CN110247987A - A kind of relay protection device intelligence O&M method based on mobile 5G network - Google Patents
A kind of relay protection device intelligence O&M method based on mobile 5G network Download PDFInfo
- Publication number
- CN110247987A CN110247987A CN201910582360.XA CN201910582360A CN110247987A CN 110247987 A CN110247987 A CN 110247987A CN 201910582360 A CN201910582360 A CN 201910582360A CN 110247987 A CN110247987 A CN 110247987A
- Authority
- CN
- China
- Prior art keywords
- relay protection
- protection device
- information table
- data
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06V—IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
- G06V20/00—Scenes; Scene-specific elements
- G06V20/50—Context or environment of the image
- G06V20/52—Surveillance or monitoring of activities, e.g. for recognising suspicious objects
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/02—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/02—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
- H04L67/025—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/06—Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/30—Services specially adapted for particular environments, situations or purposes
Abstract
The invention discloses a kind of relay protection device intelligence O&M methods based on mobile 5G network, during relay protection device O&M, substitute manual on-the-spot record using mobile terminal device, improve efficiency and accuracy rate.First pass through the unique identity in mobile terminal device acquisition equipment, then after typing information, mobile terminal device will be sent to management server by mobile network after unique identity information and account information package, and management server is updated account information table according to live typing information.This method also supports novel maintenance, and pre-set image acquires equipment around relay protection device, the movement or status information of equipment is judged by image recognition technology, then corresponding updates relay protection device account information table again, realization novel maintenance.Management server also has data visualization processing mould and data-mining module, realizes that the visualization processing of operation/maintenance data and failure pre-tighten analysis.
Description
Technical field
The present invention relates to a kind of relay protection device intelligence O&M methods.
Background technique
Second defence line of the substation relay protection device as safe operation of power system, in terms of ensureing power grid security
Have great importance, Guo Wang associated production department has issued a large amount of with guidance and real in terms of the O&M of relay protection device
Safe operation and the maintenance procedure of meaning are trampled, with the development of internet technology, each department also sufficiently uses in management aspect
Information system management technology guarantees regulation enforcement in place, provides basic guarantee for the safe O&M of relay protection device, but exist at present
The acquisition and check of electrical substation field devices information rely primarily on operating personnel and manually make a copy of, the relay protection of only a small number of producers
Equipment realizes the identification and management of equipment using bar code, and not the foundation of related to current state net operation management system be associated with and
Unified identification management.Protection equipment needs typing of the teams and groups personnel to the equipment progress equipment account that will be put into operation before putting into operation,
The appearance for phenomena such as needing that a large amount of human and material resources is spent to be copied, typing work, and easily leading to clerical mistake, runs in equipment
Maintenance phase, it is often necessary to there is operating personnel's timing, fixed point to go walkaround inspection equipment operation condition, the verification week of relay protection device
Phase and content, to the state of the operation and maintenance of the walkaround inspection, protective relaying device of protective relaying device, transforming plant protecting device
Monitoring, staff's hand-kept inspection item is inconvenient, and this adds increased the workloads of patrol officer, be also not easy to save and
Inquiry, occurs omitting and neglect, cause to be difficult to scent a hidden danger ahead of time, and administrative staff can not effectively be helped to carry out aid decision.With
The increase of relay protection device quantity, the heavy load of patrol officer, while also increasing asset management difficulty cause data
It updates not in time, accuracy is difficult to the problems such as ensureing.In relay protection device management link, management process lacks effectively linking,
Business information can not be shared, and job performance lacks periodical evaluation feedback, not yet establish the closed loop management mechanism of Continuous optimization.
Summary of the invention
Goal of the invention: being directed to the above-mentioned prior art, proposes that a kind of relay protection device based on mobile 5G network is intelligent
O&M method substitutes the relay protection device manual account management work of transmission.
Technical solution: a kind of relay protection device intelligence O&M method based on mobile 5G network, the method are based on
Hardware include mobile terminal, management server and data server;The mobile terminal passes through mobile 5G and is connected to the network institute
Management server is stated, the management server connects the data server;Wherein, the mobile terminal includes camera mould
Block, input module and communication module;Described method includes following steps:
Step 1: unique identity being established to each collection relay protection device, and labeling is in relay protection device outer surface;
Relay protection device account information table is established in the management server, relay protection device account information table and each collection relay are protected
It is associated to protect equipment;
Step 2: passing through the unique identities mark on the camera module collection in worksite relay protection device of the mobile terminal
Know, the account information of corresponding relay protection device is then updated by the input module;
Step 3: the communication module of the mobile terminal is by the unique identity information and the account information package
The management server is sent to by the mobile 5G network afterwards;
Step 4: the management server protects the relay according to the data packet that the mobile terminal issues is received
It protects equipment account information table and carries out data update, and the relay protection device account information table is stored in the data service
In device.
Further, further include novel maintenance step: being additionally provided with relay protection device state diagram in the management server
As identification model, preset image capture device sets the relay protection of acquisition around the mobile terminal or relay protection device
Standby image uploads in the management server, and the management server pre-processes the relay protection device image
Afterwards, it is input in the relay protection device status image identification model and carries out relay protection device movement and state recognition, most
The relay protection device account information table is updated according to recognition result afterwards.
Further, the unique identity generates two dimensional code using Universally Unique Identifier algorithm, and combines and pass through
GPS device generates after acquiring location data to relay protection device, and the unique identity information is stored in the number
According to server.
Further, the method for building up of the account information table of the relay protection device includes:
Establish equipment account sub-information table, it is set state standby account sub-information table include: equipment unique identity, title,
Model, series number, the name of manufacturer, factory number, the date of production, installed date;
Overhaul of the equipments account sub-information table is established, the overhaul of the equipments account sub-information table includes: mounting technique record, goes through
Check and acceptance result after the date of secondary maintenance and content, all previous service personnel and maintenance;
Establish equipment spare unit account sub-information table, the equipment spare unit account sub-information table include: equipment and spare part title,
Model, series number, technical specification, manufacturing firm, the spare unit amount of norm and inventory;
Establish equipment operation account sub-information table, equipment operation account sub-information table include: the equipment starting date, when
Between with number, the overview of all previous equipment fault and failure, reason, damaged condition, repair situation, unit exception operating condition, different
The number often run and time.
Further, further include operation/maintenance data visualization processing step: the management server further includes data visualization
Processing module, the visualization processing module by after the data processing recorded in the account information table of the relay protection device,
It is shown in the mobile terminal or WEB front-end with figure, chart, model form.
Further, further include novel maintenance data query step: the visualization processing module will deposit after data processing
Storage sends corresponding figure to the request of data type according to the mobile terminal or WEB front-end in the data server
Shape, chart, model to the mobile terminal or WEB front-end.
Further, further include data mining step: the management server is equipped with data-mining module, the data
Excavate module for it is for statistical analysis to the relay protection device account information table information come obtain equipment fault distribution and
Probability scenarios, and early warning is carried out to equipment operation condition according to the equipment fault distribution and probability scenarios.
The utility model has the advantages that a kind of relay protection device intelligence O&M method based on mobile 5G network of the invention, utilizes
Information-based means realize the account management of electric protection equipment, can be realized scene and long-range relay protection device is intelligently transported
Relay protection device O&M level and management level is substantially improved in dimension.
Detailed description of the invention
Fig. 1 is the flow chart of method of the invention;
Fig. 2 be the present invention is based on hardware structural diagram;
Fig. 3 is unique identity Establishing process schematic diagram.
Specific embodiment
Further explanation is done to the present invention with reference to the accompanying drawing.
A kind of relay protection device intelligence O&M method based on mobile 5G network, this method based on hardware include moving
Dynamic terminal, management server and data server.Mobile terminal passes through mobile 5G network connection management server, management service
It is as shown in Figure 2 that device connects data server.Wherein, mobile terminal includes camera module, input module and communication module.Such as
Shown in Fig. 1, this method includes the following steps:
Step 1: unique identity being established to each collection relay protection device, and labeling is in relay protection device outer surface.
Relay protection device account information table is established in management server, relay protection device account information table is set with each collection relay protection
It is standby associated.
As shown in figure 3, unique identity generates two dimensional code using Universally Unique Identifier algorithm (UUID), and combine logical
It crosses after GPS device acquires location data to relay protection device and generates, and unique identity information is stored in advance in data
On server.
The method for building up of the account information table of relay protection device in management server includes:
Establish equipment account sub-information table, state standby account sub-information table include: equipment unique identity, title, model,
Series number, the name of manufacturer, factory number, the date of production, installed date.
Overhaul of the equipments account sub-information table is established, overhaul of the equipments account sub-information table includes: mounting technique record, all previous inspection
Check and acceptance result after the date repaired and content, all previous service personnel and maintenance.
Equipment spare unit account sub-information table is established, equipment spare unit account sub-information table includes: the title of equipment and spare part, type
Number, series number, technical specification, manufacturing firm, the spare unit amount of norm and inventory.
Establish equipment operation account sub-information table, equipment operation account sub-information table include: equipment starting the date, the time with
Number, reason, damaged condition, repairs situation, unit exception operating condition, abnormal fortune at the overview of all previous equipment fault and failure
Capable number and time.
Step 2: by the unique identity on the camera module collection in worksite relay protection device of mobile terminal, so
The account information of corresponding relay protection device is updated by input module afterwards.
Step 3: the communication module of mobile terminal will pass through mobile 5G after unique identity information and account information package
Network is sent to management server.
Step 4: management server believes relay protection device account according to the data packet for receiving mobile terminal sending
It ceases table and carries out data update, and relay protection device account information table is stored in data server.
Relay protection device status image identification model, mobile terminal or relay protection device are additionally provided in management server
The preset image capture device of surrounding uploads to the relay protection device image of acquisition in management server, management server pair
After relay protection device image is pre-processed, it is input in relay protection device status image identification model and carries out relay protection
Device action and state recognition finally update relay protection device account information table according to recognition result.
Further include operation/maintenance data visualization processing step: management server is equipped with data visualization processing module, visually
Change processing module for after the data processing recorded in the account information table of relay protection device, mobile terminal or WEB front-end with
Figure, chart, model form are shown.
Further include novel maintenance data query step: visualization processing module will be stored in the data clothes after data processing
It is engaged in device, corresponding figure, chart, model is sent to the request of data type described according to mobile terminal or WEB front-end
Mobile terminal or WEB front-end.
Further include data mining step: management server be equipped with data-mining module, data-mining module be used for after
Electric protection equipment account information table information is for statistical analysis to obtain equipment fault distribution and probability scenarios, and according to equipment therefore
Barrier distribution and probability scenarios to carry out early warning to equipment operation condition.
A kind of relay protection device intelligence O&M method based on mobile 5G network of the invention, first by relay protection
The unique identity of equipment is stored in remote server, and establishes relay protection device account information table in the server,
Account information table include equipment account sub-information table, overhaul of the equipments account sub-information table, equipment spare unit account sub-information table with
And equipment runs account sub-information table.
During relay protection device O&M, substitute manual on-the-spot record using mobile terminal device, improve efficiency with
And accuracy rate, specifically, input module can be touch-screen input.First pass through the unique identities in mobile terminal device acquisition equipment
Mark, then after typing information, mobile terminal device will pass through after unique identity information and account information package
Mobile network is sent to management server.Management server links relay protection device account according to unique identity information
Information table is updated account information table according to live typing information.Novel maintenance is also supported, around relay protection device
Pre-set image acquires equipment, acquires relay protection device according to the triggering of fixed frequency or relay protection device or action signal
Image judges the movement or status information of equipment by image recognition technology, then corresponding update relay protection device again
Account information table realizes novel maintenance.
Data visualization processing module in management server is convenient for transferring operation/maintenance data in mobile terminal or WEB front-end
When, related data can be shown in the form of more intuitive, provide decision support for equipment O&M.Data in management server are dug
It digs module to be used to carry out data mining and analysis to operation/maintenance data, according to the equipment fault distribution and probability scenarios come to equipment
Operating condition carries out early warning, so that sufficient preparation is carried out before the failure occurs, the generation for avoiding power grid accident from hindering.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (7)
1. a kind of relay protection device intelligence O&M method based on mobile 5G network, which is characterized in that the method is based on
Hardware include mobile terminal, management server and data server;The mobile terminal passes through mobile 5G and is connected to the network institute
Management server is stated, the management server connects the data server;Wherein, the mobile terminal includes camera mould
Block, input module and communication module;Described method includes following steps:
Step 1: unique identity being established to each collection relay protection device, and labeling is in relay protection device outer surface;Institute
It states management server and establishes relay protection device account information table, relay protection device account information table is set with each collection relay protection
It is standby associated;
Step 2: by the unique identity on the camera module collection in worksite relay protection device of the mobile terminal, so
The account information of corresponding relay protection device is updated by the input module afterwards;
Step 3: the communication module of the mobile terminal will lead to after the unique identity information and the account information package
It crosses the mobile 5G network and is sent to the management server;
Step 4: the management server sets the relay protection according to the data packet that the mobile terminal issues is received
Standby account information table carries out data update, and the relay protection device account information table is stored in the data server
In.
2. the relay protection device intelligence O&M method according to claim 1 based on mobile 5G network, feature exist
In further including novel maintenance step: relay protection device status image identification model is additionally provided in the management server, it is described
The relay protection device image of acquisition is uploaded to institute by preset image capture device around mobile terminal or relay protection device
State in management server, after the management server pre-processes the relay protection device image, be input to it is described after
Relay protection device movement and state recognition are carried out in electric protection equipment state image recognition model, more according to recognition result finally
The new relay protection device account information table.
3. the relay protection device intelligence O&M method according to claim 1 based on mobile 5G network, feature exist
In the unique identity generates two dimensional code using Universally Unique Identifier algorithm, and combines and protected by GPS device to relay
It is generated after shield equipment acquisition location data, and the unique identity information is stored in the data server.
4. the relay protection device intelligence O&M method according to claim 1 based on mobile 5G network, feature exist
In the method for building up of the account information table of the relay protection device includes:
Establish equipment account sub-information table, it is set state standby account sub-information table include: equipment unique identity, title, model,
Series number, the name of manufacturer, factory number, the date of production, installed date;
Overhaul of the equipments account sub-information table is established, the overhaul of the equipments account sub-information table includes: mounting technique record, all previous inspection
Check and acceptance result after the date repaired and content, all previous service personnel and maintenance;
Equipment spare unit account sub-information table is established, the equipment spare unit account sub-information table includes: the title of equipment and spare part, type
Number, series number, technical specification, manufacturing firm, the spare unit amount of norm and inventory;
Establish equipment operation account sub-information table, equipment operation account sub-information table include: the equipment starting date, the time with
Number, reason, damaged condition, repairs situation, unit exception operating condition, abnormal fortune at the overview of all previous equipment fault and failure
Capable number and time.
5. the relay protection device intelligence O&M method according to claim 1 based on mobile 5G network, feature exist
In further including operation/maintenance data visualization processing step: the management server is equipped with data visualization processing module, it is described can
Depending on changing processing module for after the data processing recorded in the account information table of the relay protection device, in the mobile terminal or
WEB front-end is shown with figure, chart, model form.
6. the relay protection device intelligence O&M method according to claim 5 based on mobile 5G network, feature exist
In further including novel maintenance data query step: the visualization processing module will be stored in the data clothes after data processing
Be engaged in device in, according to the mobile terminal or WEB front-end the request of data type is sent corresponding figure, chart, model to
The mobile terminal or WEB front-end.
7. the relay protection device intelligence O&M method according to claim 5 based on mobile 5G network, feature exist
In further including data mining step: the management server is equipped with data-mining module, the data-mining module for pair
The relay protection device account information table information is for statistical analysis to obtain equipment fault distribution and probability scenarios, and according to
The equipment fault distribution and probability scenarios to carry out early warning to equipment operation condition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910582360.XA CN110247987A (en) | 2019-06-28 | 2019-06-28 | A kind of relay protection device intelligence O&M method based on mobile 5G network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910582360.XA CN110247987A (en) | 2019-06-28 | 2019-06-28 | A kind of relay protection device intelligence O&M method based on mobile 5G network |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110247987A true CN110247987A (en) | 2019-09-17 |
Family
ID=67890492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910582360.XA Pending CN110247987A (en) | 2019-06-28 | 2019-06-28 | A kind of relay protection device intelligence O&M method based on mobile 5G network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110247987A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110605718A (en) * | 2019-09-20 | 2019-12-24 | 国网湖北省电力有限公司电力科学研究院 | Transformer substation inspection robot system and inspection method |
CN110852406A (en) * | 2019-11-12 | 2020-02-28 | 国网天津市电力公司 | Transformer substation protection equipment ledger management system based on mobile communication |
CN111079654A (en) * | 2019-12-18 | 2020-04-28 | 济南大陆机电股份有限公司 | Hydrological equipment information acquisition method and system based on picture recognition |
CN111432031A (en) * | 2020-04-17 | 2020-07-17 | 支付宝(杭州)信息技术有限公司 | Internet of things equipment identity information generation method and device and electronic equipment |
CN111900694A (en) * | 2020-07-07 | 2020-11-06 | 贵州电网有限责任公司 | Relay protection equipment information acquisition method and system based on automatic identification |
CN112001636A (en) * | 2020-08-25 | 2020-11-27 | 融创房地产集团有限公司 | Equipment operation state information acquisition method and related equipment |
CN112906441A (en) * | 2019-12-04 | 2021-06-04 | 中国移动通信集团设计院有限公司 | Image recognition system and method for communication industry survey and maintenance |
CN113570014A (en) * | 2021-07-30 | 2021-10-29 | 国能浙江北仑第一发电有限公司 | Method for unique identity coding, replacement and upgrade management of relay protection board card |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130084010A1 (en) * | 2011-10-04 | 2013-04-04 | Raf Technology, Inc. | In-field device for de-centralized workflow automation |
CN203217621U (en) * | 2012-12-06 | 2013-09-25 | 厦门明翰电气股份有限公司 | On-site comprehensive maintenance system of electrical equipment for distribution network |
CN206894809U (en) * | 2017-11-27 | 2018-01-16 | 重庆览辉信息技术有限公司 | Electric power safety operation and O&M intelligent monitoring system |
-
2019
- 2019-06-28 CN CN201910582360.XA patent/CN110247987A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130084010A1 (en) * | 2011-10-04 | 2013-04-04 | Raf Technology, Inc. | In-field device for de-centralized workflow automation |
CN203217621U (en) * | 2012-12-06 | 2013-09-25 | 厦门明翰电气股份有限公司 | On-site comprehensive maintenance system of electrical equipment for distribution network |
CN206894809U (en) * | 2017-11-27 | 2018-01-16 | 重庆览辉信息技术有限公司 | Electric power safety operation and O&M intelligent monitoring system |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110605718A (en) * | 2019-09-20 | 2019-12-24 | 国网湖北省电力有限公司电力科学研究院 | Transformer substation inspection robot system and inspection method |
CN110852406A (en) * | 2019-11-12 | 2020-02-28 | 国网天津市电力公司 | Transformer substation protection equipment ledger management system based on mobile communication |
CN112906441A (en) * | 2019-12-04 | 2021-06-04 | 中国移动通信集团设计院有限公司 | Image recognition system and method for communication industry survey and maintenance |
CN112906441B (en) * | 2019-12-04 | 2023-10-27 | 中国移动通信集团设计院有限公司 | Image recognition system and method for exploration and maintenance in communication industry |
CN111079654A (en) * | 2019-12-18 | 2020-04-28 | 济南大陆机电股份有限公司 | Hydrological equipment information acquisition method and system based on picture recognition |
CN111432031A (en) * | 2020-04-17 | 2020-07-17 | 支付宝(杭州)信息技术有限公司 | Internet of things equipment identity information generation method and device and electronic equipment |
CN111432031B (en) * | 2020-04-17 | 2022-06-03 | 支付宝(杭州)信息技术有限公司 | Internet of things equipment identity information generation method and device and electronic equipment |
CN111900694A (en) * | 2020-07-07 | 2020-11-06 | 贵州电网有限责任公司 | Relay protection equipment information acquisition method and system based on automatic identification |
CN111900694B (en) * | 2020-07-07 | 2022-12-27 | 贵州电网有限责任公司 | Relay protection equipment information acquisition method and system based on automatic identification |
CN112001636A (en) * | 2020-08-25 | 2020-11-27 | 融创房地产集团有限公司 | Equipment operation state information acquisition method and related equipment |
CN113570014A (en) * | 2021-07-30 | 2021-10-29 | 国能浙江北仑第一发电有限公司 | Method for unique identity coding, replacement and upgrade management of relay protection board card |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110247987A (en) | A kind of relay protection device intelligence O&M method based on mobile 5G network | |
CN105656210B (en) | A kind of intellectual monitoring operational system of switchgear | |
CN104035404B (en) | The development approach of operation order real-time status monitoring | |
CN108762224A (en) | A kind of wisdom power plant comprehensive monitoring management system | |
CN102819249B (en) | Linkage control system and control method for power tunnel | |
CN102367742B (en) | Monitoring system | |
CN205901441U (en) | Management and control system is concentrated in new forms of energy power station | |
CN204965565U (en) | Access control system of transformer substation | |
CN104950855A (en) | Town sewage plant and pump station operation monitoring management system and town sewage plant and pump station operation monitoring management method | |
CN104460609A (en) | Remote monitoring method and system for oil and gas production | |
CN103699967A (en) | Panoramic information platform based on electric network regulation and control integration | |
CN101300546A (en) | Method and system for a programmable camera for configurable security and surveillance systems | |
CN103729990A (en) | On-line cable line monitoring system based on all-in-one sensor | |
CN106787208A (en) | A kind of intellectual monitoring O&M method based on switch cubicle | |
CN105868940A (en) | Grid fault information issuing and processing system | |
CN104908783A (en) | System architecture of comprehensive monitoring and maintaining system for railway electricity | |
CN105072415A (en) | Transformer substation video monitoring method using distributed storage and server unified management | |
CN111062504A (en) | AR technology-based intelligent power distribution station operation and maintenance system and method | |
CN109659936A (en) | A kind of smart grid Dispatching Control System failure method of disposal and system | |
CN102685551A (en) | Method and system for viewing key event from video data | |
CN106209135A (en) | Intelligent transmitter receiver for Condition-based Maintenance of Transmission Line | |
CN104504768A (en) | Real-time monitoring system for mobile operation of high-voltage transmission line and monitoring method of real-time monitoring system | |
CN101777248B (en) | Method for implementing system maintenance in security network | |
CN105811578A (en) | Power transmission line monitoring platform, power source monitoring algorithm thereof and image early warning algorithm of power transmission line monitoring platform | |
CN109587161A (en) | The monitoring method of smart grid remote control command transmission overall process information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190917 |
|
RJ01 | Rejection of invention patent application after publication |