CN110258549A - A kind of reparation structure and method for repairing and constructing for foundation pit supporting pile - Google Patents

A kind of reparation structure and method for repairing and constructing for foundation pit supporting pile Download PDF

Info

Publication number
CN110258549A
CN110258549A CN201910507444.7A CN201910507444A CN110258549A CN 110258549 A CN110258549 A CN 110258549A CN 201910507444 A CN201910507444 A CN 201910507444A CN 110258549 A CN110258549 A CN 110258549A
Authority
CN
China
Prior art keywords
foundation pit
pit supporting
installing ring
supporting pile
slight crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910507444.7A
Other languages
Chinese (zh)
Other versions
CN110258549B (en
Inventor
赵富豪
赵志强
赵炳钦
赵大维
赵景乐
熊锡佳
肖智勇
郭欣
赵林锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Guangqiang Foundation Engineering Co ltd
Original Assignee
Dongguan Guangqiang Construction Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Guangqiang Construction Foundation Engineering Co Ltd filed Critical Dongguan Guangqiang Construction Foundation Engineering Co Ltd
Priority to CN201910507444.7A priority Critical patent/CN110258549B/en
Publication of CN110258549A publication Critical patent/CN110258549A/en
Application granted granted Critical
Publication of CN110258549B publication Critical patent/CN110258549B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of reparation structures for foundation pit supporting pile, frame is repaired to be coated at the slight crack of foundation pit supporting pile, the reparation frame includes the first iron wire, the second iron wire and several reinforcing bars, several spacing of reinforcements are distributed vertically, and the first iron wire and second iron wire finish up to connect and be fastened around on foundation pit supporting pile;Repairing installing ring includes respectively in the left installing ring and right installing ring of semi-circular setting, one end of left installing ring is hinged on one end of right installing ring, the other end of right installing ring is connected with connection boss, the right installing ring other end is provided with the locking member for tensing left installing ring, it is formed between left installing ring, right installing ring and foundation pit supporting pile for enveloping the slip casting space for repairing frame, is provided with the grouting nozzle communicated with slip casting space on left installing ring and/or right installing ring;Grouting Pipe is connected on grouting nozzle for being passed through concrete slurry.Its key points of the technical solution are that having the characteristics that reparation convenience is high.

Description

A kind of reparation structure and method for repairing and constructing for foundation pit supporting pile
Technical field
The present invention relates to the technical field of building foundation, in particular to a kind of reparation structure for foundation pit supporting pile and repair Multiple construction method.
Background technique
As the rapid development of skyscraper increases, foundation pit will be increasing, deeper, the construction of the supporting construction of foundation pit It is more and more difficult, in building construction process, in order to guarantee underground structure construction and surrounding deep foundation pit environment safety and apply Work is convenient, it is necessary to take deep-foundation side wall and surrounding enviroment the measure of supporting and reinforcing.
Notification number is that CN103469798B Chinese patent discloses a kind of foundation pit supporting construction, including pattern foundation pit supporting structure campshed, Sealing stops native curtain and anti-side campshed, and pattern foundation pit supporting structure campshed is set as the cast-in-place concrete thin-walled pipe in long stake, stub interval Stake, sealing stops native curtain and anti-side campshed is disposed as cement mixing pile, and sealing stops native curtain, and to be set as a row engaged Cement mixing pile, anti-side campshed is set as the cement mixing pile of the two-way occlusion of several rows, and the sealing stops native curtain setting and exists Pattern foundation pit supporting structure campshed corresponds to foundation pit periphery side, and anti-side campshed is arranged in pattern foundation pit supporting structure campshed and corresponds in the hole bottom of foundation pit side.
Above-mentioned pattern foundation pit supporting structure campshed is hollow cast in place concrete thin tunnel pile, wherein carries out the earthwork to foundation pit in digging machine When excavating, staff's careless manipulation, digging machine touches pattern foundation pit supporting structure campshed, will lead to pattern foundation pit supporting structure campshed and slight crack occurs, if Have in this way the pattern foundation pit supporting structure campshed quantity of damage it is excessive when, will lead to the pattern foundation pit supporting structure campshed of whole side structural strength reduce, lead It causes the pile body of pattern foundation pit supporting structure campshed to be subjected to displacement inclination at slight crack, influences the supporting effect of pattern foundation pit supporting structure campshed, and exist Security risk, therefore there are certain improvements.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of reparation knot for foundation pit supporting pile It is high to have the characteristics that foundation pit supporting pile repairs convenience for structure.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of reparation structure for foundation pit supporting pile, is applied to foundation pit supporting pile, which includes:
Frame is repaired, is coated at the slight crack of foundation pit supporting pile, which includes the first iron wire, the second iron wire and several two The reinforcing bar being separately fixed on the first iron wire and the second iron wire is held, several spacing of reinforcements are distributed vertically, first iron wire and institute The second iron wire ending is stated to connect and be fastened around on foundation pit supporting pile;
Installing ring is repaired, left installing ring and right installing ring including being respectively in semi-circular setting, one end hinge of the left installing ring It connects in one end of right installing ring, the other end of the right installing ring is connected with connection boss, and the other end of the left installing ring is opened Equipped with the connection caulking groove chimeric for connection boss, the right installing ring other end is provided with the locking structure for tensing left installing ring When part, the left installing ring and right installing ring pairing, the connection boss is entrenched on connection caulking groove, the left installing ring, the right side It is formed between installing ring and foundation pit supporting pile for enveloping the slip casting space for repairing frame, the left installing ring and/or right peace The grouting nozzle communicated with slip casting space is provided on dress circle;
Grouting Pipe is connected on grouting nozzle for being passed through concrete slurry.
Through the above technical solutions, when digging machine is when excavating the earthwork in foundation pit, when digging machine causes foundation pit supporting pile breakage, Construction personnel has found the position of foundation pit supporting pile slight crack, by excavate on foundation pit side-wall around foundation pit supporting pile fracture position Reparation frame is enclosed at the slight crack of foundation pit supporting pile goes forward side by side first by the soil body so that foundation pit supporting pile slight crack is integrally exposed Row is fixed, and will be repaired installing ring installation and is covered on outside reparation frame, concrete slurry is injected into slip casting sky by Grouting Pipe, grouting nozzle Between in, stand the foundation pit supporting pile, after waiting concrete slurry solidification, remove and repair installing ring, pass through the reparation structure There is the foundation pit supporting pile of destruction to repair to more;
On the one hand, the concrete slurry after solidification can fill the slight crack of foundation pit supporting pile, and the concrete grout after solidification Expect it is cylindrical be socketed in outside foundation pit supporting pile, and then vertical support force can be provided for foundation pit supporting pile, improve foundation pit branch Buckle resistance energy of the fender pile at its slight crack avoids foundation pit supporting pile from causing the drop of buckle resistance energy due to the appearance of slight crack It is low, and directly slight crack is repaired in foundation pit supporting pile periphery, the high spy of convenience is repaired with foundation pit supporting pile slight crack Point.
Preferably, first iron wire and the second iron wire connect fixed and are fixed on foundation pit supporting pile by concrete nail On, there are filling gaps between the reinforcing bar and the outer wall of foundation pit supporting pile.
Through the above technical solutions, the first iron wire and the second iron wire have certain bending, therefore it can finish up and connect And fixed around foundation pit supporting pile, and be fixed on foundation pit supporting pile by concrete nail, so that reinforcing bar is in foundation pit supporting pile Outer position is fixed, and by the characteristic of the first iron wire and the second iron wire, enables to reinforcing bar and foundation pit supporting pile There are filling gaps between outer wall, and then when penetration concrete slurry, concrete slurry can completely by reinforcing bar package wherein into Row solidification, to improve the structural strength of the concrete slurry after solidification.
Preferably, rubber layer is provided on the inner wall of the left installing ring and right installing ring.
Through the above technical solutions, rubber layer can be filled the gap of left installing ring and right installing ring, note is kept The airtightness for starching space, avoids concrete slurry from leaking in slip casting space.
Preferably, the surface that the rubber layer is used to contact with concrete slurry is coated with concrete parting agent.
Through the above technical solutions, present rubber layer surface is smeared mixed before injecting concrete slurry into slip casting space Solidifying soil release agent can avoid rubber layer from being sticked together with the concrete slurry after solidification after concrete slurry solidification.
Preferably, the locking member includes the first lock shaft being hingedly mounted on the left installing ring other end and hinge The second lock shaft being mounted on the right installing ring other end is connect, at least one locking hole, institute are offered on first lock shaft It states and is plugged with the check lock lever that at least one end is threadedly coupled with locking hole on the second lock shaft.
Through the above technical solutions, in left installing ring and right installing ring pairing, by the way that check lock lever is threaded in lock In tieholen, with the spinning movement of check lock lever, left installing ring can be controlled and right installing ring is mutually drawn close, tensed, thus left peace Dress circle and right installing ring are fixed in the position of foundation pit supporting pile.
In view of the deficienciess of the prior art, another object of the present invention is to provide a kind of repairing for foundation pit supporting pile It is high to have the characteristics that foundation pit supporting pile repairs convenience for the method for repairing and constructing of complex structure.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of method for repairing and constructing using the reparation structure as described in the above technical scheme for foundation pit supporting pile, including such as Lower step:
S1 excavates the soil body being located at around foundation pit supporting pile slight crack on foundation pit side-wall, and to table locating for foundation pit supporting pile slight crack Face region is cleaned;
S2 will repair frame and be fastened around at the slight crack of foundation pit supporting pile;
S3, left installing ring and right installing ring enclose foundation pit supporting pile and are placed in slip casting will repair frame and foundation pit supporting pile slight crack After in space, right installing ring is tensed left installing ring to realize the fixation on foundation pit supporting pile by locking member;
S4, concrete slurry are passed into slip casting space by Grouting Pipe, grouting nozzle;
S5 stands the foundation pit supporting pile, after waiting concrete slurry solidification, removes and repairs installing ring.
Preferably, in step sl, clean foundation pit supporting pile slight crack locating for surface region include foundation pit supporting pile slight crack, The top of foundation pit supporting pile slight crack and the lower part of foundation pit supporting pile slight crack.
Preferably, after removing reparation installing ring, the soil body around foundation pit supporting pile slight crack is backfilled, and tamp foundation pit branch The soil body around fender pile slight crack.
In conclusion the present invention having the beneficial effect that in contrast to the prior art
The application is enclosed at the slight crack of foundation pit supporting pile and is fixed by that will repair frame, will repair installing ring installation covering It is repairing outside frame, concrete slurry is injected into slip casting space by Grouting Pipe, grouting nozzle, stands the foundation pit supporting pile, is waited Concrete slurry solidification after, remove repair installing ring, by the reparation structure to more have the foundation pit supporting pile of destruction into Row is repaired, and by directly repairing to slight crack in foundation pit supporting pile periphery, there is foundation pit supporting pile slight crack to repair convenience high The characteristics of.
Detailed description of the invention
Fig. 1 is the scheme of installation of foundation pit supporting pile in technical solution of the present invention;
Fig. 2 is the scheme of installation that structure is repaired in technical solution of the present invention;
Fig. 3 is the structural schematic diagram that frame is repaired in technical solution of the present invention;
Fig. 4 is status diagram when repairing installing ring closure in technical solution of the present invention;
Fig. 5 is the status diagram repaired when installing ring is opened in technical solution of the present invention.
Appended drawing reference: 1, foundation pit supporting pile;2, sealing, only native curtain;3, anti-side campshed;4, frame is repaired;41, the first iron Silk;42, the second iron wire;43, reinforcing bar;44, concrete nail;5, installing ring is repaired;51, left installing ring;52, right installing ring;53, it keeps off Side;54, boss is connected;55, caulking groove is connected;56, locking member;561, the first lock shaft;562, the second lock shaft;563, it locks Hole;564, check lock lever;57, slip casting space;58, grouting nozzle;59, rubber layer;6, Grouting Pipe.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one
As shown in Figure 1, a kind of reparation structure for foundation pit supporting pile, is applied to foundation pit supporting pile 1, foundation pit supporting pile 1 is applied In pattern foundation pit supporting structure, foundation pit supporting pile 1 uses cast in place concrete thin tunnel pile or driven cast-in-place pile.Excavate the earthwork in digging machine to be formed When foundation pit, foundation pit supporting pile 1 can be close to foundation pit side-wall, achieve the purpose that supporting foundation pit side wall, prevent foundation pit from slight slope occur The problems such as landing, wherein the corresponding foundation pit periphery side of foundation pit supporting pile 1 is provided with sealing, only native curtain 2, sealing, only native curtain Spacing between 2 and foundation pit supporting pile 1 is arranged according to the demand of space and foundation pit position soil property.Foundation pit supporting pile 1 corresponds to base It cheats and is provided with anti-side campshed 3 in the hole bottom of side, anti-side campshed 3 is for providing the resistance to tilting of 1 bottom of foundation pit supporting pile, only Water, only native curtain 2 and anti-side campshed 3 are all made of cement mixing pile.
The top of foundation pit supporting pile 1 pours capping beam to improve the connectivity of whole foundation pit supporting pile 1, therefore, is digging When machine excavates the earthwork in foundation pit, if the quantity that digging machine causes foundation pit supporting pile 1 to damage is excessive, foundation pit supporting pile 1 will be caused Supporting intensity reduces, and needs to repair the slight crack on foundation pit supporting pile 1 thus.Slight crack on discovery foundation pit supporting pile 1 When, construction personnel excavates the soil body being located at around 1 slight crack of foundation pit supporting pile on foundation pit side-wall first, so that foundation pit supporting pile 1 is split Integrally it is exposed at trace, is repaired with facilitating, and surface region locating for 1 slight crack of foundation pit supporting pile is cleaned, so that The surface region of foundation pit supporting pile 1 to reduce dust as far as possible.
Specifically, in conjunction with shown in Fig. 2 and Fig. 3, which includes repairing frame 4, repairing installing ring 5 and Grouting Pipe 6.It repairs Multiple frame 4 is coated at the slight crack of foundation pit supporting pile 1, which includes the first iron wire 41, the second iron wire 42 and several two The reinforcing bar 43 being separately fixed on the first iron wire 41 and the second iron wire 42 is held, the both ends of reinforcing bar 43 are fixed on by welding On first iron wire 41 and the second iron wire 42, several reinforcing bars 43 are spaced vertical distribution, the first iron wire 41 and the second iron wire 42 ending phase It connects to surround foundation pit supporting pile 1, the joint of the first iron wire 41 and the second iron wire 42 is fixed, and by 41 He of the first iron wire Second iron wire 42 is fixed on foundation pit supporting pile 1 by concrete nail 44, in one embodiment, is provided on concrete nail 44 For the through-hole that the first iron wire 41 or the second iron wire 42 pass through, with realize concrete nail 44 and the first iron wire 41 or the second iron wire 42 it Between fixation.In another embodiment, setting is socketed in consolidating on concrete nail 44 on the first iron wire 41 or the second iron wire 42 Ring is determined, to realize the fixation between concrete nail 44 and the first iron wire 41 or the second iron wire 42.Reinforcing bar 43 and foundation pit supporting pile 1 There are filling gaps between outer wall.The reparation frame 4 is capable of fixing on foundation pit supporting pile 1 as a result, and 43 vertical direction of reinforcing bar Setting, and then circumferentially-spaced outer the placing for being distributed in 1 slight crack of foundation pit supporting pile of several reinforcing bars 43.
In conjunction with shown in Fig. 4 and Fig. 5, repairing installing ring 5 includes the left installing ring 51 in semi-circular setting and right installation respectively The both ends of circle 52, left installing ring 51 and right installing ring 52 are provided with rib 53, and one end of left installing ring 51 is hinged on right installation One end of circle 52, the other end of right installing ring 52 are connected with connection boss 54, and the other end of left installing ring 51 is provided with for connection The chimeric connection caulking groove 55 of boss 54, right 52 other end of installing ring are provided with the locking member 56 for tensing left installing ring 51, When left installing ring 51 and right 52 pairing of installing ring, connection boss 54 is entrenched in connection caulking groove 55, left installing ring 51, right installing ring It is formed between 52 and foundation pit supporting pile 1 for enveloping the slip casting space 57 for repairing frame 4, left installing ring 51 and/or right installation The grouting nozzle 58 communicated with slip casting space 57 is provided on circle 52.
It is worth noting that left installing ring 51 and right installing ring 52 mutually tense with the tensioning action of locking member 56 Draw close, connection boss 54 be gradually embedded connection caulking groove 55 in, until connection boss 54 with connect the complete pairing of caulking groove 55, with reality Sealing between existing 52 other end of left installing ring 51 and right installing ring.If since 1 outside wall surface of foundation pit supporting pile is not smooth enough, left Installing ring 51 and right installing ring 52 can not complete pairing when, pass through connection boss 54 and the setting that connect caulking groove 55, connection boss 54 and connection caulking groove 55 can be avoided between 52 other end of left installing ring 51 and right installing ring and gap occur, to keep slip casting empty Between 57 airtightness and integrality.
Wherein, rubber layer 59 is provided on the inner wall of left installing ring 51 and right installing ring 52, rubber layer 59 can be to left peace The gap of dress circle 51 and right installing ring 52 is filled, and further to keep the airtightness in slip casting space 57, avoids concrete grout Material leaks in slip casting space 57.Before injecting concrete slurry into slip casting space 57, need to be used for and mix in rubber layer 59 Smear concrete parting agent in the surface of solidifying soil paste material contact.
It is worth noting that Grouting Pipe 6 is connected on grouting nozzle 58 for being passed through concrete slurry.Concrete slurry passes through Grouting Pipe 6 is injected, and is entered in slip casting space 57 after grouting nozzle 58, concrete slurry is to the slight crack on foundation pit supporting pile 1 It is filled closely knit, and after concrete slurry fills full slip casting space 57, is cooled down by standing, concrete slurry solidification, Concrete slurry after solidification forms cylindrical support outside foundation pit supporting pile 1, should be able to mutually erect to foundation pit supporting pile 1 Support on direction improves the resistance to tilting of foundation pit supporting pile 1.
In the application, in conjunction with shown in Fig. 4 and Fig. 5, locking member 56 includes being hingedly mounted on left 51 other end of installing ring The first lock shaft 561 and the second lock shaft 562 for being hingedly mounted on right 52 other end of installing ring, the first lock shaft 561 On offer at least one locking hole 563, at least one end and 563 screw thread of locking hole are plugged on the second lock shaft 562 and is connected The check lock lever 564 connect.In left installing ring 51 and right 52 pairing of installing ring, by the way that check lock lever 564 is threaded in locking hole In 563, with the spinning movement of check lock lever 564, left installing ring 51 can be controlled and right installing ring 52 is mutually drawn close, tensed, from And left installing ring 51 and right installing ring 52 are fixed in the position of foundation pit supporting pile 1.
It is solidified in concrete slurry, after the slight crack on foundation pit supporting pile 1 is repaired, removes and repair installing ring 5, backfill base The soil body around 1 slight crack of support pile is cheated, and tamps the soil body around 1 slight crack of foundation pit supporting pile.Therefore, the application passes through the reparation Structure has the foundation pit supporting pile 1 of destruction to repair to more, directly repairs, has to slight crack in 1 periphery of foundation pit supporting pile It is high to have the characteristics that 1 slight crack of foundation pit supporting pile repairs convenience.
Embodiment two
A kind of method for repairing and constructing using the reparation structure as described in the above technical scheme for foundation pit supporting pile 1, including Following steps:
Step S1 excavates the soil body being located at around 1 slight crack of foundation pit supporting pile on foundation pit side-wall, and to 1 slight crack institute of foundation pit supporting pile The surface region at place is cleaned;Specifically, cleaning surface region locating for 1 slight crack of foundation pit supporting pile includes foundation pit supporting pile 1 The lower part of 1 slight crack of slight crack, the top of 1 slight crack of foundation pit supporting pile and foundation pit supporting pile.
Step S2 will repair frame 4 and be fastened around at the slight crack of foundation pit supporting pile 1;Specifically, the first iron wire 41 and second The ending of iron wire 42 connects to surround foundation pit supporting pile 1, and the joint of the first iron wire 41 and the second iron wire 42 is fixed, and will First iron wire 41 and the second iron wire 42 are fixed on foundation pit supporting pile 1 by concrete nail 44,43 circumferentially-spaced points of several reinforcing bars Cloth is in outer the placing of 1 slight crack of foundation pit supporting pile, and there are filling gaps between 1 outer wall of reinforcing bar 43 and foundation pit supporting pile.
Step S3, left installing ring 51 and right installing ring 52 enclose foundation pit supporting pile 1 will repair frame 4 and pattern foundation pit supporting structure After 1 slight crack of stake is placed in slip casting space 57, right installing ring 52 is tensed left installing ring 51 to realize in base by locking member 56 Cheat the fixation on support pile 1.
Step S4, concrete slurry are passed into slip casting space 57 by Grouting Pipe 6, grouting nozzle 58.
Step S5 stands the foundation pit supporting pile 1, after waiting concrete slurry solidification, removes and repairs installing ring 5, after solidification Concrete slurry formed tubulose supporting element be fixed on outside foundation pit supporting pile 1.
Step S6 backfills the soil body around 1 slight crack of foundation pit supporting pile, and tamp foundation pit after removing reparation installing ring 5 The soil body around 1 slight crack of support pile.
Therefore, the application can have the foundation pit supporting pile 1 of destruction to repair by the method for repairing and constructing to more, Slight crack is directly repaired in 1 periphery of foundation pit supporting pile, and it is high to have the characteristics that 1 slight crack of foundation pit supporting pile repairs convenience.
The above is only exemplary embodiment of the invention, protection scope and is not intended to limit the present invention, this hair Bright protection scope is determined by the attached claims.

Claims (8)

1. a kind of reparation structure for foundation pit supporting pile is applied to foundation pit supporting pile (1), which is characterized in that the reparation structure Include:
It repairs frame (4), is coated at the slight crack of foundation pit supporting pile (1), which includes the first iron wire (41), the second iron Silk (42) and several both ends are separately fixed at the reinforcing bar (43) on the first iron wire (41) and the second iron wire (42), several reinforcing bars (43) the vertical distribution in interval, first iron wire (41) and second iron wire (42) ending, which connect, is fastened around pattern foundation pit supporting structure In stake (1);
It repairs installing ring (5), left installing ring (51) and right installing ring (52) including being respectively in semi-circular setting, the left installation One end of circle (51) is hinged on one end of right installing ring (52), and the other end of the right installing ring (52) is connected with connection boss (54), the other end of the left installing ring (51) offers the connection caulking groove (55) chimeric for connection boss (54), the right peace Dress circle (52) other end is provided with the locking member (56) for tensing left installing ring (51), left installing ring (51) He Youan When dress circle (52) pairing, the connection boss (54) is entrenched in connection caulking groove (55), the left installing ring (51), right installing ring (52) it is formed between foundation pit supporting pile (1) for enveloping the slip casting space (57) for repairing frame (4), the left installing ring (51) grouting nozzle (58) communicated with slip casting space (57) and/or is provided on right installing ring (52);
Grouting Pipe (6) is connected on grouting nozzle (58) for being passed through concrete slurry.
2. a kind of reparation structure for foundation pit supporting pile according to claim 1, which is characterized in that first iron wire (41) connect fixed and be fixed on foundation pit supporting pile (1) by concrete nail (44), the reinforcing bar with the second iron wire (42) (43) there are filling gaps between the outer wall of foundation pit supporting pile (1).
3. a kind of reparation structure for foundation pit supporting pile according to claim 1, which is characterized in that the left installing ring (51) and on the inner wall of right installing ring (52) it is provided with rubber layer (59).
4. a kind of reparation structure for foundation pit supporting pile according to claim 3, which is characterized in that the rubber layer (59) surface for contacting with concrete slurry is coated with concrete parting agent.
5. a kind of reparation structure for foundation pit supporting pile according to claim 1, which is characterized in that the locking member (56) include the first lock shaft (561) for being hingedly mounted on left installing ring (51) other end and be hingedly mounted on right installation The second lock shaft (562) on (52) other end is enclosed, offers at least one locking hole on first lock shaft (561) (563), the check lock lever that at least one end is threadedly coupled with locking hole (563) is plugged on second lock shaft (562) (564)。
6. a kind of repairing construction side of reparation structure for foundation pit supporting pile of application as described in claim 1 ~ 5 any one Method, which comprises the steps of:
S1 excavates the soil body being located at around foundation pit supporting pile (1) slight crack on foundation pit side-wall, and to foundation pit supporting pile (1) slight crack institute The surface region at place is cleaned;
S2 will repair frame (4) and be fastened around at the slight crack of foundation pit supporting pile (1);
S3, left installing ring (51) and right installing ring (52) enclose foundation pit supporting pile (1) will repair frame (4) and pattern foundation pit supporting structure After stake (1) slight crack is placed in slip casting space (57), right installing ring (52) is tensed left installing ring (51) by locking member (56) To realize the fixation on foundation pit supporting pile (1);
S4, concrete slurry are passed into slip casting space (57) by Grouting Pipe (6), grouting nozzle (58);
S5 stands the foundation pit supporting pile (1), after waiting concrete slurry solidification, removes and repairs installing ring (5).
7. a kind of method for repairing and constructing according to claim 6, which is characterized in that in step sl, clean pattern foundation pit supporting structure Surface region locating for stake (1) slight crack includes foundation pit supporting pile (1) slight crack, the top of foundation pit supporting pile (1) slight crack and foundation pit The lower part of support pile (1) slight crack.
8. a kind of method for repairing and constructing according to claim 6, which is characterized in that after removing reparation installing ring (5), The soil body around foundation pit supporting pile (1) slight crack is backfilled, and tamps the soil body around foundation pit supporting pile (1) slight crack.
CN201910507444.7A 2019-06-12 2019-06-12 Repair structure and repair construction method for foundation pit supporting pile Expired - Fee Related CN110258549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910507444.7A CN110258549B (en) 2019-06-12 2019-06-12 Repair structure and repair construction method for foundation pit supporting pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910507444.7A CN110258549B (en) 2019-06-12 2019-06-12 Repair structure and repair construction method for foundation pit supporting pile

Publications (2)

Publication Number Publication Date
CN110258549A true CN110258549A (en) 2019-09-20
CN110258549B CN110258549B (en) 2021-02-09

Family

ID=67917896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910507444.7A Expired - Fee Related CN110258549B (en) 2019-06-12 2019-06-12 Repair structure and repair construction method for foundation pit supporting pile

Country Status (1)

Country Link
CN (1) CN110258549B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519631A (en) * 2020-04-23 2020-08-11 广东万宜基础工程有限公司 Repairing structure and repairing method of foundation pit support
CN112095622A (en) * 2020-09-19 2020-12-18 深圳鹏城岩土科技有限公司 Repair structure and repair construction method for foundation pit supporting pile
CN112609682A (en) * 2020-12-17 2021-04-06 广东广强基础工程有限公司 Energy-saving repair structure for supporting row piles and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2210135A (en) * 1987-09-23 1989-06-01 Wimpey Group Services Limited A method of connecting to, repairing and/or strengthening a structural component
WO1998050640A1 (en) * 1997-05-07 1998-11-12 Amog Technologies Pty. Ltd. Repair of structural members
CN205653782U (en) * 2016-05-23 2016-10-19 中国建筑第八工程局有限公司 Mould is repaired to bored concrete pile pile head
CN106930338A (en) * 2015-12-30 2017-07-07 卡本复合材料(天津)有限公司 A kind of reinforcement means of the sleeve of glass under water
CN207794073U (en) * 2018-01-30 2018-08-31 青岛瑞源工程集团有限公司 A kind of pile foundation reparation socket
CN108797395A (en) * 2018-08-28 2018-11-13 南京路友道路工程有限公司 A method of using glass sleeve reinforcement bridge pier column
CN109487785A (en) * 2018-12-25 2019-03-19 贵州建工集团第四建筑工程有限责任公司 Combined type ruggedized construction and its construction method based on building pile foundation
CN109826200A (en) * 2019-01-23 2019-05-31 广东建基基础工程有限公司 A kind of pattern foundation pit supporting structure repairs structure and its construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2210135A (en) * 1987-09-23 1989-06-01 Wimpey Group Services Limited A method of connecting to, repairing and/or strengthening a structural component
WO1998050640A1 (en) * 1997-05-07 1998-11-12 Amog Technologies Pty. Ltd. Repair of structural members
CN106930338A (en) * 2015-12-30 2017-07-07 卡本复合材料(天津)有限公司 A kind of reinforcement means of the sleeve of glass under water
CN205653782U (en) * 2016-05-23 2016-10-19 中国建筑第八工程局有限公司 Mould is repaired to bored concrete pile pile head
CN207794073U (en) * 2018-01-30 2018-08-31 青岛瑞源工程集团有限公司 A kind of pile foundation reparation socket
CN108797395A (en) * 2018-08-28 2018-11-13 南京路友道路工程有限公司 A method of using glass sleeve reinforcement bridge pier column
CN109487785A (en) * 2018-12-25 2019-03-19 贵州建工集团第四建筑工程有限责任公司 Combined type ruggedized construction and its construction method based on building pile foundation
CN109826200A (en) * 2019-01-23 2019-05-31 广东建基基础工程有限公司 A kind of pattern foundation pit supporting structure repairs structure and its construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王军: "水下桩基施工中玻纤套筒夹克法研究", 《江苏科技信息》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519631A (en) * 2020-04-23 2020-08-11 广东万宜基础工程有限公司 Repairing structure and repairing method of foundation pit support
CN112095622A (en) * 2020-09-19 2020-12-18 深圳鹏城岩土科技有限公司 Repair structure and repair construction method for foundation pit supporting pile
CN112095622B (en) * 2020-09-19 2021-09-03 深圳鹏城岩土科技有限公司 Repair structure and repair construction method for foundation pit supporting pile
CN112609682A (en) * 2020-12-17 2021-04-06 广东广强基础工程有限公司 Energy-saving repair structure for supporting row piles and construction method thereof
CN112609682B (en) * 2020-12-17 2022-04-22 广东广强基础工程有限公司 Energy-saving repair structure for supporting row piles and construction method thereof

Also Published As

Publication number Publication date
CN110258549B (en) 2021-02-09

Similar Documents

Publication Publication Date Title
CN110258549A (en) A kind of reparation structure and method for repairing and constructing for foundation pit supporting pile
CN106958256B (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN110374134A (en) A kind of combined member increased suitable for retaining wall and construction method
CN109611102A (en) Construction of the flyover method is worn under a kind of cold excavation
CN104533451A (en) Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN108560580A (en) Earth-retaining wall construction method
CN110485437A (en) Roadbed side slope entirety green safeguard structure and its construction method
JP3625892B2 (en) Construction method of underground structure using precast concrete column
CN107558477A (en) The supporting construction and construction method that a kind of foundation ditch is combined with side slope
CN107366303A (en) Construction method and retaining wall of the aluminum alloy mould plate as highway gravity retaining wall template
KR101220256B1 (en) Retaining wall structure
CN108868779A (en) Tunnel portal support device and tunnel portal construction method
CN109281239A (en) Ribbed abutments in road operation state bore slope cutting method
CN208605185U (en) Tunnel portal support device
CN207828980U (en) A kind of foundation pit supporting construction
CN110439592A (en) Shield tunnel two serves as a contrast concrete structure and construction method
CN108005086B (en) A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure
CN110671132A (en) Deformation control construction structure and method for deep-buried loess tunnel based on arch sheathing
CN212003113U (en) Broken rock mass slip casting is with only thick liquid device
CN106120853B (en) A kind of inverted construction method of frame bridge
CN206220558U (en) Old City Wall door opening ruggedized construction
CN210857237U (en) Combined protective blanket
CN203783113U (en) Slope scaffold vertical rod base
JPH0522771B2 (en)
CN109736318A (en) Tunnel foundation ditch construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210108

Address after: Room 805, 8 / F, Lianhe building, Dongcheng South Road, Dongcheng Street, Dongguan, Guangdong 523000

Applicant after: GUANGDONG GUANGQIANG FOUNDATION ENGINEERING Co.,Ltd.

Address before: Room 805, 8 / F, Lianhe building, Dongcheng South Road, Dongcheng Street, Dongguan, Guangdong 523000

Applicant before: Dongguan Guangqiang Construction Foundation Engineering Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210209

CF01 Termination of patent right due to non-payment of annual fee