CN110259024A - A kind of metope exempts from levelling wall panel assembly and installation method - Google Patents

A kind of metope exempts from levelling wall panel assembly and installation method Download PDF

Info

Publication number
CN110259024A
CN110259024A CN201910584627.9A CN201910584627A CN110259024A CN 110259024 A CN110259024 A CN 110259024A CN 201910584627 A CN201910584627 A CN 201910584627A CN 110259024 A CN110259024 A CN 110259024A
Authority
CN
China
Prior art keywords
keel
component
thick china
metope
day
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910584627.9A
Other languages
Chinese (zh)
Inventor
洪宪钰
徐志鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Chengtou New Material Technology Co., Ltd
Original Assignee
Hangzhou Heyan Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Heyan Technology Co Ltd filed Critical Hangzhou Heyan Technology Co Ltd
Priority to CN201910584627.9A priority Critical patent/CN110259024A/en
Publication of CN110259024A publication Critical patent/CN110259024A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements

Abstract

Exempt from levelling wall panel assembly and installation method the invention discloses a kind of metope, wall panel assembly includes keel component and thick china component, thick china component is mounted in keel component, keel component is by day keel, ground joist and centre keel composition, thick china component is by linking up with, reinforcing rib and thick china composition, institute's day keel and ground joist are channel steel or U-shaped aluminium, its keel is arranged close on the ceiling in corner, and U-shaped opening is downward, ground joist is arranged close on the ground in corner, U-shaped opening is upward, and guarantee that day keel and ground joist are in same plane, centre keel is square tube, upper and lower ends are connected in the U-shaped opening of day keel and ground joist, mounting hole is additionally provided on centre keel, centre keel is fixed on metope using expansion bolt or screw, and, it is provided on centre keel and links up with matched hanging hole;Hook is fixedly connected on the inboard of reinforcing rib, and thick china is fixedly connected on the outside of reinforcing rib.Thick china of the present invention whole style design and can be completed in factory-assembled, and when site operation, after keel component is installed, thick china component is hung in keel component, it is quick for installation rapidly, substantially reduce on-site construction time.

Description

A kind of metope exempts from levelling wall panel assembly and installation method
Technical field
The present invention relates to a kind of wall panel assembly of Fast Installation, particularly relates to a kind of metope and exempt from levelling integrated wall plate component And installation method.
Background technique
Wallboard is indoor hardware fitting emerging in recent years, substitutes coating or wallpaper, is directly installed on metope, has Feature quick for installation and environmentally protective.General wallboard be installed on metope first and be carried out in metope it is levelling, it is levelling after in wall The laying of keel is carried out on face, keel are laid with the installation for completing then to carry out wallboard again later, and whole process is relatively complicated, operation Inefficiency.Chinese patent (208830527 U of publication number CN) discloses a kind of honeycomb sound-insulation wall of modular surgical room, It include the keel being mounted to a wall and the cellular board by hook connection, keel installation is on metope, inevitable requirement metope Smooth, i.e., metope is also required to just can be carried out the finishing of wallboard, inefficiency after bricklayer's is levelling.Chinese patent (publication number CN 109457899 A) a kind of decoration is disclosed with leveling layer adjustable component and decoration is exempted from leveling layer installation system is exempted from, elder generation is in wall Handware wall connecting piece is installed on face, on upper and lower two wall connecting pieces, profile, the right and left installation of decorative panel are installed The installation that decorative wall panels are realized on profile, although the patent is levelling without metope, it requires, in fact, the adjusting for passing through gasket Guarantee that all wall connecting pieces are in same plane, i.e., it is the levelling wall connecting piece that is converted to of metope is levelling, therefore workload Or it is biggish, it can not achieve the Fast Installation of wallboard.
Summary of the invention
The purpose of the present invention is to provide one kind without metope it is levelling, quick-installed wall panel assembly and installation method.
To achieve the purpose of the present invention, proposed adoption following technical scheme:
A kind of metope exempts from levelling wall panel assembly, it is characterised in that: includes keel component and thick china component, thick china Component is mounted in keel component, and the keel component is made of day keel, ground joist and centre keel, the veneer board group Part is made of hook, reinforcing rib and thick china, and the day keel and ground joist are channel steel or U-shaped aluminium, and day keel are mounted on On the ceiling in corner, and U-shaped opening is downward, and ground joist is arranged close on the ground in corner, U-shaped opening upward, and Guarantee that day keel and ground joist are in same plane, centre keel is square tube, and upper and lower ends are connected in the U-shaped of day keel and ground joist In opening, it is additionally provided with mounting hole on centre keel, centre keel is fixed on metope using expansion bolt or screw, also, It is provided on centre keel and links up with matched hanging hole;The hook is fixedly connected on the inboard of reinforcing rib, and thick china is fixed It is connected to the outside of reinforcing rib.
Preferably, the hanging hole is up big and down small bellmouth;When thick china component is installed in keel component, cone Shape hole top is larger to be inserted into hanging hole convenient for hook, and under the effect of gravity, hook slips down to bellmouth lower part, bellmouth lower part It is smaller so that thick china component mounted configuration stabilization do not shake.
Effect preferably, on the reinforcing rib, is provided with two hooks up and down, is unlikely to after guaranteeing thick china installation from one While raising.
Preferably, the reinforcing rib inboard is provided with anticollision strip;The effect that anticollision strip is arranged is, first, due to Reinforcing rib and centre keel are metalwork, and buffering is formed between reinforcing rib and centre keel, can avoid metal when being affiliated to together The mutual collision friction of part generates noise;Second, since anticollision strip is by certain elasticity, in the phase of anticollision strip screen resilience and draw-bar load Under interaction, so that thick china component is hung mounted configuration stabilization and do not shake.
Preferably, at least provided with 2 reinforcing ribs, 2 reinforcing ribs can be symmetrical set on the thick china Symmetrical above and below it can be arranged;The effect of reinforcing rib is, first is that connection thick china and hook, be in addition guarantee thick china it is heated, It will not be deformed after dampness or long-time service, to keep thick china surfacing for a long time.
Preferably, the thick china height is slightly less than metope height, when thick china is installed on metope, to guarantee to hang There is the space slided up and down in hook, convenient for the installation or removal of thick china.
A kind of metope exempts from the installation method of levelling wall panel assembly, including following implementation steps:
(1), the width and height of in-site measurement metope, the day keel to be matched according to the numerical value of measurement in factory process production, Ground joist, centre keel and thick china component;
(2), sky dragon bone fixation is arranged close on the ceiling in corner, keeps the U-shaped opening of day keel downward;
(3), it is set according to the sky dragon position of bone, is found out using level meter and be in conplane ground location with day keel, so Ground joist is installed using expansion bolt in the position afterwards, keeps the U-shaped opening of ground joist upward;
(4), the upper and lower ends of centre keel are connected in the U-shaped opening of day keel and ground joist, then use expansion bolt Or screw passes through mounting hole, and centre keel is fixed on metope;
(5), thick china component is installed on centre keel by linking up with.
Compared with prior art, the present invention is by the day keel for being mounted on ceiling and surface-based ground joist come really Determine the mounting surface of thick china component, therefore metope is without levelling;Centre keel is connected in the U-shaped opening of day keel and ground joist, So that several centre keels are generally aligned in the same plane, that is, it ensure that mounting surface is same plane, the thick china integral smoothness after installation It is high;Centre keel is fixed on metope using expansion bolt or screw, and after the installation of thick china component, the stress of keel is mainly by perpendicular dragon Bone and ground joist undertake, and ensure that the stability of keel structure.Thick china component can be finished in factory process, construction site keel Thick china component is hung on keel after the installation is completed, is installed very convenient rapid.
Detailed description of the invention
Fig. 1 is Structure explosion diagram of the embodiment of the present invention;
Fig. 2 is structure of embodiment of the present invention sectional side elevation;
Fig. 3 is centre keel of embodiment of the present invention structure chart.
Specific embodiment
Carry out the technical solution that the present invention is further explained with reference to the accompanying drawing.
In conjunction with Fig. 1, Fig. 2 and Fig. 3, a kind of metope exempts from levelling wall panel assembly, includes keel component and thick china component, Thick china component is mounted in keel component, and keel component is made of day keel 1, ground joist 2 and centre keel 3, thick china component It is made of hook 4, reinforcing rib 5 and thick china 6, day keel 1 and ground joist 2 are channel steel or U-shaped aluminium, and day keel 1 use screw 71 are arranged close on the ceiling 8 in corner, and U-shaped opening is downward, and ground joist 2 is arranged close to corner using expansion bolt 72 Ground 9 on, U-shaped opening upward, and guarantees that day keel 1 and ground joist 2 are in same plane, and centre keel 3 is square tube, upper and lower two End is connected in the U-shaped opening of day keel 1 and ground joist 2, and mounting hole 31 is additionally provided on centre keel 3, uses expansion bolt Or centre keel 3 is fixed on metope 10 by screw, also, is provided with and 4 matched hanging holes 32 of hook on centre keel 3;Hook 4 It is fixedly connected on the inboard of reinforcing rib 5, thick china 6 is fixedly connected on the outside of reinforcing rib 5.Hanging hole 32 is up big and down small taper Hole, in general, the thickness of hook 4, in 1.5mm or so, the width on 32 top of hanging hole is 8-10mm, the width of lower part is 3-4mm; When thick china component is installed in keel component, bellmouth top is larger to be inserted into hanging hole 32 convenient for hook 4, in gravity Under, hook 4 slips down to bellmouth lower part, and bellmouth lower part is smaller so that thick china component mounted configuration stabilization is not shaken, together When, for 32 lower width of hanging hole slightly larger than the thickness of hook 4, its role is to the left-right positions of fine-tuning thick china component, make phase Gap between adjacent thick china component becomes larger or becomes smaller, and the piece for adapting to different-style closes up.On reinforcing rib 5, it is provided with Lower two hooks 4 guarantee to be unlikely to raise from one side after thick china 6 is installed.5 inboard of reinforcing rib is provided with anticollision strip 51;Setting The effect of anticollision strip 51 is, first, anticollision strip 51 is in reinforcing rib 5 and erects since reinforcing rib 5 and centre keel 3 are metalwork Buffering is formed between keel 3, be can avoid metalwork mutual collision friction when being affiliated to together and is generated noise;Second, due to anticollision Item 51 is tied after so that thick china component is hung installation under the interaction of 4 pulling force of 51 screen resilience of anticollision strip and hook by certain elasticity Structure stabilization is not shaken.Behind thick china 6, at least provided with two reinforcing ribs 5, two reinforcing ribs 5 can be symmetrical set Setting symmetrical above and below;The effect of reinforcing rib 5 is, first is that connection thick china 6 and hook 4, avoid thick china 6 by material shadow It rings, hook 4 cannot be mounted directly, be in addition to guarantee that thick china 6 will not be deformed in heated, dampness or after being used for a long time, thus long Time keeps 6 surfacing of thick china.6 height of thick china is slightly less than 10 height of metope, when thick china 6 is installed on metope 10, It can guarantee that hook 4 has the space slided up and down, convenient for the installation or removal of thick china 6.
A kind of metope exempts from the installation method of levelling wall panel assembly, including following implementation steps:
(1), the width and height of in-site measurement metope 10 makes the day keel to match according to the numerical value of measurement in factory process 1, ground joist 2, centre keel 3 and thick china component;
(2), day keel 1 are arranged close on the ceiling 8 in corner using screw 71, keep the U-shaped opening of day keel 1 Downward;
(3), it according to 1 position of day keel, is found out using level meter and is in conplane 9 position of ground with day keel 1, Then ground joist 2 is installed using expansion bolt 72 in the position, keeps the U-shaped opening of ground joist 2 upward;
(4), the upper and lower ends of centre keel 3 are connected in the U-shaped opening of day keel 1 and ground joist 2, then use expanding screw Bolt or screw pass through mounting hole 31, and centre keel 3 is fixed on metope 10;
(5), thick china component is installed on centre keel 3 by hook 4.
Thick china component of the present invention whole style design and can be completed in factory-assembled, when site operation, by keel component After being installed, thick china component is hung in keel component, it is quick for installation rapid, substantially reduce on-site construction time.

Claims (7)

1. a kind of metope exempts from levelling wall panel assembly, it is characterised in that: include keel component and thick china component, veneer board group Part is mounted in keel component, and the keel component is made of day keel, ground joist and centre keel, the thick china component It is made of hook, reinforcing rib and thick china, the day keel and ground joist are channel steel or U-shaped aluminium, and day keel, which are mounted on, to be leaned on On the ceiling in nearly corner, and U-shaped opening is downward, and ground joist is arranged close on the ground in corner, and U-shaped opening upward, and is protected Card day keel and ground joist are in same plane, and centre keel is square tube, and upper and lower ends are connected in day keel and the U-shaped of ground joist is opened In mouthful, it is additionally provided with mounting hole on centre keel, centre keel is fixed on metope using expansion bolt or screw, also, It is provided on centre keel and links up with matched hanging hole;The hook is fixedly connected on the inboard of reinforcing rib, and thick china is fixed to be connected It connects in the outside of reinforcing rib.
2. a kind of metope according to claim 1 exempts from levelling wall panel assembly, it is characterised in that: the hanging hole is upper big Under small bellmouth.
3. a kind of metope according to claim 1 exempts from levelling wall panel assembly, it is characterised in that: on the reinforcing rib, It is provided with two hooks up and down.
4. a kind of metope according to claim 1 exempts from levelling wall panel assembly, it is characterised in that: the reinforcing rib is inboard It is provided with anticollision strip.
5. a kind of metope according to claim 1 exempts from levelling wall panel assembly, it is characterised in that: on the thick china, At least provided with 2 reinforcing ribs, 2 reinforcing ribs can be symmetrical set also symmetrical above and below be arranged.
6. a kind of metope according to claim 1 exempts from levelling wall panel assembly, it is characterised in that: the thick china height It is slightly less than metope height.
7. a kind of metope exempts from the installation method of levelling wall panel assembly, including following implementation steps:
(1), the width and height of in-site measurement metope, the day keel to be matched according to the numerical value of measurement in factory process production, pheretima Bone, centre keel and thick china component;
(2), sky dragon bone fixation is arranged close on the ceiling in corner, keeps the U-shaped opening of day keel downward;
(3), it is set according to the sky dragon position of bone, is found out using level meter and be in conplane ground location with day keel, then existed Ground joist is installed using expansion bolt in the position, keeps the U-shaped opening of ground joist upward;
(4), the upper and lower ends of centre keel are connected in the U-shaped opening of day keel and ground joist, then use expansion bolt or spiral shell Centre keel is fixed on metope by nail across mounting hole;
(5), thick china component is installed on centre keel by linking up with.
CN201910584627.9A 2019-07-01 2019-07-01 A kind of metope exempts from levelling wall panel assembly and installation method Pending CN110259024A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910584627.9A CN110259024A (en) 2019-07-01 2019-07-01 A kind of metope exempts from levelling wall panel assembly and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910584627.9A CN110259024A (en) 2019-07-01 2019-07-01 A kind of metope exempts from levelling wall panel assembly and installation method

Publications (1)

Publication Number Publication Date
CN110259024A true CN110259024A (en) 2019-09-20

Family

ID=67923551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910584627.9A Pending CN110259024A (en) 2019-07-01 2019-07-01 A kind of metope exempts from levelling wall panel assembly and installation method

Country Status (1)

Country Link
CN (1) CN110259024A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031304A (en) * 2020-09-18 2020-12-04 浙江中天精诚装饰集团有限公司 Fast-assembly environment-friendly wall surface system and installation method
CN112814303A (en) * 2021-01-28 2021-05-18 广东八和建材有限公司 Assembled wall hanging plate system
CN112922258A (en) * 2021-01-27 2021-06-08 璞勒仕建筑工程(上海)股份有限公司 Wall surface dry construction structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205776919U (en) * 2016-06-07 2016-12-07 汉尔姆(杭州)家具有限公司 The modularity partition wall being easily installed
CN107227830A (en) * 2017-04-16 2017-10-03 浙江亚厦装饰股份有限公司 A kind of metope leveling system and leveling method
CN108193847A (en) * 2017-12-29 2018-06-22 重庆玛谛家居有限公司 A kind of mounting structure of full aluminum wallboard
CN208473207U (en) * 2018-07-10 2019-02-05 北京斯克兰顿建材有限公司 A kind of assembled hanging plate mounts system
CN210316353U (en) * 2019-07-01 2020-04-14 杭州鹤言科技有限公司 Wall surface leveling-free wallboard assembly

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205776919U (en) * 2016-06-07 2016-12-07 汉尔姆(杭州)家具有限公司 The modularity partition wall being easily installed
CN107227830A (en) * 2017-04-16 2017-10-03 浙江亚厦装饰股份有限公司 A kind of metope leveling system and leveling method
CN108193847A (en) * 2017-12-29 2018-06-22 重庆玛谛家居有限公司 A kind of mounting structure of full aluminum wallboard
CN208473207U (en) * 2018-07-10 2019-02-05 北京斯克兰顿建材有限公司 A kind of assembled hanging plate mounts system
CN210316353U (en) * 2019-07-01 2020-04-14 杭州鹤言科技有限公司 Wall surface leveling-free wallboard assembly

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031304A (en) * 2020-09-18 2020-12-04 浙江中天精诚装饰集团有限公司 Fast-assembly environment-friendly wall surface system and installation method
CN112031304B (en) * 2020-09-18 2022-01-04 浙江中天精诚装饰集团有限公司 Fast-assembly environment-friendly wall surface system and installation method
CN112922258A (en) * 2021-01-27 2021-06-08 璞勒仕建筑工程(上海)股份有限公司 Wall surface dry construction structure and construction method thereof
CN112814303A (en) * 2021-01-28 2021-05-18 广东八和建材有限公司 Assembled wall hanging plate system

Similar Documents

Publication Publication Date Title
CN110259024A (en) A kind of metope exempts from levelling wall panel assembly and installation method
CN204282729U (en) A kind of dried hanging hang structure of wooden facing
CN107268865A (en) A kind of modularization falls grade suspended ceiling device and installation method
CN109267671A (en) A kind of decoration method of indoor wall system
CN111677214A (en) Assembly type dry hanging structure and method for resin plate modeling design
CN108005280A (en) The close splicing seams of aluminium veneer curtain wall and its joining method
WO2010065034A2 (en) Insulated exterior cladding system
CN210288789U (en) Quick assembly's assembled partition wall mounting structure
CN105735603A (en) Mounting device for movable decorative plate
CN210316353U (en) Wall surface leveling-free wallboard assembly
EP2255045A1 (en) Aluminium facade cladding with brick or ceramic appearance
CN207092350U (en) A kind of modularization falls a grade suspended ceiling device
CN109610717A (en) A kind of installation method of W font furred ceiling keelson
CN103452223A (en) Suspended ceiling pendant and stone panel mounting process utilizing same
CN207063280U (en) A kind of combined type falls a grade furred ceiling
CN209568576U (en) A kind of partition splicing type multifunctional wallboard
CN113463815A (en) Open wire strip type drop ceiling and installation method thereof
CN210013374U (en) Assembled plane suspended ceiling module
CN205637443U (en) Installation device of movable decorative board
CN208685810U (en) Can quick assembling wall body decoration system
CN105735598A (en) Movable decorative wall plate, wall plate mounting hanging piece and mounting method
CN219219515U (en) Integrated keel-free suspended ceiling
CN205637454U (en) Installation pendant of movable decorative board
CN205637453U (en) Installation pendant of movable decorative board
CN218622882U (en) Ceiling system with adjustable height

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200509

Address after: 310000 Room 308, No. 22, Lianxin Road, Langchuan Township, Chun'an County, Hangzhou City, Zhejiang Province

Applicant after: Hangzhou Chengtou New Material Technology Co., Ltd

Address before: Room 9-9, Building 9, Yayuan, Ulan County, Liangzhu Street, Yuhang District, Hangzhou City, Zhejiang 310000

Applicant before: Hangzhou Heyan Technology Co.,Ltd.