CN110258312A - The structure linkage section and its design method, construction method of segment assembled pier stud - Google Patents

The structure linkage section and its design method, construction method of segment assembled pier stud Download PDF

Info

Publication number
CN110258312A
CN110258312A CN201910643029.4A CN201910643029A CN110258312A CN 110258312 A CN110258312 A CN 110258312A CN 201910643029 A CN201910643029 A CN 201910643029A CN 110258312 A CN110258312 A CN 110258312A
Authority
CN
China
Prior art keywords
segment
assembled
vertical muscle
public
parent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910643029.4A
Other languages
Chinese (zh)
Other versions
CN110258312B (en
Inventor
曾永平
刘力维
庞林
陈克坚
郑晓龙
董俊
陶奇
宋晓东
杨国静
苏延文
徐昕宇
周川江
颜永逸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201910643029.4A priority Critical patent/CN110258312B/en
Publication of CN110258312A publication Critical patent/CN110258312A/en
Application granted granted Critical
Publication of CN110258312B publication Critical patent/CN110258312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of structure linkage section of segment assembled pier stud and its design methods, construction method, wherein, structure linkage section includes public segment and parent segment, public segment includes the first noumenon, the first noumenon is equipped with the first assembled end and the second assembled end, several the first vertical muscle are additionally provided in the first noumenon, every first vertical muscle runs through the first noumenon, and it is stretched out respectively from the first assembled end and the second assembled end, parent segment includes the second ontology, second ontology is equipped with third assembly end and the 4th assembled end, the height of second ontology is greater than or equal to the sum of the length that the first vertical muscle stretches out the first assembled end and the second assembled end, several perforation holes are additionally provided in second ontology, penetrate through the quantity of hole, position, cross sectional dimensions is adapted with the first vertical muscle, first assembled end and third assembly end are equipped with shear connector A, second assembled end and 4th assembled end is equipped with shear connector B, shear connector A and shear connector B and is adapted;The identical groove of shape size is equipped at all assembly ends.

Description

The structure linkage section and its design method, construction method of segment assembled pier stud
Technical field
The present invention relates to technical field of bridge engineering, in particular to the structure linkage section of a kind of segment assembled pier stud and its Design method, construction method.
Background technique
In municipal traffic engineering and railway engineering, design, production and the construction of segment assembled beam are more mature, existing The beam method processed such as some long line methods, short line casting has been widely used in the construction of size bridge, and bridge pier column is with cast-in-place construction Cause the whole bridge construction completion time of project tediously long based on mode, is to realize one of fabricated important obstruction of full-bridge, limits assembled The performance of structural advantage.Integral prefabricated pier stud is a kind of engineer application form for realizing that pier stud is prefabricated assembled, but this method is deposited Construction weight is big, size and volume are big, the outstanding problems such as limited by transporting, lifting.Segment assembled pier stud (PSBC), will The segmented prefabrication and assembly construction of pier stud can significantly reduce the weight and size of prefabricated components.
For pier stud as main lateral resistant member, anti-seismic performance is to evaluate a key index of pier stud assembled technology. Existing segment assembled pier stud (PSBC) mainly uses two kinds of combination assembling forms based on stem grafting seam connection between segment:
The first is the segment assembled pier stud of prestressing force connection, and each segment is only leaned on through full pier stud in vitro or in vivo Deformed bar connection, it is discontinuous that muscle is indulged in each segment.Stress, deformation and the injury characteristic of this segment assembled pier stud are the same as cast-in-place There is very big difference in pier stud.Under geological process, it is small that configuration deformed bar leads to residual deformation after small shake, but lacks continuous Vertical muscle cause whole energy dissipation capacity poor, destroying is in brittleness, therefore is not suitable for the application in middle and high earthquake intensity area.
Another segment assembled pier stud is aided with the energy consumption muscle material such as vertical muscle, each segment to improve anti-seismic performance between segment Between mainly using grout sleeve connect.A kind of this segment assembled pier stud, each segment both ends of pier stud are both needed to pre-buried multiple grouting Sleeve, and grout hole and slurry outlet are reserved for each grout sleeve, it is perfused using dedicated grouting material.Grout sleeve with it is dedicated The price of grouting material is higher, and grouting construction is relatively complicated, and with increasing for joint face, connection is increased with material price, when construction Between extend, it is serious to limit the engineering application value of the segment assembled pier stud using this method.
Summary of the invention
It is an object of the invention to overcome the above-mentioned deficiency in the presence of the prior art, a kind of segment assembled pier stud is provided Structure linkage section and its design method, construction method, can reduce construction cost and difficulty, further improve component standard Change, preferably carries out industrialized mass production.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of structure linkage section of segment assembled pier stud, including public segment and parent segment;
The public affairs segment includes the first noumenon, and the first noumenon is equipped with the first assembled end and the second assembled end, described Several the first vertical muscle are additionally provided in the first noumenon, the every first vertical muscle runs through the first noumenon, and respectively from first Assembled end and the second assembled end are stretched out;
The parent segment includes the second ontology, and second ontology is equipped with third assembly end and the 4th assembled end, described The height of second ontology is greater than or equal to the sum of the length that the described first vertical muscle stretches out the first assembled end and the second assembled end, described Several perforation holes are additionally provided in second ontology, the quantity of the perforation hole, position, cross sectional dimensions are indulged with described first Muscle is adapted;
Described first assembled end and third assembly end are equipped with shear connector A, and the described second assembled end and the 4th assembled end are equipped with Shear connector B, the shear connector A and shear connector B are adapted;
Described first assembled end and the second assembled end are equipped with the first annular recess, third assembly end and the 4th assembly It holds and is equipped with the second annular recess, the shape size of first annular recess and the second annular recess is identical.
More for prefabricated subsection assembled pier stud seam, vertical muscle is difficult to elongated arrangement, and then influences economy and practicability Etc. practical problems, prefabricated subsection is designed as two class standard segments, the first kind is with vertical muscles and joints-vital links in a speech section (public segment), and second is It connects segment (parent segment).The vertical muscle of the first of public segment stretches out, and general without setting crotch, the first vertical muscle protrudes into the perforation of parent segment In hole, and carry out slip casting connection.One parent segment can connect two public segments up and down, be saved by designing male segment and mother Section, it can be achieved that the vertical muscle mechanical property of segment assembled pier stud it is continuous, and without grout sleeve or slurry anchor, significantly reduce The difficulty of construction and cost of seam crossing are reduced because segmentation bring connects difficulty.Further, in public segment and parent segment Contact surface on set concrete shear key, while improving shear behavior, realize the positioning and limit in installation process.Segment The first annular groove and second annular groove and sealing material being arranged at seam are used cooperatively, and improve intersegmental sealing Performance meets the requirement of durability of pier column.
Meanwhile the public segment and parent segment be a part of pillarwork, meets corresponding structural strength, rigidity It is required that.The length of the public affairs segment and parent segment is suitable, and parent segment sectional dimension is consistent with public segment, can reserve and pass through up and down Logical hole provides one to the vertical muscle to be connected and binding material and reliably constrains bad border, offsets vertical muscle without crotch to cohering The reduction of slip property.It penetrates through hole and parent segment length is isometric, opening is big, the corresponding minimum of various sizes of vertical muscle coheres length Degree does not play control action in the design, it can be achieved that common high-strength mortar or self-leveling concrete mortar depositing construction, without cohering The high prices proprietary material grouting construction such as mortar, saves material cost, reduces difficulty of construction.The vertical muscle and stirrup of parent segment The ratio of reinforcement can be identical as public segment, the intensity of parent segment no longer needs to be checked, and bond length, which meets minimum bond length, to be wanted It asks, seam crossing adhesion strength does not play control action, is consistent the design method of segment assembled pier stud with cast-in-place pier stud, drops Low design difficulty.Assembling process uses consistent operational procedure, reduces difficulty of construction.If uniline dosage is big, lead to Design standard segment is crossed, industrialized production is realized, the prefabricated processing cost of segment can be further decreased.
Preferably, several second vertical muscle are additionally provided on the parent segment, the second vertical muscle is along second ontology Elongated arrangement, the quantity of the second vertical muscle are equal to the quantity of the described first vertical muscle, and the sectional area of the second vertical muscle is equal to institute State the sectional area of the first vertical muscle.Preferably, the described second vertical muscle is arranged in the outside of the perforation hole, i.e., farther away from neutrality Axis arrangement.So that parent segment, when calculating bend-carrying capacity, effective cross-section is greater than the adjacent public segment in lower part, held by curved It carries power and is greater than public segment, therefore parent segment is not necessarily to carry out the design of additional bend-carrying capacity.
Preferably, the perforation hole includes spiral reinforcement hole, steel pipe hole, ripple pore etc..
Preferably, the length that the described first vertical muscle stretches out the described first assembled end, which is less than or equal to, stretches out second assembly The length at end.When the two equal length, the structure at the assembled end in public segment two is consistent, facilitates and is processed and assembled.
Preferably, it is additionally provided with stirrup in the first noumenon and the second ontology, and the first noumenon and the second ontology Stirrup reinforcement ratio per unit volume is equal.
Preferably, the public segment and parent segment be circular cross-section, square-section or other.
Preferably, the shear connector A is groove structure, and the shear connector B is bulge-structure, may be designed as other forms Shear connector or shearing key combination, as long as being able to achieve anti-shear concrete effect, meet related specifications shear resistance capacity design It is required that.
Preferably, sealing material is filled at first annular recess and the second annular recess.Specifically, all Epoxy glue is uniformly smeared at first annular recess and the second annular recess, waterproof roll is pasted in winding, then smears closing glue, scrapes benefit It is flat.
The invention also discloses a kind of design methods of the structure linkage section of segment assembled pier stud, comprising the following steps:
Step 1: being designed as two class standard segments for the structure linkage section of segment assembled pier stud, respectively public segment and Parent segment;
Step 2: designing public segment, quantity, sectional dimension, position including calculating the first vertical muscle in public segment, Yi Ji One vertical muscle stretches out the length at the first assembled end and the second assembled end respectively;
Step 3: design parent segment, including the length according to the first assembled end of vertical muscle stretching first and the second assembled end The sum of determine parent segment height;The number of the perforation hole of parent segment is determined according to the quantity, sectional dimension, position of the first vertical muscle Amount, sectional dimension, position;The quantity of the second vertical muscle, section ruler in parent segment are determined according to quantity, the sectional dimension of the first vertical muscle It is very little, and the second vertical muscle is arranged relative to the first vertical muscle far from neutral axis;
Step 4: according to shear resistance capacity design requirement, the shear connector on the public segment and parent segment is designed;
The sequencing of the step 3 and step 4 can be exchanged.
Design method of the present invention breaches the design method of conventional vertical muscle connection, without grout sleeve, Vertical muscle connection is directly carried out by parent segment, in turn ensures that its bend-carrying capacity is greater than adjacent public section in the design of parent segment Section carries out special design and checking computations there is no need to the bend-carrying capacity to parent segment, public segment stretch out the length of vertical muscle not by The limitation of connector size, adhesion strength do not play control action.Parent segment volume distributed ratio is equal with adjacent public segment, in segment Shear connector is arranged without being checked in shear resistance capacity between segment, after Uniting, it is ensured that do not shear between segment It destroys.The setting of parent segment arrangement of reinforcement method and intersegmental shear connector keeps the design method of segment assembled pier stud equivalent cast-in-place Pier stud, whole structural behaviour are equivalent cast-in-place.
Preferably, design method further includes the stirrup reinforcement ratio per unit volume for calculating the public segment, and according to the public segment Stirrup reinforcement ratio per unit volume design the stirrup of the parent segment.
The invention also discloses a kind of construction methods of the structure linkage section of segment assembled pier stud, comprising the following steps:
Step 1: binding material is smeared toward the first assembled end of public affairs segment, parent segment is lifted to public segment, and will The assembled end of the 4th of parent segment is aligned the first assembled end of the public segment, and perforation hole contraposition assembly to the public affairs of parent segment are saved At first vertical muscle of section, at the shear connector B contraposition assembly to the shear connector A of public segment of parent segment;
Step 2: filling binding material extremely overflows in the perforation hole of the parent segment, and will cohere described in spilling Material is smeared uniform in the third assembly face of parent segment;
Step 3: above another public segment lifting to the parent segment, the second of another public segment is assembled In face of the third assembly face of the neat parent segment;
Step 4: the first vertical muscle of another public segment is inserted into the perforation hole, the process of insertion perforation hole In vertical muscle vibrated to assist being inserted by vibrating spear;
Step 5: step 1 is repeated to four, until completing the assembly of all public segments and parent segment;
Step 6: after the assembly for completing all public segments and parent segment, all the first annular recess and the second ring are cleared up Shape groove uniformly applies at all first annular recess and the second annular recess after the binding material reaches design strength Epoxy glue is smeared, waterproof roll is wound, then smear closing glue, scrapes filling-in.
The binding material includes high-strength mortar, self-leveling concrete etc., in the construction process, due to using parent segment Hole is penetrated through, the method for filling of binding material and vertical muscle connection construction are more convenient, can reduce construction cost and difficulty, segment The first annular groove and second annular groove being arranged at seam also reduce construction while sealing between guaranteeing segment Difficulty improves the engineering application value of segment assembled pier stud.
Preferably, the shear connector A is groove structure, and the shear connector B is bulge-structure.
