CN110258790A - The vertical dry type connecting node of prefabricated assembled frame column with shearing resistance keyway and engineering method - Google Patents
The vertical dry type connecting node of prefabricated assembled frame column with shearing resistance keyway and engineering method Download PDFInfo
- Publication number
- CN110258790A CN110258790A CN201910515853.1A CN201910515853A CN110258790A CN 110258790 A CN110258790 A CN 110258790A CN 201910515853 A CN201910515853 A CN 201910515853A CN 110258790 A CN110258790 A CN 110258790A
- Authority
- CN
- China
- Prior art keywords
- frid
- shear key
- column
- shearing resistance
- energy consumption
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010008 shearing Methods 0.000 title claims abstract description 49
- 238000012407 engineering method Methods 0.000 title claims abstract description 15
- 238000005265 energy consumption Methods 0.000 claims abstract description 53
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- 238000009434 installation Methods 0.000 claims abstract description 14
- 239000003822 epoxy resin Substances 0.000 claims description 8
- 229920000647 polyepoxide Polymers 0.000 claims description 8
- 238000009415 formwork Methods 0.000 claims description 6
- 239000000835 fiber Substances 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 2
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims 1
- 229910052760 oxygen Inorganic materials 0.000 claims 1
- 239000001301 oxygen Substances 0.000 claims 1
- 229920005989 resin Polymers 0.000 claims 1
- 239000011347 resin Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 6
- 238000005452 bending Methods 0.000 abstract description 3
- 239000011229 interlayer Substances 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 9
- 239000010410 layer Substances 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000021715 photosynthesis, light harvesting Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 210000003108 foot joint Anatomy 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Business, Economics & Management (AREA)
- Electromagnetism (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway and engineering methods, first floor column on the basis of being arranged in including rectangular foundation, the steel bar connector being embedded in basis, bottom, the upper strata post that first floor capital face is set in the built-in connection of cross or groined type, shearing resistance keyway component, bottom and energy consumption connector, the section of first floor column and the section of upper strata post be it is rectangular, the four corners on first floor column top and the four corners of upper strata post lower part have been symmetrically arranged rectangular gap;Shearing resistance keyway component has two groups and is separately positioned at upper strata post and the connecting node of first floor column and at first floor column and basic connecting node.Cost performance is high, construction and installation are convenient.Built-in fitting is arranged in the node in prefabricated post, and the shearing resistance of node is realized by the way that shearing resistance keyway is arranged in joint face;The bending resistance and energy consumption of heel join node realize that interlayer connection node is located at column moment of flexure smaller part, and is substantially at elastic stage by setting energy consumption connector.
Description
Technical field
The present invention relates to assembly concrete frame structure fields, especially with the prefabricated assembled frame column of shearing resistance keyway
Vertical dry type connecting node and engineering method.
Background technique
Assembly concrete frame structure, which ties up in assembled architecture, to be widely used, the globality and reliability of structure
It is mainly realized by the connection between prefabricated components, wherein the vertical connection of prefabricated post is assembly concrete frame structure
It is crucial.
The vertical connection of prefabricated post mostly uses reinforced bar sleeve grouting connection at present, the problem is that: first, make in earthquake
Under, this node will appear the damage for being difficult to repair;Second, the energy consumption of node is mainly realized by the plastic deformation of reinforcing bar,
Energy dissipation capacity is poor;Third, prefabricated column end reinforcing bar is overhanging to bring very big inconvenience to stencil design, element precast, transport and installation,
Construction efficiency is low.
Summary of the invention
The object of the present invention is to provide the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway and engineering method,
Solve vertical posts stress is unreasonable, assembly concrete frame column vertically connect existing structural damage is big, Path of Force Transfer not
It defines, the energy dissipation capacity of node is limited, the construction efficiency of assembled column is limited, the technical issues of loss is not easily repaired occurs.
To achieve the above object, the present invention adopts the following technical scheme: the present invention provides the prefabrication and assembly construction with shearing resistance keyway
The vertical dry type connecting node of formula frame column and engineering method, including rectangular foundation, the steel bar connector being embedded in basis, bottom setting
On the basis of first floor column, in the built-in connection of cross or groined type, shearing resistance keyway component, bottom be arranged in first floor column
The upper strata post and energy consumption connector of top surface, the section of first floor column and the section of upper strata post are rectangular, the quadrangle on first floor column top
The four corners at place and upper strata post lower part have been symmetrically arranged rectangular gap;
Shearing resistance keyway component has two groups and is separately positioned at the connecting node of upper strata post and first floor column and first floor column and base
At the connecting node of plinth;
First floor column lower part is arranged in, perpendicular to the axis direction of first floor column in built-in connection, and built-in connection includes laterally pre-buried
The end of pipe and longitudinal built-in pipe, the end of lateral built-in pipe and longitudinal built-in pipe is stretched out outside first floor column, is provided on end
For passing through the third circular hole of energy consumption connector;The bottom of energy consumption connector is connect with steel bar connector.
Further, the height of first floor column is greater than the height of upper strata post.
Further, first floor column and upper strata post is of same size.
Further, shearing resistance keyway component includes the first shear key frid and the second shear key frid;
First shear key frid is square, and the first shear key frid is provided centrally with groove, and rectangular four corners setting is useful
In the first circular hole for passing through bolt, the first shear key frid is embedded in the side in concrete and is additionally provided with dowel or peg;
Second shear key frid is square, and the second shear key frid is provided centrally with protrusion, and rectangular four corners setting is useful
In the second circular hole for passing through bolt, the second shear key frid is embedded in the side in concrete and is additionally provided with dowel or peg;
After first shear key frid is engaged with the second shear key frid, the center of circle of the center of circle of the first circular hole and the second circular hole is located at same
On one axis.
Further, the width of the first shear key frid and the second shear key frid is of same size;First shear key frid
Width and first floor column it is of same size.
Further, the height of the depth of groove and protrusion is adapted.
Further, pointing is additionally provided between the first shear key frid and the second shear key frid;Pointing is height
Strong epoxy resin or mortar.
Further, energy consumption connector includes energy consumption connection plug, the steel sleeve being socketed in outside energy consumption connection plug, fastening
Nut and backing plate, energy consumption connect and are provided with mantle fiber on plug, third circular hole upper surface, third circular hole lower end surface and energy consumption connection core
It is fixed between stick by fastening nut.
Further, there are the gaps of 1-2mm between energy consumption connection plug and steel sleeve.
Further, energy consumption connector uses Q235 steel.
Another aspect of the present invention provides the above-mentioned vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway
Engineering method, the specific steps are as follows:
Step 1: installation mold and pouring prefabricated post:
S1, installs first floor post mold and built-in connection is arranged in mold, and in first floor column top, the first shear key is arranged in end mould
The second shear key frid is arranged in frid, first floor column bottom;
Rectangular gap is arranged in S2 in top end mould;
S3 installs upper layer post mold, and the second shear key frid is arranged in its bottom;
Rectangular gap is arranged in upper layer column bottom in S4;
Step 2: formwork and pouring basis:
When formwork, the first shear key frid is set at the top of basis, while the steel connecting with energy consumption connector is set in basis
Muscle adapter;
Step 3: smearing high-strength epoxy resin on the surface of the first shear key frid on basis;
Step 4: installation first floor column, adjusts verticality and installs suspension column:
By the lower end of energy consumption connection plug sequentially pass through third circular hole on built-in connection and steel sleeve and with reinforcing bar in basis
The upper end of adapter connection, energy consumption connection plug is secured with nuts on built-in connection;
Step 5: high-strength epoxy resin is smeared on the first shear key frid surface in first floor column top;
Step 6: installation upper strata post, after the first shear key frid is engaged with the second shear key frid, the center of circle of the first circular hole and the
The center of circle of two circular holes is located on same axis, adjusts verticality, and bolt is each passed through the first circular hole and the second circular hole, and tightens solid
It is fixed, complete the connection of first floor column and upper strata post.
The beneficial effects of the present invention are embodied in:
1, the vertical dry type connecting node of the prefabricated assembled frame column provided by the invention with shearing resistance keyway and engineering method, construction letter
Single, easy to process, economically feasible, cost performance is high, construction and installation are convenient.
2, the vertical dry type connecting node of the prefabricated assembled frame column provided by the invention with shearing resistance keyway and engineering method, the section
Built-in fitting is arranged in point in prefabricated post, and the shearing resistance of node is realized by the way that shearing resistance keyway is arranged in joint face;Heel join node
Bending resistance and energy consumption by setting energy consumption connector realize, interlayer connection node is located at column moment of flexure smaller part, and is substantially at bullet
Character state.Reasonable stress, Path of Force Transfer is clear, excellent earthquake resistance.
3, the present invention realizes " curved scissors separation ", keeps the stress of node more reasonable, Path of Force Transfer definitely, and improves
The energy-dissipating property ability of node, while prefabricated column end can realize efficient assembly without protruding bar.
Other features and advantages of the present invention will be illustrated in the following description, and partly becomes from specification
It is clear that understand through the implementation of the invention.The main object of the present invention and further advantage can be by the description
Specifically noted scheme is achieved and obtained.
Detailed description of the invention
The present invention will be further described in detail with reference to the accompanying drawing.
Fig. 1 is the basic composition schematic diagram of the present invention;
Fig. 2 is present invention energy consumption connector schematic diagram;
Fig. 3 is the plan view of the first shear key frid;
Fig. 4 is shearing resistance keyway component assembled state schematic diagram;
Fig. 5 is the node composition schematic diagram of the embodiment of the present invention 1;
Fig. 6 is the perspective view of embodiment 1;
Fig. 7 is the A-A section of Fig. 5;
Fig. 8 is built-in connection and energy consumption connector connection schematic diagram;
Fig. 9 is the node composition schematic diagram of the embodiment of the present invention 3;
Figure 10 is the A-A section of Fig. 9;
Figure 11 is built-in connection and energy consumption connector connection schematic diagram;
Figure 12 is shearing resistance keyway component structural schematic diagram;
Figure 13 is the built-in connection structural schematic diagram of embodiment 3.
Appended drawing reference: the basis 1-, 2- steel bar connector, 3- first floor column, 4- built-in connection, 5- shearing resistance keyway component, 6-
Upper strata post, 7- energy consumption connector, the rectangular gap of 8-, 9- third circular hole, the first shear key of 10- frid, 11- the second shearing resistance keyway
Plate, the first circular hole of 12-, the second circular hole of 13-, 14- energy consumption connection plug, 15- steel sleeve, 16- backing plate.
Specific embodiment
Carry out the technical solution that the present invention will be described in detail by the following examples, embodiment below is only exemplary,
It is only capable of for explanation and illustration technical solution of the present invention, and the limitation to technical solution of the present invention cannot be construed to.
Embodiment 1
In order to reach " curved scissors separation ", keep the stress of node more reasonable, Path of Force Transfer definitely, and improves the consumption of node
Energy ability, while prefabricated column end can realize that the purpose efficiently assembled, the present invention are provided with the pre- of shearing resistance keyway without protruding bar
The vertical dry type connecting node of assembling frame column processed and engineering method.
Specifically, as shown in Figure 1, existing including rectangular foundation 1, the steel bar connector 2 being embedded in basis 1, bottom setting
Basis 1 on first floor column 3, in the built-in connection 4 of cross or groined type, shearing resistance keyway component 5, bottom be arranged in the first floor
The upper strata post 6 and energy consumption connector 7 of 3 top surface of column, first floor column 3 is of same size with upper strata post 6, and the height of first floor column 3 is greater than upper
The height of layer column 6.The section of first floor column 3 and the section of upper strata post 6 are rectangular, the four corners and upper strata post 6 on 3 top of first floor column
The four corners of lower part have been symmetrically arranged rectangular gap 8, facilitate in-site installation.
As shown in Fig. 5,6,7, shearing resistance keyway component 5 has two groups and is separately positioned on the connection of upper strata post 6 Yu first floor column 3
At node and at the connecting node of first floor column 3 and basic 1.Such connection type ensure that node Shear transfer, column well
The bending resistance and energy consumption of foot connecting node are arranged energy consumption connector 7 by periphery and realize, the interlayer spreading node of prefabricated post is located at curved
Square smaller part, and it is substantially at elastic stage, and be attached using bolt.
3 lower part of first floor column is arranged in, perpendicular to the axis direction of first floor column 3 in built-in connection 4, and built-in connection 4 includes
Lateral built-in pipe and longitudinal built-in pipe.The part of lateral built-in pipe and longitudinal built-in pipe being embedded in concrete is uniform along surface
Peg is set.Guarantee that the concrete of built-in connection 4 and first floor column 3 forms good entirety.Specifically, as shown in figure 8, pre-buried company
Fitting 4 is in cross, including two lateral built-in pipes and two longitudinal built-in pipes, and welding is solid between adjacent two lateral built-in pipes
It is fixed, it is welded and fixed between adjacent two longitudinal built-in pipes.
The end of lateral built-in pipe and the end of longitudinal built-in pipe are stretched out outside first floor column 3, are provided on end for wearing
Cross the third circular hole 9 of energy consumption connector 7;The bottom of energy consumption connector 7 is connect with steel bar connector 2.Built-in connection 4 can be adopted
It is welded, is arranged in 3 column section middle position of first floor column with square steel tube, rectangular steel pipe or steel plate.
As shown in figure 3, shearing resistance keyway component 5 includes the first shear key frid 10 and the second shear key frid 11;First is anti-
Keyway plate 10 is cut to be square, the first shear key frid 10 is provided centrally with groove, rectangular four corners be provided with for across
First circular hole 12 of bolt, the first shear key frid 10 are embedded in the side in concrete and are additionally provided with dowel or peg;The
Two shearing resistance keyway plates 11 are square, and the second shear key frid 11 is provided centrally with protrusion, and rectangular four corners, which are provided with, to be used for
Across the second circular hole 13 of bolt, the second shear key frid 11 is embedded in the side in concrete and is additionally provided with dowel or bolt
Nail.
As shown in figure 4, after the first shear key frid 10 is engaged with the second shear key frid 11, the center of circle of the first circular hole 12 with
The center of circle of second circular hole 13 is located on same axis.The width of the width of first shear key frid 10 and the second shear key frid 11
It is identical;The width of first shear key frid 10 is of same size with first floor column 3.The depth of groove and the height of protrusion are adapted.
Pointing is additionally provided between first shear key frid 10 and the second shear key frid 11;Pointing be high-strength epoxy resin or
Person's mortar.Shearing resistance keyway component 5 is the pre-embedded steel slab with dowel, can be very good the shear resistance for guaranteeing connecting node.
As shown in Fig. 2, energy consumption connector 7 includes the steel that energy consumption connects plug 14, is socketed in outside energy consumption connection plug 14
Casing 15, fastening nut and backing plate 16, energy consumption connect and are provided with mantle fiber, 9 upper surface of third circular hole, third circular hole 9 on plug 14
It is fixed between lower end surface and energy consumption connection plug 14 by fastening nut.There are 1- between energy consumption connection plug 14 and steel sleeve 15
The gap of 2mm.The connector 7 that consumes energy uses Q235 steel.Steel sleeve 15 realizes tension and compression for preventing energy consumption connection 14 buckling of plug
Stress is consistent with energy consumption.Connector 7 consume energy in the case where guaranteeing bonding strength, reduces its yield point, there is preferably consumption
It can ability.
The engineering method of the above-mentioned vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, the specific steps are as follows:
Step 1: installation mold and pouring prefabricated post:
S1 installs 3 mold of first floor column and built-in connection 4 is arranged in mold, the first shearing resistance is arranged in 3 top end mould of first floor column
The second shear key frid 11 is arranged in keyway plate 10,3 bottom of first floor column;
Rectangular gap 8 is arranged in S2 in top end mould;
S3 installs 6 mold of upper strata post, and the second shear key frid 11 is arranged in its bottom;
Rectangular gap 8 is arranged in 6 bottom of upper strata post in S4;
Step 2: formwork and pour basis 1:
When formwork, the first shear key frid 10 is set at 1 top of basis, while setting is connect with energy consumption connector 7 in basis 1
Steel bar connector 2;
Step 3: smearing high-strength epoxy resin on the surface of the first shear key frid 10 on basis 1;
Step 4: installation first floor column 3, adjusts verticality and installs suspension column:
By the lower end of energy consumption connection plug 14 sequentially pass through third circular hole 9 on built-in connection 4 and steel sleeve 15 and with basis 1
Interior steel bar connector 2 connects, and the upper end of energy consumption connection plug 14 is secured with nuts on built-in connection 4;First floor column 3 and basis
Foot joint between 1 is used cooperatively by energy consumption connector 7 and shearing resistance keyway component 5, realizes the dry type of connecting portion
Connection, column column connected node are used cooperatively by bolt and shearing resistance keyway component 5, and the dry type for realizing connecting portion connects,
Convenient for assembly.
Step 5: smearing high-strength epoxy resin on 10 surface of the first shear key frid at 3 top of first floor column;
Step 6: installation upper strata post 6, after the first shear key frid 10 is engaged with the second shear key frid 11, the first circular hole 12
The center of circle and the center of circle of the second circular hole 13 are located on same axis, adjust verticality, and bolt is each passed through the first circular hole 12 and second
Circular hole 13, and fixation is tightened, complete the connection of first floor column 3 and upper strata post 6.
Nut can use double nut or stop nut.
Embodiment 2, the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway and engineering method, with embodiment 1,
The difference is that as shown in the figure 9,10,11,12, built-in connection 4 is in groined type.
Embodiment 3, the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway and engineering method, with embodiment 1,
The difference is that as shown in the figure 13, built-in connection 4 is in cross, including a lateral built-in pipe and a longitudinal direction it is pre-buried
Pipe.Lateral built-in pipe is identical with longitudinal quantity of built-in pipe.
The vertical dry type connecting node of prefabricated assembled frame column provided by the invention with shearing resistance keyway and engineering method, cylinder knot
Structure is novel, with conspicuous characteristics, accepts rationally, power transmission clearly has good promotional value.First shear key frid 10 and second is anti-
It cuts and is connected between keyway plate 11, the specific pre-buried position of the first shear key frid 10 and the second shear key frid 11 can spirit
Setting living.
The above is only the preferable specific embodiments of the present invention, but scope of protection of the present invention is not limited thereto, any
The change or replacement that those familiar with the art is expected in the technical scope disclosed by the present invention should all be covered
Within protection scope of the present invention.
Claims (10)
1. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, it is characterised in that: including rectangular foundation
(1), be embedded in first floor column (3) on basic (1) of the steel bar connector (2) in basic (1), bottom setting, in cross or
The built-in connection (4) of person's groined type, shearing resistance keyway component (5), bottom setting first floor column (3) top surface upper strata post (6) and
It consumes energy connector (7), the section of first floor column (3) and the section of upper strata post (6) are rectangular, the four corners on first floor column (3) top
Rectangular gap (8) have been symmetrically arranged with the four corners of upper strata post (6) lower part;
The shearing resistance keyway component (5) have two groups and be separately positioned at the connecting nodes of upper strata post (6) and first floor column (3) with
And at the connecting node of first floor column (3) and basic (1);
The built-in connection (4) is arranged in first floor column (3) lower part, perpendicular to the axis direction of first floor column (3), built-in connection
It (4) include lateral built-in pipe and longitudinal built-in pipe, first floor column is stretched out in the end of lateral built-in pipe and the end of longitudinal built-in pipe
(3) outside, it is provided on end for the third circular hole (9) across energy consumption connector (7);The bottom of energy consumption connector (7) and steel
Muscle adapter (2) connection.
2. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, feature exist as described in claim 1
In the height of first floor column (3) is greater than the height of upper strata post (6).
3. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, feature exist as described in claim 1
In shearing resistance keyway component (5) includes the first shear key frid (10) and the second shear key frid (11);
First shear key frid (10) is square, and the first shear key frid (10) is provided centrally with groove, rectangular four corners
It is provided with the first circular hole (12) for passing through bolt, the first shear key frid (10) is embedded in the side in concrete and also sets up
There are dowel or peg;
Second shear key frid (11) is square, and the second shear key frid (11) is provided centrally with protrusion, rectangular four corners
It is provided with the second circular hole (13) for passing through bolt, the second shear key frid (11) is embedded in the side in concrete and also sets up
There are dowel or peg;
After first shear key frid (10) is engaged with the second shear key frid (11), the center of circle of the first circular hole (12) and the second circular hole
(13) the center of circle is located on same axis.
4. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, feature exist as claimed in claim 3
In the width of the first shear key frid (10) is of same size with the second shear key frid (11);First shear key frid (10)
Width and first floor column (3) it is of same size.
5. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, feature exist as claimed in claim 3
In the depth of groove and the height of protrusion are adapted.
6. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, feature exist as claimed in claim 3
In being additionally provided with pointing between the first shear key frid (10) and the second shear key frid (11);Pointing is high-strength ring
Oxygen resin or mortar.
7. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, feature exist as described in claim 1
In, energy consumption connector (7) include energy consumption connection plug (14), be socketed in the external steel sleeve (15) of energy consumption connection plug (14),
Fastening nut and backing plate (16), energy consumption connect and are provided with mantle fiber, third circular hole (9) upper surface, third circular hole (9) on plug (14)
It is fixed between lower end surface and energy consumption connection plug (14) by fastening nut.
8. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, feature exist as claimed in claim 7
In there are the gaps of 1-2mm between energy consumption connection plug (14) and steel sleeve (15).
9. the vertical dry type connecting node of the prefabricated assembled frame column with shearing resistance keyway, feature exist as described in claim 1
In energy consumption connector (7) uses Q235 steel.
10. the vertical dry type connection of the prefabricated assembled frame column with shearing resistance keyway as described in any one of claim 1-9
The engineering method of node, which is characterized in that specific step is as follows:
Step 1: installation mold and pouring prefabricated post:
Simultaneously built-in connection (4) are arranged in mold in S1, installation first floor column (3) mold, in first floor column (3) top end mould setting the
The second shear key frid (11) is arranged in one shearing resistance keyway plate (10), first floor column (3) bottom;
Rectangular gap (8) are arranged in S2 in top end mould;
S3 installs upper strata post (6) mold, and the second shear key frid (11) is arranged in its bottom;
Rectangular gap (8) is arranged in upper strata post (6) bottom in S4;
Step 2: formwork and pouring basic (1):
When formwork, the first shear key frid (10) is set at the top of basic (1), while setting is connected with energy consumption in basic (1)
The steel bar connector (2) of part (7) connection;
Step 3: smearing high-strength epoxy resin on the surface of the first shear key frid (10) of basic (1);
Step 4: installation first floor column (3), adjusts verticality and installs suspension column:
The lower end of energy consumption connection plug (14) is sequentially passed through into third circular hole (9) and steel sleeve (15) on built-in connection (4)
And connect with basic (1) interior steel bar connector (2), the upper end of energy consumption connection plug (14) is secured with nuts in built-in connection
(4) on;
Step 5: high-strength epoxy resin is smeared on the first shear key frid (10) surface at the top of first floor column (3);
Step 6: installation upper strata post (6), after the first shear key frid (10) is engaged with the second shear key frid (11), the first circle
The center of circle in hole (12) and the center of circle of the second circular hole (13) are located on same axis, adjust verticality, and bolt is each passed through the first circle
Hole (12) and the second circular hole (13), and fixation is tightened, complete the connection of first floor column (3) and upper strata post (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910515853.1A CN110258790B (en) | 2019-06-14 | 2019-06-14 | Vertical dry type connecting node with shear key groove for prefabricated frame column and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910515853.1A CN110258790B (en) | 2019-06-14 | 2019-06-14 | Vertical dry type connecting node with shear key groove for prefabricated frame column and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110258790A true CN110258790A (en) | 2019-09-20 |
CN110258790B CN110258790B (en) | 2024-04-09 |
Family
ID=67918409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910515853.1A Active CN110258790B (en) | 2019-06-14 | 2019-06-14 | Vertical dry type connecting node with shear key groove for prefabricated frame column and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258790B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022062284A1 (en) * | 2020-09-27 | 2022-03-31 | 青岛理工大学 | Bamboo joint type energy-dissipation concrete-filled steel tube column base joint and mounting method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014095279A (en) * | 2012-11-09 | 2014-05-22 | Nagoya Structure Design Inc | Foundation structure and joint structure between steel column and foundation |
CN108487456A (en) * | 2018-03-09 | 2018-09-04 | 中国建筑股份有限公司 | A kind of not damaged prefabricated assembled frame structure system and its construction method of consuming energy |
CN108978848A (en) * | 2018-06-25 | 2018-12-11 | 中民筑友房屋科技有限公司 | A kind of assembly method of low-rise freame structural system |
CN109706956A (en) * | 2019-01-24 | 2019-05-03 | 沈阳建筑大学 | A kind of rectangular built-in fitting device with circular hole |
CN210562613U (en) * | 2019-06-14 | 2020-05-19 | 中国建筑股份有限公司 | Vertical dry-type connecting node of prefabricated assembled frame post of keyway that shears in area |
-
2019
- 2019-06-14 CN CN201910515853.1A patent/CN110258790B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014095279A (en) * | 2012-11-09 | 2014-05-22 | Nagoya Structure Design Inc | Foundation structure and joint structure between steel column and foundation |
CN108487456A (en) * | 2018-03-09 | 2018-09-04 | 中国建筑股份有限公司 | A kind of not damaged prefabricated assembled frame structure system and its construction method of consuming energy |
CN108978848A (en) * | 2018-06-25 | 2018-12-11 | 中民筑友房屋科技有限公司 | A kind of assembly method of low-rise freame structural system |
CN109706956A (en) * | 2019-01-24 | 2019-05-03 | 沈阳建筑大学 | A kind of rectangular built-in fitting device with circular hole |
CN210562613U (en) * | 2019-06-14 | 2020-05-19 | 中国建筑股份有限公司 | Vertical dry-type connecting node of prefabricated assembled frame post of keyway that shears in area |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022062284A1 (en) * | 2020-09-27 | 2022-03-31 | 青岛理工大学 | Bamboo joint type energy-dissipation concrete-filled steel tube column base joint and mounting method |
Also Published As
Publication number | Publication date |
---|---|
CN110258790B (en) | 2024-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560423B (en) | Construction method of common steel bar and finish-rolled twisted steel bar mixed reinforcement assembly pier | |
CN2797476Y (en) | Mixed jointing node of assembled concrete frame structure beam column | |
CN103510639B (en) | A kind of can the overlaid plate type shear wall of restore funcitons and implementation method thereof | |
WO2019149270A1 (en) | Assembled pier for mixed reinforcement of normal steel rebar and finished threaded steel bar | |
CN110258789B (en) | Beam column connecting node with replaceable energy-consumption steel bar and construction method thereof | |
CN106758813A (en) | For the UHPC wells formula rib floorings and its construction method of steel reinforced concrete composite beam bridge | |
CN110424240B (en) | Bidirectional prestress reinforcement-free combined beam based on slow-bonding prestress UHPC permanent template and construction method | |
CN108660908A (en) | A kind of prestressed concrete cable-stayed bridge of the beam prefabricated pin-connected panel of tower | |
CN115653084A (en) | Recoverable precast concrete frame structure system | |
CN203640084U (en) | Superimposed slab shear wall with restorable function | |
CN211665926U (en) | Assembled hybrid frame structure | |
CN111877140A (en) | Connecting structure for segment prefabricated assembled pier combination and construction method | |
CN110409283B (en) | Rib-free prestressed self-maintenance composite beam based on slow-bonding prestressed UHPC permanent formwork and construction method | |
CN110258790A (en) | The vertical dry type connecting node of prefabricated assembled frame column with shearing resistance keyway and engineering method | |
CN212103638U (en) | A connection structure that is used for prefabricated pin-connected panel pier combination of segment | |
CN109989478A (en) | A kind of precast prestressed concrete frame structure | |
CN206941799U (en) | The prestressing force assembling type node construction of beam-ends friction energy-dissipating | |
CN110485563B (en) | Post-tensioning method prestress assembly type concrete frame beam column dry type connection node | |
CN211340366U (en) | Continuous combined beam bridge | |
CN210562613U (en) | Vertical dry-type connecting node of prefabricated assembled frame post of keyway that shears in area | |
CN110258788B (en) | Semi-dry type connection node of frame beam and frame column and construction method thereof | |
CN219080668U (en) | Assembled energy consumption shear wall | |
CN111719693A (en) | Prestress assembly type steel-concrete sleeved beam-column joint | |
CN112575891B (en) | Low-seismic-loss beam column node based on waveform BFRP connecting plate | |
CN111155643A (en) | Assembly type mixed frame structure and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |