes, and the auxiliary device is further provided with: the top of first slip montant has seted up the through-hole, and this through-hole cooperatees with the one end that supporting mechanism was kept away from to the head rod, first supplementary right angle frame still includes the second positioning bolt that is located first slip montant top, the bottom of second positioning bolt runs through to the through-hole of first slip montant.
The invention adopts the auxiliary device for bricklaying pipes, and the auxiliary device is further provided with: the second auxiliary right-angle frame comprises a second right-angle frame and a second sliding vertical rod fixedly connected with the right-angle top of the second right-angle frame, second strip-shaped sliding grooves are formed in the bottoms of two cross rods of the second right-angle frame, and the top of the second sliding vertical rod is in sliding connection with a second connecting rod.
The invention adopts the auxiliary device for bricklaying pipes, and the auxiliary device is further provided with: the through hole is formed in the top of the second sliding vertical rod, the through hole is matched with one end, away from the supporting mechanism, of the second connecting rod, the second auxiliary right-angle frame further comprises a third positioning bolt located at the top of the second sliding vertical rod, and the bottom end of the third positioning bolt penetrates through the through hole of the second sliding vertical rod.
The invention adopts the auxiliary device for bricklaying pipes, and the auxiliary device is further provided with: the inside of first bar spout is equipped with the slip connecting block, the height of slip connecting block is the high one time of first bar spout, the slip connecting block is arranged in the second bar spout.
The beneficial effects of the invention are as follows: through the setting of first supplementary right angle frame and the supplementary right angle frame of second, can adjust the size that first supplementary right angle frame and the supplementary right angle frame of second formed rectangular cross section, thereby reach the square tube structure of building into different cross sections, different demands under the actual working condition have been satisfied, the position of adjustment slewing mechanism on supporting mechanism again, make first supplementary right angle frame and the supplementary right angle frame of second wholly upwards remove the height of one deck brick again, thereby plan the position for next layer brickwork, if need build into spiral structure, then need rotate the cover when slewing mechanism up-regulates, make first supplementary right angle frame and the supplementary right angle frame of second skew certain angle for preceding one deck brick, thereby reach spiral structure's purpose, can make the operation simpler system through above structure, work efficiency has been improved, and has very high practical value.
According to the invention, through the arrangement of the first positioning bolt, the second positioning bolt and the third positioning bolt, the structure can be more stable, and the safety of operation is ensured.
According to the invention, through the arrangement of the scales on the sliding sleeve, more accurate adjustment and grasp of the spiral angle can be ensured when the spiral structure is built, the operation precision is improved, and the operation efficiency is improved.
Drawings
The foregoing and/or other advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are meant to be illustrative only and not limiting of the invention, wherein:
FIG. 1 is a schematic perspective view of a large cross section of a brickwork pipe auxiliary device according to an embodiment of the invention;
FIG. 2 is a schematic view of a partial sectional plan view of a brickwork pipe auxiliary device according to an embodiment of the invention;
FIG. 3 is a schematic front view of a brickwork pipe auxiliary device according to an embodiment of the invention;
FIG. 4 is a schematic perspective view of a first auxiliary right angle frame according to an embodiment of the present invention;
Fig. 5 is a schematic perspective view of a small cross section of a brickwork pipe auxiliary device according to an embodiment of the invention.
In the drawings, the list of components represented by the various numbers is as follows:
1. The device comprises a supporting mechanism, 11, a strip-shaped groove, 12, a base, 2, a rotating mechanism, 21, a sliding sleeve, 22, a rotating sleeve, 23, a first positioning bolt, 24, a first connecting rod, 25, a second connecting rod, 3, a first auxiliary right-angle frame, 31, a first right-angle frame, 32, a first sliding vertical rod, 33, a second positioning bolt, 34, a first strip-shaped sliding chute, 4, a second auxiliary right-angle frame, 41, a second right-angle frame, 42, a second sliding vertical rod, 43, a third positioning bolt, 44, a second strip-shaped sliding chute, 5 and a sliding connecting block.
Detailed Description
Hereinafter, an embodiment of a brickwork pipe assisting device of the present invention will be described with reference to the drawings.
The examples described herein are specific embodiments of the present application, which are intended to illustrate the inventive concept, are intended to be illustrative and exemplary, and should not be construed as limiting the application to the embodiments and scope of the application. In addition to the embodiments described herein, those skilled in the art can adopt other obvious solutions based on the disclosure of the claims and specification, including those adopting any obvious substitutions and modifications to the embodiments described herein.
The drawings in the present specification are schematic views, which assist in explaining the concept of the present invention, and schematically show the shapes of the respective parts and their interrelationships. Note that, in order to clearly show the structures of the components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
Fig. 1-5 illustrate an embodiment of the present invention: a brickwork pipe auxiliary device, comprising: the support mechanism 1, the surface sliding connection of the support mechanism 1 has the slewing mechanism 2, the bottom of the slewing mechanism 2 has first auxiliary right angle frame 3 and second auxiliary right angle frame 4 symmetrical each other with respect to the support mechanism 1, the second auxiliary right angle frame 4 locates at the top of the first auxiliary right angle frame 3 and is connected with the first auxiliary right angle frame 3 in a sliding manner, the surface of the support mechanism 1 has the bar-shaped groove 11, the bottom of the support mechanism 1 is fixedly connected with the base 12, and the base 12 is the cast iron seat, the slewing mechanism 2 includes the sliding sleeve 21 sleeved on the support mechanism 1, the first positioning bolt 23 matched with the bar-shaped groove 11 through the surface of the sliding sleeve 21, the slewing sleeve 22 rotationally connected with the sliding sleeve 21, the first connecting rod 24 and the second connecting rod 25 fixedly connected with the outer side surface of the slewing sleeve 22, the first connecting rod 24 and the second connecting rod 25 are symmetrical with respect to the center of the slewing sleeve 22 and two axes are collinear, the sliding sleeve 21 is a step cylinder sleeve with a small diameter and a big end down, the rotating sleeve 22 is a sleeve with a small diameter and a big end down, the upper end of the rotating sleeve 22 is sleeved at the lower end of the sliding sleeve 21, the outer surface of the sliding sleeve 21 is carved with an angle value, the minimum measurement unit is one degree, the first auxiliary right-angle frame 3 comprises a first right-angle frame 31 and a first sliding vertical rod 32 fixedly connected with the right-angle top of the first right-angle frame 31, the tops of the two cross bars of the first right-angle frame 31 are provided with first strip-shaped sliding grooves 34, the top of the first sliding vertical rod 32 is in sliding connection with the first connecting rod 24, the top of the first sliding vertical rod 32 is provided with a through hole which is matched with one end of the first connecting rod 24 far away from the supporting mechanism 1, the first auxiliary right-angle frame 3 also comprises a second positioning bolt 33 positioned at the top of the first sliding vertical rod 32, the bottom of second positioning bolt 33 runs through to the through-hole of first slide montant 32, second supplementary rectangular frame 4 includes second rectangular frame 41, with the second slide montant 42 of second rectangular frame 41 right angle top fixed connection, second bar spout 44 has been seted up to the bottom of two crossbars of second rectangular frame 41, the top and the second connecting rod 25 sliding connection of second slide montant 42, the through-hole has been seted up at the top of second slide montant 42, this through-hole cooperatees with the one end that second connecting rod 25 kept away from supporting mechanism 1, second supplementary rectangular frame 4 still includes the third positioning bolt 43 that is located the second slide montant 42 top, the through-hole to second slide montant 42 is run through to the bottom of third positioning bolt 43, the inside of first bar spout 34 is equipped with slide connecting block 5, slide connecting block 5's height is the double of first bar spout 34 height, slide connecting block 5 is located second bar spout 44.
Working principle: when the invention is used, a user adjusts the relative distance between the first auxiliary right angle frame 3 and the second auxiliary right angle frame 4 to achieve a required proper cross section, then screws the second positioning bolt 33 and the third positioning bolt 43 to fix the relative position of the first auxiliary right angle frame 3 and the second auxiliary right angle frame 4, then adjusts the height of the rotating mechanism 2 on the supporting mechanism 1 to achieve a proper position, then bricks are laid in a rectangular square frame formed by the first auxiliary right angle frame 3 and the second auxiliary right angle frame 4, after one layer is built, the position of the rotating mechanism 2 on the supporting mechanism 1 is continuously adjusted, so that the first auxiliary right angle frame 3 and the second auxiliary right angle frame 4 are moved upwards again to plan the position for the next layer of bricks, if a spiral structure is required to be built, the rotating sleeve 22 is rotated while the rotating mechanism 2 is adjusted upwards, so that the first auxiliary right angle frame 3 and the second auxiliary right angle frame 4 deviate a certain angle relative to the previous layer of bricks, and the purpose of the spiral structure is achieved.