Preferably, in the step 1, when binding material is smeared at the first assembled end of past public affairs segment, at the shear connector A The binding material of filling is at least one of four parts of depression volume, guarantees that shear connector A and shear connector B cooperation is close;
Preferably, in the step 2, loading of the binding material at the shear connector A of parent segment is at least depression volume One of four parts, guarantee that shear connector A and shear connector B cooperation is close.
Preferably, in the step 6, the winding width of the waterproof roll is that the first annular recess and second are cyclic annular recessed The sum of height of slot, winding thickness are less than the depth of first annular recess.
Compared with prior art, the structure linkage section of assembled pier stud in segment of the present invention the utility model has the advantages that
By the public segment of design and parent segment, it can be achieved that indulging the continuous of muscle mechanical property between each segment of assembled pier stud of segment, And without grout sleeve and dedicated grouting material, difficulty and cost because of segmentation bring connection construction are reduced.It can be into One step improves the standardization level of component, preferably carries out industrialized mass production, further decreases processing cost.
Compared with prior art, the design method of the structure linkage section of assembled pier stud in segment of the present invention is beneficial Effect:
Design method of the present invention directly passes through parent segment and carries out vertical muscle connection, in turn ensures in the design of parent segment Its bend-carrying capacity is greater than adjacent public segment, and there is no need to the bend-carrying capacities to parent segment to carry out special design and checking computations; Bonding reinforcing bar length is unrestricted, and adhesion strength does not play control action;Parent segment volume distributed ratio is equal with adjacent public segment, section Shear resistance capacity in section is without being checked;Shear connector is set between segment, after Uniting, it is ensured that do not send out between segment Raw failure by shear.The setting of parent segment arrangement of reinforcement method and intersegmental shear connector makes the design method etc. of segment assembled pier stud With cast-in-place pier stud, whole structural behaviour is equivalent cast-in-place.
Compared with prior art, the construction method of the structure linkage section of assembled pier stud in segment of the present invention is beneficial Effect:
In the construction process, hole is penetrated through due to using parent segment, the method for filling of binding material connect with vertical muscle and applies Work is more convenient, can reduce construction cost and difficulty, and the first annular groove being arranged at the seam of segment and the second annular are recessed Slot also reduces difficulty of construction while sealing between guaranteeing segment, improves the engineering application value of segment assembled pier stud.
Detailed description of the invention:
Fig. 1 is a kind of front view of public segment of the present invention.
Fig. 2 is a kind of top view of public segment of the present invention.
Fig. 3 is a kind of top view of public segment of the present invention.
Fig. 4 is a kind of front view of parent segment of the present invention.
Fig. 5 is a kind of top view of parent segment of the present invention.
Fig. 6 is a kind of top view of parent segment of the present invention.
Fig. 7 is the schematic cross-section in steel pipe hole of the present invention.
Fig. 8 is the front view in steel pipe hole of the present invention.
Fig. 9 is the schematic cross-section of ripple pore of the present invention.
Figure 10 is the front view of ripple pore of the present invention.
Figure 11 is the schematic cross-section in spiral reinforcement hole of the present invention.
Figure 12 is the front view in spiral reinforcement hole of the present invention.
Figure 13 is the schematic diagram of public segment and parent segment assembly of the present invention.
Figure 14 is the cross-section diagram of public segment and parent segment assembly of the present invention.
Marked in the figure: 1- public affairs segment, 10- the first noumenon, the assembled end 11- first, the assembled end 12- second, 13- first are vertical Muscle, the first annular recess of 14-;2- parent segment, the second ontology of 20-, 21- third assembly end, the assembled end 22- the 4th, 23- through hole Hole, 24- second indulge muscle, the second annular recess of 25-;3- shear connector A, 4- shear connector B, 5- binding material.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments The range of invention.
Embodiment 1
A kind of structure linkage section of segment assembled pier stud, including public segment 1 and parent segment 2.
As shown in Figure 1, the public affairs segment 1 includes the first noumenon 10, the first noumenon 10 is reinforced concrete structure, institute It states and is equipped with stirrup in ontology 10.The first noumenon 10 is equipped with the first assembled end 11 and the second assembled end 12, and described first spells Dress end 11 and the second assembled end 12 are used to be assembled with parent segment 2.It is first vertical that several are additionally provided in the first noumenon 10 Muscle 13, the every first vertical muscle 13 run through the first noumenon 10, and respectively from the first assembled end 11 and the second assembled end 12 It stretches out.In the present embodiment, it is preferred that the length that the first vertical muscle 13 stretches out the described first assembled end 11 is equal to described in stretching The length at the second assembled end 12.As shown in Fig. 2-Fig. 3, the public affairs segment 1 can be circular cross-section and be also possible to square-section.
Further, in order to meet shear resistance capacity design requirement, the first assembled end 11 of the public affairs segment 1 is equipped with shearing Key A 3, the second assembled end 12 are equipped with shear connector B 4, and the shear connector A 3 and shear connector B 4 are adapted.Shear connector may include Multiple structural forms, in the present embodiment, the shear connector A 3 are tapered groove structure, and the shear connector B 4 is protrusion knot Structure, and to reduce header structure.And the size (cross section, height) of shear connector A 3 is slightly larger than shear connector B 4, facilitates and is aligned It is assembled.
As shown in figure 4, the parent segment 2 includes the second ontology 20, second ontology 20 is reinforced concrete structure, the Stirrup is equipped in two ontologies 20, the reinforcement ratio per unit volume of the stirrup of the parent segment 2 is identical as the public segment 1.Described second Body 20 is equipped with third assembly end 21 and the 4th assembled end 22, and third assembly end 21 and the 4th assembled end 22 are used for and described It is assembled public segment 1.
It is assembled to realize with upper and lower two public segments 1, the height of second ontology 20 need to be greater than or equal to institute The sum of the length that the first vertical muscle 13 stretches out the first assembled end 11 and the second assembled end 12 is stated, if being additionally provided in second ontology 20 Dry perforation hole 23, the quantity of the perforation hole 23, position, cross sectional dimensions are adapted with the described first vertical muscle 13.Such as Shown in Fig. 5-Fig. 6, the parent segment 2 can be circular cross-section and be also possible to square-section, the parent segment 2 and public segment 1 Section form, size are consistent.
Further, in order to meet shear resistance capacity design requirement, the third assembly end 21 of the parent segment 2 is equipped with shearing Key A 3, the 4th assembled end 22 are equipped with shear connector B 4, and the shear connector A 3 and shear connector B 4 are adapted.Shear connector may include Multiple structural forms, in the present embodiment, the shear connector A 3 are tapered groove structure, and the shear connector B 4 is protrusion knot Structure, and to reduce header structure.And the size (cross section, height) of shear connector A 3 is slightly larger than shear connector B 4, facilitates and is aligned It is assembled.
Further, several second vertical muscle 24 are additionally provided on the parent segment 2, the second vertical muscle 24 is along described The elongated arrangement of second ontology 20, the quantity of the second vertical muscle 24 are equal to the quantity of the described first vertical muscle 13, the second vertical muscle 24 sectional area is equal to the sectional area of the described first vertical muscle 13, and the second vertical muscle 24 is arranged in the outer of the perforation hole 23 Side.I.e. second vertical muscle 24 is arranged compared to the first vertical muscle 13 farther away from neutral axis, guarantees that the bend-carrying capacity of parent segment 2 is greater than The adjacent public segment 1 in lower part, there is no need to the bend-carrying capacities to parent segment 2 to carry out special design and checking computations.
As shown in Figs. 7-8, the perforation hole 23 can be steel pipe hole, described as shown in Fig. 9-Figure 10 Perforation hole 23 can be ripple pore, and as shown in Figure 11-Figure 12, the perforation hole 23 can be spiral reinforcement hole, unlimited In 3 kinds of forms of the present embodiment.
In addition, in order to meet seal request, it is equal at the described first assembled end 11 of the public segment 1 and the second assembled end 12 Equipped with the first annular recess 14, the third assembly end 21 of the parent segment 2 and the 4th assembled end 22 are equipped with the second ring-type Groove 25, first annular recess 14 are identical with the shape size of the second annular recess 25.When segment is assembled, two neighboring Epoxy glue is uniformly smeared at the first annular recess 14 and the second annular recess 25 of segment, waterproof roll is pasted in winding, then is smeared Glue is closed, filling-in is scraped.
Embodiment 2
A kind of design method of the structure linkage section of segment assembled pier stud, comprising the following steps:
Step 1: being designed as two class standard segments for the structure linkage section of segment assembled pier stud, respectively 1 He of public segment Parent segment 2;
Step 2: designing public segment 1, sectional dimension, height, stirrup reinforcement ratio per unit volume including calculating public segment 1, and first Quantity, sectional dimension, position and the first vertical muscle 13 of vertical muscle 13 stretch out the first assembled end 11 and the second assembly end 12 respectively Length;
Step 3: design parent segment 2, including stretching out the first assembled end 11 and the second assembled end 12 according to the first vertical muscle 13 Length the sum of determine parent segment 2 height;Passing through for parent segment 2 is determined according to the quantity, sectional dimension, position of the first vertical muscle 13 The quantity of via holes 23, sectional dimension, position;Determine in parent segment 2 that second is vertical according to quantity, the sectional dimension of the first vertical muscle 13 Quantity, the sectional dimension of muscle 24, and the second vertical muscle 24 is arranged relative to the first vertical muscle 13 far from neutral axis;According to the public affairs The stirrup reinforcement ratio per unit volume of segment 1 designs the stirrup of the parent segment 2;Parent segment 2 is determined according to the sectional dimension of public segment 1 Sectional dimension;
Step 4: according to shear resistance capacity design requirement, the shear connector on the public segment 1 and parent segment 2, Xiang Shi are designed The shear connector A 3 and shear connector B 4 matched is separately positioned on two assembled ends at prefabricated both ends, standard assemblied so as to meet Demand.
The sequencing of the step 3 and step 4 can be exchanged.
Embodiment 3
As shown in Figure 13-Figure 14, a kind of construction method of the structure linkage section of segment assembled pier stud, including following step It is rapid:
Step 1: after the completion of public segment 1 is assembled, with the first vertical muscle 13 of the wet public segment 1 of tap water, and toward having spelled Binding material 5, the surface of wet and levelling dabbing are smeared at the assembled end 11 of the first of the public segment 1 of dress, and guarantee that public segment 1 is cut Filling is at least one of four parts of the binding material 5 (high-strength mortar, self-leveling concrete etc.) of depression volume in power key A 3.It connects , the perforation hole 23 of parent segment 2 to be assembled is first moistened with tap water, by the lifting of parent segment 2 to public 1 top of segment, and The 4th of parent segment 2 assembled end 22 is aligned to the first assembled end 11 of the public segment 1, the perforation hole 23 of parent segment 2 is right At the assembly to the first vertical muscle 13 of public segment 1 of position, the shear connector B 4 of parent segment 2 is aligned into the assembled shear connector A to public segment 1 At 3;
Step 2: toward the interior filling binding material 5 of the perforation hole 23 of the parent segment 2 to spilling, and will be described in spilling Binding material 5 is smeared uniformly in the third assembly face 21 of parent segment 2, guarantees that filling is at least groove at 2 shear connector A 3 of parent segment One of four parts of binding material 5 of volume;
Step 3: by another public lifting of segment 1 to 2 top of parent segment, the second of another public segment 1 is spelled Dress face 12 is aligned the third assembly face 21 of the parent segment 2, and the shear connector B 4 of another public segment 1 is aligned assembly extremely The shear connector A 3 of parent segment 2;
Step 4: the first vertical muscle 13 of another public segment 1 is inserted into the perforation hole 23, insertion perforation hole 23 During vertical muscle vibrated to assist being inserted by the stick that vibrates gradually of minor diameter, be self-possessed by segment and squeeze extra binding material 5 Out;
Step 5: step 1 is repeated to four, until completing the assembly of all public segments 1 and parent segment 2;
Step 6: after the assembly for completing all public segments 1 and parent segment 2, all the first annular recess 14 and the are cleared up Two annular recess 25 (are controlled) after the binding material 5 reaches design strength with the time, in all first annular recess, 14 Hes Epoxy glue is uniformly smeared at second annular recess 25, waterproof roll is pasted in winding, and the winding width of the waterproof roll is first The sum of the height of annular recess 14 and the second annular recess 25, it is cyclic annular that winding thickness is less than first annular recess 14/ second The depth of groove 25, then closing glue is smeared, scrape filling-in.
Above embodiments are only to illustrate the present invention and not limit the technical scheme described by the invention, although this explanation The present invention has been described in detail referring to above-mentioned each embodiment for book, but the present invention is not limited to above-mentioned specific implementation Mode, therefore any couple of present invention modifies or equivalent replacement;And the technical side of all spirit and scope for not departing from invention Case and its improvement, are intended to be within the scope of the claims of the invention.

Claims (10)

1. a kind of structure linkage section of segment assembled pier stud, which is characterized in that including public segment (1) and parent segment (2);
The public affairs segment (1) includes the first noumenon (10), and the first noumenon (10) is equipped with the first assembled end (11) and second Assembled end (12), the first noumenon (10) is interior to be additionally provided with several the first vertical muscle (13), and the every first vertical muscle (13) is passed through The first noumenon (10) are worn, and are stretched out respectively from the first assembled end (11) and the second assembled end (12);
The parent segment (2) includes the second ontology (20), and second ontology (20) is equipped with third assembly end (21) and the 4th Assembled end (22), the height of second ontology (20) are greater than or equal to the described first vertical muscle (13) and stretch out the first assembled end (11) With the sum of the length of the second assembled end (12), several perforations hole (23) are additionally provided in second ontology (20), it is described to pass through The quantity of via holes (23), position, cross sectional dimensions are adapted with the described first vertical muscle (13);
The first assembled end (11) and third assembly end (21) are equipped with shear connector A (3), the second assembly end (12) and the Four assembled ends (22) are equipped with shear connector B (4), and the shear connector A (3) and shear connector B (4) are adapted;
Described first assembled end (11) and the second assembled end (12) are equipped with the first annular recess (14), third assembly end (21) it is equipped with the second annular recess (25) with the 4th assembled end (22), first annular recess (14) and the second annular recess (25) shape size is identical.
2. a kind of structure linkage section of segment assembled pier stud according to claim 1, which is characterized in that the parent segment (2) several the second vertical muscle (24) are additionally provided on, the second vertical muscle (24) is along the elongated arrangement of second ontology (20), institute The quantity for stating the second vertical muscle (24) is equal to the quantity of the described first vertical muscle (13), and the sectional area of the second vertical muscle (24) is equal to institute State the sectional area of the first vertical muscle (13).
3. a kind of structure linkage section of segment assembled pier stud according to claim 2, which is characterized in that described second is vertical Muscle (24) is arranged in the outside of perforation hole (23).
4. a kind of structure linkage section of segment assembled pier stud according to claim 1, which is characterized in that the through hole Hole (23) includes spiral reinforcement hole, steel pipe hole, ripple pore.
5. a kind of structure linkage section of segment assembled pier stud according to claim 1 to 4, which is characterized in that described The length that first vertical muscle (13) stretches out the described first assembled end (11) is less than or equal to the length for stretching out the described second assembled end (12) Degree.
6. a kind of structure linkage section of segment assembled pier stud according to claim 1 to 4, which is characterized in that described Stirrup, first annular recess (14) and the second annular recess (25) are additionally provided in the first noumenon (10) and the second ontology (20) Place is filled with sealing material.
7. a kind of design method of the structure linkage section of segment assembled pier stud, which comprises the following steps:
Step 1: being designed as two class standard segments for the structure linkage section of segment assembled pier stud, respectively male segment (1) and mother Segment (2);
Step 2: designing public segment (1), quantity, sectional dimension, position including calculating the first vertical muscle (13) in public segment (1), And first vertical muscle (13) stretch out the length of the first assembled end (11) and the second assembly end (12) respectively;
Step 3: design parent segment (2), including the first assembled end (11) and the second assembled end are stretched out according to the first vertical muscle (13) (12) length the sum of determine parent segment (2) height;It is determined according to the quantity, sectional dimension, position of the first vertical muscle (13) Quantity, the sectional dimension, position of the perforation hole (23) of parent segment (2);Quantity, sectional dimension according to the first vertical muscle (13) is true Determine quantity, the sectional dimension of the second vertical muscle (24) in parent segment (2), and the second vertical muscle (24) is relative to the first vertical muscle (13) It is arranged far from neutral axis;
Step 4: according to shear resistance capacity design requirement, the shear connector on the public segment (1) and parent segment (2) is designed;
The sequencing of the step 3 and step 4 can be exchanged.
8. a kind of design method of the structure linkage section of segment assembled pier stud according to claim 7, which is characterized in that It further include calculating the stirrup reinforcement ratio per unit volume of the public segment (1), and set according to the stirrup reinforcement ratio per unit volume of the public segment (1) Count the stirrup of the parent segment (2).
9. a kind of construction method of the structure linkage section of segment assembled pier stud, which comprises the following steps:
Step 1: the first assembled end (11) toward public affairs segment (1) smears binding material (5), by parent segment (2) lifting to public segment (1) top, and by the first assembled end (11) of the 4th of parent segment (2) the assembled end (22) the alignment public segment (1), mother is saved At perforation hole (23) the contraposition assembly to the first vertical muscle (13) of public segment (1) of section (2), by the shear connector B of parent segment (2) (4) at contraposition assembly to the shear connector A (3) of public segment (1);
Step 2: filling binding material (5) is to overflowing in the perforation hole (23) of the parent segment (2), and by the institute of spilling Binding material (5) is stated to smear uniformly in the third assembly face (21) of parent segment (2);
Step 3: another public segment (1) is lifted to the parent segment (2), and the second of another public segment (1) Assembled face (12) is aligned the third assembly face (21) of the parent segment (2);
Step 4: the first vertical muscle (13) of another public segment (1) is inserted into the perforation hole (23), insertion perforation hole (23) vertical muscle is vibrated to assist being inserted by vibrating spear during;
Step 5: step 1 is repeated to four, until completing the assembly of all public segment (1) and parent segment (2);
Step 6: after the assembly for completing all public segments (1) and parent segment (2), clear up all the first annular recess (14) and Second annular recess (25), after the binding material (5) reaches design strength, in all first annular recess (14) and second Epoxy glue is uniformly smeared at annular recess (25), is wound waterproof roll, then smear closing glue, is scraped filling-in.
10. a kind of construction method of the structure linkage section of segment assembled pier stud according to claim 9, feature exist In the winding width of the waterproof roll is the sum of the height of the first annular recess (14) and the second annular recess (25), winding Thickness is less than the depth of first annular recess (14).
CN201910643029.4A 2019-07-16 2019-07-16 Structure connecting section of section assembly pier column, design method and construction method thereof Active CN110258312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910643029.4A CN110258312B (en) 2019-07-16 2019-07-16 Structure connecting section of section assembly pier column, design method and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910643029.4A CN110258312B (en) 2019-07-16 2019-07-16 Structure connecting section of section assembly pier column, design method and construction method thereof

Publications (2)

Publication Number Publication Date
CN110258312A true CN110258312A (en) 2019-09-20
CN110258312B CN110258312B (en) 2024-03-22

Family

ID=67926577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910643029.4A Active CN110258312B (en) 2019-07-16 2019-07-16 Structure connecting section of section assembly pier column, design method and construction method thereof

Country Status (1)

Country Link
CN (1) CN110258312B (en)

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002088977A (en) * 2000-09-19 2002-03-27 Kajima Corp Horizontal restraining bar for columnar concrete member and concrete member making use thereof
KR20100070975A (en) * 2008-12-18 2010-06-28 (주)한맥기술 Assembly cross beam structure for multigirder concrete bridge and method of construction thereof
KR20110008752A (en) * 2009-07-21 2011-01-27 한국건설기술연구원 Precast concrete segments for constructing bridge piers with elongated round holes surrounding reinforcing bars and the method using the same
JP2011089275A (en) * 2009-10-21 2011-05-06 Tobishima Corp Construction method for asceismic reinforcement of existing reinforced concrete bridge pier
CN103352573A (en) * 2013-07-08 2013-10-16 陕西煤业化工建设(集团)有限公司 Construction method for lifting butt joint of single cylindrical pier steel bar
CN103758031A (en) * 2014-01-26 2014-04-30 招商局重庆交通科研设计院有限公司 Method for manufacturing assembled type bridge pier by utilizing steel fiber reinforced self-compacting concrete
KR20140075551A (en) * 2012-12-11 2014-06-19 이병욱 how to make a pier using foam with post tension system
US20160130813A1 (en) * 2014-11-12 2016-05-12 King Saud University Fiber reinforced composite system for strengthening of wall-like rc columns and methods for preparing such system
US20160265212A1 (en) * 2015-03-13 2016-09-15 National Applied Research Laboratories Precast segment, stacking structure and energy dissipation column thereof
JP2016183503A (en) * 2015-03-26 2016-10-20 前田建設工業株式会社 Shear reinforcing bar, reinforcement concrete structure and constructing method therefor
CN107435293A (en) * 2017-07-06 2017-12-05 东南大学 Pre-stress FRP bar stretching and anchoring device and its construction method for precast assembly bridge pier
KR20180019864A (en) * 2016-08-17 2018-02-27 한국철도기술연구원 CONSTRUCTION METHOD OF HYBRID RAILWAY BRIDGE USING PRESTRESSED CONCRETE FILLED TUBE and TRANSVERSE PRESTRESSED CONCRETE BLOCK
CN107974933A (en) * 2017-07-06 2018-05-01 东南大学 The precast assembly bridge pier anti-seismic structure and its construction method of built-in replaceable viscous damper and energy consumption reinforcing bar
CN108103927A (en) * 2017-12-30 2018-06-01 北京工业大学 The recoverable full precast assembly double-layer frame Bridge Pier Structure System of function after shake
CN108774947A (en) * 2018-08-01 2018-11-09 宁波交通工程建设集团有限公司 Packaged type bridges pier stud super high strength concrete connection structure and construction method
CN208280002U (en) * 2018-02-05 2018-12-25 横琴共轭科技有限公司 A kind of assembled concrete pier system of mixed configuration FRP tendons and regular reinforcement
CN109914234A (en) * 2019-03-22 2019-06-21 西安建筑科技大学 A kind of bolted prefabricated subsection shearing resistance assembly concrete pier
CN210262684U (en) * 2019-07-16 2020-04-07 中铁二院工程集团有限责任公司 Structural connecting section of segmental assembling type pier stud

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002088977A (en) * 2000-09-19 2002-03-27 Kajima Corp Horizontal restraining bar for columnar concrete member and concrete member making use thereof
KR20100070975A (en) * 2008-12-18 2010-06-28 (주)한맥기술 Assembly cross beam structure for multigirder concrete bridge and method of construction thereof
KR20110008752A (en) * 2009-07-21 2011-01-27 한국건설기술연구원 Precast concrete segments for constructing bridge piers with elongated round holes surrounding reinforcing bars and the method using the same
JP2011089275A (en) * 2009-10-21 2011-05-06 Tobishima Corp Construction method for asceismic reinforcement of existing reinforced concrete bridge pier
KR20140075551A (en) * 2012-12-11 2014-06-19 이병욱 how to make a pier using foam with post tension system
CN103352573A (en) * 2013-07-08 2013-10-16 陕西煤业化工建设(集团)有限公司 Construction method for lifting butt joint of single cylindrical pier steel bar
CN103758031A (en) * 2014-01-26 2014-04-30 招商局重庆交通科研设计院有限公司 Method for manufacturing assembled type bridge pier by utilizing steel fiber reinforced self-compacting concrete
US20160130813A1 (en) * 2014-11-12 2016-05-12 King Saud University Fiber reinforced composite system for strengthening of wall-like rc columns and methods for preparing such system
US20160265212A1 (en) * 2015-03-13 2016-09-15 National Applied Research Laboratories Precast segment, stacking structure and energy dissipation column thereof
JP2016183503A (en) * 2015-03-26 2016-10-20 前田建設工業株式会社 Shear reinforcing bar, reinforcement concrete structure and constructing method therefor
KR20180019864A (en) * 2016-08-17 2018-02-27 한국철도기술연구원 CONSTRUCTION METHOD OF HYBRID RAILWAY BRIDGE USING PRESTRESSED CONCRETE FILLED TUBE and TRANSVERSE PRESTRESSED CONCRETE BLOCK
CN107435293A (en) * 2017-07-06 2017-12-05 东南大学 Pre-stress FRP bar stretching and anchoring device and its construction method for precast assembly bridge pier
CN107974933A (en) * 2017-07-06 2018-05-01 东南大学 The precast assembly bridge pier anti-seismic structure and its construction method of built-in replaceable viscous damper and energy consumption reinforcing bar
CN108103927A (en) * 2017-12-30 2018-06-01 北京工业大学 The recoverable full precast assembly double-layer frame Bridge Pier Structure System of function after shake
CN208280002U (en) * 2018-02-05 2018-12-25 横琴共轭科技有限公司 A kind of assembled concrete pier system of mixed configuration FRP tendons and regular reinforcement
CN108774947A (en) * 2018-08-01 2018-11-09 宁波交通工程建设集团有限公司 Packaged type bridges pier stud super high strength concrete connection structure and construction method
CN109914234A (en) * 2019-03-22 2019-06-21 西安建筑科技大学 A kind of bolted prefabricated subsection shearing resistance assembly concrete pier
CN210262684U (en) * 2019-07-16 2020-04-07 中铁二院工程集团有限责任公司 Structural connecting section of segmental assembling type pier stud

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王占军;: "凤咀江特大桥墩身和盖梁施工方案", 山西建筑, no. 10, 1 April 2007 (2007-04-01) *
高禄巍;: "双层跨海大桥现浇下横梁施工技术", 国防交通工程与技术, no. 02, 20 March 2015 (2015-03-20) *

Also Published As

Publication number Publication date
CN110258312B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
CN202831402U (en) Concrete filled steel tubular column with inner-connected circular pipe and outer-sleeved concrete filled steel tube
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CN106988200B (en) Longitudinal non-shearing resistance perforated steel plate anti-pulling connecting piece and construction method thereof
CN109629403A (en) A kind of concrete support rod structure and preparation method thereof
CN108867862A (en) Post-tensioning prestressing without bondn precast concrete can restore bean column node
CN108660908A (en) A kind of prestressed concrete cable-stayed bridge of the beam prefabricated pin-connected panel of tower
CN210262684U (en) Structural connecting section of segmental assembling type pier stud
CN105970803A (en) Shearing resisting energy consumption device and construction method of prefabricated pier
CN205421715U (en) Novel I -shaped carrier bar excels in
CN207714553U (en) The vertical pivoting angle connecting joint structure of prefabricated sandwich wall and prefabricated sandwich wall
CN110258312A (en) The structure linkage section and its design method, construction method of segment assembled pier stud
CN205688575U (en) A kind of R-joining formula assembling concrete component shear connections structure
CN101787675A (en) Connecting structure of circular steel pipe light aggregate concrete beam and reinforced concrete bridge deck and construction process thereof
CN103643741A (en) Method for connecting prefabricated concrete members
CN105888133A (en) Bearing structure for building
CN206233359U (en) A kind of assembled architecture reinforced concrete member
CN207660193U (en) A kind of overlength eaves gutter applied in assembling type steel structure building
CN1651677A (en) Ribbed reinforced concrete prefabricated structural board
CN108755937A (en) A kind of steel core concrete column connect cross abnormity node with box-girder and I-beam
CN201089978Y (en) Transition connecting construction for steel construction and concrete structure
CN208455613U (en) A kind of sleeve connection assembled pile foundation
CN206971459U (en) A kind of fabricated shear wall suitable for frame-shear-wall structure
CN207525778U (en) The intermediate connecting node structure of prefabricated sandwich wall and prefabricated sandwich wall
CN209260533U (en) Connecting structure between assembled steel web and precast slab
CN208472946U (en) Anchor tube is linked and packed formula beam-column node structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant