CN110258708A - 4立铲中央枢轴的更换方法 - Google Patents
4立铲中央枢轴的更换方法 Download PDFInfo
- Publication number
- CN110258708A CN110258708A CN201910483506.5A CN201910483506A CN110258708A CN 110258708 A CN110258708 A CN 110258708A CN 201910483506 A CN201910483506 A CN 201910483506A CN 110258708 A CN110258708 A CN 110258708A
- Authority
- CN
- China
- Prior art keywords
- mid
- centerpivot
- game
- points
- axis hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/006—Pivot joint assemblies
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/28—Small metalwork for digging elements, e.g. teeth scraper bits
- E02F9/2891—Tools for assembling or disassembling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
Abstract
本发明公开了4立铲中央枢轴的更换方法,该方法包括以下步骤:(1)将4立铲调至检修区域,圈定检修区域,挂牌进行检修,通过16‑18块枕木将配重支撑;(2)在中盘四周各安装1个液压千斤顶,中盘上表面各确定一个观测点分别标为A、B、C、D;(3)中盘经过水平校准后,中盘的轴孔和底盘的轴孔对正,再用吊车将中央枢轴吊出,再将新的中央枢轴的放入轴孔内,安装中央枢轴下锁母,完成中央枢轴的更换。本发明能够有效解决目前的中央枢轴更换方式,需要经过支撑配重、抽掉提升大绳和绷绳、落下动臂、拆掉机械室顶棚、吊走提升卷筒等工序,费时费力,劳动强度高,工作效率低下的问题。
Description
技术领域
本发明涉及中央枢轴更换方法技术领域,特别涉及 4立铲中央枢轴的更换方法。
背景技术
目前,4立铲在使用之后,需要定期检修,当发现中央枢轴出现裂纹等问题时,需要及时对中央枢轴进行更换,传统方法更换中央枢轴时,需要支撑配重、抽掉提升大绳和绷绳、落下动臂、拆掉机械室顶棚、吊走提升卷筒、吊走司机室、吊走机械室墙壁、吊走动臂、吊走配重、吊走中盘,当换完中央枢轴后,按照拆卸的反序进行安装,每次更换中央枢轴需要最少15人的参与,工期一般在15至20天,费时费力,劳动强度高,工作效率低下,并且,吊装、高处作业等危险作业频次特别高。
发明内容
针对上述技术问题,本发明提供了 4立铲中央枢轴的更换方法,能够有效解决目前的中央枢轴更换方式,需要经过支撑配重、抽掉提升大绳和绷绳、落下动臂、拆掉机械室顶棚、吊走提升卷筒等工序,费时费力,劳动强度高,工作效率低下的问题。
为了实现上述目的,本发明的技术方案具体如下:
4立铲中央枢轴的更换方法,包括以下步骤:
(1)将4立铲调至检修区域,通过16-18块枕木将配重支撑;
(2)在中盘四周各安装1个液压千斤顶,中盘上表面各确定一个观测点分别标为A、B、C、D,将全站仪架设在距离中盘15米处,调整全站仪高度,使全站仪可以同时观测到A、B、C三个点,将全站仪基准点的高程设为10.000m,分别读出A、B、C三点的高程进行比较,再次调整液压千斤顶,使三点处于同一水平面内,再转站一次,使全站仪可同时观测到B、C、D三点的位置,分别读出三点的高程,调整千斤顶使三点处于同一水平面,最后再转站一次,使全站仪可同时观测到ACD三点的位置,分别读出三点的位置进行复检,如此重复,使中盘趋于水平;
(3)中盘经过水平校准后,中盘的轴孔和底盘的轴孔对正,再用吊车将中央枢轴吊出,再将新的中央枢轴的放入轴孔内,安装中央枢轴下锁母,完成中央枢轴的更换。
所述液压千斤顶为200t的液压千斤顶。
本发明的有益效果是:本发明与传统的更换中央枢轴的方法相比,本发明进行更换中央枢轴时,司机室、机械室墙壁、动臂、配重、中盘等大件都不需要拆除,只需要增加一步水平校准,可以在很大程度上保证检修的安全,并且采用本发明后,不仅需要的检修区域较小,而且还可以将检修时间降低到8-10天,减少了危险作业的频次。
具体实施方式
实施例1
4立铲中央枢轴的更换方法,包括以下步骤:
(1)将4立铲调至检修区域,通过16块枕木将配重支撑;
(2)在中盘四周各安装1个液压千斤顶,中盘上表面各确定一个观测点分别标为A、B、C、D,将全站仪架设在距离中盘15米处,调整全站仪高度,使全站仪可以同时观测到A、B、C三个点,将全站仪基准点的高程设为10.000m,分别读出A、B、C三点的高程进行比较,再次调整液压千斤顶,使三点处于同一水平面内,再转站一次,使全站仪可同时观测到B、C、D三点的位置,分别读出三点的高程,调整千斤顶使三点处于同一水平面,最后再转站一次,使全站仪可同时观测到ACD三点的位置,分别读出三点的位置进行复检,如此重复,使中盘趋于水平;
(3)中盘经过水平校准后,中盘的轴孔和底盘的轴孔对正,再用吊车将中央枢轴吊出,再将新的中央枢轴的放入轴孔内,安装中央枢轴下锁母,完成中央枢轴的更换。
Claims (2)
1.4立铲中央枢轴的更换方法,其特征在于,包括以下步骤:
(1)将4立铲调至检修区域,通过16-18块枕木将配重支撑;
(2)在中盘四周各安装1个液压千斤顶,中盘上表面各确定一个观测点分别标为A、B、C、D,将全站仪架设在距离中盘15米处,调整全站仪高度,使全站仪可以同时观测到A、B、C三个点,将全站仪基准点的高程设为10.000m,分别读出A、B、C三点的高程进行比较,再次调整液压千斤顶,使三点处于同一水平面内,再转站一次,使全站仪可同时观测到B、C、D三点的位置,分别读出三点的高程,调整千斤顶使三点处于同一水平面,最后再转站一次,使全站仪可同时观测到ACD三点的位置,分别读出三点的位置进行复检,如此重复,使中盘趋于水平;
(3)中盘经过水平校准后,中盘的轴孔和底盘的轴孔对正,再用吊车将中央枢轴吊出,再将新的中央枢轴的放入轴孔内,安装中央枢轴下锁母,完成中央枢轴的更换。
2.根据权利要求1所述的 4立铲中央枢轴的更换方法,其特征在于:所述液压千斤顶为200t的液压千斤顶。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910483506.5A CN110258708A (zh) | 2019-06-04 | 2019-06-04 | 4立铲中央枢轴的更换方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910483506.5A CN110258708A (zh) | 2019-06-04 | 2019-06-04 | 4立铲中央枢轴的更换方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110258708A true CN110258708A (zh) | 2019-09-20 |
Family
ID=67916834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910483506.5A Pending CN110258708A (zh) | 2019-06-04 | 2019-06-04 | 4立铲中央枢轴的更换方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258708A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0565833A1 (de) * | 1992-03-24 | 1993-10-20 | Iveco Magirus Ag | Vorrichtung zum lotrechten Ausrichten der Hochachse eines mit einem Untergestell dreh- und neigungsverstellbar verbundenen Aufbaus |
CN201507309U (zh) * | 2009-09-17 | 2010-06-16 | 江西铜业股份有限公司 | 一种wk-4型电铲回转中央枢轴 |
CN103590440A (zh) * | 2013-10-19 | 2014-02-19 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 电铲回转辊盘与环形轨道更换方法 |
CN106758737A (zh) * | 2017-01-20 | 2017-05-31 | 安徽省交通建设股份有限公司 | 横向预应力全宽钢筋混凝土桥面板钢板组合梁及其桥位安装施工方法 |
CN109680615A (zh) * | 2018-12-30 | 2019-04-26 | 广东瀚阳轨道信息科技有限公司 | 短线法节段梁的三维坐标测量施工方法 |
-
2019
- 2019-06-04 CN CN201910483506.5A patent/CN110258708A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0565833A1 (de) * | 1992-03-24 | 1993-10-20 | Iveco Magirus Ag | Vorrichtung zum lotrechten Ausrichten der Hochachse eines mit einem Untergestell dreh- und neigungsverstellbar verbundenen Aufbaus |
CN201507309U (zh) * | 2009-09-17 | 2010-06-16 | 江西铜业股份有限公司 | 一种wk-4型电铲回转中央枢轴 |
CN103590440A (zh) * | 2013-10-19 | 2014-02-19 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 电铲回转辊盘与环形轨道更换方法 |
CN106758737A (zh) * | 2017-01-20 | 2017-05-31 | 安徽省交通建设股份有限公司 | 横向预应力全宽钢筋混凝土桥面板钢板组合梁及其桥位安装施工方法 |
CN109680615A (zh) * | 2018-12-30 | 2019-04-26 | 广东瀚阳轨道信息科技有限公司 | 短线法节段梁的三维坐标测量施工方法 |
Non-Patent Citations (1)
Title |
---|
阮波: "同步顶升系统在WK-35挖掘机大修中的应用", 《铜业工程》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208885016U (zh) | 混凝土浇筑装置及浇筑系统 | |
CN109081247A (zh) | 一种连廊大跨度钢梁的吊装方法 | |
CN203682934U (zh) | 一种rh车载式液压提升钢包装置 | |
CN100480398C (zh) | 高炉大修拆装炉自吊装施工方法及炉顶起重装置 | |
CN109057350A (zh) | 混凝土浇筑装置及浇筑系统 | |
CN109055637B (zh) | 一种高炉大修中炉壳安装的液压提升工艺 | |
CN110528398A (zh) | 跨空箱梁施工方法 | |
CN110258708A (zh) | 4立铲中央枢轴的更换方法 | |
CN102286927A (zh) | 桥梁墩柱盖梁钢筋笼整体安装施工方法 | |
CN105715028A (zh) | 连续升降装置及含连续升降装置的升降脚手架 | |
CN205799359U (zh) | 升降油缸密封接头快速更换装置 | |
CN202220435U (zh) | 逆作地下混凝土结构降模设备 | |
CN200978204Y (zh) | 落地抱杆提升机 | |
CN101692548A (zh) | 带电更换引流线吊瓶串工具 | |
CN204876526U (zh) | 一种工具式悬挑钢梁 | |
CN208516221U (zh) | 超高层的建筑垃圾垂直运输系统 | |
CN102684088B (zh) | 变压器拆装方法 | |
CN208201022U (zh) | 轻便型摆动溜槽 | |
CN102383613B (zh) | 发电厂主厂房钢屋架吊装施工方法及专用吊装起重装置 | |
CN205187695U (zh) | 一种钢结构吊装起吊架 | |
CN204920175U (zh) | 连续升降装置及含连续升降装置的升降脚手架 | |
CN105253793B (zh) | 一种镀锌车间锌锅牵引运输吊装的施工方法 | |
CN208733919U (zh) | 用于文物保护区的钢梁架设装置 | |
CN208803390U (zh) | 桥梁加固升降平台 | |
CN203865857U (zh) | 分体式移梁起重机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |
|
RJ01 | Rejection of invention patent application after publication |