The above disclosed features are not limited to the disclosed combinations with other features, and other combinations between features can be made by those skilled in the art according to the purpose of the invention to achieve the purpose of the invention.
Claims (6)
1. A brickwork pipe auxiliary device, characterized by comprising: the support mechanism (1), the surface sliding connection of the support mechanism (1) has slewing mechanism (2), the bottom of slewing mechanism (2) is equipped with first supplementary right angle frame (3) and second supplementary right angle frame (4) that are symmetrical each other about supporting mechanism (1), second supplementary right angle frame (4) are located the top of first supplementary right angle frame (3) and with first supplementary right angle frame (3) sliding connection; the rotating mechanism (2) comprises a sliding sleeve (21) sleeved on the supporting mechanism (1), a first positioning bolt (23) penetrating through the surface of the sliding sleeve (21) and matched with the strip-shaped groove (11), a rotating sleeve (22) rotationally connected with the sliding sleeve (21), a first connecting rod (24) and a second connecting rod (25) fixedly connected with the outer side surface of the rotating sleeve (22), wherein the first connecting rod (24) and the second connecting rod (25) are symmetrical about the center of the rotating sleeve (22) and have two collinear axes; the first auxiliary right-angle frame (3) comprises a first right-angle frame (31) and a first sliding vertical rod (32) fixedly connected with the top of the right angle of the first right-angle frame (31), first strip-shaped sliding grooves (34) are formed in the tops of two transverse rods of the first right-angle frame (31), and the top of the first sliding vertical rod (32) is in sliding connection with the first connecting rod (24); the second auxiliary right-angle frame (4) comprises a second right-angle frame (41) and a second sliding vertical rod (42) fixedly connected with the top of the right angle of the second right-angle frame (41), second bar-shaped sliding grooves (44) are formed in the bottoms of two transverse rods of the second right-angle frame (41), and the top of the second sliding vertical rod (42) is in sliding connection with the second connecting rod (25).
2. A brickwork pipe auxiliary device according to claim 1, characterized in that: the surface of supporting mechanism (1) has offered bar recess (11), the bottom fixedly connected with base (12) of supporting mechanism (1), just base (12) are cast iron seat.
3. A brickwork pipe auxiliary device according to claim 1, characterized in that: the sliding sleeve (21) is a stepped cylindrical sleeve with a small diameter and a large diameter, the rotating sleeve (22) is a sleeve with a small diameter and a large diameter, the upper end of the rotating sleeve (22) is sleeved at the lower end of the sliding sleeve (21), an angle value is carved on the outer surface of the sliding sleeve (21), and the minimum measurement unit is one degree.
4. A brickwork pipe auxiliary device according to claim 1, characterized in that: the top of first slip montant (32) has seted up the through-hole, and this through-hole cooperatees with the one end that supporting mechanism (1) was kept away from to head rod (24), first supplementary right angle frame (3) still include second positioning bolt (33) that are located first slip montant (32) top, the through-hole to first slip montant (32) is run through to the bottom of second positioning bolt (33).
5. A brickwork pipe auxiliary device according to claim 1, characterized in that: the through hole is seted up at the top of second slip montant (42), and this through hole cooperatees with the one end that supporting mechanism (1) was kept away from to second connecting rod (25), second supplementary right angle frame (4) still include be located third positioning bolt (43) at second slip montant (42) top, the through hole to second slip montant (42) is run through to the bottom of third positioning bolt (43).
6. A brickwork pipe auxiliary device according to claim 1, characterized in that: the inside of first bar spout (34) is equipped with sliding connection piece (5), the height of sliding connection piece (5) is the one time of first bar spout (34) height, sliding connection piece (5) are arranged in second bar spout (44).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910487679.4A CN110259157B (en) | 2019-06-05 | 2019-06-05 | Brickwork pipe auxiliary device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910487679.4A CN110259157B (en) | 2019-06-05 | 2019-06-05 | Brickwork pipe auxiliary device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110259157A CN110259157A (en) | 2019-09-20 |
CN110259157B true CN110259157B (en) | 2024-05-14 |
Family
ID=67916935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910487679.4A Active CN110259157B (en) | 2019-06-05 | 2019-06-05 | Brickwork pipe auxiliary device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110259157B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4227215A1 (en) * | 1992-08-17 | 1994-02-24 | Mueller & Baum | Attaching scaffolding planks to trestle - involves support with U=shaped rail holding planks being attached by plates and bolts and hammer head fitting into rail |
US6138841A (en) * | 1999-01-08 | 2000-10-31 | Lynk, Inc. | Hanging rack for sports equipment |
CN104481163A (en) * | 2014-11-20 | 2015-04-01 | 中冶天工上海十三冶建设有限公司 | L beam construction device and method for building structure reinforcement |
CN107611218A (en) * | 2017-07-24 | 2018-01-19 | 邓杵娇 | A kind of auxiliary installation tool structure for photovoltaic apparatus component |
CN109235904A (en) * | 2018-10-19 | 2019-01-18 | 科能源科技(天津)有限公司 | A kind of building block unit assembly mold |
CN208830747U (en) * | 2018-08-27 | 2019-05-07 | 深圳市绿发鹏程环保科技有限公司 | One kind, which is laid bricks, produces ancillary equipment |
CN210396181U (en) * | 2019-06-05 | 2020-04-24 | 中国建筑第二工程局有限公司 | Bricklaying pipe auxiliary device |
-
2019
- 2019-06-05 CN CN201910487679.4A patent/CN110259157B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4227215A1 (en) * | 1992-08-17 | 1994-02-24 | Mueller & Baum | Attaching scaffolding planks to trestle - involves support with U=shaped rail holding planks being attached by plates and bolts and hammer head fitting into rail |
US6138841A (en) * | 1999-01-08 | 2000-10-31 | Lynk, Inc. | Hanging rack for sports equipment |
CN104481163A (en) * | 2014-11-20 | 2015-04-01 | 中冶天工上海十三冶建设有限公司 | L beam construction device and method for building structure reinforcement |
CN107611218A (en) * | 2017-07-24 | 2018-01-19 | 邓杵娇 | A kind of auxiliary installation tool structure for photovoltaic apparatus component |
CN208830747U (en) * | 2018-08-27 | 2019-05-07 | 深圳市绿发鹏程环保科技有限公司 | One kind, which is laid bricks, produces ancillary equipment |
CN109235904A (en) * | 2018-10-19 | 2019-01-18 | 科能源科技(天津)有限公司 | A kind of building block unit assembly mold |
CN210396181U (en) * | 2019-06-05 | 2020-04-24 | 中国建筑第二工程局有限公司 | Bricklaying pipe auxiliary device |
Also Published As
Publication number | Publication date |
---|---|
CN110259157A (en) | 2019-09-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104196235B (en) | A kind of movable stencil supports truss and constructional method thereof | |
CN204430630U (en) | Tunnel reinforced mesh processing frame | |
CN105003091A (en) | Sway brace for prefabricated buildings | |
CN110259157B (en) | Brickwork pipe auxiliary device | |
CN111021743A (en) | Pipe truss machining jig frame and manufacturing process of pipe truss | |
CN104727560A (en) | Reinforced concrete structure reinforced steel framework forming method and reinforced steel jig frame | |
CN210396181U (en) | Bricklaying pipe auxiliary device | |
CN209907531U (en) | A support for rainwater pipeline construction | |
CN208866653U (en) | For welding the positioning device of modular unit | |
CN101871258B (en) | Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles | |
CN204401992U (en) | A kind of support frame for building | |
CN204126239U (en) | A kind of building operations roof beam structure | |
CN200955251Y (en) | Improved positioner for wall-daubing device | |
CN206047391U (en) | A kind of assembled welding positioner of large-span steel arch | |
CN205343431U (en) | Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar | |
CN210831214U (en) | Tripod for mapping engineering | |
CN210997253U (en) | Shield door built-in fitting welding frock clamp | |
CN209066818U (en) | Auxiliary guiding ruler component for the production of metope ash cake | |
CN210623788U (en) | Height-adjustable natural gas pipeline bridge mechanism | |
CN204487047U (en) | T profile group founds sectional fixture | |
CN205224198U (en) | But adjusting station os pelvicum puts up structure | |
CN206464572U (en) | Large-scale bend pipe drilling equipment | |
CN205804794U (en) | It is suitable for the awning improving petal type overhanging steel structure awning installation accuracy construction | |
CN206468018U (en) | A kind of lightgage steel joist framework assembly platform | |
CN210738079U (en) | Tool type beam slab die support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |